Loading...
Signed Inspection Report (Tue May 4, 2021 at 121 PM)INSPECTION WORKSHEET (FIST-010104-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0793-2020 Case Module:Permit Inspection Date:Tue May 4, 2021 Inspection Status:Passed Inspector:O'Brien, John Inspection Type:Firestopping Job Address:Parcel Number:75 CAREY RD Queensbury, NY, 12804 308.20-1-3.3 Contact Type Company Name Name Engineer Bergeron, Mark Applicant O'Connor, Mike Primary Owner Okie Properties, LLC Contractor Alltek Energy Systems Inc Granted Permission Alltek Energy Systems Inc Checklist Item Status Building Inspector Notes Passed 2/25/21 Firestopping Not Approved - Demise Walls - The existing demise walls will need to have all penetrations sealed with fire caulk not fire foam. The laundry drain and water supply box unit was installed in the demise wall and will need to be sealed behind it with fire taped 5/8" type x rock and on the sides with fire caulk. The unit should have been surface mounted not installed in wall. - seal all penetrations through mezzanine floor with fire caulking. 5/4/21 Firestopping Approved - Corridor walls, fire doors and fire shutter approved. May 04, 2021 Page (1) INSPECTION WORKSHEET (FIST-010104-2021) Checklist Item Status Fire separation 1, 2, 3 hour Passed 2/25/21 Firestopping Not Approved - Demise Walls - The existing demise walls will need to have all penetrations sealed with fire caulk not fire foam. The laundry drain and water supply box unit was installed in the demise wall and will need to be sealed behind it with fire taped 5/8" type x rock and on the sides with fire caulk. The unit should have been surface mounted not installed in wall. - seal all penetrations through mezzanine floor with fire caulking. 5/4/21 Firestopping Approved - Corridor walls, fire doors and fire shutter approved. Firestopping Passed - seal all penetrations through mezzanine floor with fire caulking. Penetration sealed Passed 2/25/21 Firestopping Not Approved - Demise Walls - The existing demise walls will need to have all penetrations sealed with fire caulk not fire foam. The laundry drain and water supply box unit was installed in the demise wall and will need to be sealed behind it with fire taped 5/8" type x rock and on the sides with fire caulk. The unit should have been surface mounted not installed in wall. - seal all penetrations through mezzanine floor with fire caulking. 5/4/21 Firestopping Approved - Corridor walls, fire doors and fire shutter approved. May 04, 2021 Page (2) O'Brien, John