Loading...
SOLAR-0201-2021 Office Use Only Permit#: �-hc�--�1 Oti- Permit Fee: $ g5 ` 742 Bay Road,Queensbury,NY 12804 P:518-761=8256 www.gueensbury.net Invoice#: C,» Flood Zone? Y N Reviewed By: SOLAR PANEL PERMIT APPLICATION SITE INFORMATION: Project Location: Ji SV\W1ovJ Crc le-\L 2C\ Tax'Map ID#: 19 .11 -1 ' Co Subdivision Name: PROJECT INFORMATION: Residential: Commercial Other: Single Family Multi-Family Are the solar panels? Purchased Leased Estimated cost of construction: Total System Capacity Rating (sum of all panels)-- Solar PV System: kW DC Select System Configuration: D E C E E Supply side connection with micro inverters ENE 5 2��p ' Supply side connection with DC optimizers TOWN OF QUBBNBBURY Supply side connection with string inverter BUILDING 8 CODES Load side connection with DC optimizers Load side connection with micro inverters Load side connection with string inverter Solar Panel Application Revised January 2021 DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed,. subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building-laws and ordinances, and in conformance with local zoning regulations. 5. A third-party electrical inspection will be completed at which time the Town of Queensbury's Building and Codes Enforcement department will be contacted to complete an inspection of the final installation of the solar panels. Please sign below to affirm that all answers are correct and that you have met all of the conditions and requirements to submit a unified solar permit. I have read and agree to the above: Homeowner's Signature Date Solar Co. Repre nt ' e Signature Date Solar Panel Application. Revised January 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Property Owner(s): Name(s): LOca 101(N e. MailingAddress, C/S/Z: 11 S1Wlc)u) Cfct Y_ 9,0 C�uccAsburv► , N,-I a7 -I Cell Phone:_( ) Land Line: Email: 1iY1e @ • Solar Contractor: Workers' Comp documentation must be submitted with-ttiis application Business Name: Seec1 ge_ncwwb Contact Name: Cris Schrfiricr Mailing Address, CJS/Z: o ,n CL0A .'T�6L4'.'X1 y 1-2-1 S o Cell Phone: _(51t) 253- Co 51 Land Line:_( ) Email: h rc2cJt r ,1,P cr1 CoIG r . .n rn • Electrical Contractor: Workers' Comp documentation must be submitted with this application Business Name:Sx«I t� lA)Ckhl, � Contact Name:.C i S S Ch Co r11-P (- Mailing Address, C/S/Z: L105 JOrClrl r\ aroL4 , .1Vy 121.$O Cell Phone:_(51 ) 25 S Co� 5 t Land Line:_( ) Email: CSChr6tc�lT r. @ Seed mlQkr . C'c�►r Contact Person for Compliance in regards to this project: CYI S S(h r adt_r Cell Phone: 5( 1$ ) 2-5 J� - (69'51 Land Line: � ) Email: CSC Harr P S CC-f `o Solar Panel Application Revised January 2021 Dacu&gn Envelope ID:BOB2FiP—*1-2,IB3-42123r-23--lt68289SE50I-;4 Seed- Soler. * Engineering I authorize Secd Solair to act or my behalf"M subraitting any and all pap�,-rvork associated with Iffie solar photovoltaic project located at 11 Shallow C.'reek Read, Qua!ansbury NY In add on,the inspect-or(s) fs/are pem-nd-ned to inspect the above referenced premises in accordance'ivith the salar photo veltaic installatioh project requ-Xerxnertts. Name,: Roy 'Kline Signature: Date: 3/24/2021 Seed Solar 405 jordki Road Tr oy;NY 12180 1-800-580-0248 viv,,-xv.seedsblarxom E n G in E E R S VSE Project Number:U2549.0015.211 March 1 S,2021 295.1116 SOI:AR_02012021 Kline, Roy Seed Solar ATTENTION:Cris Schroder I.:,I.:,Shallow Creek Rd A AT Solar Panel Installation 405 Jordan Rd Troy,NY 12180 REFERENCE: Kline Residence(SR21-562): 11 Shallow Creek Road,Queensbury,NY 12804 Solar Array Installation To Whom It May Concern: Per your request, we have reviewed the existing structure'at the above referenced site. The purpose of our review was to determine the adequacy of the existing structure•to support the proposed•i►istallation of solar panels on the roof as shown on the panel layout plan. Based upon our review,we conclude that the existing structure is adequate to support the proposed solar panel installation. Design Parameters Code:2020 Residential Code of New York State �� Risk Category:11 D e' C E 1'-- Design wind speed: 115 