Loading...
2001-389 1 TOWN OF QUEENSBURY FF742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development- Building & Codes (518) 761-8256 CERTIFICATE OF . OCCUPANCY Permit Number: P20010389 Date Issued: Monday, April 21, 2003 This is to certify that work requested to be done as shown by Permit Number P20010389 has been completed. Tax Map Number: 523400-295-018-0001-075-000-0000 Location: 133 AVIATION Rd Owner: COUNTIES OF WARREN &WSHINGTON I.D.A. Applicant: PROSPECT CHILD &FAMILY CENTER This structure may be occupied as a: By Order of Town Board Commercial Addition :WN OF EENSBU'Y Director of Building&Code Enforcement TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development- Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20010389 Application Number: A20010389 Tax Map No: 523400-295-018-0001-075-000-0000 Permission is hereby granted to: PROSPECT CHILD &FAMILY CENTER For property located at: 133 AVIATION Rd in the Town of Queensbury, to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: UNITED CEREBRAL PALSY ASSO Commercial Addition 2,034,667.00 133 AVIATION Rd Total Value 2,034,667.00 QUEENSBURY,NY 12804 Contractor or Builder's Name/ Address Electrical Inspection Agency V &H CONSTRUCTION,INC. 746-1520 PO BOX 126 FORT EDWARD,NY Plans &Specifications 2001-389 PROSPECT SCHOOL SOUTH 18,000 SQ FT COMMERCIAL ADDITION AS PER PLOT PLAN SPECIFICATIONS $2,520.00 PERMIT FEE PAID - THIS PERMIT EXPIRES: Tuesday,June 25,2002 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) - Dated at the Town of Queensbury; Monday,June 25,2001 SIGNED BY for the Town of Queensbury. Director of Building&Code Enforcement Building Permit Application Town of Queensbury-Dept of Community Development, 742 Bay Road, Queensbury,NY (518) 761-8256 A permit must be obtained before beginning construction. Permit File Nc /L3 • No inspection will be made until applicant has received a Fee Paid $.P j,� i valid building permit. All applicants' spaces on this Rec. Fee Paid $ application must be completed and must appear on the Reviewed By: application form. Applicant: ecr.S 2e.e eTl-0.v,ZG Owner: 7 r`9,r�re14,40 /AM/e.r a-,4.1rri,C Address: f� , B� /Z4/ Z2 yuu%rv,Pjj1 Address: /j3 "444,4.2/v,,P 4,4-7:, FQn r FPiti.a tv A/f� /10 Z,�i' Q,�.st/t�k , Nf,� ��ri- /ZBo p� Phone# (S� ) 7 - /S,2a Phone# (S/8)f?g - eV 20 RFC Property Location: Lot Number: / House Number / JUN Subdivision Name: Tax Map Number: ' -3 -/ 2001 TOWN OFKi.BsEEN33f3JRY BUILDIPNG AND CODE ❑ New Building: residence /commercial Estimated Market Value of Construction: $ - �_�.�_.: }e Addition: residence/ commercial If an Addition, what will use of new addition be? ❑ Alteration: residence/ commercial ❑ No change to exterior size: residence/com'1 S�ia1- - ,14/�/oST/e/ ?,*+.CeT ��Tli/Z ❑ Other work(describe Check Oceul)tincy111for111 71 11 0 11 l'' floor 2O1 Floor Other floor Total Below sq. ft. sq. II. sq. ft. Square Feet �1 ,1 ❑ Single family dwelling \\\>1\u! o Two family dwelling o Townhouse ❑ Multifamily dwelling �� �� -` #of units \ ❑ Office ` o Mercantile o Manufacturing ❑ 1 car detached garage❑ 2 car detached garage Iq_19?-5 ❑ 3 car detached garage ❑ 1 car attached garage _ 0)1‘ t°" ❑ 2 car attached garagetrrrj ❑ 3 car attached garage❑ Storage building- nQ,1,--3K4 commercial -D'' ❑ Storage building- � L residential cj 2k0 d et Other -/-/�c v `�.D� !� pov / Will any second-hand or ungraded lumber be used? If so, for what? /gyp • Type of Heating System: electric/ oil / /wood / Diced hot air baseboard/other: I t� 'v Number of Fireplaces to be installed We.) Number of Woodstoves to be installed p/o �,, List below the person(s)responsible for supervision of work as regards to building codes: 5 t� Name Address Phone Number i'0 Builder Y IW eatistudalo,e6 9fi6 /S2 0 Plumber ,t f,,/� /e_ s / MasoncYgosc 43a,-hC� Go4i 1��'Crvad,t SBS/--2GtC Electrician ;,,,le' g.e:•dw 4.�.QGT,QIG 7 ive-4~/AoG Perr' iike.-/34.,.,, N3 -A/..3 Declaration: please sign below after you have carefully read the statement: To the best of my knowledge the statements contained in this application, together with the plans and specifications submitted,are a true and complete statement of all proposed work to be done on the described premises and that all provisions of the Building Code, the Zoning Ordinance and all other laws pertaining to the proposed work shall he complied with,whether specified or noted,and that such work is authorized by the owner. Further, it is understood that I/we shall submit,prior to a Certificate of Occupancy or Certificate of Compliance being issued, as requested by the Zoning Administrator or Director of Building and Codes,an As Built Survey by a licensed surveyor;drawn to scale,showing actual location of all new construction. Signature: /dG%/ (...