Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
RC-0558-2021
Office Use Only PRINCIPLE STRUCTURE PERMIT APPLICATION Permit#: Permit Fee:$ 742 Bay Road,Queensbury, NY} 12804 *Rec Fee:$ )�� P: 51.8-76178256 'www.queensbury.net Invoice#: Flood Zone? Y N Reviewed By: Project Location:-; 26-Sunset Dr. Queensbury;.NY 12804, Tax Map #: 296.19-1-61 Subdivision Name: *RECREATION FEE$1000.00 for new dwelling.units: single family, duplex - I apartments,condominiums, townhouses;cr NYS Building Standards &C c r a 11OM6. This is in addition to,the permit fee(s). UL ,2 2 2021 Ej PROJECT INFORMATION: TOWN OF QUEENS6URY ® Residential ❑ Commercial;Proposed Use: BUILDING&CODES ®Single-Fa•mily:Ranch-Style Home❑Two-Family ❑ Multi-Family(#of units: ) 1. ❑Custom 2. ❑Modular(REQUIRED:NYS stamped engineered drawings of foundation plans) ❑Townhouse ® Garage (#of..cars 2 ) ❑ Business Office ❑ Retail ❑ Hotel/Motel ❑ Industrial ❑ Heated Warehouse/Storage Building ❑ Unheated Warehouse/Storage Building ❑Amusement Ride ❑ Other(describe: ) MAIN STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 11r floor: 28'x42'- 1200sgft 1ST floor: 20'x20'- 400sgft 2nd floor: 2nd floor: 3rd floor: Total square feet: Basement(habitable space):' .Unfinished Total square feet: 1200sgft Principle Structure Packet Revised March 2021 J ' ADDITIONAL"PROJECT-INFORMATION: 1. Estimated Cost of Construction: $ $200,000 2. Proposed use of the building: Single-family residential home, primary residence . 3. If Commercial or Industrial, indicate the name of the business: 4. Source of Heat: ® Gas ❑ Oil. ❑ Propane ❑ Solar ❑ Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application, one Per appliance) 5. Are there any structures not shown owthe plot plan? ❑ YES © NO Explain, if yes: 6. Are there any easements on the property?❑YES ® NO 7. SITE INFORMATION: a.'What is the dimensions or acreage of the parcel? .73 Acre' b. Is this a•corner lot? ❑YES ® NO c.Will the grade be changed as a result of the construction? F YES ❑ NO d. What is the water source? © PUBLIC ❑ PRIVATE ❑ WELL e.What type of wastewater system,is on the parcel? [] SEWER © PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge.that no construction shall be commenced prior to the issuance of a'valid permit and will be completed within a 12 month'period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is_retained. 3. 1 certify that the, application, plans and supporting materials are a true'and complete statement and/or description of the work, proposed, that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances, and in conformance with localzoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5..1 also understand that I/we are required to provide an as-built survey by a.WSlicensed-land surveyor of all newly constructed facilities rip orto'issuanceofacertificateofoccupancy. I. have read-and agree to the above: P R I NT NAME: Larry Clute President/Owner- Clute Enterprises, Inc. SIGNAURE: DATE: Principle Structure Packet Revised March 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): Larry Clute - President/Owner- Clute Enterprises, Inc. Mailing Address, C/S/Z:. 6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land Line: 518-793-7277 Email: cluteenterprises@gmail.com • Primary Owner(s): Name(s): Larry Clute - President/Owner-Clute Enterprises, Inc. Mailing Address; C/S/Z: 6 Holden Ave.-Queensbury, NY 12804 Cell Phone: . Land Line: 618-793-7277 Email: cluteenterprises@gmail.com ® Check if all work will be,performed by property owner only • Contractor(s)': (List all additional contractors on the back of this form) Contractor Name(s): Larry,Clute - President/Owner- Clute Enterprises-Inc. Contractor Trade:General Contractor Mailing Address, C/S/Z: 6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land Line: 518-793-7277 Email: cluteenterprises@gmaii.com "Workers' Comp documentation must be submitted with this application" Workers'Comp Documentation already on file with Town of Queensbury, • Art hitect(s)/Engineer(s): Business Name: Contact Name(s):. . Mailing Address, C/S/Z: Cell Phone: Land Line: Email: Contact Person for Compliance in regards to this project: Cell Phone: Land Line:518-793-7277 Email: cluteenterprises@gmail:com Principle Structure Packet Revised March 2021 Y • CHECKLIST--SINGLE FAMILY Project Location: 25 Sunset Dr. Queensbury, NY 12804 REQUIRED-2SETS 1. Building Permit application,completed YES NO N/A 2. Energy Code inspector's report from.ResCheck, completed & © ❑ ❑ 3'. Septic alteration application, if applicable 0 ❑ ❑; 4. .Solid fuel•burning or gas insert appliance form(s), if applicable ❑ ❑ 5. - Driveway permit, if applicable [L ❑ ❑ 6. Structural drawings, including: a. Floor plans ❑ ❑ b. Foundation plans. ® , ❑ ❑ c. Cross sections ® ❑ ❑ d., Elevations ® .; ❑ ❑ e. .Window &door schedule'. ❑ ❑ f. Natural light,ventilation &emergency egress ❑ ❑ 7. Plot plan:"showing proposed structure(s)'with setback dimensions from all ® ❑ ❑ surveyed property lines 8. Electrical inspection agency selected Commonwealth ©, ❑ ❑ CHECKLIST--MULTI-DWELLING/COMMERCIAL Project Location:. REQUIRED-2SETS 1. Building Permit application, completed YES NO' N/A 2. Energy Code inspector's report from ComCheck, completed &siened 11 , ❑ ❑ 3. Septic alteration application, if applicable ❑ ❑ ❑ 4. Solid fuel burning or gas insert appliance form(s), if applicable ❑ ❑ ❑ 