Loading...
3.01 3.1 WASTEWATER\Greater Qby Consolidated Sanitary Sewer Ext#2—Tidal Wave Auto Spa—Set Hearing—4-18-2022 ORDER SETTING PUBLIC HEARING CONCERNING PROPOSED EXTENSION #2 TO GREATER QUEENSBURY CONSOLIDATED SANITARY SEWER DISTRICT TO SERVE TIDAL WAVE AUTO SPA LOCATED AT 708 QUAKER ROAD, QUEENSBURY RESOLUTION NO.: 12022 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS, the Town of Queensbury wishes to extend the Greater Queensbury Consolidated Sanitary Sewer District to serve the Tidal Wave Auto Spa (TWAS) located at 708 Quaker Road in the Town of Queensbury, New York (Tax Map No.: 303.15-1-12) referred to as the "Property" in accordance with New York Town Law Article 12-A, and WHEREAS, a Map, Plan and Report (Map, Plan and Report) has been prepared by Pennoni Engineering & Surveying of New York, P.C. concerning the proposed Sanitary Sewer District Extension 42 (Extension 42) to connect the proposed Property to the existing Greater Queensbury Consolidated Sanitary Sewer District as more specifically set forth and described in the Map, Plan and Report, and WHEREAS, the Map, Plan and Report has been filed in the Queensbury Town Clerk's Office and is available for public inspection, and WHEREAS, the Map, Plan and Report delineates the boundaries of the proposed Extension 42, a general plan of the proposed system, a report of the proposed method of operation, all outlets and the terminus and course of each proposed main sewer or drain together with the location and a general description of all sewage disposal plants, pumping stations and other public works, if any, and is consistent with, so far as possible, any comprehensive plan for sewers developed and maintained pursuant to General Municipal Law §99-f, and WHEREAS, Part I of a Short Environmental Assessment Form has been prepared and presented at this meeting and the engineer indicates that it is an Unlisted Action and the Action will undergo an Uncoordinated Review, NOW, THEREFORE, IT IS HEREBY ORDERED: 1. The boundaries of the proposed Extension 42 are as set forth in the Map, Plan and Report and as follows: All that tract or parcel of land, situate in the Town of Queensbury, County of Warren and State of New York, bounded and described as follows: Beginning at a point in the southerly highway boundary of Quaker Road (County Route 70) at its intersection with the property division line between lands n/f Garvey Partnership, as described in Book 5351 of Deeds at Page 45, on the east, and lands n/f of Smart Wash of S.G.F., LLC as described in Book 5946 of Deeds at Page 272, on the west, thence south 31°02'07" west, a distance of 3 00.00 feet to a point at its intersection with the property division line between lands n/f of Switchco LLC, as described in Book 4542 of Deeds at Page 217, on the east, and said lands of Smart Wash of S.G.F., LLC, on the west, thence south 09°57'38" west, a distance of 440.97 feet to a point on the northerly highway boundary of Dix Avenue (County Route 42), thence north 80 °02'23" west, along said highway boundary a distance of 158.66 feet to a point at its intersection with the property division line between lands n/f of E. James Barrett & William M. Barrett, as described in Book 1209 of Deeds at Page 320, on the west, and said lands of Smart Wash of S.G.F., LLC, on the east, thence along said property division line the following three (3) courses and distances: (1) Along a curve to the right having a radius of 50.00 feet, an arc length of 78.54 feet, a chord bearing of north 35°02'22" west, a chord distance of 70.71 feet to a point, (2) North 09°57'37" east, a distance of 471.38 feet to a point, 2 (3) North 31°02'07" east, a distance of 3 00.00 feet to a point on the first mentioned southerly highway boundary of Quaker Road, thence south 58°57'53" east, along said highway boundary a distance of 223.62 feet to the point or place of beginning. CONTAINING 166,952 SQUARE FEET OR 3.833 ACRES, MORE OR LESS This description is based upon a survey entitled "Alta/NSPS Land Title Survey 708 Quaker Road TM4303.15-1-12 Town of Queensbury, Warren County, State of New York,"prepared by Control Point Associates, Inc., PC, dated January 21, 2021. This property may be subject to the restrictions, covenants and/or easements either written or implied. 