Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Gross Electric Queensbury concrete test report 4
4 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: JAG INDUSTRIES, INC.REPORT NUMBER: : PAGE #: 1 175 BROAD STREET, SUITE 320 INSPECTION DATE: GLENS FALLS, NEW YORK 12801 OUR FILE NUMBER:5 INSPECTOR & TEST SET: DAVE CASAW #5 ATT'N: MR. TIMOTHY BARBER AMBIENT WEATHER: GROSS ELECTRIC: BIG BAY ROAD, QUEENSBURY, NEW YORK OUR FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : PLACEMENT LOCATION OF LOAD # 3 : 1 2 0 3 4908 / 851430 4912 / 851431 4588 / 851432 10.00 / 10.00 #10.00 / 20.00 12 10.00 / 30.00 12.33 10.30 / 11.00 0 ##10.55 / 11.19 0 11.21 / 11.50 0 11.05 / 11.25 # 11 11.27 / 11.52 ##11.53 / 12.20 12.00 MAX: 1.50 )10 0.92 0 10 0.95 0 11 0.98 0 0.30 5.00 # 0.55 4.75 11 0.21 5.00 12 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.20 5.00 4.75 5.00 PLACEMENT SLUMP (INCH) (SPEC: - 4.00 )5.00 1 4.75 1 5.00 1 ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 6.20 0 0.00 0 0.00 0371100 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 140.56 0 0.00 0 0.00 0 - 90 ) 59 0 60 0 60 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 215315 - 215320 0 0 0 0 0 0 1: CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.215315 02/08/22 7 4020 0 COARSE AGGREGATE #2: LBS.215316 02/08/22 7 4040 0 COARSE AGGREGATE #3: LBS.215317 03/01/22 28 5140 0 FINE AGGREGATE: LBS.215318 03/01/22 28 4950 0 ADMIXTURE #1: OZS.215319 03/01/22 28 5230 0 ADMIXTURE #2: OZS.215320 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 2.00 TEST AGE 4000 FOUNDATION WALL: E/5 - E/1 FOUNDATION WALL: E/1 - A/1 PLACEMENT LOCATION OF LOAD # FOUNDATION WALL: A/1 - A/5 0.00 45 PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. 0 0 0 0 0 0 0 0.0 0 0 0 0 JOINTA-GALUSHA CONCRETE, INC CONCRETE SLUMP IS AFTER PLASTICIZER ADDITION. ULTIMATE 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 3: TIME CONC. BATCHED / ARRIVED: 50,550 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 DISCREPANCIES & REMARKS: 0.0 02/02/22 3.00 PLACEMENT AREA REINFORCEMENT: PLACEMENT AREA FORMWORK: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): LAB CYLINDER CONTROL NUMBERS: WATER: DESIGN STRENGTH & FORMULA: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: 0 0 0 62,150 50,800 0 0 64,600 65,700 Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 4 02/01/22 813.038 215315 10's: CLOUDY PROJECT: CONSTRUCTION TECHNOLOGY IF APPLICABLE: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: 0 0