2003-812 TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY'12804-5902 (518)761=8201
Community Development-Building&Codes (518)761-8256
CERTIFICATE OF OCCUPANCY
Permit Number; P2.0030812 Date Issued: Wednesday,:September 15, 2004
This is to certify that work requested to be done as shown by Permit Number P20030812
has been completed.
Tax Map Number: 523400-278.000-0001-008-000-0000
Location: STATE ROUTE 149
Owner: JOHN HUGHES
Applicant: JOHN HUGHES
This structure may be occupied as a:
By Order of Town Board
Garage-2 Cars Attached TOWN OF QUEENSBURY
Single Family Dwelling
Director of BuRding&Code Enforcement.
TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201
Community Development-Building&Codes (518) 761-8256
BUILDING PERMIT
Permit Number: P20030812 Application Number: A20030812
Tax Map No: 523400-278-000-0001-008-000-0000
Permission is hereby granted to: ORN HI KTNF.S
For property located at: STATE ROUTE 149
in the Town of Queensbury,to construct or place
at the above location in accordance with application together with plot plans and other information hereto filed
and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning
Ordinance. Type of Construction Value.
Owner Address: 'JOHN HUGHES
1 ROCKLANU Dar Garage-'2 Cars Attached
LAKE GEORGE NY 12845 Single Family I7weiling. $85,000.00
Total Value $85,000.00
Contractor or Builder's Name /Address Electrical Inspection Agency
t
s .
Plans&Specifications
2003-812 #6 LEISURE LANE
1352 sq ft SINGLE FAMILY DWELLING WITH 2-CAR DETACHED GARAGE AS PER PLOT PLAN
SPECIFICATIONS
$212.84 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday, October 08, 2004
(If a longer period is required,an application for an extension muist.be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the T Quee ay, October 08,2003
SIGNED BY for the Town of Queensb
ury.
ry.
Director of Building&Code Enforcement
Building Permit Application
Town of Queensbury-Dept of Community Development,742 Bay Road,Queensbury,NY
(518)761-8256
A permit must be obtained before beginning construction. Permit File No.
No inspection will be made until applicant has received a Fee Paid
valid building permit. All applicants' spaces on this Ree. Fee Paid
application must be completed and must appear on the Reviewed By.
application form. U-If
Applicant: Owner:
Address: 12 CL weAddress: f N=fl A 7 F.—
_U Vh=
Phone# 3 Vs Phone
_SE_R-9 5 2o03
r0WV()F QUE'ENSBU
Property Location: Lot Number: e- / House Number 6 f 5 jY_1Ci rtW=n Y
Subdivision Name: lzfv�f&- . Tax Map Number: a-)9-I-
&r�New Building: resid /commercial Estimated Market Value of Construction: $ 9S, �-
c3 Addition: residence/ commercial If an Addition,what will use of new addition be?
.0 Alteration: residence/ commercial
0 No change to exterior size: residence coni'l
u Other work(describe
Check OccupancyInformation I"Floor 2"d Floor Other floor
Below sq.ft. sq.ft. sq.ft. S�UarrcFeet
LU Single family dwelling
u' Two family dwelling
U Townhouse
Ll Multifamily dwelling
#of units
U Office
0 Mercantile
U Manufacturing
0 1 car detached garage
U 2 car detached garage
C3 3 car detached garage
0 1 car attached garage
Ua- 2 car attached garage
U 3 car attached garage
0 Storage building-
commercial
La Storage building-
residential
U Other
What is the proposed height of the structure feet s inches
Will any second-hand or ungraded lumber be used? If so, for what?
Type of Heating System: electric 1 oil wood /forced hot air baseboard other:
Number of Fi Iaces to be installed lvcjve- Number of Woodsloves to be installed
List below the person(s)responsible for supervision of work as regards to building codes:
Name Address Phone Number
Builder s Yv ke s Re>a 4--49 of-1 7 99 2,3.1 5
Plumber
Mason
Electrician If
Declaration: please sign below after you have carefully read the statement:
To the best of my knowledge the statements contained in this application,together with the plans and specifications
submitted,are a true and complete statement of all proposed work to be done on the described premises and that all
provisions of the Building Code,the Zoning Ordinani;e and all other laws pertaining to the proposed work shall be complied
with,whether specified ornoted,and that such work is authorized by the owner.-Further,it is understood that I/we shall
submit,prior to a Certificate of Occupancy or Certificate of Compliance being issued,as requested by the Zoning
Administrator or Director of Building and Codes,an As Built Survey by a licensed surveyor;drawn to scale,-showing actual
location of all new construction.