5. Drivewayy permit, if applicable ❑ ❑ ❑ 6. Structural drawings, including: a. Floor plans ❑ ❑ ❑' b. Foundation plans ❑ ❑ ❑ c. Cross.sections 0 ❑ ❑ d. Elevations El ❑ ❑ e. Design loads including floor,snow &wind load El El f. . Seismic design El ❑g. Plans-signed and sealed by registered architect or engineer h. Window &doo schedule El r 7. Plot plari: showing proposed structure(s)with setback dimensions from all ❑ ❑ ❑ surveyed property lines 8. Electrical inspection agency selected ❑ ❑ ❑ 9. FINAL AS-BUILT PLANS SUBMITTED ELECTRONICALLY Principle Structure Packet Revised March 2021 Office Use Only- Permit#: Permit Fee:$ 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www.aueensburv.net. Invoice#: Flood Zone? Y �N Reviewed By: SEPTIC DISPOSAL.PERMIT APPLICATION _ Project Location: 25 Sunset,Dr. Queensbury, NY 12804. Tax Map #: 295.19-1-61 RESIDENCE INFORMATION: New Construct 28'x 42'=Ranch Year.Built Gallons. #of bedrooms: X gallons per _ =total daily flow per day bedroom Garbage Grinder , Yes No 1980 or.older 150 Installed? (choose one) ❑ 1981-1991 130 Spa or Hot Tub Yes No Installed? (choose_'one) El . 1992=Present PARCEL INFORMATION: Topography ® Flat Rolling ❑_Steep.Slope %Slope. Soil Nature ©Sand ❑ Loam ❑Clay ❑ Other,explain: Groundwater . At what depth? Be'drock/Impervious At what depth? „ material Domestic Water Supply © Municipal ❑:Well ❑ Lake (if well or.lake, water, supply from any septic system absorption is Percolation'Test Rate: per minute per inch (test.to be completed by a licensed engineer/architect) PROPOSED SYSTEM INFORMATION: Tank size 1000 gallons (min:size 1,000 gallons, add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field w/#2 stone Total length 200 ft.; Each Trench U50 ft. Mtef native System Bed-ef-ethef-tyW. NOTES: 1.Ala'rm.system and associated electrical work must be inspected by a Town.;approved electrical inspection agency; 2. We will,no longer allow systems to be covered until such time as an as-built plan is received and approved.The installed system mu"st match the septic layout on file-no exceptions. 3. As- built drawings must be submitted prior to the inspection, if there has been a change to the submitted plans.. Principle Structure Packet Revised March 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL ®Check if all work will be performed by property owner only • Contractor: Contact Name(s): Lary Clute- President/Owner- Clute Enterprises, lnc., Contractor Trade: General Contractor Mailing Address, C/S/Z: 6 Holden=Ave. Queensbury,.NY 12804 Cell Phone: Land Line: 518-793J277 Email: cluteenterprises@gmail.coM **Workers' Comp documentation must be-.submitted-with'this application" • Enaineer(s): Name(s): Mailing Address, C/S/Z: Cell Phone: Land Line: Email: Contact Person.for Compliance in regards to this project: Cell Phone: Land Line: Email: Declaration: Any,permit or approval granted whicli is based upon or is granted in reliance upon any material representation or.failure to make a materialLfact or circumstance-known by or on behalf of an applicant,shall be void. I have read the regulations and agree to abide by these and all requirements of the,Town.of Queensbury Sanitary Sewage Disposal Ordinance. ; PRINT NAME: Larry Clute -.Clute Enterprises, Inc. SIGNATURE: DATE: 'Principle Structure Packet Revised March 2021 Town ofQueensbury . - '' David Duell Highway'Superintendent Highway 518-761-8212 Department Mark Benware 742 Bay Road Queensbury, NY .Deputy Highway Superintendent 12801 518-761-8210 Phone: (518) 761-8211 Fax: (518) 745-4466 . DRIVEWAY-PERMIT DATE: APPLICANT NAME: Larry Clute- President Clute Enterprises,Inc.'- TELEPHONE NO.: 518-703-7277 . 'Email: cluteenterprises@gmail.com ADDRESS TO BE INSPECTED: 25 Sunset Dr:Queensbury,NY 12804 RETURN ADDRESS: .6 Holden Ave.Queensbury,NY 12804 Applicant must show exact location and width of driveway(s) to be connected'to the'highway by placing stakes at.the specified location. The Superintendent of Highways of-the Town-of Queensbury..has reviewed this application. The following action has been taken: 'STEP 1: O`Preliminary Approval NEED: O Slight swale ( ) Deep Swale O Level with the road ( ) Level with the top of the paved wing -Size culvert pipe to be used (if necessary). O 12" O 15" O 18-' O,24" O 36" Preliminary inspection completed by: Date: Approval by Highway Supt: (or) Deputy.Supt: Upon completion; please resubmit this approved permit for a final approval,. STEP 2: . ( } Final Approval ( ) Rejected Date: David Duell, Highway Superintendent Mark Benware, Deputy Highway Superintendent = Principle Structure Packet Revised March 2021_ TOOT OF QUEENSBURY 742 Bay Road, Queensbury, NY. 12804-5902 FILE OPY Septic System Checklist Plan to scale Received Deep hole perc test results from engineer/Architect if applicable(Town Approved Engineers and Architects;June 30.to April 15 Town Engineer for unapproved Engineers and Architects) All wells on property and adjacent properties shownMvUAMl FA✓ -- *Water line shown Municipal or well 10'separation to any part of system Setback to property lines show 10'or more for any part of system Septic tank and pump stations 10'from foundation 50'from any well/lake/wetland 10'from any waterline MArSeptic tank to foundation crawl space/slab on grade,grade in crawl space must be above top of septic tank for 0',Separation required (field verification required) Septic tank