Loading...
CC-0803-2021 Office Use Only ADDITION/ALTERATION PERMIT Permit#: C —' -4PbE)5" 2�21 APPLICATION Permit Fee:$ Town of Queensbwy 742 Bay Road,Queensbury,NY 12804 Invoice#: 5r�; P:518-761-8256 www.gueensbury.net Flood Zone? Y Reviewed Byk? Project Location: 1 Main Street Tax Map ID#: 309.11-2-17 Subdivision Name: PROJECT INFORMATION: TYPE: Residential X Commercial, Proposed Use: Office space Single-Family _Two-Family _Multi-Family(#of units ) _Townhouse X Business Office _Retail _Industrial/Warehouse _Garage (#of cars_) Other(describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 384 SF 1st floor: 2nd floor: 2nd floor: 3rd floor: 3rd floor: Basement(habitable space): Basement (habitable space): Total sq ft: 384 SF Total sq ft: Scope of work to be done: Existing office building to have a 16' x 24' addition to match existing building. D E rrizi k-L7 NOV 01 2021 TOWN OF QUEENSBURY BUILDING& OODES Addition/Alteration Application Revised January 2021 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 100,000 2. Source of Heat(circle one):XGas _Oil _Propane _Solar_Other Fireplaces/inserts need a separate Fuel Burning Appliances &Chimney Application 3. Are there any structures not shown on the plot plan? YES XNO Explain: 4. Are there any easements on the property? YES X NO SITE INFORMATION: • Is this a corner lot? x YES NO • Will the grade be changed as a result of the construction? _YES X NO • What is the water source? X PUBLIC _PRIVATE WELL • What type of wastewater system is on the parcel? X SEWER _PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certifythat the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: Ethan P. Hall -Arch it t\Agent for the Applicant SIGNATURE: DATE: 30 Oct 2021 Addition/Alteration Application Revised January 2021 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): JP Gross Properties, LLC Mailing Address, C/S/Z: 27 Silver Circle, Queensbury NY 12804 Cell Phone: ( 518 )361-0607 Land Line: �) Email: jgross arosselectricinc.com Primary Owner(s): Name(s): JP Gross Properties, LLC Mailing Address, C/S/Z: 27 Silver Circle, Queensbury NY 12804 Cell Phone: 518 )361-0607 Land Line: �) Email:J,a rossCa7 Q rosse I e ctri ci n c.co m Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contact Name(s): Contractor Trade: Mailing Address, C/S/Z: Cell Phone:�_) Land Line: � ) Email: **Workers' Comp documentation must be submitted with this application** • Arch itect(s)/En>;ineer(s): Business Name. Rucinski Hall Architecture Contact Name(s): Ethan P. Hall Mailing Address, C/S/Z: 134 Dix Ave, Glens Falls NY 12801 Cell Phone: 518 )260-2888 Land Line: 518 741-0268 Email: ephall@nycap.rr.com Contact Person for Compliance in regards to this project: Ethan P. Hall Cell Phone: 518 )260-2888 Land Line: 518 )741-0268 Email: ephall@nycap.rr.com Addition/Alteration Application Revised January 2021 COMcheck.Softwa' re Version 4.i.5.0 F L::OE Envelope Corn llance Certificate Project Information Energy code: 2018 IECC 309.11-2-17 CC-0803-2021 Project Title: 1 Main:Street-Addition Location: Glens Falls, New York 3P Gross Properties LLC Climate Zone: 6a 1 Main St Project Type: Addition 384 S,f Vertical Glazing/Wall Area: 10°i° Commercial Addition Construction Site:, Owner/Agent: Designer/Contractor: 1 Main Street JP,Gross Properties LLC Ethan P. Hall. Queensbury, NY 12804 27 Silver Circle Rucinski Hall Architecture Queensbury, NY 12804 134 Disc Ave 518-361-0607 Glens Falls, NY 12801 )gross@grosselectricinc.com 518-741-0274 ephall@nycap.mcom REVIEWED FOR . ENERGY CODE Building Area Floor Are COMPLIANCE 1-Office:Nonresidential 384 Envelope Assemblies Assembly Gross Area .Cavity Cont. . Proposed Budget U- or R-Value R-Value U-Factor Factors.) Perimeter Roof 1:Attic Roof with Wood Joists,[Bldg.Use 1 Office] 384 49.0 0.0. 