Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
RC-0630-2021
q r Office Use Only PRINCIPLE STRUCTURE PERMIT APPLICATION Permit#: -•' )0 ' 24'Z Permit Fee:$ 2610 . ID5 742 Bay Road,Queensbury, NY 12804 *Rec Fee:$ P: 518-761-8266 www.queensbury.net Invoice#: 4� •J Flood Zone? Y ( Reviewed By: Project Location: 37 Howard St. Queensbury, NY 12804 Tax Map #:301.20-1-24 Subdivision Name: *RECREATION FEE$1000.00 for new dwelling units: single family, duplexes/two-family, multiplefamily, apartments,condominiums, townhouses,ar NYS Building Standards red home. ETc This is in addition to the permit fee(s). 7in E 9 V E PROJECT INFORMATION: AUG 2 4 2021 ® Residential ❑ Commercial, Proposed Use: TOWN OF QUEENSBURY BUILDING&CODES ® Single-Family: ❑Two-Family ❑ Multi-Family(#of units: ) I. ❑custom Raised-Ranch Home 2. ❑Modular(REQUIRED:NYS stamped engineered drawings of foundation plans) ❑Townhouse ❑ Garage (#of cars ) ❑ Business Office ❑ Retail ❑ Hotel/Motel ❑ Industrial ❑ Heated Warehouse/Storage Building ❑ Unheated Warehouse/Storage Building ❑Amusement Ride ❑ Other(describe: ) MAIN STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 11T floor: 26'x32'- 819sgft 11T floor: 2"d floor: 2"d floor: 3rd floor: Total square feet: Basement(habitable space): Unfinished Total square feet: 819sgft Principle Structure Packet Revised March 2021 i ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ $160,000 2. Proposed use of the building: Single-family residential home, primary residence 3. If Commercial or Industrial, indicate the name of the business: 4. Source of Heat: © Gas ❑ Oil ❑ Propane ❑Solar ❑ Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application,one per appliance) 5. Are there any structures not shown on the plot plan? ❑YES © NO Explain, if yes: 6. Are there any easements on the property?❑ YES ® NO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? .34 Acre b. Is this a corner lot? []YES ® NO c.Will the.grade be changed as a result of the construction? ❑✓ YES [] NO d.What is the water source? © PUBLIC [] PRIVATE ❑ WELL e.What type of wastewater system is on the parcel? ❑ SEWER © PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances, and in conformance with local zoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. 1 also understand that I/we are required to provide an as-built survey by a NYSlicensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: P R I NT NAME: Larry Clute - President/Owner- Clute Enterprises, Inc. SIGNAURE: DATE: �le Structure Packet Revised March 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): Larry Clute - President/Owner-Clute Enterprises, Inc. Mailing Address, C/S/Z: 6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land Line: 618-793-7277 Email: cluteenterprises@gmail.com • Primary Owner(s): Name(s): Larry Clute- President/Owner- Clute Enterprises, Inc. Mailing Address, C/S/Z: 6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land Line: 618-793-7277 Email: cluteenterprises@gmail.com ® Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contractor Name(s): Larry Clute - President/Owner- Clute Enterprises, Inc. Contractor Trade:General Contractor Mailing Address, C/S/Z: 6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land Line: 618-793-7277 Email: cluteenterprises@gmail.com **Workers' Comp documentation must be submitted with this application** • Architect(s)/Ennineer(s): Business Name: Contact Name(s): Mailing Address, C/S/Z: Cell Phone: Land Line: Email: Contact Person for Compliance in regards to this project: Cell Phone: Land Line:518-793-7277 Email: cluteenterprises@gmail.com �ciple Structure Packet Revised March 2021 CHECKLIST--SINGLE FAMILY Project Location: 37 Howard St.Queensbury, NY 12804 REQUIRED-2SETS 1. Building Permit application, completed YES NO N/A 2. Energy Code inspector's report from ResCheck,-completed &signed ® ❑ ❑ 3. Septic alteration application, if applicable © ❑ ❑ 4. Solid fuel burning or gas insert appliance form(s), if applicable I EZ 5. Driveway permit, if applicable ❑ ❑ 6. Structural drawings, including: a. Floor plans ® ❑ ❑ b. Foundation plans ❑ ❑ c. Cross sections © ❑ ❑ d. Elevations ❑ ❑ e. Window&door schedule ® ❑ ❑ f. Natural light,ventilation &emergency egress ® ❑ ❑ 7. Plot plan: showing proposed structure(s)with setback dimensions from all ❑ ❑ surveyed property lines 8. Electrical inspection agency selected ❑ ❑ ❑ CHECKLIST--MULTI-DWELLING/COMMERCIAL Project Location: REQUIRED-2SETS 1. Building Permit application, completed YES NO N/A 2. Energy Code inspector's report from ComCheck, completed&signed ❑ ❑ ❑ 3. Septic alteration application, if applicable ❑ ❑ ❑ 4. Solid fuel burning or gas insert appliance form(s), if applicable ❑ ❑ ❑ 5. Driveway permit, if applicable ❑ ❑ ❑ 6. Structural drawings, including: a. Floor plans ❑ ❑ ❑ b. Foundation plans ❑ ❑ ❑ c. Cross sections ❑ ❑ ❑ d. Elevations ❑ ❑ ❑ e. Design loads including floor,snow &wind load ❑ ❑ ❑ f. Seismic design ❑ ❑ ❑ g. Plans signed and sealed by registered architect or engineer ❑ 1-1 El h. Window&door schedule ❑ ❑ 7. Plot plan: showing proposed structure(s)with setback dimensions from all ❑ ❑ ❑ surveyed property lines S. Electrical inspection agency selected ❑ ❑ ❑ 9. FINAL AS-BUILT PLANS SUBMITTED ELECTRONICALLY Principle Structure Packet Revised March 2021 NATURAL LIGHT,VENTILATION &EMERGENCY EGRESS CALCULATION SHEET (please complete if details are not provided on plans) Details provided on submitted buildhig-pJo Project Location: 37-Howard St.Queensbury,NY 12804 Primary Owner (s): Clute Enterprises, Inc. Habitable Sq. Ft. Required Actual Required Actual Sq. ft. Rooms of Light Light Ventilation Ventilation opening Room 8% of rm. (sq. ft. 4% of room (sq. ft. for Egress Living 184 15 24 8 12 5.73 Bed 1 121 10 12 5 6 5.73 Bed 2 130 11 12 6 6 5.73 Principle Structure Packet Revised March 2021 WINDOW SCHEDULE CALCULATION SHEET (please complete if details are not provided on plans) Details provided on submitted building-ajap Project Location: 37 Howard St.Queensbury, NY 12804 Primary Owner (s): Clute Enterprises,Inc. Habitable Rooms Living Bed 1 Bed 2 Kitchen Base Base Window#/letter On Plan Manufacturer Name Model/Type Unit/Block# Cell Size Rough Opening Width 