sized for number of-bedrooms and add 250 gals for Jacuzzi tubs/garbage grinder each Leech Field 20'from foundation 100'.from any well 10'from water line , �14kSeepage pit 150'from well 50'from septic tank m4--Seepage Pits 3-times diameter apart ZSeptic tank and pump stations over 30 gallons 50'from watercourse or wetland Xdistance from bottom of trench or system 24"to bedrock or mottling 36"within 1000'of Lake George Leech field 100'from watercourse or wetland M" Toe of mound or bottom of retaining wall 10'from property line 100'from well 20'from Foundation Provide Engineer/Architect•stamp for bed or design systems MA-Department of Health Approval for all mobile home park new systems Flood Plain requirements n►t/ 2' above established flood elevation to bottom of system P&I tanks anchored or 2' above flood elevation ,F. Residential Plan Review: 1- and 2- Family Dwellings [FILE COPY Y/N/NA (1 of 2) Two )full sets of plans fio Over 1,500 sq. ft. requires engineering stamp Design loads on plans: 115 Wind Floor Loads 40 psf (North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas&Attics 30 psf Calculations Decks 40 psf Wind design for lake front properties � Window schedule with glass size & main doors/Air leakage < .5 cfm for doors, < .3 cfm for c windows/Tempered glass in bathrooms ` Door schedule/Main entrance 36" door Emergency Escape or Bedrooms & Habitable Space G � Above-grade: 5.7 sq. ft. +� Grade: 5.0 sq. ft. 24" (h)x 20" (w) minimum 44" maximum height above door G� Window control devices 24" or less 2"d story or 72" above grade l Egress window from basement 5.0 sq. ft. Floor system sizing per table 502.3.1 Residential check ERI or Prescriptive method Driveway length: 300' or more-12' width required/500' or more,turnaround required A4t? Foundation drainage on plans, if required 6" drop in 10' exterior grade IF- Framing cross section for each roof line, vertical fire stopping every 10' where required/joist spans pg. 127 Ice & snow shield-24"from exterior wall Platforms at exterior doors .14go Stairway headroom 6'8"; all stairs 36" width Stair run and rise jA Winder run and rise {� Spiral stairs meet requirements Smoke detectors—battery backup & proper location, interconnected !" ,,6-t .,/JQ-t\ Bathroom fixtures—proper clearance Hall width-36"width z Handrails more than four risers on open sides Railing&guards > 30"/basement stairs included/closed risers more than 4" in height Safety glazing notes for required areas Garage fire separation:%" gable end/5/8" under living space &%" on walls/20 min. door and closer Garage floor sloped Attic access: gasket seal & R-value equal to roof insulation -� lZfi2yl Roof over 30" -22" x 30"/Crawl spaces 18" x 24" access Residential Plan Review Revised March 2018 s� Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (2 of 2) Carbon Monoxide detector outside lowest sleeping area, on every level &interconnected within 15' of sleeping area � Soil test results, if required AbSeptic to well or water line separation All paperwork signed Note on plans energy saving light bulb Blower door test agency paperwork Aho Floodplain Permit required—check map: 2 feet above flood elevation Hurricane clips required Floors less than 2 x 10 covered by%" gypsum or 5/8" wood panel Manuals S &J required for heating system. Cold air return hard piped NASeparate room for draft HVAC or hot water heater with fresh air HRV shown and calculations Baffles at eaves for insulations and knee walls Makeup air for range hood >400 cfm ,C— r p� Continuous header for garage doors to end wall A4 jJ Chimney rain cap shown for fireplaces Deck hold down shown not less than 4 lags and bolts per table 507.2 Residential Plan Review Revised March 2018 Lando of Stophon Barton Lands of, Alfred Baloamo Lands of Juno Talley / \ U3 000 / 1 pQ.JO AO �+ m W \ �4 a \ N Lu J w ® N j N rr Cando of J (� = O Q Lemarr Young LJ' zJ pie �m -- --- -- -- - --�--- -=-- - 295.19-161 RC-0558-2021 Clute Enterprises Sunset Dr Single Family 1200 s.f., Gar. 400 s.f. Date,Juty Is,2021 a. Du S t, '"®`�'�s'�" Mnp of a Plot plan made.for' Scale 11-31Y 't,� .�aaioy®aiii . Steve s �"'""'°' r Clute Enterprises, Inc., �_i Land Surveyors -�� - :..� 169 Radland Road Qaeenebnt2,Now York 128" .,®... ®®®� Town of Qmowbnry,Warren Ca=117, New'ilbik- pulo (61B 702-8474 Now York Mo.No. 50135 NO. DATE DESCRIPTION ova NO. 295.19-1-61 C E E M JUL 2 2 2021 ,� �sh���� �� S.'r�MS. u� i� �{`� NY COPY Sizing and Selecting a Lifebreath HRV or ER Step 1:Follow.these general guidelines to determine the best HRV or ERV for your application Option 1:Size your Residential unit by Air Exchange(ac/hr)'Method Step 1 Step 2 L24qft(L x W)with 9' (H) ceiling , ac/hr=(Total Cubic Volume x.35)/60' volume=(L x W x H) or(2400 x 9)x..35/60min = 126cfm *In all cases local and all other codes requirements must be followed Option 2:Size your Residential_unit.using ASHRAE 62.2(Minimum requirement) Residential Ventilation Air Requirements(CFM/Bedrooms) Sizing A9 WMABLE 4.1a 1 ',, , Ft 3 4 5 Floor Area Sq.ft: ZA -` <Soo 30 z '45' - - 53 60 501-1000 454 68 75 1500- 6 60,E J :68, j, . ^Y:..F ;j - 83 90 1501-2000 75 83 90 98 105 2001-2500 90 98 105 113 120 2501-3000 105, 113 120 128 135 3001-3500 120 128 135 143 150 3501-4000 135 143 150 158 165 4001-5000 150., 1 159 165 173 - 180 5000-5001 165 1 173 1 180 188 .195 *In all cases local and all other codes requirements must