-"Vds" - owner, owner's agent, architect, contractor ________ _ ___ ._ _ . . (716--z)(-3 P') .: lip i ENERGY CODE COMPLIANCE APPLICATION • ' TOWN OF QUEENSBURY, WARREN COUNTY 9000 HEATING DEGREE DAYS Compliance Methods : PART 5 - Acceptable Practice Method - , 1&2 Family Dwellings (only) ;` ; r " 1 E PART 6* - Thermal Rating - Component Trade OffdUN ® 7 1&2 Family Dwellings; Multi-Family 2001 Dwellings ( 3 stories or less) lOtil,W,\;OP,-�U -4, �a� r• �)--,; PART 4* - Design by Component Performance -�OILCifP�r , . °`•�� 'R� �t � — - Commercial Buildings-Hi Rise Residential --�m� *Requires submission of worksheets APP ICANT' S NAME : PROPERTY LOCATIONS: 7//1/ al7-CW.4177M1� ��G . /53 11,// ,,.-e Rp \, PART 5 METHOD OF COMPLIANCE BY ACCEPTABLE PRACTICE: 1 . Gross Floor Area - /S, UJv square feet • • 2 . Type of Heat - Electric Oil ✓ Gas Other 3 . Is building mechanically cooled? {/- Yes No 4 . Percentage of area of windows and doors Over 17% /Under 17% 5 . R-VALUES FOR INSULATION GIVEN BELOW MUST CORRESPOND TO R-VALUES AS SHOWN ON PLANS SUBMITTED: a. Roof R 30 b . Exterior walls R '/ • c . Glazed areas R Z d. Exterior doors R y e . Floors over unheated spaces R - f . Edge of slab on grade ( heated building) R /a g. Basement/cellar walls (above grade ) R /a h . Basement/cellar walls (below grade) R i . Heating/cooling-ducts-piping in unheated space R �— 6 . Service (domestic) hot water heating device Conforms to minimum efficiency per code ,- Yes No • TEMPERATURE CONTROL MAXIMUM SETTING 140° - WILL NOT BE EXCEEDED APP ignatu cant ' s e Date Phone Number INSPECTOR' S REMARKS : _ _• ` - l-. _ .r ' yr ..- a ... - ilp BLDG. PERMIT NO. 2 0 01-3 8 9 APPLICATION FOR A TEMPORARY CERTIFICATE OF OCCUPANCY A TEMPORARY CERTIFICATE OF OCCUPANCY is hereby requested for the property located at; 133 , Aviation Road for the following uses: Prospect Child and FRmily Center March 12, 2002 P DATE SIGNATURE OF APPLICANT fr TEMPORARY CERTIFICATE OF OCCUPANCY The TEMPORARY CERTIFICATE OF OCCUPANCY is hereby WPPROVED ( )DISAPPROVED with the following conditions: Certificate of Occupancy to be issued upon completion of: Site Plan issues . See Attached TEMPORARY CERTIFICATE OF OCCUPANCY FEE: (407).00 DEPOSIT: (000.00 received on March 12, 2002 Date of Issuance Director of Bldg. & Code Enforcement THIS TEMPORARY CERTIFICATE OF OCCUPANCY EXPIRES 90 DAYS FROM THE DATE OF ISSUANCE. NOTE: This Certificate is NOT VALID unless signed by the Director of Bldg. & Code Enforcement or his designee. COMMERCIAL FINAL INSPECTION REPORT l Building& Code Enforcement Date inspection request received: L/7 2�� Office No. (518)761-8256 Dept. of Community Development • Town of Queensbury Arrive ~/'�. Depart am/ 742 Bay Road Inspector's Initials I ueensbue128iNAME : \I 4 -)i t t PERMIT#(-X I LOCATION )- � -. c( (•" , DAE LI—, )_-n TYPE OF STRUCTUREN/A YES NO COS C'nirrsteyP'B"Vent/Direct Vent location aiids /( ,2oe0//tr-/) Plumbing Vent Roof Complete Exterior fmish grade completeAli Interior/exterior guardrails 42 in.platform/decks 4 Il /'�' IIc! biterior/exterior ballasters 4 in.spacing platform/dedcs V C l2 Ul ' r ` Stair handrail 34 in.-38 in. � Step risers 7 3/4 in. ! Main door 44 in. All others 36 in. reC l (; e( Lever handles Exits at grade or platform Canopy to cover req.exit doors d Gas valve shut-off exposed&regulator(18 in.)above gradeFloor bathroom watertight Other floors okay Hot water relief valve 1 Boiler/furnace enclosure reviman en,l C Q <250,000 BTU N/R 250,000 BTU to 1,000,000 BTU's(1 hour) >1,000,000 BTU's(2 hour) . i.512_ ilov\ Gas furnace shut off within 30 ft.or within line of site Oil furnace shut off at entrance to furnace area Stockroom enclosure(1 hour),'/4 hour door Storage/receiving/shipping room(2 hour), 1 '/2 doors 1 Li hour doors and closers '4 how corridor doors and closers Firewalls/fire separation,2 hour,3 hour complete Fire dampers,2 hour fire wall/separation or greater Fire door/shutters 1 'A hour,3 hour Ceiling fire stopping 3,000/5,000 sq.ft. Fan shutdown,smoke vents or fan Exit door/panic bars assembly hardware Elevators . Elevator signage Handicapped bathroom grab bars/sinks/toilets ' , Handicapped bath/parking lot signage , Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/12 in.beyond Active listening system and signage assembly space Fina edrical Nariance required_ <_ Final Survey,new structures .