37" 37" 37" 31" 37" 49" Sq. Ft. Vent 5.73 5.73 5.73 2.64 3.44 6.47 Sq. Ft. Egress/ Clear Opening 5.73 5.73 5.73 2.64 3.44 6.47 Clear Opening- Width in inches 33.75" 33.75" 33.75" 27.75" 33.75" 20.5" Clear Opening- Height in inches 25" 25" 25" 12" 13" 45.5" Special Hardware or instructions U-Valued Principle Structure Packet Revised March 2021 Office Use Only Permit#: Permit Fee:$ 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www.aueensbury.net Invoice#: Flood Zone? Y N Reviewed By: SEPTIC DISPOSAL PERMIT APPLICATION Project Location: 37 Howard St.Queensbury, NY 12804 Tax Map#: 301.20-1-24 RESIDENCE INFORMATION: New construct 26'x 32'Raised-Ranch Year Built Gallons #of bedrooms: X gallons per =total daily flow per day bedroom Garbage Grinder Yes No 1980 or older 150 Installed? (choose one) ❑ 1981-1991 130 Spa or Hot Tub Yes No Installed? (choose one) 1992-Present 110 PARCEL INFORMATION: Topography ® Flat Rolling ❑ Steep Slope %Slope Soil Nature ©Sand ❑ Loam ❑Clay ❑ Other, explain: Groundwater At what depth? Bedrock/Impervious At what depth? material Domestic Water Supply ® Municipal ❑Well ❑ Lake (if well or lake, water supply from any septic system absorption is ft.) Percolation Test Rate: ; per minute per inch (test to be completed by a licensed engineer/architect) PROPOSED SYSTEM INFORMATION: Tank size 1000 gallons (min. size 1,000 gallons, add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field w/#2 stone Total length 150 ft.;.Each Trench 2x50 ft. Seepage net.../s Alternative �_ Sys-tellBed er ether type t -y- ' Y�'L7ITCI7'IT.� i NOTES: 1. Alarm system and associated electrical work must be inspected by a Town approved electrical inspection agency; 2. We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file—no exceptions. 3. As- built drawings must be submitted 'prior to the inspection, if there has been a change to the submitted plans. Principle Structure Packet Revised March 2021 i d i f CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL ❑ Check if all work will be performed by property owner only • Contractor: Contact Name(s): Larry Clute - President/Owner- Clute Enterprises, Inc. Contractor Trade: General Contractor Mailing Address, C/S/Z: 6 Holden Ave. Queensbury, NY 12804 Cell Phone: Land Line: 518-793-7277 Email: cluteenterprises@gmail.com **Workers' Comp documentation must be submitted with this application** • Eneineer(s): Name(s): Mailing Address, C/S/Z: Cell Phone: Land Line: Email: Contact Person for Compliance in regards to this project: Cell Phone: Land Line: Email: Declaration: Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: Larry Clute - Clute Enterprises, Inc. SIGNATURE: DATE: Q`/T2/qG Principle Structure Packet Revised March 2021 Office Use Oniy ACCESSORY STRUCTURE Permit#: 1,-d 20 21 _ r Town ofQe nsbiuy PERMIT APPLICATION permit Fee:$ 742 Bay Road;Queensbury,NY 12804- Invoice 0.:518-761-8256' www.aueensbury.net. Flood Zone? Y N Reviewed By: Project Location:6� Tax Map ID#: uhdivi'sion ame, �f - PROJECT INFORMATION:FrORMATION: TYPE: Residential. ❑ Commercial, Proposed Use: STRUCTURE: ❑ Boathouse(with or w/o sundeck) ❑ Canopy [:] Carport ❑ Cell Tower ❑Deck ❑ Detached Garage(>300 s.f.): ❑_Dock ❑Gazebo 13 Pavilion ❑ Pole Barn ❑ Porch [] Ramp ❑ Shed(<30U s.f.) ❑Solar.Panels(w/o rafter upgrades) ❑.3-Season Porch ❑ Other: SQUARE FOOTAGE OF STRUCTURE: 1st floor: 2nd.floor: Total square feet:_ Ise `Q Brief description of scope of-project: Accessory Structure Application Revised January 2021 rl ti = ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of construction:$ g0l OHO 2. Are there any structures not shown on the plot plan? DYES 1O Explain: 3. Are there any easements on the property? ❑YES XINO DECLARATION: 1. 1 acknowledge that no.construction shall,be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Anythanges to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.,After 1 year,from the initial application date, 100%of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application; plans.and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes,,local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor ofall newly constructed facilities prior to-issuance of a certificate of occupancy. I have read and agree to the abov PRINT NAME: SIGNATURE: DATE: L , Accessory Structure Application Revised January 2021 Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (1 of 2) Two (2)full sets of plans Over 1,500 sq.ft. requires engineering stamp Design loads on plans: 115 Wind Floor Loads 40 psf (North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas &Attics 30 psf Calculations Decks 40 psf Wind design for lake front properties Window schedule with glass size & main doors/Air leakage < .5 cfm for doors, < .3 cfm for windows/Tempered glass in bathrooms tS Door schedule/Main entrance 36" door Emergency Escape or Bedrooms & Habitable Space t,l Above-grade: 5.7 sq. ft. Grade: 5.0 sq. ft. �(-t,-3 24" (h)x 20" (w) minimum y---s 44" maximum height above door (1'eS — Window control devices 24" or less 2"d story or 72" above grade �S = Egress window from basement 5.0 sq. ft'. Floor system sizing per table 502.3.1 Residen ial check ERI or Prescriptive method Driveway length: 300' or more-12' width required/500' or more,turnaround required � Foundation drainage on plans, if required 6" drop in 10' exterior grade Framing cross section for each roof line,vertical fire stopping every 10'where 'Q, 5 required/joist spans pg. 127 `e_5� Ice & snow shield—24"from exterior wall Platforms at exterior doors L1-It,,< Stairway headroom 6'8"; all stairs 36" width �S Stair run and rise Winder run and rise Spiral stairs meet requirements ,S Smoke detectors—battery backup & proper location, interconnected t,S Bathroom fixtures—proper clearance C+tg Hall width-36"width s Handrails more than four risers on open sides W—C.f Railing &guards >30"/basement stairs included/closed risers more than 4" in height Safety glazing notes for required areas 11, Garage fire separation: %" gable end/5/8" under living space &%" on walls/20 min. door Aand closer n/ O Garage floor sloped Attic access: gasket seal & R-value equal to roof insulation Roof over 30"—22" x 30"/Crawl spaces 18" x 24" access Residential