Signature: owner,owner's agent,architect,contractor
(7
Im- Queensbury Building & Code Enforcement - Residential Final Inspection
Office No.(518)761-8256 Arrive: D art: :� am/ rn
3i
'Date Inspection request received: lnspector's Initi �,
NAME: �,7 P IT#:
LOCATION: ATE:
TYPE OF STRUCTURE: ►
Comments
Y N N/A
Chimney Ht./"B"Vent/Direct Vent Location
Fresh Air Intake
3 inch Plumb Vent through roof minimum 6"
Roof Complete/Exterior Finish Co,m lete
Guard 30 in.or more a7 stairs,decks,patios
Guard at stairwell at 34 in. or more
Guard at deck,porches 36 in.or more
Exterior Finish Complete
Interior/Exterior Railings 34 in.to 38 in.
Platform at all exterior doors
Interior Handrails stairs 2 or more risers
Enclosed Stairs Sheetrock Underside minimum %Z"
Gypsum
Grade away from foundation 6 in.with 10 ft.
Handrail Termination at Newell Post or Wall
6 inch clearance to sill plate
.Gas Valve"shut-off exposed/regulator 18"above grade
Gas Furnace shut-off within 30 ft.or within line of site
Oil Furnace shut-off at entrance to furnace area
Furnace/Hot Water Heater operating
Low water shut-off bailer
Relief Valves installed/Heat Trap/Water Temp 110
Interior privacy/trim/doors/main entrance 36 in.
Bathroom/Kitchen watertight
Safety glazing/Window in stairwells safety glazing
Interior Smoke Detectors:
Every level: / Every Bedroom:
Outside every bedroom area:
Inter Connected: / Battery backup:
Carbon Monoxide Detector
Bathroom Fans, if no window
Plumbing fixtures
Foundation insulation
Floor truss,draft stopping finished basement 1,000 sf
Emergency egress below grade
Basement stairs closed rise>4 inches
Garage Floor Pitched
Garage fireproofing/'/a hour fire door/door closer
Duct work Sealed properly
Gas Logs in Sealed or Glass Enclosure
Attic access 30 in.x 22 in.x 30 in.(ht.)In accessible area
Crawl S _aces 18"x 24"access, i s . ft.-150 s . ft.vents
Building No./Address visible from road
Final Electrical
Site Plan /Variance required
Final Survey Plot Plan
As Built Septic S stem/Sewer Dept. Inspection Sticker
Flood Plain Certification, if required
Okay to issue C/C or C 10 Temporary/Permanent
J
L:\PamW\Building&Codes\inspection FormslRes. Final Inso.form 2.docLast printed 2/12/04
COMMONWEALTH ELEdRICklSiNSPECTION SERVICE INC;
^1
Main Office'l7b Doe Run Road - Manheim, PA 17545
MUNICIPAL CERTIFICATE to ELECTRICAL APPROVAL
� ►
t Not iN11!lt►r►ttltfiHfrititflftttitttttftCe i /+� 7 5 9 19 Cut-i
Permin Card No.N fl►tt##/tftii#ttirofoifftf### toll
Len 6 6r V1 6TW V!Wks
V 1*nerf ifffiifit!###t#tiffH!lrlq}t#trtffrft frffft►ittitt!!!fflfrfolifffftttttf ttrttfir ittofftrototftt!#t##►#rtiftNllt#ttttl#lfor ltfllfti►►►►t;rtNilifttif{tiff# l ifr!