-as-built septic system layout required Okay to issue temp.C/O(Certif.of Occupancy) • Okay to issue permanent C/O(Certif.of Occupancy) Okay to issue C/C(Certif.of Compliance) FINAL - COMMERCIAL INSPECTION REPORT Request received: ,b/ (lab £tvwv1 Office Use Town of Queensbury (518) 761-8256 ARRIVE X., am ap DEPART 2S30 an pm 742 Bay Road �/\ Ready at time: Queensbuiy, NY 12804 • Inspector's Inatals f` ail �/ P os,ed RP, �,— 3`6�9 Meet: NAME U/�15 ee,1 CA,/ I�.ra'4/`l�f C 4 i- 6—cirri ) PERMIT#Sre/0-2000 At time: LOCATION I334vtcQ �/ TYPE OF STRUCTURE INSPECT ON(date):/0/42_ Notes: N/A YES NO Chimney/"B"Vent/Direct Vent location Plumbing Vent Roof Complete COMMENTS Exterior finish grade complete Interior/exterior guardrails 42 in.platform/decks 0 // /A 'y. 5/l /I5 iii £s 7 nr4 Interior/exterior balusters 4 in. spacing platform/decks (/ // ,� Stair handrail 34 in. -38 in. Ip-, // t/ ? b e (/ --tormez ,L r Step risers 7%in. Main door 44 in. y d lO GN!-Pt?t-ekt All others 36 in. Lever handles -e/,, u_e / /4)1 Exits at grade or platform Canopy to cover req. exit doors Gas valve shut-off exposed&regulator(18 in.)above grade 2. / PGl fCCk Sl�daj f O<? h-r✓fr/di1 40 Floor bathroom watertight Other floors okay si,Va/l, GUY/ 4J«k 76 i.e. f, 'ace`( op Hot water relief valve /? �r� f Boiler/furnace enclosure veli7'�re fiai ae / m rnvxi <250,000 BTU N/R ` 250,000 BTU to 1,000,000 BTU's(1 hour) `� - 0 /4' r <3 .e,, &t >1,000,000 BTU's(2 hour) � Gas furnace shut off within 30 ft. or within line of site �c r`'it/U/4) Oil furnace shut off at entrance to furnace area • Stockroom enclosure(1 hour),'/4 hour door Storage/receiving/shipping room(2 hour), 1 'A doors 1 ''/hour doors and closers 3/4 hour corridor doors and closers Firewalls/fire separation,2 hour,3-hour complete Fire dampers,2-hour fire wall/separation or greater Fire door/shutters 1 % hour, 3 hour Ceiling fire stopping 3,000/5,000 sq. ft. Fan shutdown,smoke vents or fan Exit door/panic bars assembly hardware_ Elevators _ Elevator signage Handicapped bathroom grab bars/sinks/toilets Handicapped bath/parking lot signage Handicapped service counters 34 in., checkout 36 in. Handicapped ramp/handrails continuous/ 12 in.beyond Active listening system and signage assembly space / Final Electrical V Site Plan/Variance required . Final Survey,new structures As-built septic system layout required Okay to issue TEMPORARY C/O—Certificate of Occupancy yes - no Okay to issue PERMANENT C/O—Certificate of Occupancy yes no V. Okay to issue C/C—Certificate of Compliance yes no li '. �1�� 61-0,re( INAL - COMMERCIAL INSPECTION REPOR Request received: 0~1 Office Use Town of Queensbury (518) 761-8256 ARRIVE am/pm: DEPART am/pm 742 Bay Road Ready at time: Queensbu IVY 12804 Inspector's Initials iz:7) Meet: NAME `�(7S�p > PERMIT# ���^�U 1 --y. At time: LOCATION - ff'' TYPE OF STRUCTURE INSPECT ON(date):(019-0 Notes: w N/A YES NO Chimney/"B"Vent/Direct Vent location Plumbing Vent '9 Roof Complete COMMENTS Exterior finish grade complete Interior/exterior guardrails 42 in.plat .rm/•: ks on A go ‘,2002 Oc-/ Interior/exterior balusters 4 in. spaci platfo decks r 1 Stair handrail 34 in.-38 in. l Step risers 7' in. i V On-e5 5 61%/,,./ 4-e lyeeled Main door 44 in. , All others 36 in. I 4 W c)0^4- Q�t7L /i2 „ S-c `lf� Lever handles / / y Exits at grade or platform ..,\/ / Canopy to cover req. exit doors rig(-e7?? O X e ri7� it f t '( `�11,eJ Gas valve shut-off exposed k-regulator 18 in.)above grade f Floor bathroom watertight /Cl edsof f)( CQu ,e 4", //e Other floors okay d Hot water relief valve / ,� f� �l � � Boiler/furnace enclosure t{J l CO �l 1�1 /,,,,u, 'M..e <250,000 BTU N/R 250,000 BTU to 1,000,000 BTU's(1 h ur) rdZ 1-em 1'1 conr eckC f) an c/ >1,000,000 BTU's(2 hour) Gas furnace shut off within 30 ft. or within li e of site 'r7 Oil furnace shut off at entrance to furnace are Cl'i in 7LMe �e'i7' hour door Stockroom enclosure(1 hour),Storage/receiving/shipping room(2 hour), t%2 doorsy.e 1 ''A hour doors and closers hour corridor doors and closers' A,ta (-e &i'l 4 Firewalls/fire separation,2 hour,3-hour complete Fire dampers,2-hour fire wall/separation or greater Fire door/shutters 1 '/ hour,3 hourgt,,---/ Ceilingfire stopping 3,000/5,000 s . ft. dit.. ' pp g q Fan shutdown,smoke vents or fan Exit door/panic bars assembly hardware Elevators _ EIevator signage Handicapped bathroom grab bars/sinks/toilets Handicapped bath/parking lot signage Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/ 12 in.beyond Active listening system and signage assembly space . Final Electrical Site Plan/Variance required Final Survey,new structures As-built septic system layout required • Okay to issue TEMPORARY C/O-Certificate of Occupancy yes no Okay to issue PERMANENT C/O-Certificate of Occupancy yes no Okay to issue C/C-Certificate of Compliance yes no 1 1 FINAL — COMMERCIAL INSPECTION 4EVORT Request received: .3 //.2/0A q c Office Use 1Town of Queensbztry (518) 761-8256 ARRIVE In t n pm.