be followed Size your Commercial u nit—Note it's recommended a mechanical engineer always be consulted. Application Occupant CFM/Person CFM/SQFT Comments Density/1000sgft Retail Stores 15 10 Classroom 25-35 15 Varies with age Offices 5 10 Conference Rooms 50 15 Hair/Nail Salons 25 20 Do not Undersize Pet Shops, 1 Physical Therapy 20 15 Bars/Lounges 100 10 Non-Smoking Health Clubs 40 20 Only.10/1000 in weight room *Swimming Pools ' 1-10 Varies greatly with temperature Places of Religion 120 5 r 7 / Generated by REScheck-Web Software Compliance .Certificate E-CEBV E Project 26x42 (1092YRANCH JUL 22 2021 Energy Code: 2018 IECC TOWN OF QUEENSBURY Location: Warren County, New York BUILDING &CODES Construction Type: Single-family ' Project Type: New Construction Orientation: Bldg. faces 180 deg. from North Conditioned Floor Area: 1,092 ft2 295.19-161 RC-055&2021 Glazing Area 12% Clute Enterprises Climate Zone: '. 6 (8499 HDD) � Permit Date: Sunset Dr l Permit Number: Single Family 1200 s.f., Gar. 400 s-f- Construction Site: , Owner/Agent: Designer/Contractor: 25 Sunset Dr undefined CLUTE ENTERPRISES, INC Queehsbury, NY 12804 6 HOLDEN AVE FILE COPY QUEENSB RY NY 12804 CLUTEENTERPRISES@GMAIL.COM LC ornpliance: Passes using UA trade-off Compliance: 3.60/6 Better Than Code Maximum UA: 165• Your UA: 159 The%Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Prop.Gross Area Cavity Cont. Req. Prop. Perimeter Ceiling 1: Raised or Energy Truss 1,025 38.0 0.0 0.025 0.026 26 27 Wall 1:Wood Frame, 16"o.c.Orientation: Front 200 19.0 0.0 0.060 0.045 9 7 Door 1: Solid 20 0.160 0.300 3 6 Orientation: Front Window 1:Vinyl Frame:Double Pane with Low-E 30 0.290 0.300 9 9 Orientation: Front Wall 2:Wood Frame, 16" ox, 328 19.0 0.0 0.060 0.045 17 13 Orientation: Left side Door 2: Solid 19 0.160 0.300 3 6 Orientation: Left side Window 2:Vinyl Frame:Double Pane'with Low-E 22 0.290 0.300 6 7 Orientation: Left side Wall 3:Wood Frame, 16"o.c. 200 19.0 0.0 0.060 0.045 12 9 Orientation: Back Wall 4:.Wood Frame, 16" o.c. 328 19.0 0.0 0,060 0.045 15 12 Orientation: Right side,• Door 3:'Glass 40 0.310 0.300 12 12 Orientation: Right side Window 3:Vinyl Frame:Double Pane with Low-E 30 0.290 0.300 9 9 . Orientation: Right side Project Title: 26x42 (1092) RANCH Reportrdate: 07/07/21 Data filename: Page 1 of10 Gross Area Cavity Cont. . . Prop. Perimeter Basement Wall 1: Solid Concrete or Masonry Orientation: Front Wall height: 7.8' 184 0.0 19.0 0.038 0.050 7 9 Depth below grade: 7.0' insulation depth: 7.8' Basement Wall 2: Solid Concrete or Masonry Orientation: Left side Wall height: 7.8' 306 0.0 19.0 0.638 0.050 12 15 Depth below grade: 7.0' Insulation depth: 7.8' Basement Wall 3: Solid Concrete or Masonry Orientation: Back Wall height: 7.8' 184 0.0 19.0 0.038 0.050 7 9 Depth below grade: 7.0' Insulation depth: 7.8' Basement Wall 4:Solid Concrete or Masonry Orientation: Right side Wall height: 7.8' 306 0.01 19.0 0.038 0.050 12 15 Depth below grade: 7.0' Insulation depth: 7.8' Compliance Statement. The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements-lis d in tivR check Inspection Checklist. LA Name-Titid Signatu Date Project Title: 26x42 (1092) RANCH _Report date: 07/07/21 Data filename: Page.2 of10 REScheck Software Version : REScheck-Web Inspection Checklist. Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in'the REScheck Requirements screen. For each requirement, the,user certifies that a code requirement will be met and'how that is documented, or that an:exception is'being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified ';. FieldVerifi'ed. #, Pre-Inspection/Plan Review Complies? Comments/Assumptions & Req.ID Value Value' 103.1, iConstruction drawings and ❑Complies 103.2 ,documentation demonstrate ❑Does Not [PRl]1 energy code compliance for the (gj building envelope.Thermal ❑Not Observable ; envelope represented on i ❑Not Applicable construction documents. { I 103.1, Construction drawings and ( I❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance-for [PR3]1 lighting and mechanical systems. ❑Not Observable ; j iSystems serving multiple ❑Not Applicable dwelling units must demonstrate ,compliance with the IECC (Commercial Provisions. 302.1, Heating and cooling equipment is; Heating: Heating: ;❑Complies 403.7 sized per ACCA Manual S based I Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA 1 tJ Manual J or other methods Btuu/hrg Btu/hr9 ❑Not Observable i :❑Not Applicable approved by the code official. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) , j,'3,,,l Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 07/07/21 Data filename: Page 3 of10 Sectiors Plans'Verified'. Field,Verifie�I• # FoureiJation Inspection Complies? ,. . Comments/Assumptions & Req.ID Value Value " 402.1.1 !Conditioned basement wall I R- R- ;❑Complies ;see the Envelope Assemblies [FO4]1 ;Insulation•R-value.Where interior: R_ R_ []Does Not table for values. {insulation is.used,verification 40) t may need to occur during ;❑Not Observable !'Insulation Inspection. Not i ❑Not Applicable !required in warm-humid locations in Climate Zone 3. 