2. The proposed improvements consist of a new sewer main being installed within the public right of way. The TWAS will connect to the existing manhole in the Dix Avenue right of way situated at the southwest corner of the TWAS property on the south side of Dix Avenue. The site connection will be via an 8" gravity sewer lateral and the existing pump station and force main on site will be abandoned. 3. The facilities for this Sanitary Sewer District Extension to be constructed and capital costs associated with this Extension 42 are estimated to be approximately $134,300 to be paid for by TWAS. The cost of hook-up is included in the construction costs. There will be no cost to the Town. TWAS will be required to dedicate all infrastructure and take actions to transfer their interest to the satisfaction of the Town Water Superintendent/Wastewater Director and Town Counsel. 4. The estimated annual cost of the Extension 42 to the developed parcel would be calculated as detailed in the Map, Plan and Report filed in the Town Clerk's Office and also available on the Town of Queensbury Website: www.queensbury.net. There is no "typical property" which is a one or two family home in such proposed District as the one commercial lot/subject property is the only property in this Extension 42 and the "typical property." The cost of operation and maintenance would include the costs to operate, maintain, and supply the sewer system and is reflected in sewer rent charges. Based on an estimated annual usage of 3.6 million 3 gallons per year and an existing operation and maintenance rate of $7.00 per 1,000 gallons, the TWAS yearly amount would be $25,200 per year, paid quarterly. The Town also imposes a property's share of the Greater Queensbury Consolidated Sanitary Sewer District's debt service using a benefit tax. The estimated units are 68.87 acre units which would result in an estimated benefit tax of $1,542. The calculation of $25,200 annually plus the benefit tax would come to approximately $26,742 annually. The TWAS property is the only property in this Extension 42 so it is the mode/typical property. 5. The Developer of the Property will pay all costs of the improvements including the one-time buy-in cost and Town connection fee, so there will be no financing required by the Town on behalf of the District or otherwise. 6. A detailed explanation of how the estimated costs of the Extension 42 were computed is included in the Map, Plan and Report which has been filed with the Queensbury Town Clerk and is available for public inspection. 7. The proposed improvements shall be constructed and installed as specifically delineated in the Map, Plan and Report and in full accordance with the Town of Queensbury's specifications, ordinances or local laws, and any State laws or regulations, and in accordance with approved plans and specifications and under competent engineering supervision. 8. The Town Board shall meet and hold a public hearing at the Queensbury Activities Center, 742 Bay Road, Queensbury at 7:00 p.m., on Monday, May 2nd, 2022 to consider the Map, Plan and Report and to hear all persons interested in the proposal and to take such other and further action as may be required or authorized by law. 9. The Town Board hereby authorizes and directs the Queensbury Town Clerk to duly publish and post this Order not less than ten (10) days nor more than twenty (20) days before the public hearing date, as required by Town Law §209-d, and complete or arrange for the securing of two (2) Affidavits of Publication of Notice and two (2) Affidavits of Posting of Notice of the Public Hearing required hereby and to file a certified copy of this Order with the State 4 Comptroller on or about the date of publication. 