Loading...
03 29 2022 Queensbury Planning Board Agenda Tuesday, March 29, 2022 Second Regular Meeting: / Time 7 – 11 pm Queensbury Activities Center @ 742 Bay Road New Business: Applicant(s) SHARON SERINI Application Type Site Plan 15-2022 Freshwater Wetlands Permit 2-2022 Owner (s) Same as applicant SEQR Type Type II Agent(s) EDP- Chris Keil Lot size 2.28 acres Location Cleverdale Off Road Ward: 1 Zoning Classification: WR Tax ID No. 240.9-1-16.12 Ordinance Reference 179-3-040, 179-6-065, 179-6-050, 179-6-060 Cross Reference SUB 8-2000, SUB 2-2008, AV 49-2009, SUB (M) Warren Co. Referral March 2022 2-2008 (2010), PZ 92-2016 Public Hearing March 29, 2022 Site Information APA, LGPC, CEA Project Description: Applicant proposes construction of new 4 bedroom home with a footprint of 2,445 sq. ft. and a detached garage of 416 sq. ft. Total floor area is 3,510 sq. ft. Project includes connecting to the existing shared driveway to Cleverdale and installation of a new well and septic system. Pursuant to chapter 179-3-040, 179-6-065, 179-6-050, 179-6-060, site work for a new floor area in a CEA, site work for a beach area, shoreline planting plan and other associated development shall be subject to Planning Board review and approval. Old Business Applicant(s) HARRIS BAY YACHT CLUB Application Type Site Plan 18-2022 Special Use Permit 1-2022 Owner (s) Same as applicant SEQR Type Type II Agent(s) Lot size 17.16 acres Location 2712 State Route 9L Ward: 1 Zoning Classification: WR, LC Tax ID No. 240.-1-23.1 Ordinance Reference 179-3-040, 179-10-070, 179-5-060 Cross Reference SP 24-91, SV 112-1993, UV 111-1993, AV 11-2022 Warren Co. Referral March 2022 Public Hearing March 29, 2022 Site Information APA, LGPC, CEA Project Description: Applicant proposes to remove and replace the cashier building of 109 sq ft and the storage building of 209 sq ft located on Dock C. The existing club house of 3,172 sq ft has no improvements proposed and will remain the same. The project includes replacing the floating dock system, including 271 seasonal berthing slips for members, winter storage for up to 300 vessels, sales and service of marine products, fuel sales, and onsite pump out services. The project also includes replacing existing steel piles with driven PVC reinforces piles and replacing the existing concrete pads at the shoreline. New lines for water, sewer and electric will be installed as part of the project. Upgrades will include fire safety and lighting on the docking system. Pursuant to chapter 179-3-040, 179-10-070, 179-5-060, site plan for work at the marina, special use permit for marina operations, and hard surfacing within 50 feet of the shoreline shall be subject to Planning Board review and approval. - Any further business which may be properly brought before the Board -