Wl
Locata71,� 1, tHif♦ !flat ltrfgllNttt tot Ni r►ft t
ion itttti flfflfllfti#lift Nfflfill##it#It11fflflittlttiMf!!lutiirtrfttft.tftrtttttrotfrftolNttfft/tt!!f#tltoolftlftti
Installation Consisting o 0111ft
ftlf#f1#itiit tfftuifftil#4 1ii#Ittiiaut�tia/titfjttl ii►riltlittnifilNii#!i iival.f♦fliiluriffflfl#uitufffffti attlNl►1i
� Mrs
ill! lti
rfffioto$ trrl!##f!!if IfHI.♦♦lffffl� f
i
ffifrf lrt lMl it
tiii!lttflitttiNNlHffgii Ntiitioilff
iii toot!if Olt•/tint too♦fifrrrI oorrti♦.ottitflr f otoom# l..titfiit MfNlf!!llffrfrNl/1tl tfttoHtott♦lot t f&tooftf
6
fl lfttl♦iir
61Af6ol-
9, t
Installed By.... t!!1Hllitilirllf ♦♦L+ci No,
.ffftittf.1.t..#ii}�itiliftttiititft}ffttt♦NYit11
The conditions following governed the issuance of this certificate, and any certificate previously issued is
cancelled; -
This certificate only covers the electrical equipment and installation conditions as of date. Upon the
t
introduction of additional equipment or alterations, application shall he promptly trade for inspection.
Inspectors of this Company shall have the privilege of makl inspections at any time, and if its
p p
rules are violated, the Company shall have the righ0#too
ke thi ce ificatef
swoj -
atetoll tlltit► ttt008416116 frfoiiftfiftNfifffrt INSPECTOR t#ifN/lrotoff pot If 1644t14f0441 lr tottittfr if 19ff0ttitr4ffifR#iiltttl MSI t
Member NIPtAt,I#AlEtI#
c,, Ueensbury Building & Code Enforcei-nent - Residential Final Inspection
0
Office No.(518)761-8256 Arrive: anI m 2!pa a m
Date Inspection request received: 0 Inspector's Initi`� a
NAME: �h1L, IT#: 00 1" b I.q,
LOCATION: .ATE:
TYPE OF STRUCTUR : 6
Comments
Y N N/A
Chimney Ht./"B"Vent/Direct Vent Location
Fresh Air Intake
3 inch,Plumb Vent through roof minimum 6"
Roof Complete/Exterior Finish Com lete
Guard 30 in.or more @ stairs,decks,patios
Guard at stairwell at 34 in. or more
Guard at deck,porches 36 in.or more
Exterior Finish Complete
Interior/Exterior Railings 34 in.to 38 in.
Platform at"all exterior doors "
Interior Handrails stairs 2 or more risers
Enclosed Stairs Sheetrock Underside minimum '/"
G sum w
Grade away from foundation 6 in. with 10 ft.
Handrail Termination at Newell Post or Wall
6 inch clearance to sill plate
Gas Valve shut-off exposed/regulator 18"above grade
Gas Furnace shut-off within 30 ft. or within line of site
Oil Furnace shut-off at entrance to furnace area
Furnace/Hot Water Heater operating
Low water shut-off boiler
Relief Valves installed/Heat Trap/Water Temp, 110 z
Interior privacy/trim/doors/main entrance 36 in.
Bathroom/Kitchen watertight
Safety glazing/Window in stairwells safety glazing
Interior Smoke Dete tars:
Every level: / Every Be 'room: x/
Outside every bedroom area
Inter Connected: u/ / Battery backupe/
Carbon Monoxide Detector ✓
Bathroom Fans, if no window
Plumbing fixtures
Foundation insulation
Floor truss,draft stopping fmished basement 1,004 sf � �
Emergency egress below grade
Basement stairs closed rise>4 inches
Garage Floor Pitched
Gara e.fire roofing/3/4 hour fire door/door closer
Duct work Sealed properly
Gas Logs in Sealed or Glass Enclosure
Attic access 30 in.x 22 iii.x 30 in.(ht.)In accessible area'
Crawl Spaces I8"x 24"access, I s . ft.-150 s . ft.vents
Building No./Address visible from road
Final Electrical
Site Plan l Variance required
Final Survey Plot Plan
As Built Septic System/Sewer Dept.Inspection Sticker
Flood Plain Certification, if required
Okay to issue C/C or C/O Temporary/Permanent
L:\PamWlBuilding&Codesllnspection Forms\Res.Final Insp. form 2.docLast printed 2/12/04
Framing 1 Firestopping Inspection Report
Office No. (518)761-8256 Date Inspection request received: 4�,1,9-ee'71
Queensbury Building&Code Enforcement Arrive: a �pn Depai pm
742 Bay Road, Queensbury,NY 112804 Inspector's Initia
NAME: PERMIT#:
LOCATION: INSPECT ON:
�--TYPE OF STRUCTURE: > 01-4
Y N
Framing COMMENTS
Jack Studs Headers
Bracing Bridging
Joist hangers
Jack Posts/Main Beams
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft. 8 in.
