JB201133.0144.Wood Frame Observations.2021-04-12.Rpt.0144WOOD FRAME OBSERVATIONS REPORT
Report Number:JB201133.0144
Service Date:04/12/21 30 Corporate Cir Ste 201
Report Date:04/19/21 Albany, NY 12203-5169
518-266-0310
Client Project
Rosetti Acquisitions LLC Fowler Square SI and CMT
Attn: Christopher Falvey Bay Road and Blind Rock Road
427 New Karner Rd Queensbury, NY 12804
Albany, NY 12205
Project Number: JB201133
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
J2-SteelCR-2016-01-08,Rev.1 Page 1 of 3
Visited site to perform observation and testing of structural connections: Upon arrival, observed the following items:
Framing Level:1st Floor Framing Area/Gridlines:Between grid lines A-T/20-39
Item #Description Details
1 Connection Type: Anchoring
Status:Final connection
observations
Reference Detail(s):Approved structural drawings
Discrepancies:none observed
Notes / Exceptions:Anchoring of wood framing was observed to installed and fastened at the
above referenced locations. This fastening was completed using simpson
hold down shoes and hilti expasion anchors along perimeter. These fasteners
appeared to properly installed and in general compliance with the contract
documents.
Framing Level: 1st & 2nd Area/Gridlines:Between grid lines A-T/20-39
Item #Description Details
Connection Type: Stud Walls w/ Blocking
Status:Work in-progress
Reference Detail(s):Approved structural drawings
Discrepancies:none observed
Notes / Exceptions:Wood studs (and blocking) along perimeter were observed to be installed and
fastened at the above referenced locations. These studs/blocking appeared
to be in general compliance with the contract documents.
Framing Level: 1st & 2nd Area/Gridlines:Between grid lines A-T/20-39
Item #Description Details
3 Connection Type: Floor Trusses
Status:Work in-progress
Reference Detail(s):Approved structural drawings
Discrepancies:none observed
Notes / Exceptions:Floor trusses (w/ bracing) were observed to be installed and fastened at the
above referenced locations. These trusses/bracing appeared to be in general
compliance with the contract documents.
WOOD FRAME OBSERVATIONS REPORT
Report Number:JB201133.0144
Service Date:04/12/21 30 Corporate Cir Ste 201
Report Date:04/19/21 Albany, NY 12203-5169
518-266-0310
Client Project
Rosetti Acquisitions LLC Fowler Square SI and CMT
Attn: Christopher Falvey Bay Road and Blind Rock Road
427 New Karner Rd Queensbury, NY 12804
Albany, NY 12205
Project Number: JB201133
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
J2-SteelCR-2016-01-08,Rev.1 Page 2 of 3
Framing Level: 1st & 2nd Area/Gridlines:Between grid lines A-T/20-39
Item #Description Details
4 Connection Type: Sheathing
Status:Work in-progress
Reference Detail(s):Approved structural drawings
Discrepancies:none observed
Notes / Exceptions:Exterior sheathing was observed to be installed and fastened at the above
referenced locations. Type of fastener and nail pattern appeared to be in
general compliance with the contract documents.
Framing Level: Area/Gridlines:
Item #Description Details
Connection Type:
Status:
Reference Detail(s):
Discrepancies:
Notes / Exceptions:
Framing Level: Area/Gridlines:
Item #Description Details
Connection Type:
Status:
Reference Detail(s):
Discrepancies:
Notes / Exceptions:
Framing Level: Area/Gridlines:
Item #Description Details
Connection Type:
Status:
Reference Detail(s):
Discrepancies:
Notes / Exceptions:
WOOD FRAME OBSERVATIONS REPORT
Report Number:JB201133.0144
Service Date:04/12/21 30 Corporate Cir Ste 201
Report Date:04/19/21 Albany, NY 12203-5169
518-266-0310
Client Project
Rosetti Acquisitions LLC Fowler Square SI and CMT
Attn: Christopher Falvey Bay Road and Blind Rock Road
427 New Karner Rd Queensbury, NY 12804
Albany, NY 12205
Project Number: JB201133
Services:
Dente Group - A Terracon Co. Rep.: F. Torre, CWI
Reported To:BBL Superintendent
Contractor:BBL
Report Distribution:
(1) Rosetti Acquisitions LLC, Christopher
Falvey
(1) 260 Structural Engineering, Dan
Thomas(1) BBL Construction Services, Bobby
Chatterton
(1) BBL Construction Services, Eric
Weatherwax Reviewed By:____________________________________
(1) BBL Construction Services, Ryan Etue (1) D.A. Collins Construction Co Inc,
Robin Stothers M. McHenry
(1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James
Campagnone Materials Department Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
J2-SteelCR-2016-01-08,Rev.1 Page 3 of 3
Items referenced above were field connections unless otherwise noted. Connections were visually observed to be in general
accordance with the referenced details of the project plans and specifications unless noted in the Discrepancies section.
Discrepancies, if any, are further detailed on the attached Discrepancy List.
Additional Remarks:
BD000P, 08-24-13, Rev.1
Selec t Picture Selec t Picture
Selec t Pic ture Select Pic ture
Photo No. 1 North section of building Photo No. 2 Hold down brackets
Photo No. 3 Hilti anchors Photo No. 4 Trusses (typical)
Project Number:JB201133Fowler Square SI and CMT
Report Number:JB201133.0144
Bay Road and Blind Rock Road Technician:F. Torre, CWI 30 Corporate Cir Ste 201
Queensbury, NY 12804 Date:04/12/21 Albany, NY 12203-5169
Scale:Not to Scale 518-266-0310