Keith R. Manz letter.08.21.2021.with attachment p G EITH R. MANZ, P.E.
AUG 23 2021 8 High Rock Ave Ste 5E
ratoga Springs, NY 12866
TOWN OF OUEENSBURY
BUILDING 8_O`S
August 21, 2021 TOWN OF QUEENSSURY
BUILDNT
Based on our limited ed exaNG mination,
n
i compliance
with our comments shall not be construed as
with the plans and sppecifications are in
full compliarx� with the eui�ng Codes of
Mr. Dean Burdick, V.P. New York State.
Stone Installations
TOWN OF QUEENSBURY
RE: 60 Howard Street, Queensbury, NY BUILDING & CO S EPT.
Percolation Test Results Reviewed y:
Date:
Dear Mr. Burdick:
The results of the certified percolation test performed at the aforementioned
property is as follows;
Results — HIGHEST STABILIZED RATE = 4 minutes per inch.
Respectfully submitted,
�pF NEM11v
X.
r
P
pROFESS�ONP
Keith R. Manz, P.E.
KRM/krm
Cc: file
301-20-1-31 SEP-0627-2021
ASAD - S Blocks Inc
60 Howard St
Residential Septic Alteration
1
a
.y
Lw
A f `®
s SL
a
. S3000 ?ONimin9
_ Q �I an8SN33no iO NM01