0.021 0.021 Basement Wall 1:Solid Concrete:8"Thickriess,'Normal Density, 345 — 19.0 0.049 0.119 Furring:None,Wall Ht 6.2,Depth B.G.5.8;[Bldg.Use 1-Office] NORTH Exterior Wall 2:Wood-Framed, 16"o.c.,[Bldg.Use 1-Office] 216 21.0 0.0 0.062 0.051 Door 1:Glass(>50%glazing):Metal Frame,Entrance Door,Pert. - 37 — 0.320 0.770 Specs.:Product ID product label,SHGC 0.33,[Bldg.Use 1-Office](b) EAST Exterior Wall.3:Wood-Framed, 16"o.c.,[Bldg.Use 1:Office] -144 21.0 0.0 0.062 0.051 Window 1:Wood Frame:Fixed,Pert.Specs.:Product ID product label, 16 — -- 0.290 0.360 SHGC 0,33,[Bldg:Use 1 -Office](b) WEST Exterior Wall 1:.Wood-Framed,16"o.c.,[Bldg.Use,1 :Office] 144- 21.0. 0.0 0.062 0.051 (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting document qn. �0� p i 202i OFQUE:NSDURY TOBu1LD6►dG 8&CODES Project Title: 1 Main Street-Addition Report date: 10/30%21 Data filename: Y:\Gross Electric\1 Main Street\Const Dwg's\1 Main Street.cck Page 1 of 14 Envelop& Design 84%better thancode EnVel®pe Compliance Statement Compliance Statement: The proposed envelope design represented in this.document is consistent with the building plans, specifications, and other calculations submitted'with this permit application:The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck ver ion. .0 a to omply with any applicable mandatory requirements listed in the Inspection Checklist.. Ethan P. Hall-Architect Name-Title Signat � ' ?L[;T, Date '. � r • y a: Project.Title: 1.Main Street-Addition Report date: 10/30/21 Data filename: Y:\Gross Electric\1 Main Street\Const Dwg's\1 Main Street.cck Page 2 of 14 ®I�c>�eck Software Vers�on 4:1._5.0 Interior Lighting Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: 1 Main Street-Addition Project Type: Addition Construction Site: Owner/Agent: Designer/Contractor: 1 Main Street JP Gross Properties LLC Ethan P.Hall Queensbury, NY 12804 27 Silver Circle Rucinski Hall Architecture Queensbury,.NY 12804 134 Dix Ave 518-36170607 Glens Falls, NY 12801 jgross@grosselectricinc.com 51-8-741-0274 ephall@nycap.rr.com All Interior Lighting Power A B C D Area Category. Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Common Space Types:Office-Open Plan 384 0.81 311 Total Allowed Watts= 311 Proposed Interior Lighting Power A B:. . C D E Fixture ID: Description/Lamp/Wattage Per Lamp./Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-Common Space Types:Office_Open Plan LED 1:LED Linear 17W: 1 5 - 34 . 170 Total Proposed Watts 170 Interior • o 'A •n 450/obetter than code Interior Lighting Compliance Statement Compliance Statement. The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2618 IECC requirements in CO_Mcheck sioa� an. to comply with any applicable mandatory requirements listed in the Inspection Checklist. Ethan P.Hall-ArchitectID . Name-Title Sign re Date Project.Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: YAG.ross Electric\1 Main Street\Const Dwg's\1 Main Street:cck Page 3 of 14 COMcheck Software Version 4.1..5.0 Ex- terior Lighting Complia 'ce .Certfficate Project Information Energy Code: 2018 IECC Project Title: 1 Main Street-Addition Project Type: Addition Exterior Lighting Zone 2(Neighborhood business district) Construction Site: Owner/Agent: Designer/Contractor: 1 Main Street jP Gross Properties LLC Ethan P. Hall Queensbury; NY 12804 27 Silver Circle Rucinski Hall Architecture Queensbury;NY 12804 134 Dix Ave 518-361=0607 Glens Falls, NY,12801 jgross@grosselettricinc.com 518-741-0274 ephall@nycap.rr.com Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage (B X C) Entry canopy. 1 ft2. 0.25. Yes. 0 Total Tradable Watts(a)= 0 Total Allowed Watts= 0 Total Allowed Supplemental-Watts(b)= 400 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 400 watts may be applied toward compliance of both non-tradable and.tradable areas/surfaces. Proposed Exterior Lighting Power A B C. D E Fixture ID:Description Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Entryr canopy(1 ft2):Tradable Wattage LED 1:LED A Lamp 13W: 1- 1 34 - 34 Total Tradable Proposed Watts= 34 �EXterior Lighting • + Design 921/6 better than code Exterior Lighting Compliari!ce Statement Compliance Statement. The proposed exterior lighting,design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit.application.The proposed exterior lighting systems