Signed Inspection Report (Fri Apr 9, 2021 at 953 AM)INSPECTION WORKSHEET (RPLUM-009497-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0060-2021 Case Module:Permit
Inspection Date:Fri Apr 9, 2021 Inspection Status:Partial Pass
Inspector:O'Brien, John Inspection Type:Rough Plumbing
Job Address:Parcel Number:448 AVIATION RD
Queensbury, NY, 12804
302.5-1-3
Contact Type Company Name Name
Architect Hoffman & Riley Architects
Primary Owner Our Lady of the Annunciation Parish
Center
Granted Permission Our Lady of the Annunciation Parish
Center
Contractor Bishop Beaudry Construction LLC
Applicant Bishop Beaudry Construction LLC
Checklist Item Status
Permit Card Visible From Road Passed
Building Inspector Notes Failed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
Plumbing Under Slab Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
Rough Plumbing / Nail Plates Failed
4/09/21 Rough Plumbing Partial Approval
Apr 09, 2021 Page (1)
INSPECTION WORKSHEET (RPLUM-009497-2021)
Checklist Item Status
- Plumbing Under Slab Approved
Plumbing Vent Vents in Place Failed
3" Vent Through Roof Failed
1 ½ inch minimum Drain Size Failed
Shower liner test (2" of water)Failed
Washing Machine Drain 2 inch minimum Failed
Washing Machine Trap: 18"-42" discharge Failed
Cleanout every 100 feet change of direction Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
Pressure Test Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved (Head)
Drain Vent Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved (Head)
Air Head Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
Apr 09, 2021 Page (2)
INSPECTION WORKSHEET (RPLUM-009497-2021)
Checklist Item Status
5 psi or 10 ft. above highest conn. for 15 minutes Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved (10' Head)
Pressure Test Failed
Water Supply Piping Failed
Air Head Failed
50 P.S.I for 15 minutes Failed
Air Test Gas Piping 10 psi for 10 Minutes Failed
All Return Air Hard Duct Work Failed
Duct Insulation - if required in unheated spaces Failed
Duct Testing Outside Conditioned Space Failed
Duct work sealed properly Failed
Apr 09, 2021 Page (3)
O'Brien, John