• DEPART /. _ a 6 742 Bay Road 4 S! / Ready at time: 1 flOyec Queensbury, NY 12804 c toot Inspector's Initials Z 1 / ,/ (3 �C Meet: NAME /"DScec (1`�//1( ;irii l' 1 �°nf r PERMIT# 200 -3 S? At time: 1 LOCATION /.9 /tea&a INSPECT ON(date): �/� '' TYPE OF STRUCTURENotes: N/A YES NO 1 Chimney/"B"Vent/Direct Vent location _ /fpav/ y/0*/04& ho l-cha 2G1 toPlumbing Vent / Roof Complete COMMENTS SP/1SdP 141. �1 Jc i11aVP�t,n(; Exterior finish grade complete / . Interior/exterior guardrails 42 in.platform/decks _ 4e1I /ID d U,`& QS ,p.P, Q45 Interior/exterior balusters 4 in.spacing platform/decks f/ s o J Stair handrail 34 in.-38 in. 1�IS5� btvlc�l N�Oa v n/ � 1 Step risers 7 3/4 in. *- %/i t atidyt 77Y-Pitch ci Ohoj SOS/ 1 Pit Main door 44 in. �J All others 36 in. M's 511 AO 17L' /a i 07 y;e i S 0`le On Lever handles ly �`0//l #2 C!"USAP�d_Site, Exits at grade or platform Ganopy tos over st doors _/n 7'r�[ yy1 7'�c/1 iyjt`SS/1" Q/Qi1 Gas valve shut-off exposed&regulator(18 in.)above grade `/ Floor bathroom watertight ves t-di"i`l/e Côst ,SRc p GP+ce/ Other floors okay Hot water relief valve /' --1/10i11elluori ' 4AC/Sca�[y G�e4ct'e62eleS, Boiler/furnace enclosure ,��� 1 <250,000 BTU N/R — Curet/dnQ/ cycate . Gt/d / 250,000 BTU to 1,000,000 BTU's(1 hour) kV ittel >1,000,000 BTU's(2 hour) "`//y,,,, O/1 new paern-ejf , c/ Gas furnace shut off within 30 ft.or within line of site � Oil furnace shut off at entrance tofurnace area • a, c y, vest- �4,Art a`to/ Q /I/ K!//�j�/ Stockroom enclosure(1 hour), /4 hour door ,`/7 Storage/receiving/shipping room(2 hour), 1 ''A doors erf feCtilrP 1 %z hour doors and closers ' hour corridor doors and closers �gI• Firewalls/fire separation,2 hour,3-hour complete �` 4 id StSJ?S f�'lt ,My q a Q Fire dampers,2-hour fire wall/separation or greater �V eON tiv 2Kc.e ar-e Cie 4tfV` Fire door/shutters 1 '/z hour,3 hour Ceiling fire stopping 3,000/5,000 sq.ft. f.Qfr1/fl4,Q4f S I);2 5 missI , "n eas Fan shutdown,smoke vents or fan /� Exit door/panic bars assembly hardware s Qr kG `/ dJ V f Elevators EIevator signage — 3 yt- iv/la�S njtissi,t, Q/,jHandicapped bathroom grab bars/sinks/toilets / `� ,J Handicapped bath/parking lot signage S eR1d/� // /�PGI/ �jU��i[drul Cea5/-5/4 Handicapped service counters 34 in.,checkout 36 in. — ccdta/H-1 b / . yn-e /Le 1- C73yyi✓ L� yOv/ Handicapped ramp/handrails continuous/12 in.beyond j ,a Active listening system and signage assembly space 0 DU del fi,5 RAC1 a* ocife A0 t inal Electrical 1-Q jd ��v Site Plan/Variance required x / �/ Final Survey,new structures -- l S/cc nce a lox etes7//'a ev'/� As-built septic system layout required //1(111-e nell- Cypited3 k'Y /7 elk -ogre /5 r Okay to issue TEMPORARY C/O-Certificate of Occupancy yes X no t / Okay to issue PERMANENT C/O-Certificate of Occupancy yes no l I ViOlo.yC �(`/s`i O ` -wI/I ('c/ � l Okay to issue C/C-Certificate of Compliance yes no /'6 o1.l l.��n+mO s1' Yec74i,l• cl) =�:. .- w.-775,..:-=..F— m�.�,..S...r r ° =1 4141g s. ,,�. 'iW �j1�s�S_t/1•�T�Ct i''J(�f e� "IA.0f ( 0 stile, FINAL — COMMERCIAL INSPECTION RE ORT Request received: ,3� 0,. q c Office Use -4 Town of Queensbury (518) 761-8256 ARRIVE/O/) &prn: DEPART I-Z a/�n 742 Bay Road frOyec S�ov/ f Ready at time: Queensbuty, iVY 12804Inspector's Initials A67 C/ / Meet: NAME ATION f�p 4-'�•`/ .ALOP7//Y G'it 7i:er- PERMIT# ' -0Q - 3 g 7 At time: �h�r rSG�— / TYPE OF STRUCTURE INSPECT ON(date): OZ d Notes: N/A YES NO Chimney/"B"Vent/Direct Vent location y , /J , // / J y --a�1 ar 1 T/t d/) Ao 7 C/ta eG( o 1 Plumbing Vent J J .�,(( S•6t5dy l 2 t tt 4/01,,,1 rt c Roof Complete COMMENTS .y Exterior finish grade complete ,� � p/oJi ; Interior/exterior guardrails 42 in.platfordecks - J Interior/exterior balusters 4 in. spacing platform/decks t ,,,y,,� "� iSSit nW1clt 0;1 Teo .i Stair handrail 34 in. -38 in. /�� ..,�, y. Step risers 7%in. -- //17-t 1//�a7%4 1Y.e/he% c7/'Ohc4 Sou/ /A/C 1I Main door 44 in. J All others 36 in. \ - i7Ps$.11 ��' fay-Pt^ o.ilea SA/le Dill Lever handles 0_I #z civ5/ec SA/t e Exits at grade or platform ' Canopy to cover req. exit doors \ /� .,[ r. Gas valve shut-off exposed&regulator( 8 in.)above wade —�n �r 1(I i i]2a%� /1''UI�cli r1i,S.Si it-0� ��/1 Floor bathroom watertight IUeS t-d//`Ue. C-Sdudwes f s`e/G'&j o• , Other floors okay fGv ee Hot water relief valve /' Boiler/furnace enclosure '��U>dtemoSlp /aitc(/sca�J/�/t G�•27 i'c/'e/Le j,es', <250,000BTUN/R :% — /'p�17d,�ct! Rf/D 250,000 BTU to 1,000,000 BTUs(1 hoiv) W5 v� GuCJ, >1,000,000 BTU's(2 hour) /�dSS /1 D!q Aokiraviem-e/ ci Gas furnace shut off within 30 ft. or within line of sitecf 'L �M Oil furnace shut off at entrance to furnace areal • cl,�o%t V t�e5 • oi`„ti4e a/ci e / //}i/ Stockroom enclosure(1 hour),'/4 hour door I ( ! /(�6fi' Storage/receiving/shipping room(2 hour), 1 1/4 doors 1 '/2 hour doors and closers �1�e"�/2Ce 3/4 hour corridor doors and closers --Aaiteldect .S15Ja 5 f/lt' S61/Z e I Q • Firewalls/fire separation,2 hour,3-hour comp ete Fire dampers,2-hour fire wall/separation or g eater 11 Fire door/shutters 1 1/2hour,3 hour 1Ai eu1 "442c.e arzcv J c{l1 A/v Ceiling fire stopping 3,000/5,000 sq. ft. �JPi/'/11l1/1�&2]L Stit15 n?/;Js•if�J In eas t" Fan shutdown, smoke vents or fan �/ / Exit door/panic bars assembly hardware falik6L,9 `ot ElevatorsJ f / / / Elevator signage — 3 /+'�j/( L4 L'(/a/C/5 /27/'SS/ILC., Q/G 4j Handicapped bathroom grab bars/sinks/toilets 5-Y p/e�rci/k J, G� 6o/'/c4 • east..-" Handicapped bath/parking lot signage ( pp !//2 Handicapped service counters 34 in., checkout 36 in. -- Ye/th-1 halL)Cfrie° /La coYyt ( y zr/t Handicapped ramp/handrails continuous/ 12 in. beyond — B 7 Active listening system and signage assembly space o� ��t���t', j �i�JG1 le %10 coal Electrical I Q la�� �� 1/ Site Plan/Variance required Final Survey,new structures /tI S c As-built septic system layout requiredr'e /1c� a�Oh c� 2aS �j�o/�P/^�r it'll-e not c ypog.eei; J ft 01- -- iire f.5 Okay to issue TEMPORARY C/O-Certificate of Occupancy yes X no Okay to issue PERMANENT C/O-Certificate of Occupancy yes no l/I Vibicat/co l3 1c lotuvt Cie ! Okay to issue C/C-Certificate of Compliance yes no 6/Ceik-ePii...../1105-f 5 c7r,o/1 — dl�wdl( 11d- re{caitoo ors riorWl side G-tu►r�/� of i / `�hp j�ress )4 <4ic'rkgA cveet (.s° t s de) a Ltd, jcill< ;Ft -r;,,a - 0-1� nPu t {,,•;rd;,�Cal COMMERCIAL FINAL INSPECTION REPORT C€c Building& Code Enforcement' Date inspection request received: Office No. (518)761-8256 Fe)p "°-�-rt�C' Dept. of Community Development •_'�" C' Town of Queensbury Arrive, 'Iu Depart 742 Bay Road Inspector's Initial Queensbury, NY 12804 I NAME P g 0,6 P /7C AO a PERMIT# t LOCATION (mot V) DATE C 7 —(3 TYPE OF STRUCTURE N/A YES NO COMMENTS ChimneyP'B"Vent/Direct Vent location Plumbing Vent Roof Complete Exterior finish grade•$ .lete Interior/exterior guardrail,42 in. latfonn/decks Interior/exterior ballasters in.spa g platfomm/decks Stair handrail 34 in.-38 in. Step risers 7 3/a in. Main door 44 in. All others 36 in. RECEA'\E-A) Lever handles Exits at grade or platfomn • Canopy to cover req.exit doors Gas r bathroom off exposed&r1 lator(18 in.)above grade L.T��\ F n om B k Floor bathroom wateati t 'v 1� Other floors okay Hot water relief valve Viler/furnace eanclosure a� PE.t.) RT t i^tb , J7, <250,000 BTUN/R 1 s1fl11� p �pl 14�F._ 250.000 BTU to 1,000.000 B i 's(1 hour) ��' LEY >1.000,000 BTU's(2 hour) RC=�Cras furnace shut off within 301 or ithin line of site Oil furnace shut off at entrance to pace area Stockroom enclosure(1 hour),3 hou door �^ Storage/receiving/shipping room(2 h our), 1 ''A doors ��{'J) 1 `4 hour doors and closers 3.hour corridor doors and closers I Firewalls/fire separation,2 hour,3 liour complete Fire dampers,2 hour fire wall/sepaEation or greater /j Fire door/shutters 1 ''A hour,3 hour Ceiling fire stopping 3,000/5,000 sq.ft. Fan shutdown,smoke vents or fan 2) Exit door/panic bars assembly hardware Elevators ? Elevator signage �L% e Handicapped bathroom grab bars/sinks/toilets ndicappedparking lot signage l L1116T `` 1130 CUL checkout Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/12 in.beyond \D Active listening system and signage assembly space • Final Electrical Site Plan/Variance required_ GC t:SCAC� 13Pi'L FR-A13V- w.1PLAN ate Final Survey,new structures 7.p 1 t h tJ fz CG0i911)Q t& M 1 .-1s-built septic system layout required Okay to issue temp.C/O(Certif of Occupancy) c�J(rE � 1��> • Okay to issue permanent CIO(Certif.of Occupancy) Okay to issue C/C(Certif.of Compliance) 0' fr • • •STEEL P.O. Box 4006 y �N Albany; NY 12204.0006 • (548)_436-4851 • FAX #: 436-1458 FASTENER DEPT. FAX #: 436.0181 FAX TRANSMITTAL Cofer Sheet DATE: 1011 t 01 • • TO: Name: -'0' ;� Company: _ 1 G 1 C _ 14214G.•S ,4 Ass ( C Fax.#:• FROM; Name: 43Erf MADI i:rkt4 __. ..._. . Number of pages: _.__ (Including cover page) MESSAGE HERE i S OUR WO PoSS4L 7o Co fA/F4T 7/ ( 4 FA0. 