have been -designed to meet the 2018 IECC requirements in-COMcheck ion 4.1.5 n to comply with any applicable mandatory requirements listed in the Inspection Checklist. Ethan P.Hall-Architect rM• Name-Title Signa e.. D to Project Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: Y:\Gross Electric\1 Main Street\Const Dwg's\1 Main Street.cck Page 4 of 14 COMcheck Software Version 4.1.5.0 Inspection -Checklist- Ehergy Code: 2018 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen: For each requirement, the user certifies that a code requirement will be rnet and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table,a reference to that table is provided. Sectlon . # . . Plan Revidw Complies? Cornrnents/Assurraptions �c Re' JID C103.2 ;Plans and/or.specifications provide all ;❑Complies ;Requirement will be met._- (PR111 "information with which compliance ;❑Does Not can be determined for the building Location on plans/spec:A-1 ;envelope and document where -❑Not Observable exceptions to the standard are :❑Not Applicable claimed. ; C103.2 ;Plans,specifications, and/or ;❑Complies ;Requirement will be met. [PR4]1 :calculations provide all information ;❑Does Not. with which compliance can be - Location on plans/spec:A-1 . ;determined for the interior lighting ;❑Not.Observable: ;and electrical systems and.equipment ;[]Not Applicable ; and document where exceptions to :the standard are claimed.Information ;provided should include interior !lighting power calculations,wattage of !bulbs and ballasts,transformers and. ' control devices. C103.2 Plans, specifications;and/or ;❑Complies Requirement will be met. [PR8]1 ;calculations provide all information ;❑Does Not ;with which compliance can be :Location on plans/spec:A-1 `determined for the exterior lighting ❑Not Observable :and electrical systems and equipment ;❑Not.Applicable and document where exceptions t.o ;the standard are claimed. Information iprovided should include exterior- lighting power calculations,wattage of I bulbs and ballasts,transformers and control devices. C402.4,1 'The vertical fenestration area <=30 ;❑Complies ;Requirement will be met. (PR10]1 ;percent of the gross above-grade wall ;❑Does Not area. ; :Location on plans/spec:A-1 .:UNot Observable. . ❑Not Applicable C402.4.1 'The skylight area <= 3 percent of the f❑Complies ;Requirement will be met: [PR11]1 ;gross roof area. ;❑Does Not . '.❑Not Observable;Location on planslspec:A-1 ❑Not Applicable C406 'Plans,specifications, and/or ;❑Complies ;Requirement will be met. [PR9]1 ;calculations provide all information �❑Does Not . ;with which compliance can be ; :Location on plans/spec:A-1 determined for the additional energy ;❑Not Observable !efficiency package.options. ❑Not Applicable Additional Comrents/Assumptions: 1. High Impact(Tier 1) 2 Medium Impact:(Tier 2) 3 Low Impact(Tier 3) Project Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: Y.\Gross Electric\1 Main Street\Const Dwg's\1 Main Street:cck Page 5 of 14 Section # !s®®tiwg/Foul4itidn.leispeetioh.-- 'C®inplies? ;.. ®rnments/�ssufilpgions: lif Req.i® C303.2-. iBelow-grade wall insulation installed ;❑Complies ;Requirement will be met. [F02]z per manufacturer's instructions: ;❑Does Not ❑Not Observable;Location on plans/spec:A-1 ❑Not Applicable C303.2.1 Exterior insulation protected against ![]Complies. iRequirement will be met. [F06]1 damage,sunlight;moisture,wind; ;❑Does Not; landscaping and equipment ❑Not Observable; maintenance activities. ;. []Not Applicable C402.1.4 ;Below-grade wall insulation R-value. ;❑Complies Seethe Envelope Assemblies table for values. [FOl]2 ❑Does Not ❑Not Observable': ❑Not Applicable Additional Comments//Assumptions: 1 High Impact(Tier 1) 2 Medium,lmpact.(Tier 2) 3 Low Impact(Tier 3) Project Title: 1 Main Street-Addition Report date: 10/30/21 Data-filename: Y:\Gross Eiectric\1 Main Street\Const Dwg's\I Main Street.cck Page, 6 of 14 Section . . . # Framing/Rouol =46 Inspection' C®AaepiEea?