Stairwells 36 in.or more
Headroom 6 ft. 8 in.
Notches/Holes/Bearing Walls
Metal Strapping for Notches Top Plate
I V2(w) 16 gauge(8) 16D nails each side
Draft stopping 1,000 sq. ft,floor trusses
Anchor Bolts 6 ft. or less on center
Ice and snow shield 24 inches from wall
Fire separation 1,2,3 hour
Fire wall 2, 3,4 hour
Fir stopping
Venetration sealed
16 inch insulation in*cavity min.
Garage Fire Separation
House side V2inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in.(H)
20 in. (W)
5.7 sf above/below grade
5.0 sf grade
LASuel-lerningway\Building.Codes.Inspection.FORMS\Frarning Firestopping Inspection Report.doc January 28,2003
. c
Framing /FirestoPpin ,Inspection Report Tck�is
Office No. (518)761-8256 Date Inspection request received: 1�1
Queensbury Building&Code Enforcement Arrive: am/pm Depart: am/pm
742 Bay Road, Queensbury,NY 12804 Inspector's Initials:
n
NAME: PERMIT#: 66. 't
LOCATION: INSPECT ON: L 7--ot ay
TYPE-OF STRUCTURE:
Y N NIA Framing COMMENTS
�r .
Jack Studs/Headers
Bracing/Bridging
Joist hangers
Jack Posts/Main Beams
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft. 8 in.'
Stairwells 36 in. or more
Headroom 6 ft. 8 in.
Notches/Holes I Bearing Walls
Metal Strapping for Notches Top Plate
1 l2(w) 16 gauge(8) 16D nails each side
Draft stopping 1,000 sq. ft. floor trusses
Anchor Bolts 6 ft. or less on center
Ice and snow shield 24 inches from wall
Fire separation 1,2,3 hour
ire wall,2, 3,4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side %Z inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in. (H)
20 in. (W)
5.7 sf above I below grade
5.0 sf grade
L:\Suellemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003
_ l � -
Rough Plumbing 1 Insulation Ixspection Report
Office No. (518)761-8256 Date Inspection request received: .
Queensbury Building&Code Enforcement . Arrive: am/pm Depart: am/pm.
742 Bay Road,Queensbury,NY 12804 Inspector's Initials:
NAME: PERMIT #:
LOCATION:.. INSPECT ON:FIL
TYPE OF STRUCTURE: �-
Y N NIA.
PVC: R-1,.R-2,I0,R-4-Drain/Vents
Cast Iron, Copper,Drain/Vent 1 Comm.
Plumbing Vent/-Vents in Place
Rough Plumbing/Nail Plates'.
1 1/ inch min.Drain Size
W ing Machine Drain 2 inch min.
ead;or Air Supply Test =
4
Drain and Vents
5 TSI.or 10 feet above highest
connection for 15 minutes
Cleanout every 100 feet 1 change of direction
Water Supply Piping `
Cooper Commercial
"er,CPVC,Pex One and Two-Family
1,41fs-ulation]Residential Check 1 Commercial Check
Proper Vent,Attic Vent
Duct 1 Hot Water Piping Insulation
If required unheated spaces
Combustion Air Supply for Furnace
Duct work sealed properlyNo duct tape
COMMENTS:,
L:\sueHemingway\Buiiding.Codes,Inspection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003"
Rough Plumbing / Insulation Re
port
eport
Office No. (518) 761-8256 Date Inspection request received:
JL -AL '
!"��
Queensbury Building&Code Enforcement Arrive: am/1 D part: /pm
p
742 Bay Road, Queensbury,NY 12804 Inspector's Initials:
V
NAME: PERMIT #:
LOCATION: INSPECT ON: 44
TYPE OF STRUCTURE:
Y r$ N/A
fVC: R-1,R-2,R-3,R4 Drain/Vents
/Cast]Lron,Copper Drain/Vent/Comm.
-Plidn bin g.Vent./Vents in Placp,,
ough Plumbing/Nail Plates'W)A ia,--
I % inch min.Drain Size
P"A's ing Machine Drain 2 inch min.