303.2 ;Conditioned basement wall ❑Complies [F05]1 insulation installed per ?: []Does Not manufacturer's instructions. jj❑Not Observable S❑Not Applicable 402.2.9 ;Conditioned basement wall ft ft ;❑Complies ;See the Envelope Assemblies [FO6]1 ;insulation depth of burial or :❑Does Not table for values. distance from top of wall, ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ; ❑Complies [FOii]z to protect exposed exterior j❑Does Not insulation and extends a, �J ❑Not Observable minimum of 6 in. below,grade. ; I I❑Not Applicable 403.9 Snow-and ice-melting system ❑Complies [F012]2 controls installed. E ❑Does Not []Not Observable ❑Not•Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) ;,•3 1 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH , Report date: 07/07/21 Data filename: Page 4 of10 Section PlansVerified' Field Verified # Framing%Rough-ln'Inspection Value Value Complies?`. Comments/Assumptions & Req.ID 402.1.1, j Door U-factor. U- ; U- ;❑Complies ;See the Envelope Assemblies, 402.3.4 ; !]Does Not ;table for values. [FR1]1 1 i ❑Not Observable 1❑Not Applicable 402.1.1, 1 Glazing U-factor(area-weighted ', U- ; U. ;❑Complies ;See the Envelope Assemblies 402.3.1, 1 average). '❑Does Not ;table for values. 402.3.3, 402.5 I ;❑Not Observable [FR2]1 ; ❑Not Applicable i i00 303.1.3 j U-factors of fenestration products !❑Complies [FR4]1 are determined in accordance 11:1Does Not with the NFRC test procedure or. r !taken from the default table. 1❑Not Observable ; 1 _ ❑Not Applicable 402.4.1.1 !Air barrier and thermal barrier f❑Complies (FR23]1 installed per manufacturer's y❑Does Not 1J instructions. J❑Not Observable I j❑Not Applicable 402.4.3 {Fenestration that is not site built I❑Complies [FR20]1 :is listed and labeled as meeting 1❑Does Not �� �AAMA/WDMA/CSA 101/I.S.2/A440 []Not Observable I or has infiltration rates per NFRC . 1400 that do not exceed code. ❑Not Applicable limits. 1 402.4.5 IC-rated recessed lighting fixtures i❑Complies (FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate :s cfm f leakage at 75 Pa. ❑Not Observable } 1❑Not Applicable 403.3.1 ;Supply and return ducts in attics ! ❑Complies [FR12]1 !insulated >= R-8 where duct is ❑Does Not I>= 3 inches in diameter and >_ R-6 where <3 inches. Supply and I❑Not Observable ; return ducts in other portions of ❑Not Applicable i Ithe building insulated >= R-6 for !diameter>= 3 inches and R-4.2 tfor< 3 inches in diameter. 403.3.2 Ducts, air handlers and filter j❑Complies [FR13]1 boxes are sealed with 1. 1❑Does Not !joints/seams compliant with U ;International Mechanical Code or ; ❑Not Observable International Residential Code, as f ❑Not Applicable j applicable. 403.3.5. Building cavities are not used as 10Complies [FR15P: ducts or plenums. i❑Does Not �'. ❑Not Observable ❑Not Applicable 1 403.4 i HVAC piping conveying fluids R- R- ;❑Complies [FR17]2 1above 105°F or chilled fluids 1 :❑Does Not i below 55°F are insulated to?R- ! 1 3 ; ; ;❑Not Observable ; ! :❑Not Applicable ! 403.4.1 ;Protection of insulation on HVAC i ;❑Complies [FR24]1 !piping. J❑Does Not ! 1❑Not Observable { # ONot Applicable 403.5.3 `Hot water pipes are insulated to R- R- ;❑Complies [FR18]2 ?R-3. ! 1 :❑Does Not i 1,❑Not Observable 1 1 1❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 07/,07/21 Data filename: Page 5 of10 Section 4. Plans Verified. ;,Field Verified # Framing./Rough-In Inspection; Complie's?, Comments/Assumptions & Req.ID Value, Value• 403.6 Automatic or gravity dampers are 10Complies [FR19]2 installed on all'outdoor air i❑Does Not i intakes and exhausts. #❑Not Observable I❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: •07/07/21 Data filename: Page 6 of10 Section Plaris Verified ' ,. Field Verified # Insulation Inspection'�, Complies?'. 'Comments/Assumptions & Req.ID Value Value 303.1 All installed insulation is labeled I 1 ❑Complies [IN13]2 or the installed R-values .' !❑Does Not provided. f {❑Not Observable J❑Not Applicable 402.1.1, (Wall insulation R-value. If this is a j -R- R- ;❑Complies' ;See the Envelope Assemblies 402.2.5, mass wall with at-least 1/2 of the ❑ Wood ;.❑ Wood ;❑Does Not table for values. 402.2.6 !wall insulation on the wall [IN3]1 !exterior,the exterior insulation: Mass 1 Mass ;❑Not Observable 0) ;requirement applies(FR10). j❑ Steel ❑ Steel !❑Not Applicable ' 303.2 ;Wall insulation is installed per ❑Complies [IN4]1 !manufacturer's instructions. []Does Not I❑Not Observable I❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) •,3 Low impact(Tier 3) � . Project Title: 26x42 (1092) RANCH Report date: 07/07/21 Data filename: Page 7 of10 . Section Plans.Ve"rifled Pield'Verified;,; #'.:. Final Inspection Provisions Compli'es2 .' Comittents/Assumptions & Re•q.ID 'Value Value • , 402.1'1, ;Ceiling insulation R-value. R- R- ;❑Complies ;See the Envelope Assemblies 402.2 1, 1 ❑ Wood ;❑ Wood !❑Does Not ;table for values. 402.2.2, i 402.2.E I ;❑ Steel ❑ Steel ;❑Not Observable ; [Fill' ; ENot Applicable 303.1.1.1,!Ceiling Insulation installed per j + . ❑Complies 303.2 !manufacturer's instructions. 