1i .t-r • inott* REv(L-JAA____Li • 1-61104:5 Ifs. t L tytS.r. l+ `.'t.. Ca`'WJDC • T'd e13N31SI J 13315 ANFiE'1Fi 2T:bT T0. TO 100 , - _9' [ hqit5i x4x5i 5idt 3 Y P12 fa Tto sr. _ , — L7x4x�2 � �'' x8l a8 '� . Ks*, 1t4xt wel I _ N 1 4_I • ___ _� Pq I `I M • X I Pqa I--I Mt 1 �� -. e_' I i31. � 4xl1 I I�1 ' Lv_ `Rl �_ w N p13 I F _K. Y&.. -a' �4'`�xli II L7><4x I I L7 4x r. . X'• 1.:a2 `,, 1 xIIt ° �i w `. x10 ally, I Il t ._7,c4x. /' 05-4 ..,..% 9 , X Si. 7 - • N _ 85. .,— • 1.1 - -�M Oil I ■ 1�`.I' q2i - X141' tii, M if I . . M ff M X II , J M�Ib �� �- _ O 1 4xtxiI5 �. ■ ' \ „ O x --w r P11 �_� K► "in I' �a6 _r I r N • M i' L7x4x .xx I "M � 3 xlOallR 4 a6 I I' 0 1 I. 1;' Ill i i; I J • Mark M1s . I I �, I I • = Facz. West �-I► 1 rn I I N I. to I M I I _ ICI I /46 PII I Ir fI 1 +, I I jj a 9 ►+• _+I e, AL 'II • 1)4 a2 / ,�►`12,1 � �" .. ntA Ai_jl_5__. vL r<!1 r a6 I3� AIIR 6P. T Gvn,l ►l IT ) N diL s�o AA' w i !vim �N � I � S�t;v� .v SOfbST T7�U/ 1 f_1L/ �Wi„�t,NL.ny Slr.l lee.1719. Tll `�: I?v _ a'l L`i�✓t/ Ilp 5 C yQup.�et.ry r.rn.up�.h,Ul n1,n ,,:r✓1e:sAwth { )t } r nasion r Albany stool bso D..rbbtNM or on a p.nt.f ws GPVNp�—rla - /� (L,,vJI�-r a I1SL srcz 106,301 and 301 and sut,ects the cave,s.,b.9.• I of stmoo or .y.o11.s wpmcoor.-04f b.rro.g ah..ar N .nv wtrurn.uo�nr.�s.n.a Harrlwa.a F;mIdBolts uol.1N. 6�V/RI - .uol Vy H Constro4 on ,,...... 1,F4 �p 8 _ X nnixs: A7J2 5 DRAWN 11Y 21 OZQ 2 P9 I-pl0 _ A.id�tions Aliarrwtiun s T1 invG.lio. p P 4_ x I. r•mm...0 ro P . Proyp ae_+ C{7.'cI �.raml1jCads ..r 20 2- II 1- 12 22_i 2l� IIIiVISt s C�CIII'1 l_IIY 1-pe 2-62 1 SCALE 4 4�0't�c1$�/ x2?AJ �•3/OIAC � boa ciiI5 D. C0iurrsetS 1•49t1411% /A714I FY Mwfano I Wald :Iru..t1VIr.STEl:l.,l,.. A5004r11 E-1D P. O. 1 0.V d171)G,d1.8:1VY,A.Y. 12204 . - i., -An 3"Ea •:--..;.'.. t,t 0‘4-)4 /2 . ..'.• .•.. ..•.. •. .•* c.. m1- S'_tlI 4oc1aiI 0 a .' t.41xP S-x 5• t-.--..,. ,...—,,1.,.......'.,..r%---•,'..... • 1• ,I1,I 1 .041h1 4.p i10.r3iei.1!t•-•41:....::,1,.1..:..,.:•..-..,....:.:..._.7.:...:. A 4irAE1 PIP - 4* I .. .. .•..-,.:'.-4:,4$41v„httC:a4Ai.„„t.tR,1,s.,:1:,:' :•- • ; I- Pe • ' -ill • '101 I . • - ,--. • 1411 SI • C ' ' ik' IVYS 41; ll — 111 - •` -''' ' , I 5?-. ..., ..... --- -•;:lk 4AL, :ir ...i4 - 4 IL liFfs . ,. . :. . ,2- .1.7x,43,k - .. - + - -- - 1 t /x52.aG • 1 - - . ...... . ._. . •; __---,, _.,.._•,- . - .. .I• I.. ! *-43thxa • Lr- ._ -- .„,„,•:., ..II . M. ---- ,,-- ,.... •.• .. -711111 pI0 .QG r 4 4:i ILI - •.il! ..., 1%.• ..- • . CV •,-'4' . 11; A 7-.4-* 4-0.- qa-11111: _hill? 0 •.44: 141141 tia:14 i 1.. I il r - - tcti-i m s- .. 1 . . c... , ii, a6.03,43 .4. . i r- • .,,1„ • ii.,-;4 to Hi 0 ..k---.-I-4. 1 N1. —t • Ili - -at. -ph coca cia. I, I t.9- . z ... ,.• M „:. N • I I - c.t. c\i 0 pli 14 4. .il LA .44%r•Ir..... . . . . • •••-c I ...01 . 4 . + A' ...::! 0 . C4 ••••41 11 06 •••••0 .100 • 01 X "‘... • I . I 1,- ..... t..5 •• . . • . 11 : ill I I I '__ CO • & III •A . ' 1 III1RS' T! 11.. 711:,..,. I III . ti).. • II il • _ . — . I 4111111Z • _ • I 4111 cs- P9 1• 1, 1 4.11M .._ • - • .1. 1 Mcirk.TVr.ts I - 1 .. 0 • i 4111IM . . •::-3• • • rn Foca. Mr.. st I • I • 1; • A; cm f• F I 41 . • I a 4I 1 1 •.-.. -'• .. :-..• IN 1$ 1 • d ill I. I I I It 4- 11-5 -' " • • •:;1.I • • 1 I pil • 1'I 1 il t i A.. IN - 'ii•i 1 . 1.1...i . fl• • . • • :ei•1 le13 x34x: Ill . .., • KIP-fr•- 1' 44 : . • 0 P4 • • C\O -.' ... q 1, .11 I ' . .L in ;Fr..• .-p-ot.-T eC144 isteCTI or.] 04 ,.. . q4:'wi\I e-ak) we-z- : ID 111111 .. , 5V/ -r(-rC)-t1PL., Pr?"1— ki-4141,1eIj - N....0 ., . ! 64.-1N-(f--""TLOPL-;•e>4 3 6'4 VI 0 I)16(k : 5>CS - 11,0)14011.All...n/31wsl.lac.1109 .111 e.,Isti rrrrr ved. Thu dlesww0 il 1 17 US.C.Sees.IS.301 and 504 a d slab ccis Ili•Com,e .Of 010.000 Cr nor..to.tII.ga ihneget q' ! 1:i I • 11- 1 . 10 HarclWora. FicAlciBoltS um 11.95(914 GA9.j'Vri .. 1111111.11 0,1•• 1 V 14 C i uet' 21020 ., . 44 2118 -4d, 11 .4.-x.•-,. ,•.:.A32s ' 1/11-MZITY 1 °475 r n'n 4.! A dlefsi ion 5 4 Alta,at;.,r,s T.. 3.r9 3.00 so_ >,2 nn:i%c.d. . p . 2-pll 1-03 20... x21, Pmecr:. c..0 P. . -C. Pro.5.E.c.c..4 Cln;iol 4 F. ,iic.,..+..,- 2 1 -.., t 1.1,20 2..,12 ._ x2-.- .1.;I:lilSioN.s LEECKED IlY • SCALE ' 6-4C3 • /I\ /3,61 AC._....-.Z . ba:14;15 C4 C°1uiv"11 Metta.r;a I Wald ..I Lite(IN Y Si'Ell.,,,,, • AS130GirB E 70 I?. O. BO.V 40on,dr.n..svy,N.1.. 