Signed Inspection Report (Tue May 4, 2021 at 123 PM)INSPECTION WORKSHEET (COMFIN-010103-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0793-2020 Case Module:Permit
Inspection Date:Tue May 4, 2021 Inspection Status:Passed
Inspector:O'Brien, John Inspection Type:Commercial Final Inspection
Job Address:Parcel Number:75 CAREY RD
Queensbury, NY, 12804
308.20-1-3.3
Contact Type Company Name Name
Engineer Bergeron, Mark
Applicant O'Connor, Mike
Primary Owner Okie Properties, LLC
Contractor Alltek Energy Systems Inc
Granted Permission Alltek Energy Systems Inc
Checklist Item Status
Blower Door Test Certification Passed
May 04, 2021 Page (1)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
Building Inspector Notes Passed
3/9/21 Commercial Final Inspection Not Approved
- Install downspout on hot water relief valve to within 6" of floor.
- Hot water not working.
-Remove paint from UL Labels on fire doors.
- Install Fire shutter
- install grab bars for handicapped toilet
- Install mirror at lavatory. Bottom of mirror glass install 40" max from finish floor.
- Install Handicapped Unisex Bathroom Sign on wall in corridor on latch side of door. 60" to center of sign to finish
floor.
-Remove paint from UL Labels on fire doors.
- Install Fire shutter
- Provide letter from HVAC Contractor that the heating and cooling system has been balanced.
- Complete all Fire Marshal's Items
3/15/21 Commercial final Inspection Partial Approval
- Hot water not working.
- Remove paint from UL Labels on fire doors.
- Install Fire shutter
- Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape
both sides of drop ceilings and fire caulk any penetrations through wall on both sides.
- Install bug screen on sidewall vent stack termination.
- Complete Fire Marshal's Items.
3/22/21 Final Inspection Partial Approval-Temporary CO approved.
Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
May 04, 2021 Page (2)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
- Pay $165 Temporary CO fee.
3/23/21 Commercial Final Inspection Partial Approval
Temporary CO Approved.
- Received Final As-Built Plans
Remaining Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
4/6/21 Commercial Final Inspection Partial Approval
Remaining Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
5/4/21 Commercial Final Inspection Approved - Ok to issue CO!
- Corridor walls, fire doors and fire shutter approved.
Chimney / B Vent / Direct Vent Location Passed
Plumbing Vent Through Roof/Roof complete Passed
Side Wall Termination
Ext Finish /Grade Complete/6 in 10ft or Equivalent Passed
Int/Ext Guardrails 42 inch Platform Decks Passed
Int/Ext Balusters 4 inch Spacing Platform Decks Passed
May 04, 2021 Page (3)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
ÿþ Passed
12" beyond top & bottom Passed
Step risers: riser 7" & treads 11"Passed
Doors 36 inch wLever Hand Panic Hardware, if req Passed
Exits At Grade Or Platform 36 (w) x 44 (l)Passed
Gas Shut-off Exposed & Regulator (18) Above Grade Passed
Floor Bathroom Watertight Other Floors Okay Passed
Relief Valve ,Heat Trap/Water Temp 110 deg or less Passed
- Install downspout on hot water relief valve to within 6" of floor.
- Hot water not working.
Outside Spigots have Air Gap Passed
Gas Furnace Shut Off Passed
HVAC Vent Terminal 10' from Lot Line & Openings Passed
May 04, 2021 Page (4)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
¾ Hour Corridor Doors & Closers Passed
-Remove paint from UL Labels on fire doors.
- Install Fire shutter
- Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape
both sides of drop ceilings and fire caulk any penetrations through wall on both sides.