1❑Does Not [FI2]' I Blown insulation marked every i 300 ft2. : []Not Observable ; I ( ❑Not Applicable 402.2.3 Vented attics with air permeable f ElComplies [F122]2 insulation include baffle adjacent €. I❑Does Not to soffit and eave vents that i extends over insulation. ;❑Not Observable ; I ;❑Not Applicable 402.2.4 f Attic access hatch and door R- ; R- ;❑Complies [FI31' I insulation ;-R-value of the 1 ❑Does Not adjacent assembly. ;❑Not Observable ; ❑Not Applicable 402.4.1.2 j Blower door test @ 50 Pa. <=5 ACH 50 = ; ACH 50 = ;❑Complies [FI17]1 lath in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.3.3, j Ducts are pressure tested to ; cfm/100 cfm/100 ;❑Complies [FI27]' ;determine air leakage with ftz I ft2 ❑Does Not jeither: Rough=in test:Total :[--]Not Observable 'leakage measured with a ; pressure differential of 0.1 inch ; ;❑Not Applicable iw.g. across the system including (the manufacturer's air handler ►enclosure if installed at time of ; test. Postconstruction test:Total < I leakage measured with a pressure differential of 0.1 inch Ew.g, across the entire system I ('including the manufacturer's air I handler enclosure. ; 403.3.4 !Duct tightness test result,of<=4 cfm/100 cfm/100 ;❑Complies [FI4]' cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ;[]Not Observable I :❑Not Applicable ,tests,verification may need to I occur during Framing Inspection. 1 403.3.2.1 !Air handler leakage designated 111Complies [FI24]' by manufacturer at<=2%of ❑Does Not (design air flow. ❑Not Observable { I,❑Not Applicable 403.1.1 Programmable thermostats ; . I❑Complies. [FI9]2 installed for control of primary ❑Does Not heating and cooling systems and initially set by manufacturer to I []Not Observable code specifications,. ; f❑Not Applicable ; 403.1.2 !Heat pump thermostat installed ;❑Complies [FI10]2 on heat pumps. f❑Does Not bNot Observable ElNot Applicable 403.5.1 (Circulating service hot water ; j❑Complies [Fill]2 Isystems have automatic or ❑Does Not j accessible manual controls. []Not Observable t ❑Not Applicable i 1 High Impact(.Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 07/07/211 Data filename: Page 8 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.l® 403.6.1 All mechanical ventilation system' ;❑Complies [FI25]2 i fans not part of tested and listed i❑Does Not HVAC equipment meet efficacy 1 []Not Observable and air flow limits per Table i ❑Not Applicable R403.6.1. ` able 403.2 Hot water boilers supplying heat ;❑Complies [FI26]2 through one-or two-pipe heating 1 i❑Does Not i systems have outdoor setback i ) }control to lower boiler water ( 1❑Not Observable (temperature based on outdoor } !❑Not Applicable �temperature. i ? 403.5.1.1 Heated water circulation systems I ❑Complies [FI2812 have a circulation pump,The i 10Does Not I system return pipe is a dedicated 1 1 return pipe or a cold water supply 1 ❑Not Observable pipe, Gravity and thermos- I I❑Not Applicable syphon circulation systems are I not present.Controls for y circulating hot water system ; pumps start the pump with signal for hot water demand within the loccupancy.Controls ; automatically turn off the pump when water is in circulation loop is at set-point temperature and 4 no demand for hot water exists. 403.5.1.2 Electric heat trace systems { I❑Complies [FI29]2 comply with.IEEE 515,1 or UL I T❑Does Not 515.Controls automatically I !adjust the energy input to the ![]Not Observable heat tracing to maintain the `❑Not Applicable !desired water temperature in the piping, ; 403.5.2 i Demand recirculation water )[]Complies [F130]2 ;systems have controls that I❑Does Not i manage operation of the pump and limit the temperature of the )❑Not Observable ;water entering the cold water i❑Not Applicable {piping to <= 1049F, 403.5.4 Drain water heat recovery units j❑Complies [FI31]2 tested in accordance with CSA i �❑Does Not B55.1. Potable water-side 11!❑Not Observable pressure loss of drain water heat i❑Not Applicable recovery units < 3 psi for PP individual units connected to one !or two showers. Potable water- aside pressure loss of drain water ; heat recovery units< 2 psi for individual units connected to 1 ,three or more showers, ! 404.1 ;90%or more of permanent i❑Complies [FI6]1 `fixtures have high efficacy lamps.! j❑Does Not !' 1❑Not Observable j !❑Not Applicable 404.1.1 Fuel gas lighting systems have !❑Complies [FI23]3 no continuous pilot light. f ❑Does Not ❑Not Observable !❑Not Applicable 401.3 Compliance certificate posted. 1 10Complies [F[7]2 f PDoes Not +J '❑Not Observable 1 f❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 07/07/21 Data filename: Page 9 of10 Section Plaiis Verified `:'•Field Verifietl;'-` 4t FinallnspectiomProvisions Complies?•. Comments/Assumptions & Req.ID Value V I' e 303:3 Manufacturer manuals for { " 113c6mplies [FI18]3 mechanical and water heating ;• ;❑Does Not systems have been provided.' P ' ''" ❑Not Observable ; ❑Not Applicable Additional Comments/Assumptions: 1 JHlgh Impact(Tier 1) 2 Medium Impact(Tier 2) TI Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 07/07/21 Data filename: Page 10 of10 2010 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 19.00 Below-Grade Wall 19.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0.29 0.70 Door 0.32 MO CoolingHeating & Heating System Cooling System: Water Heater: Name: Date: Comments ! EMS HVAC Load Calculator JUL 2 2 2021 �www.hvacloadcalculator.com TOWN OF QUEENSBURY BUILDING&CODES Date: Tue Jul 6 Loaded Document: gf info Welcome - GFOIL 2021 12:20pm , Co pany Info Client Information Company EG�HE ING OIL LLC� Name CLUTE ENTERPRISES/25 SUS - I :ap Preparer l IRg AN NELSON Address1 CLUTE ENTERPRISES 6 HOLE I I I Phone (518) 792-2220 Address2 Email Address3 brianCgfheatingoil.com i � I � f Phone 295.19-1-61 RC-0558-2021 Email I f Clute Enterprises Sunset Dr Date Single Family 1200 s.f., Gar. 400 s.f. 07-Jul-2021 =_ This HVAC load calculation has been performed usin g sound engineering princi les as prescribed- by Manual J eighth edition and ASHRAE Handbook of Fundamentals. Duct sizing has been performed as prescribed by Manual D. - 1 i I 1. Design Conditions(Temp. F) O Check If Using Celcius INDOOR OUTDOOR TEMP Front of DIFF Building is South � WINTER 70 —` 0 Facing 90 _ � 0 J j Total 1200 Sq.Ft SUMMER 65 95 30 Conditioned Area l I I 2. Summer Humidity Moderately H v 40 Grains i Difference ii 1 ! ! 