Signed Inspection Report (07-26-2021) (2).pdfINSPECTION WORKSHEET (COMFIN-012240-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0131-2021 Case Module:Permit Inspection Date:Mon Jul 26, 2021 Inspection Status:Passed Inspector:O'Brien, John Inspection Type:Commercial Final Inspection Job Address:Parcel Number:2546 State Rte 9L Queensbury, NY, 12804 240.5-1-26 Contact Type Company Name Name Primary Owner J & D Marina LLC Applicant J & D Marina LLC Granted Permission J & D Marina LLC Architect McKernon Group Inc Contractor McKernon Group Inc Checklist Item Status Jul 26, 2021 Page (1) INSPECTION WORKSHEET (COMFIN-012240-2021) Checklist Item Status Building Inspector Notes Passed 5/12/21 Commercial Final Inspection Not Approved Remaining Items: - Final Electrical Inspection - Install permanent handrail on stairs to 2nd floor with returns into wall at top and bottom of stairs. - Complete plumbing at second floor bathroom and kitchenette sink. In meantime cap drain lines until plumbing is completed. - Complete guardrails and handrails on 1st floor deck as discussed. - Complete guardrails on 2nd floor deck - Complete exits to grade as discussed. - Install customer service counter with 34" maximum height from finish floor. - Install lever handle hardware on all doors. - Complete all Fire Marshal's Items. 5/14/21 Commercial Final Inspection Partial Approval - Ok to open store and office area. - Lever handle Hardware installed on passage and entry doors. - Final Electrical Inspection Approved - All areas under construction barricaded from public. - Upstairs incomplete plumbing capped off. - Existing handrail installed on stairs to 2nd floor. 7/26/21 Commercial Final Inspection Approved - Ok to issue CO! Plumbing Vent Through Roof/Roof complete Passed Ext Finish /Grade Complete/6 in 10ft or Equivalent Passed Wood deck: 2'+ from grade dia bracing required - H/C ramp compliant Passed Int/Ext Guardrails 42 inch Platform Decks Passed Int/Ext Balusters 4 inch Spacing Platform Decks Passed Jul 26, 2021 Page (2) INSPECTION WORKSHEET (COMFIN-012240-2021) Checklist Item Status ÿþ Passed 12" beyond top & bottom Passed 6/25/21 Install as discussed Step risers: riser 7" & treads 11"Passed Doors 36 inch wLever Hand Panic Hardware, if req Passed Exits At Grade Or Platform 36 (w) x 44 (l)Passed Floor Bathroom Watertight Other Floors Okay Passed Relief Valve ,Heat Trap/Water Temp 110 deg or less Passed H/C toilet flush handle on open side Passed H/C side & rear grab bars 36" above floor Passed H/C grab bar: 42" side, 12" from center Passed H/C 18" minimum vertical grab bar Passed H/C vertical grab bar 39" from floor and corner Passed Jul 26, 2021 Page (3) INSPECTION WORKSHEET (COMFIN-012240-2021) Checklist Item Status H/C rear grab bar 36" with 24" to open side Passed H/C mirrors 40" above floor Passed H/C sinks 34" above floor Passed Handicapped Bath/Parking Lot Signage Passed Low flow toilet 1.3 gal/flushing cycle - showerhead/faucet Passed Universal Symbol of Access displayed - on all H/C signs Passed Public Toilet Room Handicapped Accessible Passed Handicapped Service Counters 34 inch Passed Handicapped Ramps Passed Final Electrical / Flex Gas Piping Bonded Passed Occupancy sensor lighting control Passed Jul 26, 2021 Page (4) INSPECTION WORKSHEET (COMFIN-012240-2021) Checklist Item Status OK to Issue Temporary C/O Passed 5/12/21 Commercial Final Inspection Not Approved Remaining Items: - Final Electrical Inspection - Install permanent handrail on stairs to 2nd floor with returns into wall at top and bottom of stairs. - Complete plumbing at second floor bathroom and kitchenette sink. In meantime cap drain lines until plumbing is completed. - Complete guardrails and handrails on 1st floor deck as discussed. - Complete guardrails on 2nd floor deck - Complete exits to grade as discussed. - Install customer service counter with 34" maximum height from finish floor. - Install lever handle hardware on all doors. - Complete all Fire Marshal's Items. 5/14/21 Commercial Final Inspection Partial Approval - Ok to open store and office area. - Lever handle Hardware installed on passage and entry doors. - Final Electrical Inspection Approved - All areas under construction barricaded from public. - Upstairs incomplete plumbing capped off. - Existing handrail installed on stairs to 2nd floor. OK to Issue C/O Passed 5/12/21 Commercial Final Inspection Not Approved Remaining Items: - Final Electrical Inspection - Install permanent handrail on stairs to 2nd floor with returns into wall at top and bottom of stairs. - Complete plumbing at second floor bathroom and kitchenette sink. In meantime cap drain lines until plumbing is completed. - Complete guardrails and handrails on 1st floor deck as discussed. - Complete guardrails on 2nd floor deck - Complete exits to grade as discussed. - Install customer service counter with 34" maximum height from finish floor. - Install lever handle hardware on all doors. - Complete all Fire Marshal's Items. 5/14/21 Commercial Final Inspection Partial Approval - Ok to open store and office area. - Lever handle Hardware installed on passage and entry doors. - Final Electrical Inspection Approved - All areas under construction barricaded from public. - Upstairs incomplete plumbing capped off. - Existing handrail installed on stairs to 2nd floor. Jul 26, 2021 Page (5) INSPECTION WORKSHEET (COMFIN-012240-2021) Checklist Item Status 7/26/21 Commercial Final Inspection Approved - Ok to issue CO! Jul 26, 2021 Page (6) O'Brien, John