10. The Town Board hereby declares that this action is an Unlisted Action pursuant to 6 NYCRR 617 et. seq., and will perform uncoordinated review of this Project. Duly adopted this 18t'day of April, 2022,by the following vote: AYES NOES ABSENT: 5 om Tidal Wave Auto Spa Map, Plan & Report s Greater Queensbury Consolidated Sewer District _ __ Extension # 2 708 Quaker Road A Queensbury, NY 12804 Warren County Prepared For. TWAS Properties, LLC c/o SHJ Construction Group 124 East Thompson Street Post Office Drawer 311 Thomaston, Georgia 30286 Prepared By., PENNONI ENGINEERING & SURVEYING OF NEW YORK, P.C. New York, NY 10001 ofN W R M LL March 2022 v 066�� PROF Charles Miller. PE ECMES20007 r Tidal Wave Auto Spa Map & Plan Report ECMES 20007 Table of Contents SECTION PAGE 1.0 EXISTING FACILITIES ..................................................................................................................................1 2.0 PROPOSED SEWER DISTRICT EXTENSION................................................................................................1 2.1 DISTRICT EXTENSION BOUNDARY...........................................................................................................1 2.2 PROPOSED SEWER DISTRICT FLOWS..............................................................:........................................1 2.3 PROPOSED SEWER SYSTEM FACILITIES...................................................................................................2 3.0 DISTRICT EXTENSION FORMATION COSTS .............................................................................................2 3.1 CONSTRUCTION COSTS.............................................................................................................................2 3.2 OPERATION AND MAINTENANCE COSTS ...........................................................................:....................2 4.0 IMPLEMENTATION PLAN ......................................................................................:....................................2 4.1 COST APPORTIONMENT...................................................................................................................:........2 4.2 CONSTRUCTION FINANCING ....................................................................................................................2 4.3 SEWER RENT...............................................................................................................................................3 4.4 IMPLEMENTATION SCHEDULE .................................................................................................................3 APPENDICES APPENDIX A— Boundary,Description APPENDIX B— Sewer Map APPENDIX C— Cost Estimate PENNONI ENGINEERING & SURVEYING pe n~~fin OF NEW YORK, P.C. . Tidal Wave Auto Spa ' Map && Plan Report EC|NES2OOO7 1,0 EXISTING FACILITIES The purpose o[this Wqap, Plan and Report isbo present data and information to the ToVvnof(}ueeOsbury re|at�etotbepnoposed Tidal Wave Auto Spa (Tl8/AS)�located ot 7OO Quaker Road, Queenabuq6New York for the extension of the.Greater Queensbury Consolidated Sanitary Sewer District(GQCSSD)to include the referenced property.The GQCSSD sends the wastewater to the City of Glens Falls Wastewater Treatment Plant for treatment. The site was previously a car wash but is currently vacant.TVVASis proposingto renovate the car wash facility into a new updated car wash.Wastewater generated at the property was disposed of through an existing force main that discharges to the municipal system.The force main extends from the site tothe west across Barrett Drive onto the adjoining property to the west and then connects to the sewer district lateral in Dix Avenue.The existing