JB191099.0006FOUNDATION OBSERVATIONS REPORT Dhoti irprracor ea,..MV
Report Number: JB191099.0006
Service Date:07/22/19 594 Broadway
Report Date:07/26/19
Cr
Watervliet,NY 12189-3709
C ( 7)-i5—7p1C)1 518-266-0310
Client Project
Ellsworth&Son Excavating,Inc. Apex Capital,LLC
Attn:Ruben Ellsworth 59 West Mountain Road
76 Ellsworth Lane Ext. Queensbury,NY 12804
Large George,NY 12845
Project Number: JB 191099
This representative of the Dente Group was on site to observe the removal of the unsuitable soils from beneath the
foundations as indicated on the previous visit. Upon arrival to the site, the following was observed.
The contractor had already removed the unsuitable soils prior to my arrival to the site. The depth of the undercut ranged from
approximately 3 to 5 feet below planned footing subgrade down to natural soils suitable for the design bearing capacity. A
geotextile fabric was placed on the subgrade and the area was backfilled with crushed stone and compacted with a large
reversable plate tamper as recommended.
Services: Observe foundation construction activities as requested in general accordance with project specifications and/or client
request(s).
Dente Group-A Terracon Co. Rep.: John Odorisio
Reported To:
Contractor:
Report Distribution:
I)Ellsworth&Son Excavating,Inc.,
Ruben Ellsworth
Reviewed By:r/
M.Mc en
Materials Group Manager
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001,10-16-13,Rev.1O Page 1 of I
r
ti.11:14.,
r o -
I r. may-
it 14iiii-iise„....ii 7. 4.. .,..,,,_
Photo No. 1 Undercut with fabric along line A Photo No.2 Line A stone placement
ir-fla11111
tee..
f 1``H
j y
Photo No. 3 Fabric and stone on line 1 Photo No.4 Stone compaction on line 1
Ellsworth 8 Son Excavating,Inc. Project Number: JB191099 lrerraconAttn:Ruben Ellsworth Report Number: JB191099.0006
76 Ellsworth Lane Ext. Technician: John Odorisio 594 Broadway
Large George,NY 12845 Date: 07/22/19 Watervliet,NY 12189-3709
Scale: Not to Scale 518-266-0310