`• . `...Comrnents/Assurqpt ions . & Req.ID C303.1.3, 'Fenestration products rated in ;❑complies ;Requ,irement will be rnet. [F.R1.2]2 accordance with NFRC. ;❑Does Not '❑iVot Observable:Location on plans/spec:A-1 ❑Not Applicable .; C303.1.3 'Fenestration products are certified as ;❑Complies. ;Requirement will.be met. [FR1311 :to performance labels or certificates CID oes Not i provided. :Location on plans/spec:A-1 ;❑Not Observable: ;❑Not Applicable C402.4.3 .;Vertical fenestration SHGC value. I❑Complies ;See the Envelope Assemblies table for values. [FR10]1 T❑Does Not j ;❑Not Observable; ❑Not Applicable C402.4.3, ;,Vertical fenestration U-Factor. ;❑Complies ;See the Envelope Assemblies table for values. C402.4.3. 1 ;❑Does Not 4 ; [FR811 ❑Not Observable ❑Not Applicable ; C402.4'.4 ;U-factor of opaque doors associated ;❑Complies ;See the Envelope Assemblies table for values. [FR14]2 ;with the building thermal envelope ;❑Does Not- meets requirements. : ❑Not Observable ❑Not Applicable . c402.5.1 ;The building envelope contains a ;❑Complies ;Requirement will be met. [FR1611 'continuous air barrier that is sealed in :❑Does Not an approved manner and either Location on plans/spec:A-1 :constructed ortested in an approved ;❑Not Observable manner.Air barrier penetrations are !CNot Applicable ;sealed in an approved manner. . C402.5.2, Factory-built fenestration and doors ❑Complies ;Requirement will be met. C402.5.4 are labeled as meeting air leakage ;❑Does Not - [FR18]3 ;requirements: ;❑Not Observable; ❑Not Applicable C402.5.7 ;Vestibules are installed on all building ;❑Complies ;Exceptlonh.Requirement does not apply.- [FR17]3 entrances. Doors have self-closing j❑Does Not. devices, ;❑Not Observable!. ❑NotApplicable Additional Comments/Assumptions- 1 High Impact(Tier 1) - 2 Medium,Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 1 Main-Street-Addition Report date: 10/30/21 Data filename: Y:\Gross Electric\1 Main Street\Const Dwg's\1 Main Street.cck Page 7 of 14 Section , - .. ..:. # NiecBianicai.Rougw-Bn Inspecgidw -:.':Complies?.:. .. C®rnenenta/tissurropti®ns 6c Req.iD C402.5.5, "',Stair and elevator shaft vents have ;❑Complies Exception: Requirement does not apply. C403.2.4. 'motorized dampers that automatically CIDoes Not 3 ;close.Refernece section C403.7.7 for [ME3]3 'operational details. ❑Not Observable ❑Not Applicable Additional Comments/Assurnptions: 1 High Impact(Tier 1) - 2 Medium Impaci flier 2) 3 Low Impact(Tier 3) Project Ttle: 1 Main Street-Addition Report date: 10/30/21 Data filename: Y:\Gross Electric\1 Main Street\Const Dwg's\1 Main Street.cck Page 8 of 14 Section . Rquoh-In Eleetiical Inspection •.:'::CoMpliea9:. Corverrieots/Assuriepti®ns-- a Rom C405.2J. ;Spaces required to have light- ;[]Complies ;Requirement will be met: 2 :reduction controls have a manual ;❑Does Not [EL22]1 :control that allows the occupant to ILocation on places/spec:A-1 reduce the connected lighting load "n :[]Not Observable :a reasonably uniform illumination 1❑Not Applicable ; pattern>_.50 percent. ; C405.2.1, :Occupancy sensors installed in ;❑Complies - ;Requirement will be met.: . C405.2.1. classrooms/lecture/trainirig rooms, ;❑Does Not 1 conference/meeting/multipurpose Location on plains/spec:A-1 [EL18]1 ;rooms,copy/print rooms, +❑Not Observable; ;lounges/breakrooms,enclosed offices, ❑Not Applicable open plan office areas, restrooms, :storage rooms, locker rooms, ; ;warehouse storage areas,and other ;spaces<=300 sgft that are enclosed by floor-to-ceiling height partitions. 1 ;Reference section language ; C405.2.1.2 for control.function in I ;warehouses and.section C405.2.13 j ;for open plan office spaces. C405.2.1. ;Occupancy sensors control function in ;❑Complies Exception: Requirement does not apply. 2 :warehouses: In warehouses,the ;❑Does Not [EL19]1 ;lighting in aisleways and open areas is controlled with occupant sensors that; :❑Not Observable: ;automatically reduce lighting power Not Applicable by 50%or more when the areas are, unoccupied.The occupant sensors 'control lighting in each aisleway independently and do not control alighting beyond the aisleway being ;controlled by the sensor. ; C405.2.1. ;Occupant sensor control,function in ;❑complies ;Exception: Requirement does not apply. 