Loading...
Signed Inspection Report (Thu Apr 14, 2022 at 253 PM)INSPECTION WORKSHEET (FDTN-017697-2022) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0597-2021 Case Module:Permit Inspection Date:Thu Apr 14, 2022 Inspection Status:Partial Pass Inspector:Smith, Mark Inspection Type:Building Foundation Job Address:Parcel Number:21 WHITBECK DR Queensbury, NY, 12804 289.19-1-27 Contact Type Company Name Name Contractor BBL Construction Services Applicant BBL Construction Services Primary Owner Rosetti Acquisitions LLC Architect HCP Architects, LLP Granted Permission BBL Construction Services Checklist Item Status Building Inspector Notes Failed 11/29/21 footings approved, exterior piers approved. 12/8/21 Building Foundation Partial Approval - Exterior foundation walls and exterior columns approved 12/13/21 2" ridged insulation at interior of foundation walls verified. 4/6/22 partial approval for foundation - sanitary plumbing under slab approved. 4/14/22 partial approval for foundation - poly under slab and rebar at hunched areas approved. Footings Passed 11/29/21 footings approved, exterior piers approved. Apr 14, 2022 Page (1) INSPECTION WORKSHEET (FDTN-017697-2022) Checklist Item Status Piers Passed 11/29/21 footings approved, exterior piers approved. Monolithic Slab Failed Reinforcement in Place Passed 11/29/21 footings approved, exterior piers approved. Foundation / Wallpour Passed 12/8/21 Building Foundation Partial Approval - Exterior foundation walls and exterior columns approved Reinforcement in Place Passed 12/8/21 Building Foundation Partial Approval - Exterior foundation walls and exterior columns approved Masonry Wall Failed Reinforcement in Place Failed Foundation Dampproofing Failed Foundation Waterproofing Failed Footing Drain Daylight or Sump Failed Footing Drain Stone - 12 inch width Failed Apr 14, 2022 Page (2) INSPECTION WORKSHEET (FDTN-017697-2022) Checklist Item Status Footing Drain Stone - 6 inches above footing Failed Footing Drain stone - 6 mil poly Failed Plumbing Under Slab Passed 4/6/22 partial approval for foundation - sanitary plumbing under slab approved. PVC / Cast / Copper Failed Foundation Insulation Interior / Exterior Passed 12/13/21 2" ridged insulation at interior of foundation walls verified. Rough Grade 6 inch drop within 10 ft.Failed Poly Under Slab Passed 4/14/22 partial approval for foundation - poly under slab and rebar at hunched areas approved. Apr 14, 2022 Page (3) Smith, Mark