"Head or Air Supply Test
Drain and Vents
5 PSI or 10 feet above highest
connection for 15 minutes
Cleanout every 100 feet/change of direction
Water Supply Piping
Cooper Commercial
Cooper,CPVC,Pex One and Two-Family
Insulation/Residential Check/Commercial Check
Proper Vent,Attic Vent
Duct/Hot Water Piping Insulation
If required unheated spaces
Combustion Air Supply for Furnace
Duct work sealed prope Ul No duct tape.COMMENTS:
Ck,� l
1
�� �70
L-\SueHemingway\Building.CGdes.hispection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003
FV
Framing /Firestopping-Inspection Report
Office No. (518)761-8256 Date Inspection request received:
Queensbury Building&Code Enforcement Airive:- am/p part am/pm
742 Bay Road,Queensbury,NY 1.2804 Inspector's Initials:
NAME: Wo JNQO PERMIT#:
LOCATION: INSPECT ON:
TYPE OF STRUCTURE: .-�S
N 1vtA COMMENTS
raming
Tack Studs/Headers
Bracing/Bridging
Joist hangers6 '�
Jack Posts/Main Beams
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft. 8 in.
Stairwells 36 in. or more
Headroom 6 ft. 8 in. -
Notches/Holes/Bearing Walls
Metal Strapping for Notches Top Plate
1 Vz(w) 16 gauge(8) 16D nails each side
Draft stopping 1,000 sq. ft. floor trusses
Anchor Bolts 6 ft. or less on center
Ice and snow shield 24 inches from wall
Fire separation 1, 2,3 hour.
Fire wall 2, 3,4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation•
House side %a inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling1wall
Windows Habitable Space/Bedrooms
24 in. (H)
20 in. (W)
5.7 sf above/below grade
5.0 sf grade
L:\SueHemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2Q43
Foundation Inspection Report
Office No. (518)761-8256 Date Inspection request received: '
Queensbury Building&&Code Enforcement Arrive: am/p l .' arn/pm
742 Bay Rd., Queensbury,NY 12804 Inspector's Initials:
NAME: PERMIT#:
LOCATION: INSPECT ON: —
TYPE OF STRUCTURE:
Comments
Y N N/A
Footings
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour
Reinforcement in Place
Foundation Dampproofing
Foundation/Waterproofing
Type of Dampproofmg/Waterproofing
Footing Drain Daylight or Sump.
Footing Drain Stone:
12 inch width
6 inch a ove footing
6 0l for wet areas under slab
ackfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:1SueHenzingway\Building.Codes.Inspection.FORMS\Foundation Inspection Reportdoc January 28,2003
Foundation Inspection Report
Office No. (518)761-8256 Date Inspection Ourceiv : 6 Queensbury Building&.Code Enforcement Arrive: r epart:742 Bay Rd., Queensbury,NY 12804 Inspector's Intl
Z' )
Nam: P Z#:
LOCATION: SPECT ON: F
TYPE OF STRUCTURE:
Comments
Y N NIA
outings .
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour
Reinforcement in Place
Foundation Dampproofing
Foundation/Waterproofing
Type of Dampproofmg/Waterproofing
Footing Drain Daylight or Sump.
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior 1 Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:1SucHemingway\Bttilding.Codes.Inspection.FORMS\Foundation Inspection Reportdoe January 28,2003
Jab Site Address; ,s l Date:
Owner: �, s Application No. File No. �.
WINDOW SCHEDULE
�n+�' � '�,�,k�'u ,�,J �.;;.«Q 1 D�JQQ�y`raj�t' ,,,�a�w�t'tk�t��tt��'•''�'. •t�':�>`t"w�';�.:,?::',s•�y::,�: .
•14'� 4, T�Y��.Y ,,..int.+r�eil;:iw� i :La%Nf'i:Gn..•.1:•.`wr:�:.