3. How Tight is Structure ! Average-under 1500 Sq. Ft. Winter Summer Air/Changes/Hr. j I I J 14. Fireplace Evaluation I + Number Evaluation CFM ` I none No Fireplace f j I 5. Number of Occupants generally equals number of bedrooms + 1 I I I j Overhang Characteristics Enter all measurements decimally -� ? _.1 7"=.5 j -YYVP2fi7 Rq ' 3h 5fl 3R 2�x=.2 8ix=-7 jw. #� — = 4 5"=-4 11"=A { 5-x=_3 I Example-F ft.8 in.=2.7 � I 1 i EAST WEST' S/SE/SW N/NE/NW Distance of OH from top of 1.6 1.6 1.6 1.6 window (A) Length of overhang (B) 1.6 1.6 1.6 F1.6 Total linear ft. across top of 4 6 9 6 windows located below overhang I Solar GainThrough Glass O Check this box if using manufacturer specifications and enter the latitude, U-value and ' SHGC i Latitude 45 U- SHGC Value I � , Facing Area(sq ft) Type Glass HTM Unshaded Shaded BTUH North or 24 Double .. 24.00 0 47 1,129 Shaded i i NE/NW 10 0.00 0 0 0 I South 57 Double 40.00 34 23 1,358 SE/SW 0 0.00 0 0 0 1 r i East 33 Double 75.00 33 0 2,475 t i West 10 Double l 75.00 10 0 750 Does glass have reflective L No1 5,712 j i coating? Skylight 150 0 fI 0 Clear I Total 5,712 j Solar Gain i i I I i I i I DUCTS OR PIPES Location(Heating) Conditioned are ..j Duct 0.00 j Loss Location(Cooling) Conditioned are .. Duct 0.00 Gain i I Duct/Pipe Insulation I Duct Leakage i Area of Attic or j 0 I Floor Where Duct is I� j Located Attic Temperature(If J ducts located in � attic) 1 { Load Calculation i j Elements of Load Area or Lin. Insulation/R- U- Heat Heat Gain Latent Ft value Value Loss Btuh Btuh I Btuh { i Solar Gain from 5,712 I i Glass Gross Wall 1296 j I I Glass 1 124 Double .. 0.56 6,250 � f , I j i Skylight 0 0.00 0 Doors 2 Insulate .. 0.40 72 24 i Net Wall 1,170 R-21 0.07 6,845 2,282 j I J Ceiling 1196 R-38 0.03 2,799 1,399 Floor I Over Crawl or 0 R-19 ., 0.05 0 0 Unheated Basement i ! I Open-Beach 0 � 0.00 0 0 House Above Carport Slab On Grade - Flo No Insul ..1 0.80 0 0 enter-linear ft Infiltration-Enter 19136 31,574 5,262 cubic-ft of building I I ! People 690 600 Appliances O Q Enter I Value i i I ! I Sub Total 47,539 15,373 I ( I Duct 0 0 441 s I Loss/Gain J Total Sensible 47,539 15,373 Load I I Latent Load 4,337 i Total Latent 5,379 1 Load i SUMMARY f i Heating Load Sensible Cooling Latent Cooling Total Cooling Load *Nominal Tons 47,539 15,373 5,379 20,751 1.71 i OUTDOOR AIR FLOW RATE 34.5 ' * CAUTION - The cooling capacity of the air conditioner must meet both, sensible and latent loads. It is recommended a Manual S calculation be performed. Using manufacturer's specs. The nominal tons assume .75 SIT ratio at the chosen outdoor design temperature. I i i Summary Including Basement Heating Load Sensible Cooling Latent Cooling Total Cooling Load Nominal Tons I 58,955 19,363 6,755 26,118 2.15 i I Whole House (Block Load) Completed Scroll to top For Additional Options 4 � I Solar Gain Through Glass I i O Check if Using Manufacturer specs i Latitude 40 U- SHGC j Value I � I ! ,l Facing Area(sq ft) Type Glass HTM BTUH i North or 16 � Double 24.00 384 � ` Shaded i j ! NE/NW 0 0.00 0 South 0 Single 50.00 0 SE/SW 0 0.00 0 East 0 Double—_ 75.00 0 West 16 Double ., 75.00 1,200 Does glass have reflective coating? No 1,584 i t i j Total Solar 1,584 Gain i Basement Load Calculation Elements of Area or Lin. Insulation/R- U- Heat Heat Gain Latent I Load Ft value Value Loss Btuh Btuh Btuh Solar Gain From 1,584.00 ! Glass I ; - Gross Wall Above 288 jGrade f j Glass 1 32 Double .• 0.56 1',613 I Doors 0 0.00 0 0 f INet Wall-Above 256 0.04 968 323 R-25 Grade I Wall Below Grade 864 FR-197-1 0.03 2,333 778 ! Ceiling 0 R-21 .. 0.04 0 0 I Floor 1196 0.02 2,583 2,583 i Infiltration-Enter 950� 3,919 1,306 j cubic-ft of I building j People 0 0 0 ` f Appliances l 1 I i I Total Sensible 11,415 3,990 j Load Latent Load 1,077 Total Latent 1,377 I i Load i i I i Basement Summary i Heating Load Sensible Cooling Latent Cooling Total Cooling Load *Nominal Tons 11,415 3,990 1,377 5,067 0.44 i i i * CAUTION - The cooling capacity of the air conditioner must meet both, sensible and latent loads. It is recommended a Manual S calculation be performed. Using manufacturer's specs. The nominal tons assume .75 SIT ratio at the chosen outdoor design temperature. I 4 i Room by Room Load Calculation Total House Total House System CFM ___.._ . ....... Cooling Heating i Heat Loss Sensible Heat 0 0 f' Gain I 58,955 _..._..- ... ..... .... .. __. 19,363 1 , +Add-Room Room HeatLoss HeatGain CFM_Heat CFM_Cool Name I : :Check-Calculations-When-Completed i - auto- 11,415 3,990 0 0 basement Totals: 11,415 3,990 0 0 i Percent Of Original: 19% 20% I i I Round to Rectangle Conversion Calculator(Optional) Enter Round Side A (Inches) Side B (Inches) Diameter ! 