force main is to be abandoned and a separate connection from the site Lo the 8" sewer main in Dix Avenue is hereby requested. ' The site is bordered by Dix Avenue to the south,Quaker Road to the north Barrett Drive and commercial properties to the west and commercial properties to the east. The site was served directly-by the City of Glens Falls without any formal agreement.This has repnesented |ssu' sxvith arrears vvhichthe City is looking torennedyby extending the GO��SSD.The City of Glens Falls has sufOcient.capacityto treat this waste as they have since the late 1870/o.The ' Queensbury collection system in this area is an 8"gravity that is currently treating about 10,000 gallons per-day. It is rated for approximately 150,000 gpd.This collection system discharges directly to the City of Glen's Falls collection system and is conveyed to its Wastewater Treatment Plant. Also,the,site is serviced by the Town of Queensbury Water Department.The water service is tapped from the water main in Dix Avenue ne&,the northwest corner of the site and feeds the facilities on site. There isno planned upgrade for the water service line. 2.0 PROPOSED SEWER DISTRICT EXTENSION 2,1 DISTRICT EXTENSION BOUNDARY The proposed sewer district extension will consist of the property located at 708 Quaker Road and as described by the legal description in Appendix A.The property will connect to the GQCSSD. ` 2.2 PROPOSEDSEWER DISTRICT FU0WS The proposed car wash is estimated to generate an average daily flow of 10,000 gallons per day(gpd). This is based on an average 500 cars per day using the auto spa with water usage of 20 gpd/car.The maximum anticipated flow iy5O8pnn. The wastewater will consist of domestic bathroom flow plus the flow associated with the operations of the car wash. Flows from the car wash will be preliminarily treated by a water separation equipment. The treatment system consists of primary and secondary settling tanks, a process tank and then an oil PENN(0N{ ENGINEERING &SURVEYlNG 1 ~ K�� ������0� �,�, _—_---_ Tidal Wave Auto_ Spa Map & Plan Report ECMES 20007 1 water separator.The treated wastewater will be recycled for re-use by the car wash and a portion of it will be gray water discharged to the sewer. 2.3 PROPOSED SEWER SYSTEM FACILITIES The new sewer main will be installed within the public right of way.The Tidal Wave Auto Spa (TWAS)will connect to the existing manhole in the Dix Avenue right of way situated'at the,southwest corner of the TWAS property on the south side of Dix Avenue. It is anticipated that the site,connection will be via an 8"gravity sewer lateral and the existing pump station and force main on site will be abandoned.A map of the proposed sewer infrastructure is included as Appendix B. 3.0 DISTRICT EXTENSION FORMATION COSTS These costs include one-time_ costs such as construction costs(hook up fees);buy in fees,soft costs and permit fees. 3.1 FEES&SOFT COSTS These are as follows.The buy in is$8,700.27 dollars and is due at time of permit issuance.A charge of $1,850 is applied for soft costs(attorney review,Town engineer,Town Board's time,Town clerk's time). There is$125 fee for the Wastewater Permit which will be issued after all other costs listed are paid and a County Permit is obtained along with required Certificates of Insurance being provided.The total fees and soft costs are$10,675.27. 3.2 CONSTRUCTION COSTS The estimated construction cost for the costs related to the extension to the GQCSSD is approximately$134,300. This amount is proposed to be privately paid by the Tidal Wave Auto Spa. A copy of the cost estimate is included as Appendix C. The total construction costs plus upfront fees and soft costs is approximately$144,675.27. 