Loading...
Signed Inspection Report (Tue May 4, 2021 at 123 PM)INSPECTION WORKSHEET (COMFIN-010103-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0793-2020 Case Module:Permit Inspection Date:Tue May 4, 2021 Inspection Status:Passed Inspector:O'Brien, John Inspection Type:Commercial Final Inspection Job Address:Parcel Number:75 CAREY RD Queensbury, NY, 12804 308.20-1-3.3 Contact Type Company Name Name Engineer Bergeron, Mark Applicant O'Connor, Mike Primary Owner Okie Properties, LLC Contractor Alltek Energy Systems Inc Granted Permission Alltek Energy Systems Inc Checklist Item Status Blower Door Test Certification Passed May 04, 2021 Page (1) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status Building Inspector Notes Passed 3/9/21 Commercial Final Inspection Not Approved - Install downspout on hot water relief valve to within 6" of floor. - Hot water not working. -Remove paint from UL Labels on fire doors. - Install Fire shutter - install grab bars for handicapped toilet - Install mirror at lavatory. Bottom of mirror glass install 40" max from finish floor. - Install Handicapped Unisex Bathroom Sign on wall in corridor on latch side of door. 60" to center of sign to finish floor. -Remove paint from UL Labels on fire doors. - Install Fire shutter - Provide letter from HVAC Contractor that the heating and cooling system has been balanced. - Complete all Fire Marshal's Items 3/15/21 Commercial final Inspection Partial Approval - Hot water not working. - Remove paint from UL Labels on fire doors. - Install Fire shutter - Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape both sides of drop ceilings and fire caulk any penetrations through wall on both sides. - Install bug screen on sidewall vent stack termination. - Complete Fire Marshal's Items. 3/22/21 Final Inspection Partial Approval-Temporary CO approved. Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). May 04, 2021 Page (2) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. - Pay $165 Temporary CO fee. 3/23/21 Commercial Final Inspection Partial Approval Temporary CO Approved. - Received Final As-Built Plans Remaining Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. 4/6/21 Commercial Final Inspection Partial Approval Remaining Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. 5/4/21 Commercial Final Inspection Approved - Ok to issue CO! - Corridor walls, fire doors and fire shutter approved. Chimney / B Vent / Direct Vent Location Passed Plumbing Vent Through Roof/Roof complete Passed Side Wall Termination Ext Finish /Grade Complete/6 in 10ft or Equivalent Passed Int/Ext Guardrails 42 inch Platform Decks Passed Int/Ext Balusters 4 inch Spacing Platform Decks Passed May 04, 2021 Page (3) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status ÿþ Passed 12" beyond top & bottom Passed Step risers: riser 7" & treads 11"Passed Doors 36 inch wLever Hand Panic Hardware, if req Passed Exits At Grade Or Platform 36 (w) x 44 (l)Passed Gas Shut-off Exposed & Regulator (18) Above Grade Passed Floor Bathroom Watertight Other Floors Okay Passed Relief Valve ,Heat Trap/Water Temp 110 deg or less Passed - Install downspout on hot water relief valve to within 6" of floor. - Hot water not working. Outside Spigots have Air Gap Passed Gas Furnace Shut Off Passed HVAC Vent Terminal 10' from Lot Line & Openings Passed May 04, 2021 Page (4) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status ¾ Hour Corridor Doors & Closers Passed -Remove paint from UL Labels on fire doors. - Install Fire shutter - Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape both sides of drop ceilings and fire caulk any penetrations through wall on both sides. H/C toilet flush handle on open side Passed H/C side & rear grab bars 36" above floor Passed - install grab bars for handicapped toilet H/C grab bar: 42" side, 12" from center Passed - install grab bars for handicapped toilet H/C 18" minimum vertical grab bar Passed - install grab bars for handicapped toilet H/C vertical grab bar 39" from floor and corner Passed - install grab bars for handicapped toilet H/C rear grab bar 36" with 24" to open side Passed - install grab bars for handicapped toilet H/C mirrors 40" above floor Passed - Install mirror at lavatory. Bottom of mirror glass install 40" max from finish floor. H/C sinks 34" above floor Passed Handicapped Bath/Parking Lot Signage Passed - Install Handicapped Unisex Bathroom Sign on wall in corridor on latch side of door. 60" to center of sign to finish floor. Low flow toilet 1.3 gal/flushing cycle - showerhead/faucet Passed May 04, 2021 Page (5) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status Universal Symbol of Access displayed - on all H/C signs Passed - Install Handicapped Unisex Bathroom Sign on wall in corridor on latch side of door. 60" to center of sign to finish floor. Public Toilet Room Handicapped Accessible Passed Final Electrical / Flex Gas Piping Bonded Passed Occupancy sensor lighting control Passed Bldg Num or Tenant Address on Bld or Drive Passed Bldg Access All Sides 20ft Drivable Surface Passed Engineer or Architect Approval Passed May 04, 2021 Page (6) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status OK to Issue Temporary C/O Passed 3/9/21 Commercial Final Inspection Not Approved - Install downspout on hot water relief valve to within 6" of floor. - Hot water not working. -Remove paint from UL Labels on fire doors. - Install Fire shutter - install grab bars for handicapped toilet - Install mirror at lavatory. Bottom of mirror glass install 40" max from finish floor. - Install Handicapped Unisex Bathroom Sign on wall in corridor on latch side of door. 60" to center of sign to finish floor. - Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape both sides of drop ceilings and fire caulk any penetrations through wall on both sides. - Provide letter from HVAC Contractor that the heating and cooling system has been balanced. - Complete all Fire Marshal's Items 3/15/21 Commercial final Inspection Partial Approval - Hot water not working. - Remove paint from UL Labels on fire doors. - Install Fire shutter - Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape both sides of drop ceilings and fire caulk any penetrations through wall on both sides. - Install bug screen on sidewall vent stack termination. - Complete Fire Marshal's Items. 3/22/21 Final Inspection Partial Approval-Temporary CO approved. Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). May 04, 2021 Page (7) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. - Pay $165 Temporary CO fee. 3/23/21 Commercial Final Inspection Partial Approval Temporary CO Approved. - Received Final As-Built Plans Remaining Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. 4/6/21 Commercial Final Inspection Partial Approval Remaining Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. May 04, 2021 Page (8) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status OK to Issue C/O Passed 3/15/21 Commercial final Inspection Partial Approval - Hot water not working. - Remove paint from UL Labels on fire doors. - Install Fire shutter - Both sides of each wall in rated corridor 5/8" type x rock must be tight to underside of mezzanine deck. Fire tape both sides of drop ceilings and fire caulk any penetrations through wall on both sides. - Install bug screen on sidewall vent stack termination. - Complete Fire Marshal's Items. 3/22/21 Final Inspection Partial Approval-Temporary CO approved. Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. - Pay $165 Temporary CO fee. 3/23/21 Commercial Final Inspection Partial Approval Temporary CO Approved. - Received Final As-Built Plans Remaining Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. 4/6/21 Commercial Final Inspection Partial Approval Remaining Conditions: - Install Fire shutter and submit certified documentation. - Provide documentation certifying fire doors are 1-1/2 hour fire rating. Door and Frame must be approved by Building Code of New York State(ICC). - Apply one more coat of fire spray on both sides of corridor walls totally covering mineral wool insulation in underside of mezzanine floor. 5/4/21 Commercial Final Inspection Approved - Ok to issue CO! - Corridor walls, fire doors and fire shutter approved. May 04, 2021 Page (9) INSPECTION WORKSHEET (COMFIN-010103-2021) Checklist Item Status May 04, 2021 Page (10) O'Brien, John