Signed Inspection Report (Wed May 18, 2022 at 152 PM)INSPECTION WORKSHEET (FDTN-018366-2022)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0596-2021 Case Module:Permit
Inspection Date:Wed May 18, 2022 Inspection Status:Partial Pass
Inspector:Smith, Mark Inspection Type:Building Foundation
Job Address:Parcel Number:16 WHITBECK DR
Queensbury, NY, 12804
289.19-1-27
Contact Type Company Name Name
Contractor BBL Construction Services
Architect HCP Architects, LLP
Primary Owner Rosetti Acquisitions LLC
Applicant BBL Construction Services
Granted Permission BBL Construction Services
Checklist Item Status
Permit Card Visible From Road Passed
Building Inspector Notes Failed
12/15/21 partial approval for foundation
- footings approved.
- exterior piers approved
12/21/21 partial approval for foundation
-foundation walls approved
12/27/21 Building Foundation Partial Approval
- Foundation Insulation Approved
- Backfill Approved
5/18/22 partial approval for foundation
-plumbing under slab approved
May 18, 2022 Page (1)
INSPECTION WORKSHEET (FDTN-018366-2022)
Checklist Item Status
Footings Passed
12/15/21 partial approval for foundation
- footings approved.
Piers Passed
12/15/21 partial approval for foundation
- footings approved.
- exterior piers approved
Monolithic Slab Failed
Reinforcement in Place Passed
12/15/21 partial approval for foundation
- footings approved.
- exterior piers approved
Foundation / Wallpour Passed
12/21/21 partial approval for foundation
-foundation walls approved
Reinforcement in Place Passed
12/21/21 partial approval for foundation
-foundation walls approved
Masonry Wall Failed
Reinforcement in Place Failed
Footing Dowels or Keyway in place Passed
Foundation Dampproofing Failed
May 18, 2022 Page (2)
INSPECTION WORKSHEET (FDTN-018366-2022)
Checklist Item Status
Foundation Waterproofing Failed
Footing Drain Daylight or Sump Failed
Footing Drain Stone - 12 inch width Failed
Footing Drain Stone - 6 inches above footing Failed
Footing Drain stone - 6 mil poly Failed
Backfill Approval Passed
12/27/21 Building Foundation Partial Approval
- Foundation Insulation Approved
- Backfill Approved
Plumbing Under Slab Passed
5/18/22 partial approval for foundation
-plumbing under slab approved
PVC / Cast / Copper Failed
Foundation Insulation Interior / Exterior Passed
12/27/21 Building Foundation Partial Approval
- Foundation Insulation Approved
- Backfill Approved
Rough Grade 6 inch drop within 10 ft.Failed
May 18, 2022 Page (3)
INSPECTION WORKSHEET (FDTN-018366-2022)
Checklist Item Status
Poly Under Slab Failed
May 18, 2022 Page (4)
Smith, Mark