3.3 OPERATION AND MAINTENANCE COSTS An estimate of the applicant's annual costs are as follows: SEWER RENT As stipulated in the Map Plan and Report for Greater Queensbury Consolidated Sewer District, March 5, 2021 Final version,the cost of operation and maintenance would include the costs to operate, maintain, and supply the sewer system and is reflected in the sewer rent charges. Based on an estimated annual usage of 3.6 million gallons per year, and an existing operation and maintenance rate of$7.00 per 1,000 gallons (based on a review of current rate structures), the auto spa property yearly amount would be $25,200.00 per year, paid quarterly. The Town calculates a property's share of the debt service using the Benefit Tax.This considers property classification, acreage and water usage.The district does not use EDU's.The estimated Units are 68.87 acre units which would be an estimated tax burden of$1,542.The Sewer Rent calculation of$25,200 annually plus the Benefit Tax would come to approximately$26,742 annually. PENNONI ENGINEERING & SURVEYING OF NEW YORK, P.C. (f en�noni Tidal Wave Auto Spa Map & Plan Report EC|NEG20OU7 The subject property b/the only property iO this extension,so there bno applicable mode.Asper Warren County records,the total assessed value of the property is$1,564,900,with the Land value portion of the assessment being$979/500. � � 4.0 IMPLEMENTATION PLAN 4.1COST APPORTIONMENT There will be no cost apportionment for the debt service based on the EDU system for this extension. 4.2 CONSTRUCTION FINANCING No public construction financing is needed for this extension, as the proposed sewer system will be constructed utilizing private funds provided 6y the Tida| ' aveAutoSpa. 4.4 IMPLEMENTATION SCHEDULE The public hearing forthis project hasnntbeenschedm|edyet, |tis anticipated that it will occur inthe Spring of 2O22. |f the project isapproved, conotructionofthisp 'ectvviUbe ^nintheSphnguf2O22 with completion in the Summer of2O22. PENNON[ ENGINEERING & SURVEYING ' ' OF NEW xORK, P.C. Tidal Wave Auto Spa Map & Plan Report ECMES 20007 APPENDIX A Boundary Description PENNONI ENGINEERING & SURVEYING Pennon' OF NEW YORK, P.C. 0 P0 , 26 Aveahmi Road NTROL INT SS0 ' " ' �, �a �; - �r— o µ www.cpasumey-cm JANUARY 20, 2021 09-200249 METES AND BOUNDS DESCRIPTION LANDS N/F SMART WASH OF S.G.F., LLC MAP 303.15, BLOCK 1, LOT 12 TOWN OF QUEENSBURY, WARREN COUNTY, NEW YORK. ALL THAT TRACT OR PARCELOF LAND, SITUATE IN THE TOWN OF QUEENSBURY,- COUNTY OF WARREN AND STATE OF NEW YORK, BOUNDED AND DESCRIBED AS FOLLOWS: BEGINNING AT A POINT IN THE SOUTHERLY HIGHWAY BOUNDARY OF ..QUAKER ROAD=. (COUNTY ROUTE 70) AT ITS INTERSECTION WITH THE PROPERTY DIVISION LINE BETWEEN LANDS NIF GARVEY -PARTNERSHIP, AS DESCRIBED IN BOOK 5351 OF DEEDS AT PAGE 4.5, ON THE EAST, AND LANDS N/F OF SMART WASH OF S.G.F., LLC, AS DESCRIBED IN BOOK 5946 OF DEEDS AT PAGE 272, ON THE WEST, THENCE SOUTH 31° 02' 07" WEST, A DISTANCE OF 300.00 FEET TO A POINT AT ITS INTERSECTION WITH THE PROPERTY, DIVISION LINE BETWEEN LANDS N/F OF SWITCHCO LLC, AS DESCRIBED IN BOOK 4542 OF DEEDS AT PAGE 21,7, ON THE EAST, AND SAID LANDS OF SMART WASH OF S.G.F., LLC, ON THE WEST, THENCE SOUTH 090 57' 38<' WEST, A DISTANCE OF 440:97 FEET TO A POINT ON THE NORTHERLY- HIGHWAY BOUNDARY OF DIX AVENUE. (COUNTY ROUTE 42) , THENCE NORTH 800 02' 23" WEST, ALONG SAID -HIGHWAY BOUNDARY A DISTANCE OF 158.66_.FEET TO A POINT AT ITS INTERSECTION WITH THE PROPERTY DIVISION LINE BETWEEN LANDS N/F OF E. JAMES BARRETT & WILLIAM M. BARRETT, AS DESCRIBED IN BOOK 1209 OF.DEEDS AT PAGE 320, ON THE WEST, AND SAID LANDS OF SMART WASH OF S.G.F., LLC, ON THE EAST, THENCE ALONG SAID PROPERTY DIVISION LINE THE FOLLOWING THREE (3) COURSES AND DISTANCES (1) ALONG A CURVE TO THE RIGHT HAVING A RADIUS OF 50.00 FEET, AN ARC LENGTH OF 78.54 FEET, A CHORD BEARING OF NORTH 35'- 02' 22-" WEST, A CHORD DISTANCE OF 70.71 'FEET TO A POINT, (2) NORTH 09° 57' 37" EAST,. A DISTANCE OF 471.38 FEET TO A POINT, (3) NORTH 31° 02' 07" EAST, A DISTANCE OF 300.00 FEET TO .A POINT ON THE.FIRST MENTIONED SOUTHERLY HIGHWAY BOUNDARY OF QUAKER ROAD, THENCE SOUTH 58° 57' 