0 [0: -- -- I I Duct Sizing i Use heating or cooling Type of duct,material j cfm — Determine Friction Rate (see f instructions) Total measured length of duct I g 0 f I Total equivalent length of �0 — fittings Available static pressure for 0 I duct I Enter Friction Rate: I O Calculate Friction Rate Supply Trunk or branch cfm duct air dia vel I j First section off AH 0 1st reduction or branch L j I ! _— I grid reduction or branch I 3rd reduction or branch Fo 4th reduction or branch 5th reduction or branch lI I I ! Return Trunk or branch cfm duct air i dia vel I First section off AH 0 , { { 1st reduction or branch 0 ! I 2nd reduction or branch 0 I 3rd reduction or branch 0 i 4th reduction or branch FO ; 5th reduction or branch 0 i Basement supply and return 0 I ! trunk I Room Runs cfm no of outlet duct air outlets cfm dia vel auto-basement 0 0 f I { ! i Duct Sizing Completed Scroll to top For Additional Options I I Equipment selection as per Manual S Instructions: enter load, weather and manufactures data in white cells j I { 12 Auto Complete I I i BTU H ! ! f Total Heat Loss 1589�- 55 Design Outdoor Indoor i Conditions Total Heat Gain -20 70 I .+ 25818 ` I 1 - Sensible Heat I 1 39 63 95 65 I �—--�— i Gain I i i r I Latent Heat 6,455 ID Design RH 50%, 63F WB Gain Sensible/Total 0.75 Altitude 344 ! + Ratio i target clg Temp. 21 Predominantly Heating climate Drop I j Manufactures Equipment Specifications Equipment Manufacturer Model BTUH Total Sensible Latent No output(heating) cooling BTUH BTUH BTUH @ i i ( OD design temp � I Furnace — K9! ,t-RUUD 70000 V_ l C C)7 V i Boiler 0 0 I � I Heat Pump RUUD RA 6 24000 024000 or Air Conditioner Evaporator RUUD RCS Coil Air Handler Total 69036.8 23876.16 0 23876.16 Capacity with Altitude a Correction Selected OK OK UNDERSIZED OK Equipment Size 1. Heating CFM Cooling CFM External Static Pressure of (recommended) Blower I ' 1200 0 Fo I Available static presure for Supplemental heat needed for heat duct system pump j Blower ext. 0 HP capacity C 0 I static press 47F Coil press 0 HP capacity @ 0 drop* 17r , C ! Filter press 0 HP capacity @ 0 j drop* ODDT I I Register 0 BTUH 58,955 press drop supplemental I I heat Grille 0 Pressure KW 17 j Drop supplemental I I _ heat Other Fo Other ( 0 Other 0 I Available SP 0 for duct I � I Equipment Size Limits Air conditioner-heat Pump Furnace Boiler Cool Climate Heat Climate output output Maximum Size 29,691 32,273 82,536 82,536 { I j Selected Size OK OK OK OK s, EC [ED RE) SLA-n5`A v-r Q�EENs6 rovvty OFQu eeY14)a(L N`( URY BUILDING& CODES Sizing and Selecting a Lifebreath HRV or ERV Step 1:Follow these general guidelines to determine the best HRV or ERV for your application Option 1:Size your Residential unit by Air Exchange(ac/hr) Method Step 1 Step 2 F2400scift(L x W)with 9' (H) ceiling. ac/hr=(Total Cubic Volume x.35)/60 bic volume= (L x W x H) or(2400 x 9)x.35/60min = 126cfm *In all cases local and all other codes requirements must be followed Option 2:Size your Residential unit using ASHRAE 62.2(Minimum requirement) Residential Ventilation Air Requirements(CFM/Bedrooms) Sizing A9 W6221ABLEa.1a 1 r. i3 4 5 Floor Area Sq.% 4 <500 30 1,451 - 53 60 501-3000__ 45 _ j 3f 601_ 68 75 1001-1500�------—60- 68 �� 83 90 1501-2000 75 83 90 98 105 2001-2500 90 98 105 113 120 2501-3000 105 113 120 128 135 3001-3500 120 128 135 143 150 3501-4000 135 143 150 158 165 4001-5000 150 159 165 173 180 5000-5001 165 173 1 180 1 188 1 195 *In all cases local and all other codes requirements must be followed Size your Commercial u nit—Note it's recommended a mechanical engineer always be consulted. Application Occupant CFM/Person CFM/SQFT Comments Density/1000sgft Retail Stores .15 10 Classroom 25-35 15 Varies with age Offices 5 10 Conference Rooms 50 15 Hair/Nail Salons 25 20 Do not Undersize Pet Shops 1 Physical Therapy 20 15 Bars/Lounges 100 10 Non-Smoking Health Clubs 40 20 Only 10/1000 in weight room *Swimming Pools 1-10 Varies greatly with temperature Places of Religion 120 5 •FURNACES•BOILERS-AIR CONDITIONING Ph. 518.792.2220 •PROPANE•#2 FUEL OIL•KERO•DIESEL ' FX. 792-8999 •INSTALLATION•SERVICE 1 ' ' I ' I WWW•gfheating0ll.COm DATE: nn,, '�,•I JOB NAME/LOCATION: PH: BILL TO: Ux -e -Z),e FX: (� p evi Av T�Y CELL: rt _' rA ��-�® EMAIL: Quotation and Contract l AV, Go 2� �Actit)�� �� p E C E [E JUL 2 2 2021 Need Supplemental Heat? Visitus at............................... TOWN OF QUEENSBURY ff.�4_FTFETVGM BUILDING&CODES 518.798-2220 •Fireplaces•Stoves•Inserts If you have any questions,please call, •Gas•wood•Pellet•coal Sincerely,Brian S.Nelson www.firstfiamefireplaces.com TOTAL COST OF PROPOSAL AS DEFINED ABOVE:$ WARRANTY=i YEAR PARTS&LABOR+MFR.WARR.TERMS.50%Deposit required upon signing before equipment is ordered.Balance due upon completion of job.ANY CHANGE FROM THE ABOVE DEFINED PROPOSAL-MAY INCUR EXTRA COST/CHARGESIMATERIALS& OR LABOR AND WILL BE DUE AND PAYABLE UPON COMPLETION.QUOTE VALID FOR 30 DAYS.WARRANTY VALID ONLY WHEN PAID IN FULL.In the event of nonpayment our team may stop work until payment is made.All legal fees,and finance charges incurred will be the responsibility of the customer.Customers shall hold contractor completely harmless,and shall indemnity,contractor fee,all costs,damage,losses and expenses,including judgments and attorney fees,resulting from �� any claim against this job. RECEIVED:$ CACK+ VISA MC+ EXP PIN ACCEPTANCE:I HEREBY ACCEPT THE ABOVE DEFINED PROPOSAL ITEMS,PRICES,AND SPECIFICATION. VISA PRINT NAME SIGNATURE DATE �E lAiere iVllll[�• `SKUTTLE ® MITSUBISHI TANREESS WATIR NIATIRS ��, �,,,,,IL ®"IL ELECTRIC MUD RO WERAELAW Cooling and Heating Solutions 0 v E NOV 2021 ,LIE.E�MURY- COWPAIMNUT' ,,'--.-VELOPNlENZJ -Ab LT