3 ;open plan office areas:Occupant I❑Does Not [EL20]1 ;sensor controls in open office spaces . ;>=300 sq.ft. have controls 1) ❑Not Observable; configured so that general lighting can ❑Not Applicable be controlled separately in control ; zones with floor areas<= 600 sq.ft. within the space,2).automatically turn,!. ; off general lighting in all control zones ;within 20 minutes after all occupants have left the space, 3)are configured •.so that general lighting power in each control zone is reduced by>=80%of j ;the full-zone general lighting power within 20 minutes of all occupants `leaving that control zone, and 4)are :configured such that any daylight responsive control will activate space- general lighting or control zone general lighting only'when occupancy ;for the same area is detected. C405.2.2, Each area not served by occupancy ❑Complies ;Exception: Lighting controlled by occupancy sensors. C405.2.2, sensors(per C405.2.1).have time- ;❑Does Not 11 ;switch controls and functions detailed C405.2.2. ,in sections.C405.2.2;1 and C405.2.2.2.,❑Not Observable! 2 :❑Not Applicable [EL23]z 1 High Impact(Tier l) 1 2 1 Medi6m..Impact(-Tier 2)- 3 1 Low Impact(Tier 3) Project Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: Y:\Gross Electric\i Main Street\Const Dwg's\1 Main Street.cck Page 9 of 14 Section # 13oUgh-In Electrical Inspection :Complies? : ; Commentsl�►ssuraiptions..:.- &Req.l® C405.2.3, ;Daylight Tones provided with ;❑Complies ;Exception: Requirement does not apply. C405.2.3. 'individual controls that control the ;❑Does Not 1, ;lights independent of general,area I - C405.2.3. ;lighting. See code section C405.2.3 ;❑Not Observable: Z Daylight-responsive;controls for ❑Not Applicable [EL23]2 ' ;applicable spaces, C405.2.3A Daylight; responsive control function and ' section C405.2.3.2 Sidelit zone. C405.2.4. ;Separate lighting control devices for ;❑Complies ;Requirement will be met. [EL26]1 ;specific uses installed per approved ;❑Does Not. ;lighting plans. ;Location on plans/spec:A-1 ❑Not Observable; ❑Not Applicable C405.2.4 'Additional interior lighting power ❑Complies ;Requirement will be met.- [EL27]1 :allowed for special functions per the ;❑Does Not approved lighting plans and is :Location on plans/spec:A-1 automatically controlled and ;❑Not Observable separated from general lighting. ❑Not Applicable C405.2.5 ;Automatic,lighting controls for exterior;❑Complies ;Exception: Requirement does not apply. [EL28]no0 lighting installed.Controls will be ;❑Does.Not ,daylight controlled,set based on business operation time-of-day, or ;❑Not_Observable 1 ;reduce connected lighting>30%. ❑Not Applicable . C405.3 ;Exit signs do not exceed 5 watts per ;❑Complies ;Requirement will be met. [EL6]1 face. ;❑Does Not. �ONot Observable Location on plans/spec:A-1 IF-]Not Applicable C405:6 ;Low-voltage dry-type distribution ❑Complies ;Exception: Requirement does not apply. [EL26]2. "electric transformers meet the ;❑Does Not minimum efficiency requirements of- ' Not Observable ;Table C405.6. ❑Not Applicable C4.05.7 ;Electric-motors meet the minimum . . ❑Complies ;Exception.: Requirement does not apply. [EL27]2 :efficiency requirements of Tables ;❑Does Not ?C405.7(1)through C405.7(4). ❑Not Observable; Efficiency verified through certification, under an approved certification ZI.Not Applicable program or the equipment efficiency ratings shall be provided by motor manufacturer(where certification programs do not exist). C405.8.2, ,Escalators and moving walks comply ;❑Complies ;Exception: Requirement does not apply. C405.8.2. ;with ASME A17:1/CSA B44 and have ;❑Does Not 1 .automatic controls-configured to [EL28]2, ;reduce speed to the minimum :[-]Not Observable permitted speed in accordance.with []Not Applicable ; ;ASME A17.1/CSA B44 or applicable 'local code when not conveying I I passengers. , C405.9 : ;Total voltage drop across the ;❑Complies ;Exception: Requirement does not apply. [EL29]2 ;combination of feeders and branch ;❑Does Not ;circuits <=5%. 