53" EAST, ALONG SAID HIGHWAY BOUNDARY A DISTANCE OF 223.62 FEET TO THE POINT OR PLACE OF BEGINNING. CONTAINING 166,952 SQUARE FEET OR 3.833 ACRES, MORE OR LESS THIS DESCRIPTION IS BASED UPON AY SURVEY ENTITLED "ALTA/NSPS LAND TITLE SURVEY 708 QUAKER ROAD TM# 303.15-1-12 TOWN OF QUEENSBURY, WARREN COUNTY, STATE OF NEW YORK", PREPARED BY CONTROL POINT ASSOCIATES INC. PC, DATED_JANUARY 21, 2021. THIS PROPERTY MAY BE SUBJECT TO THE RESTRICTIONS, COVENANTS AND/OR EASEMENTS EITHER WRITTEN OR IMPLIED. Corporate Headquarters 30 Independent Boulevard Suite 100,Warren,NJ 07059 Tel:908.668.0099 Fax:908.668.9595 Professional Land Surveying, Geospatial and Consulting Services' Tidal wave Auto Spa Map & Plan Report ECMES 20007 APPENDIX B Sewer Map PENNONI ENGINEERING & SURVEYING ��►n���) OF NEW YORK, P.C. APPEN,-DIX B. ,. Yf u t 674 QUAKR RD_ s 44 aIAMES BARRETT � g a u ' 303.15 1-11 714 QUAKER RD.01 � °�. a *. GAR.VEY PARTNERSHIP' 303.15-1-3 f. 25d ' 257 DIX AVE LONG RIFLE ` ENTERPRISES 1NC CONNECTION POINT TO ` Y GOCSSD SEWER =i x t 303.15-1 4 281 DIX AUE nf.SWtTCHCO LLC.17 e s �G� pp114■11�i` 5 EXIST GQCSSD '. ¥ SANITARY.SEWER i, I(+ Y caw TV { C�J 2021 Microsoft Corp fion 6a ZOZj C i L1 sYn uA�cb�s,d5 24 omT�om` 1 `� it 2 200' 100, 0' 200' GRAPHIC SCALE:1"=200' SEWER MAP PENNON ENGINEERING __ t! TIDAL WAVE AUTO SPA &SURVEYING OF • � ) NEW YORK,PC 708 QUAKER ROAD 130 W 29TH STREET QUEENSBURY,WARREN-.COUNTY,NEW YORK SUITE5F NEW YORK,NY 10001 APPLCANT:TWAS PROPERTIES,LLC PH:212-239-7615 Tidal..Wa(ve Auto Spa Map & Plan Report. ECMES 20007- -.APPENDIX C COst Estimate PENNONI-ENGINEERING &SURVEYING PEA unsoni OF NEW YORK, P.C. ~ ' w � . ^ , Cost Estimate for Sanitary Sewer Extension toG[ CSSO Tidal Wave Auto Spa(rVVA5 70O Quaker Road,Oweensbury,NY ' Mar-22 On-Site Costs Quantity !Units Unit Cost Cost Abandon Existing Pump Station/force main l EA $ 2,500.00 $ 2,500.00 O"PVC DR1O Sanitary Sewer 250 LF $ 80.00 $ 20,000.00 ' Trench Rock Removal 150 CY $ 50.00 $ 7,500.00 Se|ectBackfiU 200 CY $ �0.00 $ 12,000.00 Asphalt Pavement Restoration 1,000 SF $ 2¢00 $ 20,000.00 Mobilization 5% $ 3,100.00 Contingency 10% Dn`Site6u6tota| $ 71,300.00 Dix Ave gl�l�U� �l�t� U nit Cost Cost ----------- _-----_----- Exist Sanitary Manhole Drop Connection 1 EA $ 2,500.00 $ 2,500.00 Jack/&Bore 8"Sewer Lateral 100 LF $ 500100 $ 50,000.00 Mobilization 59& 5y6 $ 2,625.00 ' Traffic Maintenance Q Protection 3y6 ' Y6 $ 2,625.00 [ontngency 1096 Dix Ave Subtotal $ 63,000.00 ' Total Cost � $ 134,300.00 ' ' ^ Short Environmental Assessment Form Part 1 -Project Information Instructions for Coar>apletin Part i—Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part 1 based on information currently available..If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1.You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part 1—Project and Sponsor Information TWAS Properties,LLC c/o SHJ Construction Group Name of Action or Project: Tidal Wave Auto Spa Greater Queensbury Consolidated Sewer DistE.xtension#2 Project Location(describe,and attach a location map): 708 Quaker Road,Queensbury,NY 12804 Brief Description of Proposed Action: Extension od the Greater Queensbury Consolidated Sewer Dsitrict to include the referenced parcel,as well as the design and construction of a sewer lateral from the site to the nearest manhole on Dix Avenue. Name of Applicant or Sponsor: Telephone: 706.975.6682(mobile) ti TWAS Properties,LLC c/o SHJ Construction E-Mail: martie@shjconstructiongroup.com Address: 124 East Thompson Street Post Office Drawer 311 City/PO: State: Zip Cade: Thomaston [GA 30286 1. Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO YES administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in.the municipality and proceed to Part 2. If no,continue to question 2. 2. Does the proposed action require a permit,approval or funding from any other government Agency? NO YES If Yes,list agency(s)name and permit or approval: ❑ 3. a.Total acreage of the site of the proposed action? 