Plan Review Revised March 2018 Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (2 of 2) Carbon Monoxide detector outside lowest sleeping area, on every level & interconnected 441� within 15' of sleeping area 1,4-a Soil test results, if required Septic to well or water line separation $ All paperwork signed (rj Note on plans energy saving light bulbs 75% Blower door test agency paperwork ri Floodplain Permit required—check map: 2 feet above flood elevation Hurricane clips required Floors less than 2 x 10 covered by%" gypsum or 5/8" wood panel Manuals S &J required for heating system. Cold air return hard piped 11 Separate room for draft HVAC or hot water heater with fresh air HRV shown and calculations -G1 Baffles at eaves for insulations and knee walls 14 Makeup air for range hood >400 cfm Continuous header for garage doors to end wall Al /4 Chimney rain cap shown for fireplaces /V Deck hold down shown not less than 4 lags and bolts per table 507.2 Residential Plan Review Revised March 2018 TOWN OF OUEENSBURY 742 Bay Road, Queensbury, NY. 12804-5902 Septic System Checklist ,►✓� Plan to scale Received Deep hole perc test results from engineer/Architect if applicable(Town Approved Engineers and Architects;June 30 to April 15 Town Engineer for unapproved Engineers and Architects) / (,a/fte. +eti�1D /S�/rita �17f l'f p/6 All wells on property and adjacent properties shown II/1LI1n t CI (�� + r.� � U "tater line shown Municipal or well 10'separation to any part of system ry�vy�t'C 1 IV W/SSetback to property lines show 10'or more for any part of system Septic tank and pump stations 10'from foundation 50'from any well/lake/wetland 10'from any waterline 1�,LASeptic tank to foundation crawl space/slab on grade,grade in crawl space must'be above top of septic tank for 0',Separation required (field verification required) ��Septic tank sized for number of bedrooms and add 250 gals for Jacuzzi tubs/garbage grinder each q�lj Leech Field 20'from foundation 100'from any well 10'from water line Seepage pit 150'from well 50'from septic tank ,#— Seepage Pits 3-times diameter apart yam' Septic tank and pump stations over 30 gallons 50'from watercourse or wetland distance from bottom of trench or system 24"to bedrock or mottling 36"within 1000' of Lake George i eech field 100'from watercourse or wetland ,.i�Toe of mound or bottom of retaining wall 10'from property line 100'from well 20'from Foundation t-JO Provide Engineer/Architect stamp for bed or design systems 0/14—Department of Health Approval for all mobile home park new systems Flood Plain requirements i✓d 2' above established flood elevation to bottom of system All tanks anchored or 2'above flood elevation Revised 4/15/2021 ivy e c®to A higher degree of insulation s i l v e r c o t e. c o m Basem ent Wall Insulation Description Available Products. Basement wall insulation is a fiberglass blanket'laminated Basement wall insulation is.available in various R-values to a reinforced facing which can be left exposed. It is and thicknesses.Please check local code officials to see also available unfaced for non-exposed areas such.as what-meets building code in your area. crawlspaces.The reinforced facing isavailable perforated or non-perforated, depending on.your needs. Compliance and Specification Data ASTM E84 FHC-25/50* Application ASTM E136 (Non_Combustible,fiberglass only) Basement.wall insulation:allows the walls to be insulated ASTM C665 Type I (Unfaced),Type 11 (White), without the cost of framirig or finishing theiiiterior basement Type,III (Silver), All Class A walls. It can be used in new construction or for retrofit in existing homes. It gives you the flexibility to apply the ASTM E96 Rating of facing for water vapor insulation either in a Horizontal or vertical fashion,which transmission: allows you to insulate either half-wall•or full-wall. .09 perm or less(white or silver non-perforated) Generally,the perforated facing is recommended.for 30 perm or more(White or silver perforated) the majority of basement wall applications.The perforations ASTM C518 R-value of insulation only in the facing allow moisture to pass.through the material from wet walls or curing concrete,thereby helping prevent Model Building Code-BOCA, ICBO, SBCCI the reduction of thermal'performance. Reinforced Facing Information Polypropylene Scrim Kraft Facing (White)- Benefits (Perforated and Non-Perforated) • Basement wall insulation can increase your total home Foil Scrim Kraft Facing (Silver)- comfort year-round by reducing energy loss. (Perforated and Non-Perforated) • Reduces noise levels where installed. • The facing material reflects light which can help brighten your room. *The ASTM E84 standard is used solely to measure and describe properties of materials and products in response to heat and flame under controlled • This product meets the IECC.Code for a continuous laboratory conditions.This numerical flame spread is not intended to reflect R-value with a Class A Fire rating With no further hazards presented by this or any other material under actual fire conditions. modification.Please check with local code official Results are reported to the nearest five rating. for approval. _ Blanket Wrap R-value of R1 f � y Y TOWN OF QUECppEuRS gU1tDING& Not all Silvercote products are GREENGUARD Certified. See applicable product JL specifications for details,or . visit UL.COWGG to view our certified products. SIL156.00312/14 ©2014 Silvercote,LLC Air-Tite .Insulati®n_,'Systems, Inc. 19 Tanglewood Drive Phone: 518-361-3678 South Glens Falls, N.Y. 12863 Fax:5 18-792-2 1 58 E-mail:airtiteingulation@adelphia.net January 18,2022 fAN 18 n Zat2 Larry Clute O TOWN F Clute Enterprises wN 0 GUEENS13URY 6 Holden Avenue. & CODES Queensbury,N.Y. 12804 Job: Insulation Report for 37. Howard Street,Queensbury,N.Y. Larry, The following insulation was installed at the.above address: • Sprayed.a.nniniinum of 4.5"(R-35)of closed cell foam insulation at cantilevers. If you need any.additional'information,please do not hesitate to ask.Thank you. Sincerely, Kevin Lingel Generated by REScheck-Web Software cnwnw Compliance Certificate o N �, � MC o- 2 N Project 26x32 (832) RAISED RANCH _ ` N { C C� I� 0WE 1 C y Energy Code: 2018 IECC D CD Location: Warren County, New York ,Construction Type: Single-family AU6 2 4 2021 Project Type: New Construction Conditioned Floor Area: 1,940 M O Glazing Area 7% REVIEWED FOR TOWN OF QUEENSBURY w BUILDING&CODES 00 O Climate Zone: 6 (8499 ODE C®MPLIANO F, iN Permit Date: ENERGY �0 O i Permit Number: N N . LIN F, Construction Site: Owner/Agent: Designer/Contractor: 37 Howard St Clute Enterprises Inc. CLUTE ENTERPRISES, INC Queensbury, NY 12804 6 Holden Ave 6 HOLDEN AVE Queensbury, NY 12804 QUEENSBURY, NY 12804 518-793-7277 CLUTEENTERPRIS ES@GMAT L.COM �Compliance: Passes using UA trade-off Compliance: 0.0%Better Than Code Maximum UA: 128 Your UA: 128 The%Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-of. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. FILE COPY Envelope Assemblies Gross Area Cavity Cont. Prop. Req. Prop. Req. Perimeter Ceiling 1: Raised or Energy Truss 832 38.0 0.0 0.025 0.026 21 22 Wall 1:Wood Frame, 16"o.c. 928 21.0 0.0 0.057 0.045 47 37 Door 1: Solid 18 0,160 0.300 3 5 Door 3: Solid Door(under 50%glazing) 18 0.160 0.300 3 5 Window 1:Vinyl Frame 69 0.330 0.300 23 21 Basement Wall 1:Solid Concrete or Masonry Wall height: 4.0' 768 0.0 19.0 0.041 0.050 31 38 Depth below grade: 4.0' Insulation depth:4.0' Compliance Statement: The proposed building design described here Is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirement in the REScheck Inspection Checklist. � a CJ\.� - o� c 1 Name-Title Signatur Date Project Title: 26x32 (832) RAISED RANCH Report date: 08/12/21 Data filename: Page 1 of 9 n r REScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements: 100.0% were addressed directly in the REScheck-software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the use certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section P P Pla,ns.Verified'. "Fi`eld V®refied .' #" Pre-'Ins ection/,Plan Review Complies?, . Comments/Assumptions & Value Value. 103.1, ;Construction drawings and ❑Complies ;Requirement will be met. 103.2 documentation demonstrate ( ,![]Does Not [PR1]1 energy code compliance for the ; A building envelope.Thermal (" 1❑Not Observable , envelope represented on I ;❑Not Applicable construction documents. i , 103.1, ``Construction drawings and -10Complies ;Requirement will be met. 103.2, !documentation demonstrate ` I I❑Does Not 403.7 energy code compliance for ` [PR3]1 lighting and mechanical systems. .. ;❑Not Observable 0, Systems serving multiple k ;❑Not Applicable I dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is; Heating: ; Heating: ;❑Complies ;Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr a Btu/hr I❑Does Not [PR2]2, on loads calculated per ACCA I 1 I I p I Cooling: I Cooling: ;❑Not Observable ; }) Manual J or other methods Btu/hr Btu/hr ; approved by the code official. I I ,❑Not Applicable , i n n n Additional Comments/Assumptions: 1 High Impact,(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 2 of 9 Section Pla,ns:Verified .. .'Field.Verified # Foundation Inspection, Compiiee? Comments/Assumptions & Re .ID Value Value 402.1.1 ;Conditioned.basement wall ; R- R- ;❑Complies 'See the Envelope Assemblies [FO4]1 ;insulation R-value.Where interior _ I ;❑Does Not ;table for values. insulation is used,verification I R ; R- I I �' may need to occur during ❑Not Observable jInsulation Inspection. Not :❑Not Applicable required in warm-humid locations: I I I in Climate Zone 3. I I I I 303.2 ;Conditioned basement wall E]Complies ;Requirement will be met. [17O5]1 !insulation installed per ❑Does Not Q) j manufacturer's instructions. I I ;❑Not Observable I I i❑Not Applicable 402.2.9 ,Conditioned basement wall I ft I ft I❑Complies ;See the Envelope Assemblies [FO6]1 !insulation depth of burial or 1 ;❑Does Not table for values. distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 'A protective covering is installed S`S _' 1❑Complies ;Requirement will be met. [FO11]2 ito protect exposed exterior } {❑Does Not 4 insulation and extends a minimum of 6 in. below grade. l ❑Not Observable j ;❑Not Applicable : 403.9 Snow-and ice-melting system i ;❑Complies i Requirement will be met. [FO12]2 controls installed. fI ❑Does Not V ; ; I❑Not Observable ti ;❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) -3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 3 of 9 Section Plans Verified Field Verified` # Framing /Rough-In Inspection Complies? Comments/Assumptions & Re .ID Value Value 402.1.1, ;Door U-factor. U- U- ;❑Complies ;See the Envelope Assemblies 402.3.4 ;❑Does Not 1 table for values. [FRl]1 1 1 1 1❑Not Observable 09 ;❑Not Applicable ; 402.1.1, ;Glazing U-factor(area-weighted U- U- ;❑Complies ;See the Envelope Assemblies 402.3.1, average). ;❑Does Not table for values, 402.3.3, 1 1 402.5 :❑Not Observable [FR2]1 ; ; ;[E]Not Applicable ; 1 6 1 1 rJ 1 1 1 1 1 303.1.3 U-factors of fenestration products'`, ❑Complies Requirement will be met. [FR4]1 !are determined in accordance ;❑Does Not with the NFRC test procedure or 1 taken from the default table. !❑Not Observable f 1❑Not Applicable ; 402.4.11 Air barrier and thermal barrier ;❑Complies !Requirement will be met. [FR23]1 installed per manufacturer's 1 10Does Not instructions. ; ► 1 I l❑Not Observable ; ( I❑Not Applicable 402.4.3 !Fenestration that is not site built ;❑Complies ;Requirement will be met. [FR20]1 f is listed and labeled as meeting i {❑Does Not J `AAMA/WDMA/CSA 101/I3.2/A4401 y 1 or has infiltration rates per NFRC ; '❑Not Observable 1400 that do not exceed code I❑Not Applicable ; 1 `limits. ; 402.4.5 IC-rated recessed lighting fixtures 10Complies ;Requirement will be met. [FR16,]2 I sealed at housing/interior finish } E❑Does Not 1 and labeled to indicate s2.0 cfm ! f 1 f leakage at 75 Pa. I❑Not Observable ❑Not Applicable ; 403.3.1 JSupply and return ducts in attics } j❑Complies ;Requirement will be met. [FR12]1 I insulated >= R-8 where duct is i ❑Does Not l� >= 3 Inches in diameter and >= t ; ; R-6 where <3 inches. Supply and} I❑Not Observable return ducts in other portions of i 1❑Not Applicable ; jthe building insulated >= R-6 for ! I (diameter>=3 inches and R-4.2 for< 3 inches in diameter. 