mph (3-sec gust)per ASCE 7-10 Wind exposure category:C APR 0 5 2021 Ground snow load,Pg: 50 psf Existing Roof Structure TOWN OF QUEENSBURY BUILDING&C_ODES Roof structure:2x10 rafters @ 16"O.C. Contractor shall verify that the max horizontal span is not to exceed 20' Roofing material:metal seam Roof slope: 36.9° Connection to Roof Mounting connection:(1)S-5!U Clamp to min.26 ga steel at 15"O.C. (required every seam) (2)rails per row of panels,evenly spaced;panel length perpendicular to the rails not to exceed 67 in.Rail cantilever shall not exceed 50%of connection spacing. Note:Contractor shall verify min.metal gauge prior to installation of the solar panels. Conclusions Based upon our review,we conclude that the existing structure is adequate to support the proposed solar panel installation. See attached calculations. 651 W.Galena Park Blvd.,Ste.101/Draper, UT 84020/T(801)990-1775/F(801)490-1776/www:vectorse.com VSE Project Number:U2549.0015.211 Kline Residence 3/18/2021 E n G I n E E R S The solar array will be flush-mounted (no more than 10" above the roof surface) and parallel to the roof surface. Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing roof against wind(uplift), the governing load case. Because the increase in lateral forces is less than 5%, this addition meets the requirements of the exception in Section AJ601.9 of the 2020 Residential Code of New York State. Thus the existing lateral force resisting system is permitted to remain unaltered. Limitations Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work performed must be in accordance with accepted industry-wide methods and applicable safety standards. The contractor must notify Vector Structural Engineering, LLC should any damage, deterioration or discrepancies between the as-built condition of the structure and the condition described in this letter be found. Connections to existing roof framing must be staggered, except at array ends, so as not to overload any existing structural member. The use of solar panel support span tables provided by others is allowed only where the building type,site conditions,site-specific design parameters, and solar panel configuration match,the description of the span tables. The design of the solar panel racking(mounts, rails, etc.) and electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is the responsibility of others. Vector Structural Engineering assumes no responsibility for improper installation of the solar array. VECTOR STRUCTURAL ENGINEERING,LLC NY Firm License:COA0012807/081423 �o f 03/18/2021 Jacob Proctor,P.E. Unauthorized alterations or additions to this letter which bears a NY License: 102527-Expires:0 1/3 1/2023 licensed professional engineer's seal is a violation of Section Projects Eng ineer 7209(2)of the N.Y.State Education Law Enclosures JSP/jgr 651 W.Galena Park Blvd.,Ste. 101/Draper, UT 84020/T(801)990-1775/F(801)990-1776/www.vectorse.com JOB NO.: U2549.001-5.211 T. R SUBJECT: WIND PRESSURE E n G l n E E R S PROJECT: Kline Residence Com onents and Cladding Wind Calculations Label: 1S61jar Panel Array Note: Calculations per ASCE 7-10 SITE-SPECIFIC WIND PARAMETERS: .- . Basic Wind Speed [mph]: 11.5 Notes: Exposure Category: C "Risk Category.:. II ADDITIONAL INPUT& CALCULATIONS: Height of Roof, h [ft]:�.. 157-71(Approximate) Comp/Cladding Location:jGable Roofs 27°<0<_45° Enclosure Classification: Enclosed Buildings Zone 1 GCP: ,1.0 ;;Figure 30.4-2C. (enter negative pressure coefficients) Zone 2 GCP: 1.0 Zone 3 GCP: Lo- a: 9.5 Table'26.9-1 zg [ft]: -900- Table 26.9-1 Kh: 0.85 Table 30.3-1 KZt: 1 Equation 26.8-1 Kd: 0.85 Table 26.6-1 Velocity Pressure, qh [psf]: 24.4 Equation 30.3-1. GCPi: -0 Table 26.11-1 PRESSURES: p=q,, GCy — GCS,; Equation 30.9-1 Zone 1, p [psf]: 24.4 psf(1.0 W-, Interior Zones, beyond 'a' from roof edge)° - Zone 2, p [psf]: ' 24.4 psf(1.0 W, End Zones; within 'a' from roof edge) Zone 3, p-[psf]: 24.4- psf,(1:0 W; Corner.Zones,.within 'a'•from roof corner) (a= 3 ft) JOB NO.: U2549.0015.211 SUBJECT: CONNECTION E n s I n E E R S PROJECT: Kline Residence Calculate Uplift Forces on Connection Pressure Max Connection Max Trib. Max Uplift (0.6 Dead -0.6 Wind) Spacing' Areal Force (psf) (ft) (ft) (Ibs) Zone 1 12.9 1:3 3.5 45 Zone 2 12.9 1.3 3.5 45 Zone 3 12.9 1.3 3.5 45 Calculate Connection Capacity Roof Connector: S-5! U'C,lamp.,-_ Additional Connection Info: to.min. 26.ga steel Ultimate Capacity3 [Ibs/in]: 429 Factor of Safety: 3`-• Qty. of Connectors: iA Prying Coefficient: 1 Total Capacity [Ibs]: 143 Determine Result Maximum Demand: 45 Connection Capacity:1 143 Result: Capacity> Demand, Connection is adequate. Notes, , 1. 