Signed Inspection Report (Tue May 4, 2021 at 121 PM)INSPECTION WORKSHEET (FIST-010104-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0793-2020 Case Module:Permit
Inspection Date:Tue May 4, 2021 Inspection Status:Passed
Inspector:O'Brien, John Inspection Type:Firestopping
Job Address:Parcel Number:75 CAREY RD
Queensbury, NY, 12804
308.20-1-3.3
Contact Type Company Name Name
Engineer Bergeron, Mark
Applicant O'Connor, Mike
Primary Owner Okie Properties, LLC
Contractor Alltek Energy Systems Inc
Granted Permission Alltek Energy Systems Inc
Checklist Item Status
Building Inspector Notes Passed
2/25/21 Firestopping Not Approved - Demise Walls
- The existing demise walls will need to have all penetrations sealed with fire caulk not fire foam. The laundry
drain and water supply box unit was installed in the demise wall and will need to be sealed behind it with fire
taped 5/8" type x rock and on the sides with fire caulk. The unit should have been surface mounted not installed in
wall.
- seal all penetrations through mezzanine floor with fire caulking.
5/4/21 Firestopping Approved
- Corridor walls, fire doors and fire shutter approved.
May 04, 2021 Page (1)
INSPECTION WORKSHEET (FIST-010104-2021)
Checklist Item Status
Fire separation 1, 2, 3 hour Passed
2/25/21 Firestopping Not Approved - Demise Walls
- The existing demise walls will need to have all penetrations sealed with fire caulk not fire foam. The laundry
drain and water supply box unit was installed in the demise wall and will need to be sealed behind it with fire
taped 5/8" type x rock and on the sides with fire caulk. The unit should have been surface mounted not installed in
wall.
- seal all penetrations through mezzanine floor with fire caulking.
5/4/21 Firestopping Approved
- Corridor walls, fire doors and fire shutter approved.
Firestopping Passed
- seal all penetrations through mezzanine floor with fire caulking.
Penetration sealed Passed
2/25/21 Firestopping Not Approved - Demise Walls
- The existing demise walls will need to have all penetrations sealed with fire caulk not fire foam. The laundry
drain and water supply box unit was installed in the demise wall and will need to be sealed behind it with fire
taped 5/8" type x rock and on the sides with fire caulk. The unit should have been surface mounted not installed in
wall.
- seal all penetrations through mezzanine floor with fire caulking.
5/4/21 Firestopping Approved
- Corridor walls, fire doors and fire shutter approved.
May 04, 2021 Page (2)
O'Brien, John