403.3.2 !Ducts, air handlers and filter 1 (❑Complies l Requirement will be met. [FR13]1 (boxes are sealed with ;❑Does Not LJ !joints/seams compliant with ( I❑Not Observable I "International Mechanical Code or ; I I International Residential Code, as t 1❑Not Applicable applicable. ; 403.3.'5.' Building cavities are not used as g ElComplies ;Requirement will be met. [FR155]3 ducts or plenums. ;❑Does Not 1❑Not Observable ❑Not Applicable 1 JHIgh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 4 of 9 Section Plans'Veri#ied' °'.:Fie'Id Verifd';:' #, Framing,./Rough-In.lnspectibn_ Complies?' - Comments/Assumptoons & Re .ID Value Value 4033sT Ducts declared to be within the i ❑Complies ;Requirement-will be met. [FR28]3 conditioned space are either 1) ❑Does Not completely within the continuous I ❑Not Observable ; air barrier and within the building , thermal envelope, 2)buried I )[]Not Applicable ; is s ; within ceiling insulation in accordance with Section .:z R403.3.6 and the air handler is °located completely within the I -c continuous air barrier and within # ; the building thermal envelope and the duct leakage is <= 1.5 cfm/100 square feet of conditioned floor area served by :.the duct system,or 3)the ceiling insulation R-value installed- against and above the insulated ; duct>=to the proposed ceiling 'insulation R-value, less the R- value of the insulation on the 403.4 HVAC piping conveying fluids ; R- R- ;❑Complies ;Requirement will be met. [FR17]2 above 105 9F or chilled fluids ;❑Does Not l0J below 55 QF are insulated to zR- 3 ; ; ;❑Not Observable ; :[:]Not Applicable 403.4.1 ,Protection of insulation on HVAC ;❑Complies ;Requirement will be met. [FR24]1 `piping ElDoes Not 19 ❑Not Observable 1❑Not Applicable 403.5.3, Hot water pipes are insulated to ; R- ; R- ;❑Complies ;Requirement will be met, [FR18]? aR-3, ; ; ❑Does Not ❑Not Observable 1 F ;❑Not Applicable 403.6 Automatic or gravity dampers area ;❑Complies ;Requirement will be met. [FR19]2 installed on all outdoor air i❑Does Not intakes and exhausts. I ' E❑Not Observable ; ';❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 5 of 9 Section Plans Verified Field Verified # Insulation Inspection Complies? Comments/Assumptions &Req.ID Value Value . 303.1 IAII installed insulation Is labeled ;❑Complies ;Requirement will be met. [IN13]2 or theinstalled R-values 1', ;❑Does Not v 9 provided. ,❑Not Observable ❑Not Applicable 402.1.1, 'Wall insulation R-value. If this is a, R- 1 R- ;❑Complies ;see the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the 1 i ' I ;table for values. ,❑ Wood ,❑ Wood ,❑Does Not , 402.2:6 `wall insulation on the wall 1❑ Mass ❑ Mass ;❑Not Observable [IN31 I exterior,the exterior insulation !❑ Steel I❑ Steel I❑Not Applicable u requirement applies(FR10), I 6 I PP I i I I I I 303.2 i Wall insulation is installed per ; ; - ,❑Complies ;Requirement will be met. [IN411 manufacturer's instructions. E❑Does Not ;❑Not Observable i ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 4: Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 6 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Verified Complies? Comments/Assumptions & Re .ID Value 402.1.1, ;Ceiling insulation R-values R. R- ;❑Complies ;See the Envelope Assemblies 402.2.1, ;❑ Wood ;❑ Wood ;❑Does Not table for values. 402,2.2, ; {❑ Steel ❑ Steel :❑Not Observable 402.2.6 1 [Fill' ;❑Not Applicable 1 1 1 1 t 1 1 1 i 1 1 1 1 1 1 1 1 303.1,1.1, Ceiling insulation installed per ❑Complies ;Requirement will be met. 303.2 manufacturer's instructions, i ;❑Does Not [FI2]' Blown insulation marked every ; ; I300 ft2. i 1❑Not Observable , ; J❑Not Applicable 402.2.3 jVented attics with air permeable ; j❑Complies ;,Requirement will be met. (FI22]2 ;insulation include baffle adjacent i l❑Does Not to soffit and eave vents that 1 extends over insulation. ! I❑Not Observable ;❑Not Applicable ; 402.2.4 ;Attic access hatch and door j R- R- j❑Complies jRequirement will be met. [FI3]' j insulation ;!R-value of the ;❑Does Not I adjacent assembly. 1 1 1 ❑Not Observable ; ❑Not Applicable 402.4,1.2 Blower door test @ 50 Pa. <=5 j ACH 50 = ACH 50 = j❑Complies ;Requirement will be met. [FI17]' �ach In Climate Zones 1-2, and ;❑Does Not {<=3 ach in Climate Zones 3-8. ; f ;❑Not Observable ❑Not Applicable 403.3.3 ;Ducts are pressure tested to j cfm/100 cfm/100 j❑Complies ;Requirement will be met. [FI27]' (determine air leakage with ftz ft2 ElDoes Not either: Rough-in test:Total t 1 leakage measured with a !❑Not Observable pressure differential of 0.1 inch I ;[]Not Applicable ; I , 1 w.g. across the system including 1 the manufacturer's air handler enclosure if installed at time of I I I i 1 1 1 (test. Postconstruction test:Total !lea kage measured with a ; pressure differential of 0.1 inch 1 1 1 1 w,g. across the entire system lincluding the manufacturer's air ; handler enclosure. I I I I 403.3.4 Duct tightness test result of<=4 j cfm/100 j cfm/100 ;❑Complies :Requirement will be met. [FI4]' I cfm/100 ft2 across the system or ft2 a ft2 ;❑Does Not <=3 cfm/100 ft2 without air 1 1 1 handler @ 25 Pa. For rough-in ; ❑Not Observable tests,verification may need to ;❑Not Applicable ; 1 t 1 1 ;occur during Framing Inspection. 403.3.2.1 Air handler leakage designated j }❑Complies , j Requirement will be met. [FI24]' by manufacturer at <=2%of T]Does Not `design air flow, j i❑Not Observable ❑Not Applicable 403,1.1 Programmable thermostats I❑Complies ;Requirement will be met. [FI9]2 installed for control of primary i ;❑Does Not ,heating and cooling systems and I initially set by manufacturer to y1 ! 1❑Not Observable , I code specifications. s ;❑Not Applicable ; 403.1.2 j Heat pump thermostat installed ! ❑Complies ;Requirement will be met. [FI10]z Ion heat pumps. f ;❑Does Not ' ;❑Not Observable ❑Not Applicable 403.5.1 !Circulating service hot water j❑Complies j Requirement will be met. [FI11]2 jsystems have automatic or i ;❑Does Not accessible manual controls. ;❑Not Observable { ;❑Not Applicable 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 7 of 9 Section Plans Verified Field Verified' # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 :All mechanical ventilation system; ❑Complies ;Requirement will be met. [F125]2 !fans not part of tested and listed ;❑Does Not HVAC equipment meet efficacy i land air flow limits per Table ,❑Not Observable , ❑ J R403.6,1. y ! Not Applicable ; 403.2 I Hot water boilers supplying heat !