Loading...
Signed Inspection Report (Tue May 4, 2021 at 146 PM)INSPECTION WORKSHEET (FDTN-010105-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0014-2021 Case Module:Permit Inspection Date:Tue May 4, 2021 Inspection Status:Failed Inspector:O'Brien, John Inspection Type:Building Foundation Job Address:Parcel Number:170 CAREY RD Queensbury, NY, 12804 309.13-2-31.113 Contact Type Company Name Name Primary Owner Boldstar LLC Granted Permission Bonacio Construction Inc Contractor Bonacio Construction Inc Applicant Bonacio Construction Inc Checklist Item Status May 04, 2021 Page (1) INSPECTION WORKSHEET (FDTN-010105-2021) Checklist Item Status Building Inspector Notes Failed 2/3/21 Foundation Partial Approval - Footings - Footings Partial Approval except for 12' of East wall line at NE corner. 2/11/21 Foundation Partial Approval - Foundation Walls - Foundation walls partial Approval. East Wall from G10 to 6' passed F10, South Wall, West Wall and North Wall from C1 to 3' before C10. 2/19/21 partial approval for foundation insulation, 2.5" ridged insulation at interior of frost walls, east wall not completed. 3/3/21 Building Foundation Partial Approval - Balance of exterior footings approved - 12 interior column footings approved 3/8/21 Building Foundation Partial Approval - Balance of Exterior Foundation Walls and 2 exterior piers on north side of building approved. 3/22/21 Building Foundation Partial Approval - P3 Extension at 5.5A & 5.5B Approved - Shear Wall Footings at 2 locations approved. Stamped detail to follow from engineer. Reinforcing installed as per detailed email from engineer. 5/4/21 Building Foundation Not Approved - Monolithic Slab not approved. 2" foam insulation not installed at steel column locations and 24" section of south shear wall location. Provide a detail from architect addressing energy code compliant frost break. Call for recheck before placement of concrete. Footings Passed 2/3/21 Foundation Partial Approval - Footings - Footings Partial Approval except for 12' of East wall line at NE corner. 3/3/21 Building Foundation Partial Approval - Balance of exterior footings approved - 12 interior column footings approved 3/22/21 Building Foundation Partial Approval - P3 Extension at 5.5A & 5.5B Approved - Shear Wall Footings at 2 locations approved. Stamped detail to follow from engineer. Reinforcing installed as per detailed email from engineer. May 04, 2021 Page (2) INSPECTION WORKSHEET (FDTN-010105-2021) Checklist Item Status Piers Passed 3/8/21 Building Foundation Partial Approval - Balance of Exterior Foundation Walls and 2 exterior piers on north side of building approved. 3/22/21 Building Foundation Partial Approval - P3 Extension at 5.5A & 5.5B Approved - Shear Wall Footings at 2 locations approved. Stamped detail to follow from engineer. Reinforcing installed as per detailed email from engineer. Monolithic Slab Failed 5/4/21 Building Foundation Not Approved - Monolithic Slab not approved. 2" foam insulation not installed at steel column locations and 24" section of south shear wall location. Provide a detail from architect addressing energy code compliant frost break. Call for recheck before placement of concrete. Reinforcement in Place Passed 2/3/21 Foundation Partial Approval - Footings - Footings Partial Approval except for 12' of East wall line at NE corner. 3/3/21 Building Foundation Partial Approval - Balance of exterior footings approved - 12 interior column footings approved 3/22/21 Building Foundation Partial Approval - P3 Extension at 5.5A & 5.5B Approved - Shear Wall Footings at 2 locations approved. Stamped detail to follow from engineer. Reinforcing installed as per detailed email from engineer. Foundation / Wallpour Passed 2/11/21 Foundation Partial Approval - Foundation Walls - Foundation walls partial Approval. East Wall from G10 to 6' passed F10, South Wall, West Wall and North Wall from C1 to 3' before C10. 3/8/21 Building Foundation Partial Approval - Balance of Exterior Foundation Walls and 2 exterior piers on north side of building approved. May 04, 2021 Page (3) INSPECTION WORKSHEET (FDTN-010105-2021) Checklist Item Status Reinforcement in Place Passed 2/11/21 Foundation Partial Approval - Foundation Walls - Foundation walls partial Approval. East Wall from G10 to 6' passed F10, South Wall, West Wall and North Wall from C1 to 3' before C10. 3/8/21 Building Foundation Partial Approval - Balance of Exterior Foundation Walls and 2 exterior piers on north side of building approved. Masonry Wall Failed Reinforcement in Place Failed Footing Dowels or Keyway in place Passed 2/3/21 Foundation Partial Approval - Footings - Footings Partial Approval except for 12' of East wall line at NE corner. 2/11/21 Foundation Partial Approval - Foundation Walls - Foundation walls partial Approval. East Wall from G10 to 6' passed F10, South Wall, West Wall and North Wall from C1 to 3' before C10. 3/3/21 Building Foundation Partial Approval - Balance of exterior footings approved - 12 interior column footings approved Foundation Dampproofing Failed Foundation Waterproofing Failed Footing Drain Daylight or Sump Failed Footing Drain Stone - 12 inch width Failed May 04, 2021 Page (4) INSPECTION WORKSHEET (FDTN-010105-2021) Checklist Item Status Footing Drain Stone - 6 inches above footing Failed Footing Drain stone - 6 mil poly Failed Backfill Approval Failed Plumbing Under Slab Failed PVC / Cast / Copper Failed Foundation Insulation Interior / Exterior Failed 2/19/21 partial approval for foundation insulation, 2.5" ridged insulation at interior of frost walls, east wall not completed. Rough Grade 6 inch drop within 10 ft.Failed Poly Under Slab Failed May 04, 2021 Page (5) O'Brien, John