Window Window Mfg, Window Unit or " ': .> ..`: Cle
Number .,::.rw :y,� . ,. 5 's; G Special Hardware or
ber or Name Model Stock OpeCt Qpen�ng Gla�ssrb" "la �ss� 1' e e n er hG Instructions
Letter onp
Or Type Number c7 7' '
.•r��JOSt�,,� '�7�`�a�.��y •��� fR ;�q�1°i C 2"`4M` 6 P y
;?r�ylt Ill 3�o t t
Plan 1ci i 7a 7 9a! t t�yJ •7 v,
Call Site rvu7tt !1 Ti C 4 F11 7 t C 7 s h S p,t�tFp t� U#�fA� r i t
Big
�r
32,s�y ���i7 d,2.6 Vi 3�
3m ryj j 1t Z� 3
�Vy 31611 yl�fi, ?V 61 i
7 1303o <y 3s% V'3 �v� 35'rZsr'�
.d,
--PHIS LINE HAS EXAMPLES OF SAMPLE ENTRIES
Temper
` x
i�'•. „L+ Xff, .}",' " 1' 1 (� !< Jly°i� �Ltx� �)Y��i,!t;x ,.�fn}'t' , ,��t �r%'� � °:' r >� Jtl , ,`' ,,�1`
r{f;•t"� d e A '� M "f� ' '`,��,t�::SA ,'�.�"•1;r• '!, t r'{�hh'¢i q ��'t �. •'$ti W 6 .J.'s.: , r• Glazing ed
'�^ 'n�" .i{�, ° .�� ���' �,.tr •,��;.. ,. Kra Y iJ�ti,.,.�;;, y ��{'t ,`�H ,��,�;¢ � Yt7�, � $�' ' ? uj�t ��'
,„4`,. �,,d, yi '� Sq7�� � �, T. f ht+•'iY � 9`���i:�l,'��y4 1�.a�.,�yn,
rd'r'J U. �lla�"+;,t.r;��'•.. :1�,'t'fk•r:j1YAK+'�h' Si�°r11�:. .g di.1Tx';' �;"r�»ifrn.b: .r6�:'M n,�r^?,yi'.' �i�
L,,1SueHemingwaySuilding,Perm!LFORMSIWindow Schedule.doc
Job Site Address:
4. Date: q•41.03
Owner: Application No. File No.
Building Penult— Calculation Sheet
Natural Light, Ventilation & Emergency Egress Requirements
Habitable Area of . Req.Light Actual Req,Vent Actual Sq.Ft, Remarks
Room Room &%of Room Light. 4%of Room Vent Opeu hg for
in Area Square Area Square Egress
Square : t Footage Footage
Feet
.zy Atf IV4
44 - &zr
Rz ma�'
All
L,ISueHemingwaylBuilding.Permit,FQRMS1Nat,Light.Venhl,Calculagon.Sheet,doe
ix J
Pe ber
10 0-17
REScheek Compliance Certificate Checked By/DatJ
1995 MEC '
REScheckSoftware Version 3.5 Release lb
Data filename:Untitled.rck
TITLE:John Hughes
CITY: Glens Falls ®�F(,�U� 200,
STATE:New York
HDD:7635
CONSTRUCTION TYPE: Single Family
DATE:09/25/03
DATE OF PLANS: 9/25/03
PROJECT INFORMATION:
6 Leisure Lane
COMPLIANCE:Passes
Maximum UA=265
Your Home UA.=228
14.0%Better Than Code(UA)
Gross Glazing
Area or Cavity Cont. or Door
Perimeter R-Value R-Value U-Factor UA
Ceiling 1:Flat Ceiling or Scissor Truss 1352 38.0 0.0 41
Wall 1:Wood Frame, 16"o.c. 340 19.0 0.0 16
Window 1:Vinyl Frame:Double Pane with Low-E 76 0.340 26
Wall 2: Wood Frame, 16"o.c. 172 19.0 0.0 8
Door 1: Solid 36 0.330 12
Wall 3:Wood Frame, 16"o.c. 357 19.0 0.0 18
Window 2:
Metal Frame with Thermal Break:Double Pane with Low 59 0.340 20
Wall 4:Wood Frame, 16"o.c. 187 19.0 0.0 10
Window 3:Vinyl Frame:Double Pane with Low-E 21 0.340 7
Crawl 1:Masonry Block with Integral Insulation 1040 0.0 10.0 70
Wall height: 7.0'
Depth below grade:6.5'
Insulation depth: 5.0'.
Furnace 1:Forced Hot Air,80 AFUE
COMPLIANCE STATEMENT: The proposed building design described here is consistent with the building plans,specifications,
and other calculations submitted with the permit application. The proposed building has been designed to meet the 1995 NEC
requirements in RESchecMrsion 3.5 Release lb (formerly MECchenl and to comply with the mandatory requirements listed in
the RESchecklaspection Checklist.
Builder/Designer GYM Date_jjX-0 3
REScheck Inspection Checklist
1995 MEC
REScheckSoftware Version 3.5 Release lb
DATE:09/25/03
TITLE:John Hughes
Bldg. I
Dept.