1220.1 • . • FINAL — COMMERCIAL INSPECTION REPORT y Request received: � 0 Town of Queensbu (518) 761-8256 ARRIVE Office Use t�3� 1 el 742 Bay Road Ready at tim- 1 Queen y►. f, NY 12804 Inspector's Init . v Meet: NAME `c &. �� PERMIT / �,?j At time: LOCATION ` TYPE OF STRU T RE INSPECT ON(date): - otes: N/A YES NO Chimney/"B"Vent/Direct Vent location Plumbing Vent • 1" Roof Complete COMMENTS Exterior finish grade complete. Interior/exterior guardrails 42 in.platform/decks Interior/exterior balusters 4 in. spacing platform/decks Stair handrail 34 in. -38 in. Step risers 7 3/4 in>, `, Main door 44 in. ''--,, ' All others 36 in. �--, Lever handles \ '1 Exits at grade or platform Canopy to cover req. exit doors \ Gas valve shut-off exposed&regulator I8 in.)above grade Floor bathroom watertight \. Other floors okay \,�� \ Hot water relief valve \ Boiler/furnace enclosure ter V _ 1 5-Pa- QE-.-e `'-`‘11)�5 L <250,000 BTU N/R \ 6\9 ' €5�-- k., / 250,000 BTU to 1,000,000 BTU's(1 hour) >1,000,000 BTU's(2 hour) Gas furnace shut off within 30 ft. or within line of site Oil furnace shut off at entrance to furnace area • Stockroom enclosure(1 hour),%hour door Storage/receiving/shipping room(2 hour), 1 V2 doors � u� 'Y2closers 1 hour doors and closer s %hour corridor doors and closers ,..` — _6 \r� ~ Firewalls/fire separation,2 hour,3-hour complete �° �'U Fire dampers,2-hour fire wall/separation or greater -42--- ', \'N •NCI__CR-ViW Fire door/shutters 1 '/2 hour,3 hour , `� Ceiling fire stopping 3,000/5,000 sq.ft. • \ K � 3 'R 't -� Fan shutdown, smoke vents or fan L.- Exit door/panic bars assembly hardware Elevators Elevator signage / 1 V Handicapped m grab bars/sinks/toilets f � Handicappe ba arking lot signage y� �'C)p1.-- A�-adit . \O 11 c Handicapped ice counters 34 in.,checkout 36 in. ��� 'i j� V . Handicapped ramp/handrails continuous/ 12 in.beyond EtQ_,a2Q Active listening system and signage assembly space 6\ � •��� Final Electrical ���C,‘ s Site Plan/Variance required / Final Survey,new structures ,// Q�` As-built septic system layout required ✓ ?-- -)1�� (� Vi1 tt�rb 1�ViV Okay to issue TEMPORARY C/O-Certificate of Occupancy yes no / Okay to issue PERMANENT C/O-Certificate of Occupancy yes no Okay to issue C/C-Certificate of Compliance yes no 14 VAL 5 11,,,i1- outw) EkJc'fv. ( rz& i ho �e61, 5fclAK)e-1r`tLPFIRE MARSHAL 01,* TOWN OF QUEENSBURY QUEENSBURY, NY 12804 (518) 761-8205 FIRE MARSHAL INSPECTION REPORT REQUEST RECEIVED 3/(o/©2PERMIT# 2oO)-3 n NAME Fro 5?' --1' 5ck00(-504-1,1 LOCATION AV J Pr 64 ga SCHEDULE INSPECTION ON T�n.u(') 3 rj cZ 3:i pt%M P NYTIME APPROVED N/A YES I NO EXITS AISLE WIDTHS EXIT SIGNS 1 EMERGENCY LIGHTING FIRE EXTINGUISHERS FIRE ALARM SYSTEM ,1V1k! Jilatd 14)5 X FIRE SPRINKLER SYSTEM r I no"I'Q. al" x FIRE SUPPRESSION SYSTEM HOOD INSTALLATION INTERIOR FINISHES STORAGE: CLEARANCE TO SPRINKLERS CLEARANCE TO HEATING UNITS REQUIRED SIGNAGE • CHIMNEY WOOD STOVE FIREPLACE-MASONRY FIREPLACE-FACTORY BUILT REMARKS: \OK TO THIS DATE 1"i rb A r-l'11 -rej r5tilC@ex r" 1 -- 11\A 31't,A4o1,0N OK IU'l d ji i 61/0;il E1tva '0-( ,cAI s1480,9 u1 - 5fciJki { joio 4-L5+ nite6t5 'u 1 ________,_,RANk -i--72 ,t„.-t., INSPSLIP.PUB INSPE TOR COMMONWEALTH ELECTRICAL INSPECTION SERVICE,INC: Main Office 176 Doe Run Road-Manheim,PA 17545 MUNICIPAL CERTIFICATE - ELECTRICAL APPROVAL ,) Permit No. Cert. No 79030 Cut-in Card No Owner P/`-6 rS p— sC 4 c' ' Location L j$-17UA..) 724D. ��e7 V Installation Consisting of ADD` 77d-/�.i 7‘ C //� -e f�G L1 ?s---c1 ei4-U?7 .,Dia, 4'ri .'s'. , /C-'Y .t*'77 `6- xir c-1 �j�'"#�" ,aaI � .i P. . Installed By... Gv6-P13" Lic.No. The conditions following governed the issuance of this certificate,and any certificate previously issued is cancelled:- This certificate only covers the electrical equipment and installation conditions as of date. Upon the introduction of additional equipment or alterations,application shall be promptly made for inspection. Inspectors of this Company shall have the privile e of makin ' -lections at any time, and if its rules are violated,the Company shall have the right to ev �Ce this ifilat `Date 34 6 Z INSPECTOR / Member N.F.P.A..I.A.E.I. FINAL - COMMERCIAL INSPECTIO PORT d �- . _ Request received: �-- r Office Use Town of Queensbury (518) 761-8256 ARRIVE 1%i�ca pin AR ` •: a 1040 742 Bay Road ��SS 041.# ,1/ �"- Ready at time: Queensbu IVY 12804 l Inspector's Initials // PERMIT# &f At time: NAME �S�G`� U�(� ��� � 3 LOCATIO1`' r TYPE OF STRUCTURE INSPECT ON(date) Notes: 0:4) ilyfrigo, N/A Chimney/"B"Vent/Direct Vent location / �� Plumbing Vent �/ • Roof Complete NTS . Exterior finish grade complete Interior/exterior guardrails 42 in.platform/decks J/ . Interior/exterior balusters 4 in. spa Ii latform/decks �j ' Stair handrail 34 in. -38 in. ✓ Step risers 7 3/4 in. I Main door 44 in. 1, All others 36 in. sii Lever handles ✓ Exits at grade or platform i/1 Canopy to cover req. exit doors ✓� Gas valve shut-off exp ed&regulato• 8 in.) above grade Floor bathroom watertig� Other floors okay AFC:::,Z.L__ �C I l.C`;[;jA7._____. Hot water relief valve Boiler/furnace enclosure NZ <250,000 BTU NT/R -.40 . ) 250,000 BTU to 1,000,000 BTU's( hour) >1,000,000 BTU's(2 hour) Gas furnace shut off within 30 ft. or withi line of site Oil furnace shut off at entrance to furnac-area V • Stockroom enclosure(1 hour),'/4 hour door / Storage/receiving/shipping room(2 hour), 1 1/2doors 1 1/2 hour doors and closers Q %hour corridor doors and closers d Firewalls/fire separation,2 hour,3-hour •omplete ,6e_A c ) VCZ \`�1� -- .