❑Complies !Requirement will be met. [F]26]2 I through one-or two-pipe heating f UDoes Not systems have outdoor setback ;❑Not Observable control to lower boiler water l ;[]Not Applicable temperature based on outdoor ; 7 temperature, S ; ' 403.5.1.1 i Heated water circulation systems; ;[]Complies i Requirement will be met. [F]28]2 have a circulation pump.The PDoes Not isystem return pipe is a dedicated ; ; return pipe or a cold water supplyi i❑Not Observable , pipe. Gravity and thermos- i ❑Not Applicable ; 3 syphon circulation systems are not present.Controls for ;circulating hot water system l I pumps start the pump with signal; j ;for hot water demand within the I I occupancy, Controls ,automatically turn off the pump i ;when water is in circulation loop is at set-point temperature and no demand for hot water exists. ; 403.5.1.2 Electric heat trace systems i ;❑Complies ;Requirement will be met. [FI29]2 !comply with IEEE 515.1 or UL T]Does Not 1515. Controls automatically adjust the energy input to the I❑Not Observable heat tracing to maintain the ;❑Not Applicable ; desired water temperature in the piping. 403.5.2 Demand recirculation water i❑Complies ;Requirement will be met. [F130]2 isystems have controls that I❑Does Not manage operation of the pump ;❑Not Observable 11 and limit the temperature of the ' water entering the cold water ❑Not Applicable piping to<= 1049F. ; 403.5.4 'Drain water heat recovery units i❑Complies l Requirement will be met. [F131]2 tested in accordance with CSA f❑Does Not 4 B55,1. Potable water-side pressure loss of drain water heat ; ❑Not Observable recovery units <3 psi for ; ;❑Not Applicable ; ;individual units connected to one or two showers. Potable water- I ; side pressure loss of drain water '+ heat recovery units < 2 psi for t I individual units connected to I three or more showers. I 404.1 ;90%or more of permanent f ❑Complies Requirement will be met. [FI6]1 ifixtures have high efficacy lamps, ❑Does Not ; I ❑Not Observable ❑Not Applicable 404.1.1 Fuel gas lighting systems have i ;❑Complies ;Requirement will be met. [F123]3 i no continuous pilot light. 1❑Does Not -41 ;❑Not Observable ;,[]Not Applicable 401.3 Compliance certificate posted. ;❑Complies ;Requirement will be met. [F17]2 ;❑Does Not []Not Observable ; I ;❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact (Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 8 of 9 Section Plans,Verified,. ..rFieW Verified`, # Final Inspection Provisions Compiies2 Comments/Assumptions• & Reg.ID Value Value 303 3l.�' I Manufacturer manuals for i _ E Complies ;Requirement will be met. [FI18j3, : mechanical and water heating ,❑Does Not 1 systems have been provided. I []Not Observable ; ;[]Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x32 (832) RAISED RANCH Report date: 07/30/21 Data filename: Page 9 of 9 2018 MCC Energy Efficiency Certificate Insulation Rating' R-Value Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 0.00 Ceiling/ Roof 38.00 Ductwork(unconditioned spaces): Door Rating U-Factor -SHGC Window 0.33 0.70 Door 0.16 CoolingHeating & Heating System: Cooling System: Water Heater: Name: Date: Comments 301.20'1.24 C►Ute Enterprises RC-0630-2021 EMS HVAC Load Calculator ' Single n Howard St www.hvacloadcalculator.com g e Fare"Y Dwelling 8 19 s,f. Date: Thu Aug 12 Loaded Document: 37 HOW_ARD ST Welcome - GFOIL 2021 10:32am QUEENSBURY FILE COPY Company Info Client Information Company GF HEATING OIL LLC Name CLUTE ENTERPRISES/37 HOI Preparer BRIAN NELSON Address1 CLUTE ENTERPRISES 6 HOLE Phone (518) 792-2220 Address2 Email brianCgfheatingoil.com Address3 Phone p1E CE a V Email AUG 2 4 2021 TOWN OF QUEENSBURY Date 12-Aug-2021 BUILDING& CODES j OF This HVAC load calculation has been performed using sound engineering principles as prescribed by Manual J eighth edition and ASHRAE Handbook of Fundamentals. Duct sizing has been performed as prescribed by Manual D. 1. Design Conditions(Temp. F) O Check If Using Celcius INDOOR OUTDOOR TEMP Front of South DIFF Building is _. Facing WINTER 70 -20 90 _ .. _ _ . ... ...-_. ' Total 900 Sq.Ft SUMMER 65 95 30 Conditioned Area s 2. Summer Humidity Moderately H v 40 Grains Difference 3. How Tight is Structure Average-under 1500 Sq. Ft. Winter Summer Air/Changes/Hr. 4. Fireplace Evaluation Number Evaluation CFM none igh Tt V 0 5. Number of Occupants generally equals number of bedrooms + 1 3 Overhang Characteristics Enter all measurements decimally 1"=.1 7"=.5 �,�avarti� �fr sfr gri 2"=.2 8"=.7 A 4"=.3 10"=.8 5"=.4 11"=..9 a"=.5 � aN To:�7 linear it.ascss my cf evin�:vs=t 2 i3. Example-2 ft.8 in.=27 ft. EAST WEST S/SE/SW N/NE/NW .............. ............ .......... ........................... L window (A) Distance of OH from top of 1.6 1.6 1.6 1.6 Length of overhang (B) 1.6 1.6 1.6 1.6 ............. Total linear ft. across top of 0 0 10 11 windows located below overhang Solar GainThrough Glass 0 Check this box if using manufacturer specifications and enter the latitude, U-value and SHGC .............. ........ Latitude 45 U- SHGC Value Facing Area(sq ft) Type Glass HTM Unshaded Shaded BTUH .......... --.............. .................... ........... ---- North or 68 Double 24.00 0 94 2,246 Shaded NE/NW 0 0.00 0 0 0 South. 60 Double 40.00 34 26 1,376 SE/SW 0 0.00 0 0 0 East 0 Double 75.00 0 0 0 West 0 Double 75.00 0 0 0 Does glass have reflective No 1 3,622 coating? Skylight 0 Clear 150 0 Total 3,622 Solar Gain DUCTS OR PIPES Location(Heating) Conditioned are .. Duct 0.00 Loss Location(Cooling) Conditioned are .. Duct 0.00 Gain Duct/Pipe Insulation Duct Leakage Area of Attic or 0 Floor Where Duct is Located Attic Temperature(If ducts located in attic) Load Calculation Elements of Load Area or Lin. Insulation/R- U- Heat Heat Gain Latent Ft value Value Loss Btuh Btuh Btuh Solar Gain from 3,622 Glass Gross Wall 928 Glass 1 128 Double .. 0.56 6,451 Skylight 0 0.00 0 Doors 2 Insulate .. 0.40 72 24 Net Wall 798 R-21 0.07 4,668 1,556 Ceiling 816 R-38 ., 0.03 1,909 955 Floor Over Crawl or 0 R-19 ., 0.05 0 0 Unheated Basement Open-Beach 0 0.00 0 0 House Above Carport Slab On Grade - 0 No Insul .. 