Signed Inspection Report (Fri May 7, 2021 at 154 PM)INSPECTION WORKSHEET (RPLUM-010187-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0060-2021 Case Module:Permit
Inspection Date:Fri May 7, 2021 Inspection Status:Partial Pass
Inspector:O'Brien, John Inspection Type:Rough Plumbing
Job Address:Parcel Number:448 AVIATION RD
Queensbury, NY, 12804
302.5-1-3
Contact Type Company Name Name
Contractor Bishop Beaudry Construction LLC
Primary Owner Our Lady of the Annunciation Parish
Center
Granted Permission Our Lady of the Annunciation Parish
Center
Architect Hoffman & Riley Architects
Applicant Bishop Beaudry Construction LLC
Checklist Item Status
Permit Card Visible From Road Passed
Building Inspector Notes Failed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
5/7/21 Rough Plumbing Partial Approval
Remaining Item:
- Install and test pump line for ice maker drain.
Plumbing Under Slab Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
May 07, 2021 Page (1)
INSPECTION WORKSHEET (RPLUM-010187-2021)
Checklist Item Status
Rough Plumbing / Nail Plates Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
5/7/21 Rough Plumbing Partial Approval
Remaining Item:
- Install and test pump line for ice maker drain.
Plumbing Vent Vents in Place Passed
3" Vent Through Roof Passed
1 ½ inch minimum Drain Size Passed
Cleanout every 100 feet change of direction Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
Pressure Test Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved (Head)
5/7/21 Sanitary head test approved
Drain Vent Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved (Head)
5/7/21 Sanitary head test approved
Air Head Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved
5/7/21 Sanitary head test approved
May 07, 2021 Page (2)
INSPECTION WORKSHEET (RPLUM-010187-2021)
Checklist Item Status
5 psi or 10 ft. above highest conn. for 15 minutes Passed
4/09/21 Rough Plumbing Partial Approval
- Plumbing Under Slab Approved (10' Head)
5/7/21 Sanitary head test approved
Pressure Test Passed
5/7/21 Domestic water pressure test approved 100 psi
Water Supply Piping Passed
5/7/21 Domestic water pressure test approved 100 psi
Air Head Passed
5/7/21 Domestic water pressure test approved 100 psi
50 P.S.I for 15 minutes Passed
5/7/21 Domestic water pressure test approved 100 psi
Air Test Gas Piping 10 psi for 10 Minutes Failed
All Return Air Hard Duct Work Failed
Duct Insulation - if required in unheated spaces Failed
Duct Testing Outside Conditioned Space Failed
Duct work sealed properly Failed
May 07, 2021 Page (3)
O'Brien, John