Use
Ceilings:
1. Ceiling 1:Flat Ceiling or Scissor Truss,R-38.0 cavity insulation
Comments:
Above-Grade Walls:
1. Wall 1:Wood Frame, 16"o.c.,R-19.0 cavity insulation
Comments:
2. Wall 2:Wood Frame, 16"o.c.,R-19.0 cavity insulation
Comments:
3. Wall 3:Wood Frame, 16"o.c.,R-19.0 cavity insulation
Comments: -
4. Wall 4:Wood Frame, 16"o.c.,R-19.0 cavity insulation
Comments:
Windows:
1. Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.340
For windows without labeled U-factors,describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
2. Window 2:Metal Frame with Thermal Break:Double Pane with Low-E,U-factor:0.340
For windows without labeled U-factors,describe features:
#Panes Frame Type Thermal Break? Yes No
Comments
3. Window 3:Vinyl Frarue:Double Pane with Low-E,U-factor: 0.340
For windows without labeled U-factors,describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
Doors:
1. Door 1: Solid,U-factor:0.330
Comments:
Crawl Space Walls:
1. Crawl 1:Masonry Block with Integral Insulation,7.0'ht/6.5'bg15.0'insul,
R-10.0 continuous insulation
Comments:
Applies to walls of unventilated crawl spaces.
Heating and Cooling Equipment:
1. Furnace 1:Forced Hot Air,80 AFUE or higher
Make and Model Number
Air Leakage:
Joints,penetrations,and all other such openings in the building envelope that are sources of air
leakage must be sealed; ,
Recessed lights must be 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly
with a.0.5"clearance from combustible materials.If non-IC rated,the fixture must be installed with a
I 3"cleaiance from insulation.
Vapor Retarder:
[ ] I Required on the warm-in-winter side of all non-vented framed ceilings,walls,and floors.
I
Materials Identification:
[ ] I Materials and equipment must be identified so that compliance can be determined.
Manufacturer manuals for all installed heating and cooling equipment and service water heating
equipment must be provided.
[ ] I Insulation R-values,glazing U factors;and heating equipment efficiency must be clearly marked on
I the building plans or specifications.
I
Duct Insulation:
[ ] I Ducts in unconditioned spaces must be.insulated to R-5.
Ducts outside the building must be insulated to R 8.0.
Duct Construction: -
[ ] I All ducts must-be sealed with mastic and fibrous backing tape. Pressure-sensitive tape may be used
I for fibrous ducts: Duct tape is not permitted.
[ ] I The HVAC system must provide a means for balancing air and water systems.
Temperature Controls:
[ ] I Thermostats are required for each separate HVAC system. A manual or automatic means to
partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided.
I
Circulating Hot Water Systems:
[ ] I Insulate circulating hot water pipes to the levels in Table 1.
I -
Swimming Pools:
[ l I All heated swimming pools must have an on/off heater switch and require a cover unless over 20%
of the heating energy is.from non-depletable sources. .Pool pumps require a time clock.
I .
I Heating and Cooling.Piping Insulations
[ ] I HVAC piping conveying fluids above 120 OF or chilled fluids below 55 OF must be insulated to the
i ,levels in Table 2.
- Table 1: Minimum Insulation Thickness for Circulating Hot Water Pipes.
Insulation Thickness in Inches by Pipe Sizes
Heated Water Non-Circulating Runouts Circulating Mains.and Runouts
Temperature(F) up to VI Up to 1.2511 1.511 to 2.0" Over 211
170480 0.5 L,0 1.5 2.0
140-160 0.5 0.5 1.0 1.5
100-130 0.5 0.5 0.5 1.0
Table 2: Minimum Insulation Thickness for RVA C Pipes.
Fluid Temp. Insulation Thickness in Inches by Pipe Sizes
Piping System Types Range(F) 2"Runouts V and Less 1.25"to 2" 2,5"to 4"
Heating Systems
Low Pressurefremperature 201-250 1.0 1.5 1.5 2.0
Low Temperature 120-200 0.5 1.0 1.0 1.5
Steam Condensate(for feed water) Any 1.0 1.0 1.5 2.0
Cooling Systems
Chilled Water,Refrigerant, 40-55 0.5 0.5 0.75 1.0
and Brine Below 40 1.0 1.0 1.5 1.5
NOTES TO FIELD (Building Department Use Only)
,
It�� ar
� Po red
GArAyl
G
I
u!
,i
1
1 r