0.80 0 0 enter-linear ft Infiltration-Enter 6528 10,771 1,795 cubic-ft of building People 690 600 Appliances O Enter Value Sub Total 23,872 8,645 Duct 0 0 331 Loss/Gain Total Sensible 23,872 8,645 Load Latent Load 1,480 Total Latent 2,411 Load SUMMARY Heating Load Sensible Cooling Latent Cooling Total Cooling Load *Nominal Tons ....................... ............ .... .......... . -........... ........................................... 23,872 8,645 2,411 11,056 0.96 OUTDOOR AIR FLOW RATE 31.5 * CAUTION - The cooling capacity of the air conditioner must meet both, sensible and latent loads. It is recommended a Manual S calculation be performed. Using manufacturer's specs. The nominal tons assume .75 SIT ratio at the chosen outdoor design temperature. Summary Including Basement Heating Load Sensible Cooling Latent Cooling Total Cooling Load Nominal Tons 32,576 12,005 3,450 15,456 1.33 Whole House (Block Load) Completed Scroll to top For Additional Options Solar Gain Through Glass 0 Check if Using Manufacturer specs .................. ....... ...... ............................................. Latitude 40 u- F SHGC Value ............ Facing Area(sq ft) Type Glass HTM BTUH North or 16 Double 24.00 384 Shaded .NE/NW 0 0.00 0 South 0 Single 50.00 0 SE/SW 0 0.00 0 East 0 Double 75.00 0 ................... ....... West 16 Double 75.00 1,200 _... ................. _..... __. . .._.......... ... ...... _......... _... .... . ....... Does glass have reflective coating? No 1,584 Total Solar 1,584 Gain Basement Load Calculation Elements of Area or Lin. Insulation/R- U- Heat Heat Gain Latent Load Ft value Value Loss Btuh Btuh Btuh Solar Gain From 1,584.00 Glass Gross Wall Above 232 Grade Glass 1 32 Double 0.56 1,613 Doors 0 I F 0.00 0 0 Net Wall-Above 200 R-25 .. 0.04 756 252 Grade Wall Below Grade 696 R-19 ., . 0.03 1,879 626 Ceiling 0 R-21 .. 0.04 0 0 Floor 816 0.02 1,763 1,763 Infiltration-Enter 6528 2,693 898 cubic-ft of building People 0 0 0 Appliances 0 Total Sensible 8,703 3,360 Load Latent Load 740 Total Latent 1,040 Load Basement Summary Heating Load Sensible Cooling Latent Cooling Total Cooling Load *Nominal Tons 8,703 3,360 1,040 4,100 0.37 * CAUTION - The cooling capacity of the air conditioner must meet both, sensible and latent loads. It is recommended a Manual S calculation be performed. Using manufacturer's specs. The nominal tons assume .75 SIT ratio at the chosen outdoor design temperature. Room by Room Load Calculation Total House Total House System CFM __._.. _..._-........_. .. .. ___...._.__._.._....._..._ __ _.. Cooling Heating Heat Loss Sensible Heat Gain 32,576 -._.. _.._..__._...__ .-- 12,005 ♦Add-Room Room HeatLoss HeatGain CFM_Heat CFM_Cool Name :ee Check-Calculations-When-Coinpleted auto- 8,703 3,360 0 0 basement Totals: 8,703 3,360 0 0 Percent Of Original: 26% 27% Return,Trunk or branch cfm duct air dia vel First section off AH 0 1st reduction or branch 0 2nd reduction or branch 0 3rd reduction or branch 0 4th reduction or branch 0 5th reduction or branch 0 Basement supply and return 0 trunk Room Runs cfm no of outlet uct air outlets cfm dia vel auto-basement 0 0 Duct Sizing Completed Scroll to top For Additional Options Equipment selection as per Manual S Instructions: enter load, weather and manufacture's data in white cells Auto Complete BTU H - Total Heat Loss 32576 Design Outdoor Indoor Conditions Total Heat Gain 15156 -20 70 Sensible Heat 12005 95 65\ Gain Latent Heat 3,150 ID Design RH 50%, 63F WB Gain Sensible/Total 0.79 Altitude 344 Ratio target clg Temp. 21 Predominantly Heating climate Drop Manufactures Equipment Specifications Equipment Manufacturer Model BTUH Total Sensible Latent No output(heating) cooling BTUH BTUH BTUH C OD design temp Furnace RUUD R9 60000 'QRrJ,TC 060 Boiler 0 � 0 Heat Pump RUUD 0 24000 or Air Conditioner Evaporator RUUD RC Nb Nc- Coi l Air Handler a Total 59174.4 23876.16 0 23876.16 Capacity with Altitude Correction Selected OVERSIZED OVERSIZED UNDERSIZED OK Equipment Size ................. Heating CFM Cooling CFM External Static Pressure of (recommended) Blower 1200 0 Available static presure for Supplemental heat needed for heat duct system pump Blower ext. 0 HP capacity 0 static press 47F Coil press 0 HP capacity 0 drop* 17F HP capacity @ 0 Fitter press 0 drop* ODDT ............. Register 0 BTUH 32,576 press drop supplemental heat Grille 0 Pressure KW 10 Drop supplemental ... ........ ................... ....... heat Other 0 Other 0 Other 0 Available SP 0 for duct Equipment Size Limits Air conditioner- Furnace Boiler heat Pump Cool Climate Heat Climate output output Maximum Size 17,429 18,945 45,606 45,606 Selected OVERSIZED OVERSIZED OVERSIZED OVERSIZED Size Energy Cost Analysis Heat Loss 32,575.50 Heating Degree Days F7000 Heat Gain 15,155.92 Cooling Degree Days 500 Summer Design 95 Summer Design Temp 30 Temp Diff Winter Design Temp -20 Winter Design Temp 90 Diff System #1 (Old or less efficient system) Efficiency Fuel Cost Air Conditioning Fo 110 .......... Heating 0 110 0.00 Total annual operating cost of system 1 System #2 (Old or less efficient system) Efficiency Fuel Cost Air Conditioning 0 FO Heating 0 Fo 0.00 Total annual operating cost of system 1 SPECIFICATIONS&DIMENSIONS Energy Recovery Ventilator I �� C @US 0 9 O P St�ar_lchard N V' LISTED CERTIFIED DUMOREAT RE0rWr1YWKIIAW 89S5 INDOOR UNIT SPECIFICATIONS Ventilation Type: Max.Shipping Dimensions&Weight(in carton): Static plate,heat and humidity transfer V'L x 22"W x 29"H _ ; .!�.... 65lbs. Typical Airflow Range: 40-110 CFM ....r Unit is HVI Tested/Certified per CSA C439 Ci y.2,Standard motorized impeller blowers Protocol: Using one L-100-G5 Core i s .