10Not Observable []Not Applicable Additiional Commehits/Assuinpti®ns: 1 High Impact(Tier 1) 2 Medium Impact.(Tier 2) 3 Low-Impact(Tier 3) Project Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: YAGross Electric\1 Main Street\Const Dwg's\1 Main Street.cck Page 10 of 14 ,section .. ' Insulation leiepection ' :C®mplies? C®esnrnents/l9ssa�oiriipixi®eis & Req. C303.1 ;Roof insulation installed per ❑Complies Requirement will be met. [IN3]1 ;manufacturer's instructions.Blown or ;❑Does Not poured loose-fill insulation is installed ; Location on plans/spec:A-1 ;only where the roof slope is<=3 in ;❑Not Observable ;12. ;❑Not Applicable ; C402.2.1 ;Insulation installed on a suspended ;❑Complies ;Exception: Requirement does not apply. [IN20]1 1:ceiling having ceiling tiles is not being 1,❑Does Not ;specified for roor/ceiling assemblies. ;❑Not Observable_; Continuous insulation board installed ° in 2 or more layers with edge joints �ONot Applicable offset between layers. C303.1 ?Building envelope insulation is labeled ;❑Complies ;Requirement will be met. [IN 10]z with R-value or insulation certificate ;❑Does Not providing R-value and other relevant data. ❑Not Observable: ;❑Not Applicable C303.2 ;Above-grade wall insulation installed i0Complies ;Requirement will be met. [IN7]1 :per manufacturer's instructions: ❑Does Not '❑Not Observable:Location on plans%spec:A-1 ❑Not Applicable C303.2.1 Exterior insulation is protected from ;❑Complies . Exception; Requirement does not apply. [IN14]2 ;damage with a protective material. ;❑Does Not Verification for exposed foundation insulation may need to occur during ;❑Not Observable Foundation Inspection. ;❑Not Applicable ; C105 ;Installed above-grade wall insulation ;❑Complies ;See the Envelope Assemblies table for values. [IN6]1. ;type and R=value consistent with ;❑Does Not i insulation specifications reported in plans and COMcheck reports. ❑Not Observable ;❑Not Applicable C402.2.6 Radiant panels and associated ;❑Complies .;Exception: Requirement does not apply_. [IN18]3 components,designed for heat QDoes Not transfer from the panel surfaces to the occupants or indoor space are ;❑Not Observable insulated with.a minimum of R-3.5. ;❑Not Applicable ; C105 `Installed roof insulation type and R- . ElComplies ,Seethe Envelope Assemblies tattle for values. " [IN2]1 ;value consistent with insulation ;❑Does Not ;specifications reported in plans and COMcheck reports.For some ceiling ;❑Not Observable systems, verification may need to �❑Not Applicable ;occur during Framing Inspection. ; C402.5.1. All sources of air leakage in the ElComplies Requirement will be met. 1 j building thermal envelope are sealed, ;❑Does Not [IN111 ;caulked, gasketed,weather stripped :Location on plans/spec:A-1 •or wrapped with moisture vapor- ❑Not Observable ;permeable wrapping material to ❑Not Applicable minimize air leakage. Additional Coeminents/Assn mptions: 1 High Impact(Tier 1) 2 Medium.lmpact.(Tier 2j 3 1 Low Impact(Tier 3) Project Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: Y:\Gross Electric\1 Main Street\Const Dwg's\1 Main Street.cck Page 11 of 14 Section Final.Inspectiort C®rinplies�::::: : :. Corrsir��flts/Assurripti®ns rr Resiol® . C303.3, ;Furnished 0&M instructions`for ;❑Complies ;Requirement will be met. C408.2.5. 'systems and equipment to the ;Does Not 2 building owner or designated [FI17]3 representative. :❑Not Observable ;❑Not Applicable ; C402.5.6 !We a ;❑therseals installed on all loading. - Complies ;Exception: Requirement does not apply. [FI37]1 �dock cargo door openings and provide ;❑Does Not direct contact along.the top and sides !of vehicles parked in the doorway. ;❑Not Observable 1 ;❑Not Applicable C402.5.6 Meatherseals installed on all loading i❑Complies 'Exception: Requirement does not apply: [FI37]? :dock cargo door openings and provide :❑Does Not direct contact along the top and sides ; ; :of vehicles parked irrthe doorway. ;❑Not Observable I ;❑Not Applicable C402.5.6 ;Weatherseals installed on all.loading: ;❑Complies ;Exception: Requirement does not apply. [FI37]1 dock cargo door openings and provide :❑Does Not jdirect contact along the top and sides ; of vehicles parked in the doorniay. :[--]Not Observable! ❑Not Applicable C402.5:6 ;Weatherseals installed on.all loading ;❑Complies :Exception:Requirement does not apply. [F137]1 dock cargo door openings and provide ;❑Does Not ;direct contact along the top and sides ; of vehicles parked in the doorway: ;❑Not Observable ❑Not Applicable ; C402.5.8 ;Recessed luminaires in thermal ;❑Complies ;Exception:.Requirement does not apply. [FI26]3 . jenvelope to limit infiltration and be IC. UDoes Not 'rated and labeled.Seal between ;Interiorfinish and luminaire housing. ;❑Not.Observable '[]Not Applicable Applicable C40.5.4.1 .;Interior installed lamp and fixture. ;❑Complies ;See the Interior Lighting fixture schedule for values. [FI18]i :lighting power is consistent with what i❑Does Not ;is shown on the approved lighting21 i]Not Observable' plans,demonstrating proposed watts ; , :are less than or equal to allowed ❑Not Applicable watts. C405.5:1 ;Exterior lighting power is consistent ;❑Complies ;See the Exterior Lighting fixture schedule for values. [FI19]1 with what is shown on the approved . ;❑Does Not lighting plans,demonstrating . proposed watts are less than or equal ;❑Not Observable to allowed watts. ;❑Not Applicable C408.1.1 ;Building operations and maintenance ;❑Complies ;Requirement will be met. (FI57]1 !documents will be provided to the ;❑Does Not owner. Documents will cover manufacturers'information, :[:]Not Observable ;specifications,programming T❑Not Applicable ;procedures and means of illustrating to owner how building,equipment and ;systems are intended to be installed, ; :;maintained, and operated. C408.2.5. ;Fumished as-built drawings for ;❑Complies ;Requirement will be met. 1 electric power systems within 90 days Oboes Not [FI16]3 of system acceptance. ❑Not Observable .;❑Not Applicable C406.3' i Lighting systems have been tested to ❑Complies :Requirement will be met. [FI33]1 :ensure proper calibration,adjustment, ;❑Does Not programming;and operation. 'pNot Observable;Location on plans/spec:A-1 ❑Not Applicable Additional Cornments/Elssum' ptions: -11 High Impact.(Tier 1) 2 Medium Impact.(Tiee 2) 3 Low.Impact(Tier 3) Project, Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: Y:\Gross Electric\1 Main Street\Const Dwg's\l Main Street.cck Page 12 of 14 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: YAGross Electric\1 Main Street\Const Dwg's\1 Main Street.cck Page 13 of 14 Project Title: 1 Main Street-Addition Report date: 10/30/21 Data filename: YAGross Electric\1 Main Street\Const Dwg's\i Main Street.cck Page 14 of 14 TOWN OF QUEENSBURY BUILDING DEPARTMENT Based on our limited examination,compliance with our comments shall not be construed as indicating the plans and specifications are in full compliance with the Building Codes of NeMAN& ENGINEERING Job No t b o Q 2- Sheet No. --I—of Subject: Rfl A- Pr S Co By H S kc Date 41 I\91Z► t-o cL� Ce&9-ck,, tr1-►, s p EW y Loan CGJKC ��ovt s FILE COPY �'�.� A ° e uI UJ I R oc,F 'Q e-Si U+�t '�?eu loon d, r 1 -7 P3 F ? t�`� Na,61241 00, RNO 0o F �esi 5� L�ve LOad 20 rsF �FE3S40N II�tR��l 3� Resa P C p5ien &y%.w L,�aej � J.(Mys r3C ASCU q-r0q y\J S n b vJ tact A =: 5 e gS F- C W cc-rre.M Cori y4d► N `f -- v16 lv+nps�tD yr E 1 a J-0y -IS : . 0 —� Cx F°s"yt Pac I-aY C'e = 1. 0 CTab 1 c :7- 2 AS'C G - ) ----p 7ie-c F'Lctw CC = l e CTu6U -4-- 3,, ASCft - ) D Nov 2 3 2021 l-o X l-o x 1.0 x So ?,SC- BUILDING TO &CODES Y 3 5 QsF- Fwm Ft'6,4 Y-e •7-L J U S i QO 0 i'heY SI(rF.A CC S C SOA t.a �1 1�►c,� Slog l z�eF Snag l.o�d hs CS • hoc z 0.95-x 35 pif 315 r 30. 2 ' C7 on 1 2-) U-AWaocc,A loaf Y)ee-d Iiov ku be 254 Bay Rd - Queensbury,NV 12804- Phone:518-793-7444- Fax:518-793-7061 Y HAANEN ENGINEERING Job No l6o q 2 Sheet No.--12 _,of Subject: Nzli AAISSo l'Ci-e.S By 14 M. Date °" 1. WInd LdCk6 C4ALVA-O-VOYf S CN 4 SGC / R SCF- Ui i nd Aou.8 c e-s i b vn —%, Te-s i n n W i v-+d —� W i h c� lL i 1^Q.0�i 0Y1c �=c-Gh►Y C 0 .