Loading...
Application Office Use Onlv Permit#: Permit Fee: $ 85 l 742 Bay Road,Queensbury, NY 12804 P:518-761-8256 www.gueensbury.net Invoice#: ✓ l Flood Zone? Y N Reviewed By: SOLAR PANEL PERMIT APPLICATION SITE INFORMATION: Project Location: 20 Ridgewood Ct Lot 4 Tax Map ID#: 266.3-1.73.4 Subdivision Name: PROJECT INFORMATION: Residential: Commercial Other: Single Family x Multi-Family Are the solar panels? X Purchased _ Leased Estimated cost of construction: $15,055.00 Total System Capacity Rating (sum of all panels): Solar PV System: 12.24 kW DC Select System Configuration: Supply side connection with micro inverters Supply side connection with DC optimizers Supply side connection with string inverter Load side connection with DC optimizers Load side connection with micro inverters X Load side connection with string inverter Solar Panel Application Revised January 2021 DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 1005"o of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances, and in conformance with local zoning regulations. 5. A third-party electrical inspection will be completed at which time the Town of Queensbury's Building and Codes Enforcement department will be contacted to complete an inspection of the final installation of the solar panels. Please sign below to affirm that all answers are correct and that you have met all of the conditions and requirements to submit a unified solar permit. I have read and agree to the abovi4: Homeowner' Signature Date Solar Co epresent ive Signature Date Solar Panel Application Revised January 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Property Owner(s): Name(s): Chris Patten Mailing Address, C/S/Z: 20 Ridgewood Ct Lot 4 Cell Phone: _(518 )796-4654 Land Line: _( ) _ Email: patten84@gamil.com • Solar Contractor: Workers' Comp documentation must be submitted with this application Business Name: Tesla Energy Operations Contact Name: Amy Keyser Mailing Address, C/S/Z: 326 Old Niskayuna Rd, Latham NY 12110 Cell Phone: _( 518-)390-5527 Land Line: _( ) Email: • Electrical Contractor: Workers' Comp documentation must be submitted with this application Business Name: Tesla Energy Operations Contact Name: Kenneth Tiffany Mailing Address, C/S/Z: 326 Old Niskayuna Rd, Latham NY 12110 Cell Phone: _( 518�.764-886 Land Line: _(__) Email: Contact Person for Compliance in regards to this project: Amy Keyser Cell Phone: ( ) 518-390-5527 Land Line: �) Email: akeyser@tesla.com Solar Panel Application Revised January 2021 PLEASE INCLUDE WITH YOUR SUBMITTAL: 1. Completed Solar Panel Installation permit application THREE (3) COPIES OF THE FOLLOWING: 2. Signed and stamped architect or engineer solar plans, which include: a. Design/snow load b. Letter indicating rafters can handle additional load of solar panels and snow c. Proper setbacks from ridgeline for Fire Department access d. Rapid Shutdown 3. Plot plan indicating proposed structure to hold solar panels ADDITIONAL IMPORTANT INFORMATION: 1. Any changes to the approved plans prior to or during construction will require the submittal of amended plans, additional reviews and re-approval. 2. If, for any reason, the building permit application is withdrawn, 30% of the fee is retained by the Town of Queensbury. After 1 year from the initial application date, 100% of the fee is retained. Solar Panel Application Revised January 2021 OWNER AUTHORIZATION Job#: F"A 086 80�I 1 Property Address: i� t� L dq eu(XX� C , Gw Oet �b wy, nr 9 10t 6 4 I PATTE&1 as Owner of the subject property hereby authorize 1E— ENERGY OPERATIONS INC.to act on my behalf,in all matters relative to work authorized by this building permit application. �'6 S• /� - boa- 1 Signature of Owner: late: 3055 Clean?es:Way San MPAeo,CA 94AM !GMS38'028 f�650838-:C29 .. ._r...�",c. +.e :._.:•:y ..c:.,._.--•<:_ ..,_:. c.c.s av: m- >T>. M.