� Standard Features: Backd aftldamper 6",8" White painted cabinet = Automatic balancing damper 4",5",6" Line-cord power supply Louvered wall.vent 6"-white,brown Low voltage circuit for controls Unit may be mounted in an orientation Digital exteriorlenclosuael mount(fC7D W), Y Y '- Cross-core differential pressure ports (TC7D�' Carbon dioxide sensor/control-wall mount(CO2-W), Controls: duct mount(CO2-D). t Onboard 24 VAC transformer/relay package IAQ sensor-wall mount(IAQ-W) duct mount(IAQ-D) <; -f with switched dry contacts Motion occupancy sensor/control- Filters: ceiling mount(MC-C),wall mount(MC-W) Total qty.2,MERV 8,spun-polyester media: Percentage timer control(PTL) Downloads specification at: 21 3/4"x 101/2"x 1" Push-button point-of-use controls(PBL),PTL req'd. P Percentage timer control with furnace interlock(FM) renewaire.com/specifications Unit Dimensions&Weight: Dehumidistat control(DH24) 221/2"L x 24"W x 23 3/4"H MERV 13 filter-CA airstream(shipped loose) 51 lbs. Electric duct heater-RH series(1-3 kW); designed for indoor ductwork installation only Note:Indirect Gas-Fired Duct Furnace is not available on the EV90P. ELECTRICAL DATA UNIT PERFORMANCE CORE PERFORMANCE HP., Volts' :HZ Phase Input Watts FLA: Airflow CFM' ;, , ESP in Hz0 Airflow CFM Temp'EFF%o;_ Total EFF% Winter/Summer` 0.03 120 60 Single 44 @ 90 CFM 0.35 42 0.60 42 86 83/71 55 0.50 55 85 82/70 74 0.40 74 84 80/68 87 0.30 87 83 79/67 100 0.20 100 82 78/66 Y108 0.10 108 82 78/65 �� �� Note:These are core-only ratings and are not HVI certified. HVI ratings apply to complete units only. See HVI certification ratings on pg.30 of SinglelMulti-Family Catalog. UNIT DIMENSIONS ABBREVIATIONS ® AIRFLOW ORIENTATION 221/2" EA:ExhaustAiri outside Overall OA:Outside toinloke Available as shown m dimension drawing. RA:Room Air to be a housled I I FA:Fresh AY to inside 2 1/4"Typ. 1--I8"Case�-I I I I INSTALLATION ORIENTATION Unit maybe installed in any orientation. LCan T MOUNTING &APPLICATION NOTE aD I.UNLESS OTHERWISE SPECIFIED. e mounted in any orientation.RA/FA airstream O DIMENSIONS ARE ROUNDED TO THE • ed-wit M. NEAREST EIGHTH OF AN INCH. s.E .•s n 24V AC 00. TO2.SPECIFICATIONSWITH MAYBE SUBJECT iu' \t�y)j Control \t O TO CHANGE WITHOUT NOTICE. D �:•I Terminal AUG 2 4 2021 TOP VIEW TOWN OF QUEENSBURY 235/8" o. 221/4"Minimum Case BUILDING&CODES 34"Line Cord Service Area 0e"Nominal (Door can be TyP. _ Removed from If I+ 06"Nominal 'O Hinges.) C)/, TYP. 7- y © 0 O m m OA 1% :I Q c a Do i l// orj >O om /rCwin C ME T Formed Inlet Ring Pressure Ports a m 14)TyP- _ LEFT VIEW FRONT VIEW RIGHT VIEW Specifications may be subject to change without notice. i'P RenewAire \I Energy Recmtery Venfifolion I oR'rHE.mOS'r COMPLETEAND CURREf;T ItIFORh'L•iT(ON VISIT RENEWAIRE.COM 15 C INDOOR AIR SYSTEMS• �D�C�J�` A/ 1 %�� lXOI f -O C� Sizing and Selecting a LiiffebreathC/HLLLRV or ERV Step 1:Follow these general guidelines to determine the best HRV or ERV for your application Option 1:Size your Residential unit by Air Exchange(ac/hr) Method Step 1 Step 2 F2400scift(L x W)with 9' (H) ceiling. ac/hr=(Total Cubic Volume x.35)/60 bic volume=(L x W x H) or(2400 x 9)x.35/60min = 126cfm *In all cases local and all other codes requirements must be followed Option 2:Size your Residential unit using ASHRAE 62.2(Minimum requirement) Residential Ventilation Air Requirements(CFM/Bedrooms) Sizing MfAH zroAeu:4.1a 1 '`-41 3 4 5 Floor Area Scl.ft. 1 <500 30 3&, 45 - = 53 60 501;.1000 45_____,._,__ _ _ I"53;f, 60 68 75 0001=Ali°5`00 :, : _6_©=� =_; --_:ti.�_ � < 1 75 83 90 1501-2000 f 75-"' " 83 90 98 105 2001-2500 90 98 105 113 120 2501-3000 105 113 120 128 135 3001.3500 120 128 135 143 150 3501-4000 135 143 150 158 165 4001-5000 150 159 165 173 180 5000-5001 165 1 173 180 188 195 •ln all cases local and ail other codes requirements must be followed Size your,Commercial unit—Note it's recommended o mechanical engineer always be consulted. Application Occupant CFM/Person CFM/SQFT Comments Density/1000sgft Retail Stores 15 10 Classroom 25-35 15 Varies with age Offices 5 10 Conference Rooms 50 15 Hair/Nail Salons 25 20 Do not Undersize Pet Shops 1 Physical Therapy 20 15 Bars/Lounges 100 10 Non-Smoking Health Clubs 40 20 Only 10/1000 in weight room *Swimming Pools 1-10 Varies greatly with temperature Places of Religion 120 5 TOWN OF QUEENSBURY BUILDING&CODES •FURNACES•BOILERS-AIR CONDITIONING ' ■ ■ ' Ph. 518.792.2220 •PROPANE•#2 FUEL OIL•KERO•DIESEL FX. 792-8999 •INSTALLATION•SERVICE ' 1 ' 1 WWW,gfheating0li.COn1 DATE: - I JOB NAME/LOCATION: PH: BILL TO: r� �� FX: (� 96O)e 'fir/ 2Ck �v CELL: �tAf%-( 'rAL( EMAIL: Quotation and Contract Luc r-01p0s'-e- -�o \'6 cCL-V I Cn v'• ez" ' % AUG 2 4 2021 7� �t,�� � Yl C►�1 �-�'`(�� TOWS!OF QUEENSBUF2 BUILDINIG&CODES 401.4 Need Supplemental Beat? Visitus at............................... 518.798-2220 •Fireplaces•Stoves•Inserts If you have any questions,please call, •Gas.wood.Pellet•coal Sincerely,Brian S.Nelson www.firstflamefireplaces.com TOTAL COST OF PROPOSAL AS DEFINED ABOVE:$ WARRANTY=1 YEAR PARTS&LABOR+MFR.WARR.TERMS.50%Depposit'required upon signing before equipment is ordered.Balance due upon completion of job.ANY CHANGE FROM THE ABOVE DEFINED PROPOSAL MAY INCUR EXTRA COSUCHARGESIMATERIALS& OR LABOR AND WILL BE DUE AND PAYABLE UPON COMPLETION.QUOTE VALID FOR 30 DAYS.WARRANTY VALID ONLY WHEN PAID IN FULL.In the event of nonpayment our team may stop work until payment is made.All legal fees,and finance charges incurred will be the responsibility of the customer.Customers shall hold contractor completely harmless,and shall indemnity,contractor fee,all casts,damage,losses and expenses,including judgments and attorney fees,resulting frome any claim against this job. RECEIVED:$ CACK+ VISA MC+ EXP PIN ACCEPTANCE:I HEREBY ACCEPT THE ABOVE DEFINED PROPOSAL ITEMS,PRICES,AND SPECIFICATION. wrs� PRINT NAME SIGNATURE DATE ` ` MITSUBISHI �E Dire i• J:J 0® _ ISKUTTLE ELECTRIC R - 1�..�91 UIE1L'McLAIN9 TANCIESS WAIF.CI►TICS �" ^"a�°�T�P' ' Cooling and Heating Solutions EC (IE D OCT z 7 2021 l [AS BUILT TOWN OF QUEENSBURY ~� BUILDING&CODES �� - 50 �----� 0 REVISED zoC= LIJ u®l _V. �C13� 00 9 w LL Z w ®C) © � Lando of --� AZbort fharhon ��n DorothyoPoetto 307.20-26 Olb 301.20.21 160.00, v Lando of a `Dora poahe 301.20-21 1c a Lando of David of 301.20.22 ,Lando of ^O\ Kannoth Noohor ► U 301.20-23 D u�' a u�o Ifap of a Not Plea medo for Scalp 1'w30' w�.ww..waw..�ew.a S teve s .._.�_..� bNIM..[�.I�® IIi OY�.IRV.�+# _ Clute Enterprises, Inc. �' Land Surveyors .�q...........�+n.. emw 1 OF 160 Havlland good queenebuM Now York 1E804 �..w...a nw..v .aa�.u��ra�rars Toren of Qneanebail,warren Cmntl, New York 610 79E-e474 New York ua No. 60156 N0. DATE DESq iPlION DN'a NO.3D120-1-24 • 308.8-1-57