'Max Connection Spacing' is the spacing between connections along the rails. 2. 'Max Trib Area'is the product of the 'Max Connection Spacing'and 1/2 the panel width/height perpendicular to the rails. (2) rails per row of panels. Length of panels perpendicular to the rails shall not exceed 67". 3. Ultimate capacity values are from manufacturer testing. Metal gauge is unknown.A conservative thickness has been used. Metal gauge shall be verified in field prior to installation of solar panels. Roof deck model is unknown or has not been tested for this connector.The capacity used is based on conservative values from testing of the connector on similar roof deck model. 4. Install metal roof connector per manufacturer's written instructions with recommended fasteners when i indicated. a f . � JOB NO.: U2549.0015.211 TR SUBJECT: GRAVITY LOADS E n G I n E E R s PROJECT: Kline Residence GRAVITY LOADS Roof Pitch: 9.0 --1:12 Design material Increase due to Material weight ROOF DEAD LOAD (D) weight[psf] pitch [psf] Metal Seam 3.1 1.25 2.5 1/2" Plywood 1.3 1.25 1.0 Framing 3.0 3.0 Insulation 0.0 0.0 1/2" Gypsum Clg. 0.0 1.25 0.0 M, E & Misc 2.0 2.0 Total Existing Roof DL 9.4 PV Array DL 3.8 1.25 3 ROOF LIVE LOAD (Lr) Existing Design Roof Live Load [psf] 20 �R324.4.1.1 ASCE 7-10 Table 4.3-1 Roof Live Load With PV Array[psf] 02020 Residential Code of New York State,Section SNOW LOAD (S): Existing wl Solar Array Roof Slope [x:12]: 9.0 9.0 Roof Slope [°]: 37 37 Ground Snow Load, p9 [psf]: 50 50 ASCE 7-16,Section 7.2 Terrain Category: C G: ASCE 7-16,Table 7.3-1 Exposure of Roof:, Fully Exposed-: Fully Exposed ASCE 7-16,Table 7.3-1 Exposure Factor, Ce: 0.9 0.9 ASCE 7-16,Table 7.3-1 Thermal Factor, Ct: 1:1 _ 1..1 ASCE 7-16,Table 7.3-2 Risk Category: II II ASCE 7-16,Table 1.5-1 Importance Factor, I5: 1.0 1.0 ASCE 7-16,Table 1.5-2 Flat Roof Snow Load, pf[psf]: 35 35 ASCE 7-16, Equation 7.3-1 Minimum Roof Snow Load, pm [psf]: 0 0 ASCE 7-16, Section 7.3.4 Unobstructed Slippery Surface? Yes. Yes ASCE 7-16, Section 7.4 Slope Factor Figure: Figure 7-2b Figure 7-2b ASCE 7-16, Section 7.4 . Roof Slope Factor, Cs: 0.55 0.55 ASCE 7-16, Figure 7.4-1 Sloped Roof Snow Load, ps [psf]: 19 19 ASCE 7-16, Equation 7.4-1 Design Snow Load, S [psf]: 19 19 F„a, F o, 9 _ JOB_NO.:U2549.0015.211_ _- _ __.___-____ ____ _ _ _ - DF ttI D GRADES - _ (psi) 090--180- - E7oo 000 (1632 a) E Tl O I t, E E R S DFL#2 DFL#2 goo 180 1,600,000 32 DF1(5X) DFL41 5X5 8 LARGER 1.350 170 1,800.000 32 SPF#2 SPF92 875 135 1.400,000 26.2 SP#2 SP#2 1,1001 175 1,400,000 34.3 PROJECT:Kline Residence SUBJECT: BEAMS 24F-V4 24F-V4 2.400 240 1,800,000 32 24F-V8 24F-V8 2,400 240 1,800,00D 40 DESIGN LOADS Load T es: Snow Live Dead LVL 1.9 LVL 1.9X10BE 2.600 285 1.900,000' 40 YP LVL(2.0) LVL(2.OX106E) 2.200 285 2,000.003 42 Roof (f,19 fi 20 9 CRITERIA(U)j D1L DLL IDpL LSL LSL(1.3X106E) 1.700 400 1,300,000 42 Solar 3.8,. (eLANK) 120 I '180 STL36 GRADE 36 STEEL 21,600 14,400 29,000,000 490 STL46 GRADE 46 STEEL 27,700 16,500 29,000,000 - 490 STL50 GRADE 50 STEEL 30,000 20,000 29,000,000 490 Point Point Add'I Add'I ; Live Dead n Roof Floor Wall Live Solar Point n Dist Load Load as X 1.5131- Length Trib Trib Trib Load Load Load ^y 'a' PLL Pei � o m M . Marv. V_ V.%_ Dr- DTwbw DLL DLLs— GLB Label V(ft) (ff) (ft)' (ft) (plf) -(pif) From u1 (ft) (lb)_ (lb) m, Grade Size D C, Ce CFv R,(lb) R,(lb) (ft-lb) (ft-lb) (lb)' (lb) (in) (in) (in) (in) Camb Check Rafter 20 '.1:33 .,.;." " ":"`r'=.-'5.0 ay.b, 4 SPF#2 2x1D "; ,:,1:15 1.15 1.10 442 442 2209 2269 408 1436 1.148 2.000 0.693 1.333 0.97M