�S —D x po Skvrt (&�61 a -4- CCas+- o_Fr-e c* Fuc �vY o' ?G \JA l.o CbnseYv& Hve..l�. z 16 ft C uphy 30 �G_( c,u ��'Se 13u� �l�`� Me)hoa. 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No 16 q sheet No. _of Subject: A- AlSdct'.1va BY KSG, Date Fln Sec.44o m 30, 1 . 2. ; \le�v ei}4 �Z G - 06 2nb - vZ • Icy �d. v 0 .0 0 z Sr, 0. 1 b X d i'S• x 0 O S.) 21 ps F DeStiyv, ?re$S,,e IY1a lC�i�o 30 PirC- A 1' o }�i t 1 -0 0 ReF-e,r FI ur-, 30, 1 w L 4S' C r�A 0. � Oil 9 3�r Hk o-t o,4 )c t!;c•4- 6 Fir- w h�r�l�vev- i� sr.+alte� 254 Bay Rd - Queensbury, NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No 6 ad12 Sheet No. Subject: Evi& hsso G�&Ael 8y Ttry Date U,-)f a Nei LAJ � 1 1��5u� � 3d �4J - E pR Zone 5 Qy'ea Z 12(0+-x S f'" Gd G+Z" Ze�n� ,Cj af-ec, 2� 9 P.) 2-6 .9 psy gene tt alrA 2 4t4N-Y- 11 Z 2•+se a,-ex = 1Sf'kx C (- = 9 hitZ 2 20 ps i 'Z'-ps F 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No �6� L sheet No. 5 of Subject: OW-ei 9 By �i 5 XX Date 1k I ICI 21 W,p e filer IJI Pm54uY-P- an IFS ® © m ® Areq OF Z-r+e hr � oP Q Area or- Zg rc. 3 ; 2 5-F�Z A. 5r--a- cz4r•) I t'lz 9. 2'" ?s F 021, �. ,I✓ 254 Say Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No �G°g'L Sheet No. of C4' Subject: 0 By t S Date LL �r - �)►�y J P_ ib lz"b�p- bovemn It esi),A 56LOt S}Aeu r x e2. 6 I��pS �. ki p5 + 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 - HAANEN ENGINEERING Job No V6o`1 2- Sheet No.—:!!—of Subject: P-W A- 5 G L i3O-e�3 By {trS4 Date It rIP-I 5� Se-i's";c Lnacl CoAcLJm;an `�' �'i � C�aSs��i C c,•�-� a� � � (.`.1v�lcn�wYt Fv ' I. 4 Se.i Sw,ic d e.Sij,�i 94ArumeI-e-nn SS d . lw Ss O• 45 1 i 2 --p Se is w, c D e s% �n Cam- 6-yj ' 5 a !6 Yrr+i c, 6 e-S13,,l C-J-eoaY�d A S C6 , --- DLO E C��A k,vCA eve f=a yCe 'Pro C P.rau V Cck,p( ev I Z. k) 254 Bay Rd - Queensbury, NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No Sheet No. gof Ce Subject: f%5 a c+-4-e N By Date 0 10, 2-1 s24%^L t n d Co+-�.rJ•�'1�11� Seis C\/ G�s VJ . S,ps gn i ; a Pd-r �,5 lAk Pru,r+e. wajj- IS G(" - x 1;� Fir X I- psF) + 0 ,2- x C2? FEx I:71F�-X95ps(, �• 6 k��s + 3.2 k�'ps ,Ls ps r.2- V-, yC1S• L Q ���'�� He nc e- w I-v LX>Oo �s 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski Ethan Peter Hall 134 Dix Avenue �JL Glens Falls NY 12801, Voice 518 741-0268 =FILECOPY Fax 518 741-0274 Email ephall@nycap.rr.com Memo To: John O'Brien—Town Of Queensbury—Code Enforcement Office From: Ethan Hall Date: 22 November, 2021 Re: JP Gross Properties— 1 Main Street Office Addition —Structural Inspection At the above referenced project location the third party structural inspections will be performed by Dan DeNero—P.E. of Haanen Engineering. A report regarding the structural inspection will be provided upon completion of the building framing prior to issuance of the certificate of occupancy. If there are any questions please let me know. Regards, EO ::] Ethan P. Hall Architect YAGross Electric\1 Main Street\Paperwork\Structural Inspection letter-22 Nov 2021.doc RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski Ethan Peter Hall FILE COPY 134 Dix Avenue �JG Glens Falls NY 12801 , Voice 518 741-0268 Fax 518 741-0274 THIS N TO BE Email ephall@nycap.rr.corn SI E A ALL ES ROJ T ® TIO - CONS UCT Transmittal To: John O'Brien—Town of Queensbury—Code Enforcement Office From: Ethan Hall Date: 22 November, 2021 Re: 1 Main Street Office Expansion —JP Gross Properties, LLC Attached please find three(3) copies of revised plans for the above referenced project location. These revisions are in response to your review of the project and the review comments from your office and the fire marshal's office. In response to the HVAC system comments, the existing HVAC system will be utilized and has been verified by the HVAC installer that the system has the capacity to accommodate the additional office square footage. If there are any additional items required please let me know. D c L Nov 2 3 �02l. r gUILD►NQUEENSSUiRY G&CODES YAGross Electric\1 Main StreetTaperworkUransmittal-22 Nov 2021.doc