Loading...
SEP-0422-2021 Office Use Only Permit#: SC—P- 04-22 -,40 2 Permit Fee:$ 1815 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www,aueensbury.net Invoice#; Flood Zone? Y P Reviewed By:� SEPTIC DISPOSAL PERMIT APPLICATION r; Project L �-� �1 C% D E C E a V E Location: 1 LJUNL03 2021 Tax Map #: 3� _ y TOWN OF QUEENSBURY BUILDING&CODIES RESIDENCE INFORMATION: Year Built Gallons #of bedrooms: X gallons per =total daily flow per day bedroom Garbage Grinder Yes No 1980 or older 150 I Installed? (circle one) 1981-1991 130 3 Spa or Hot Tub Yes 1992-Present 110 Na -- _ Installed? (circle one) -_--- I PARCEL INFORMATION: Topography ' -X,,— Flat Rolling Steep Slope % slope_ Soil Nature GX Sand Loam Clay Other, explain: Groundwater At what depth? None encov \�V u Bedrock/Impervious material At what depth? oiryq en,covv,�ec�� _...... Domestic Water Supply X, Municipal _Well , lake (if well or lake, water supply from any septic system absorption is ft.) Percolation Test Rate: per minute per inch (test to be completed by a licensed engineer/architect) PROPOSED SYSTEM INFORMATION: I - - - - -- .._.._ ._.a. - - ....... Tank size gallons (min. size 1,000 gallons, add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field w/#2 stone 1 Total length ft.; Each Trench go ft. Seepage Pit w/#3 stone How many: ; Size: Alternative System Bed or other type: Holding Tank System Total required capacity? ; tank size # of tanks septic Application Revised December 2020 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • A lic nt• Name(s): ti S \. �.` Mailing Address, C/S/Z: .✓ e Cell Phone: _S ) IJa0 09 Land Line- _(S _) - ��Q Email:)t,��1. • Primary Owners : Name(s): carCi Mailing Address, C/S/Z: Cell Phone:_( ) Land Line: _( 1 .._.) C11Z- 1ul- Email: drei., ® c&-�cungpt&Q)n O Check if all work will be performed by property owner only • Contractor- Contact Name(s): Contractor Trade: �► Mailing Address, C/S/Z: V%f c Cell Phone:_� ) Land Link: _(SIK -1,48-01A Email: **Workers' Comp documentation must be submitted with this application** • En ineer s : Name(s): Mailing Address, C/S/Z: .1 Cell Phone: _( } Land Line: Email: P��C�NCI e-.,P (dam Contact Person for Compliance in regards to this project: Cell Phone: S 1 Land Line: _} Email: is NOTES: 1. Alarm system and associated electrical work must be inspected by a Town approved electrical inspection agency; 2. We will no longer allow systems to be covered until such time as an as-built plan is received and approved.The installed system must match the septic layout on file—no exceptions. 3. As- built drawings must be submitted prior to the inspection, if there has been a change to the submitted plans. 4. If, for any reason, the building permit application is withdrawn, 30% of the fee is retained by the Town of Queensbury. After 1 year from the initial application date, 100%of the fee is retained. Declaration: Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: 1V0. SIGNATURE: DATE:! ?1— Septic Application Revised December 2020 RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski Ethan Peter Hall C 134 Dix Avenue Glens Falls NY 12801 Voice 518 741 0268 Fax 518 741 0274 Email ephall@nycap.rr.com 21 Michaels Drive 14 June 2021 Mark Smith —Town of Queensbury Building Department 742 Bay Road Queensbury NY 12804 Re: Installation of Replacement Sewage Disposal System At the above referenced project location this office observed the installation of the new distribution box and distribution laterals prior to backfill. The attached drawing reflects the leach field placement as constructed. The existing tank was verified to be in working order as needed.. This installation is acceptable to this office. If there are any questions please contact our office to discuss. Regards, Ethan ter Hall :a � Architect ii.► - .22- 2-02,I ECEONIE JUN 1 4�2021 TOBUILDING OF U EENsB Y &CODES 1