H/C toilet flush handle on open side Passed
H/C side & rear grab bars 36" above floor Passed
- install grab bars for handicapped toilet
H/C grab bar: 42" side, 12" from center Passed
- install grab bars for handicapped toilet
H/C 18" minimum vertical grab bar Passed
- install grab bars for handicapped toilet
H/C vertical grab bar 39" from floor and corner Passed
- install grab bars for handicapped toilet
H/C rear grab bar 36" with 24" to open side Passed
- install grab bars for handicapped toilet
H/C mirrors 40" above floor Passed
- Install mirror at lavatory. Bottom of mirror glass install 40" max from finish floor.
H/C sinks 34" above floor Passed
Handicapped Bath/Parking Lot Signage Passed
- Install Handicapped Unisex Bathroom Sign on wall in corridor on latch side of door. 60" to center of sign to finish
floor.
Low flow toilet 1.3 gal/flushing cycle - showerhead/faucet Passed
May 04, 2021 Page (5)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
Universal Symbol of Access displayed - on all H/C signs Passed
- Install Handicapped Unisex Bathroom Sign on wall in corridor on latch side of door. 60" to center of sign to finish
floor.
Public Toilet Room Handicapped Accessible Passed
Final Electrical / Flex Gas Piping Bonded Passed
Occupancy sensor lighting control Passed
Bldg Num or Tenant Address on Bld or Drive Passed
Bldg Access All Sides 20ft Drivable Surface Passed
Engineer or Architect Approval Passed
May 04, 2021 Page (6)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
OK to Issue Temporary C/O Passed
3/9/21 Commercial Final Inspection Not Approved
- Install downspout on hot water relief valve to within 6" of floor.
- Hot water not working.
-Remove paint from UL Labels on fire doors.
- Install Fire shutter
- install grab bars for handicapped toilet
- Install mirror at lavatory. Bottom of mirror glass install 40" max from finish floor.
- Install Handicapped Unisex Bathroom Sign on wall in corridor on latch side of door. 60" to center of sign to finish
floor.
- Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape
both sides of drop ceilings and fire caulk any penetrations through wall on both sides.
- Provide letter from HVAC Contractor that the heating and cooling system has been balanced.
- Complete all Fire Marshal's Items
3/15/21 Commercial final Inspection Partial Approval
- Hot water not working.
- Remove paint from UL Labels on fire doors.
- Install Fire shutter
- Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape
both sides of drop ceilings and fire caulk any penetrations through wall on both sides.
- Install bug screen on sidewall vent stack termination.
- Complete Fire Marshal's Items.
3/22/21 Final Inspection Partial Approval-Temporary CO approved.
Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
May 04, 2021 Page (7)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
- Pay $165 Temporary CO fee.
3/23/21 Commercial Final Inspection Partial Approval
Temporary CO Approved.
- Received Final As-Built Plans
Remaining Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
4/6/21 Commercial Final Inspection Partial Approval
Remaining Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
May 04, 2021 Page (8)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
OK to Issue C/O Passed
3/15/21 Commercial final Inspection Partial Approval
- Hot water not working.
- Remove paint from UL Labels on fire doors.
- Install Fire shutter
- Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape
both sides of drop ceilings and fire caulk any penetrations through wall on both sides.
- Install bug screen on sidewall vent stack termination.
- Complete Fire Marshal's Items.
3/22/21 Final Inspection Partial Approval-Temporary CO approved.
Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
- Pay $165 Temporary CO fee.
3/23/21 Commercial Final Inspection Partial Approval
Temporary CO Approved.
- Received Final As-Built Plans
Remaining Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
4/6/21 Commercial Final Inspection Partial Approval
Remaining Conditions:
- Install Fire shutter and submit certified documentation.
- Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by
Building Code of New York State(ICC).
- Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in
underside of mezzanine floor.
5/4/21 Commercial Final Inspection Approved - Ok to issue CO!
- Corridor walls, fire doors and fire shutter approved.
May 04, 2021 Page (9)
INSPECTION WORKSHEET (COMFIN-010103-2021)
Checklist Item Status
May 04, 2021 Page (10)
O'Brien, John