3.8 acres b.Total acreage to be physically disturbed? 0.05 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 3'8 acres 4. Check all land uses that occur on,are adjoining or near the proposed action: ❑Urban ❑ Rural(non-agriculture) Z Industrial 0✓ Commercial ❑ Residential(suburban) ❑Forest Q Agriculture Aquatic ❑ Other(Specify): Parkland Page 1 of 3 SEAF 2019 5. Is the proposed action, NO YES N/A a. A permitted use under the zoning regulations? -1 Fs-/] El F b. Consistent with the adopted comprehensive plan? —1 F F❑ v� E1_ NO YES, 6. Is the proposed action consistent with the predominant character of the existing built or natural.landscape? ❑ Fv� 7. Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES If Yes,identify: H, NO YES 8. a. Will the proposed action result in a substantial increase in traffic above present levels? b. Are public transportation services available at or near the site of the proposed action? F Fv� c. Are any pedestrian accommodations or bicycle routes available on or near th&site of the proposed � El. action? 9. Does the proposed action meet or exceed the state energy code requirements? . NO YES If the proposed action will exceed requirements,describe design features and technologies: 10. Will the proposed action connect to an existing public/private water supply? NO YES if No,describe method for providing potable water: ❑ 11. Will the proposed action connect to existing wastewater utilities? NO YES If No,describe method for providing wastewater treatment: 12. a.Dods the project,site contain,or is it substantially contiguous to,a building,archaeological site,or district NO YES which is listed on the National or State Register of Historic Places,or that has been determined by the Commissioner of the NYS Office of Parks,Recreation and Historic Preservation to be eligible for listing on the ✓ El State Register of Historic Places? b.Is the project site,or any portion of it,located in or adjacent to an area designated as sensitive for ❑ archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site-inventory? 13. a. Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain, NO YES wetlands or other waterbodies regulated by a,federal,state or local agency? ❑ b.Would the proposed action physically alter,or encroach into,any existing wetland or wdterbody? If Yes,identify the wetla'nd or waterbody and extent of alterations in square feet or acres: Page 2 of 3 14. Identify the typical habitat types that occur on,or are likely to be found on the project site.-Check all that apply: rIShoreline M Forest rl Agricultural/grasslands M Early mid-successional OWetland rl Urban V Suburban 15. Does the site of the proposed action contain any species of animal,or associatedhabitats,-listed by the State or NO YES Federal government as threatened or endangered? 16. Is the project site located in the 100-year flood plan? NO YES 17. Will the proposed action create storm water discharge,either from point or non point sources? NO YES If Yes, Z a. Will storm water discharges flow to adjacent properties? b. Will storm water discharges be directed to established conveyance-systems(runoff and storm drains)? El , El If Yes,briefly describe: 18. Does the proposed action include construction or other activities that would result in the impoundment of water NO YES or other liquids(e.g,,retention pond,waste lagoon,dam)? If Yes,explain the purpose and size.of the impoundment: -1 F-1. R 19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste NO YES management facility? If Yes,describe: ❑ F-1 20.Has the site of the proposed action or an adjoining property been the subject of rernediation(ongoing or NO YES completed) for hazardous waste? If Yes,describe: -1 F-1 R I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor/name: Martie Murphy Date: -4-5-22 Signature: Title: Director of Entitlement PRINT FORM Page 3 of 3