-kiai3 Fire dampers,2-hour fire wall/separation or greater Fire door/shutters 1 % hour 3 hour �� a Ceiling fire stopping 3,000/5,000 sq. ft. j 1F% - GOw Fan shutdown,smoke vents or fan Exit door/panic bars assembly hardware .- J Pc-, EY-4-c V 0 pR-- p� ‘ - i-k Elevators J Elevator signage Handicapped b• oom grab bars/sinks/toilets Handicappepp m a -ct)L rking lot signage ���� \ Handica e vice counters 34 . checkout 36 in. � Handicapped ramp/handrails continuous/ 12 in.beyond / ? Active listening system and signage assembly space Final Electrical - 4V-% Site Plan/Variance required / Final Survey,new structures �/ As-built septic system layout required Okay to issue TEMPORARY C/O-Certificate of Occupancy yes no Okay to issue PERMANENT C/O-Certificate of Occupancy yes no Okay to issue C/C-Certificate of Compliance yes no FIRE MARSHAL r _ TOWN OF QUEENSBURY QUEENSBURY, NY 12804 (518) 761-8205 FIRE MARSHAL INSPECTION REPORT // REQUE EIVED PERMIT#oU�il--L NAME C L_ • )� LOCATION _ 3 SCHEDULE INSP CTIO ON t) 1146 t„,( AM aANYTIME 4 APPROVED NIA YES NO EXITS AISLE WIDTHS \. EXIT SIGNS EMERGENCY LIGHTING FIRE EXTINGUISHERS FIRE ALARM SYSTEM 'AVM-, -`I Id(Ciuv) )C FIRE SPRINKLER SYSTEM FIRE SUPPRESSION SYSTEM HOOD INSTALLATION-- INTERIOR FINISHES STORAGE: CLEARANCE TO SPRINKLERS CLEARANCE TO HEATING UNITS REQUIRED SIGNAGE CHIMNEY WOOD STOVE FIREPLACE-MASONRY FIREPLACE-FACTORY BUILT REMARKS: .E] OK TO THIS DATE 6f )1yy119) e4e1 ,s Ffe,k7dy tk had, +0 5fi 1k -112 ' de,lecro( 5eioKe ddfed teNt(- ti N -1.6)j- Toalif L6 (dm 51-eve . '-3 t. INSPSLIP.eua INSPE TOR 41/5A e(aatof flime GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road (/ Queensbury,NY 12804 Arrive �( m Depart I► , •If Inspector's Initial IP, - P NAME: Pft 9 CT (x,��_ O o PERMIT# b�►��—��q LOCATION: (�\)► T Y R O(t(7 DATE : TYPE OF STRUCTURE: / RECHECK N/A YES NO OMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is respon ible for providing protection from reezing for 48 hours following the p ment / of the concrete. Materials for this purpose on site Foundation/Wallpour Reinforcement in Place i Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- j Proper Vent, Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2, 3,hour R/ OD JVV v f Penetration Sealed ✓ Fire Wall 2, 3,4 hour Firestopping Request Received Date: Co I L 0 Schedule Inspection Date: L-- i C Oi Time: 1 i 00 pi Regular New York tate Uniform Fire Prevention and Buildin Cod New Business Inspection Inspection Report Permit Number Queensbury Fire Marshal's Office;742-Bay Road, Queensbury, NY 12804 l _ Phone(518) 761-8205_. Fax (518) 745-1160 1. ( ) 1152.1 Property Maintained' I UNDERSTAND TI-I THIS INSPECTION IS REQUIRED BY LAW BUT CAN BE 2. ( ) 1153.1 Dangerous-Structures \RESCHEDULEDATANYTIME. 3. ( ) 1154.1 VacantBuildings 1. ( ) 1161.1 Emergency Access X 2. ( ) 1162.2/ Obstructions Occupant d 3. ( ) 1162.3 LAighting 'PCd a) I r s 4. ( ) 116'2.3 Lighting and Exit Signs �J w 5. 1162.4 Elevator Warning Signs Address 1 m 7. ( 1162.6 Openings teor Fire Walls&Sep. 1'5 1 .� y I n n 12-D9CI 7 1 1162.E Exterior Egress �-• <a 8. ( 1162.7 Facilities for the Handicapped Telephone 9. ( 1163.1 General Requirements 10.( ) 1163.2 Fuel Gas Systems 11.( ) 1163.3 LPG,Containers and Tanks ' Contact Person Home Phone 12.( ) 1163.5 LPG,Tank Paint �J» 13.( ) \\163.6 Fuel Oil Systems ZI CO Ve , 14.( ) 1153.8 Heating Systems Fire epart ent (' Inspector • 15.( ) 1163.9 Chimneys,Flues,Gas Vents 5. �-�' if 16.( ) 1163\0 Incinerator and Compactors Receive- By Date cp 17.( ) 1163.11\Electrical Systems m • 18.( ) 1163.12 Commercial Cooking Equipment X a 19.( ) 1163.13a Kater Based Fire Protection Spr kier Wet Dry Suppression Detection Heat Local c 20.IX) 1163.13a SpYinkler System Supervised Yes No Smoke Supervised a 21.( ) 1163.13a StandRipe Systems 22.( ) 1163.13a Fire Puihlps AILURE TO CORRECT VIOLATIONS, NOTED WITH AN "X" MAY w 23.( ) 1163.13a Yard Hyd?a\nts RESULT IN APPROPRIATE LEGAL ACTION AGAINST YOU OR YOUR 20.( ) 1163.13b Portable Fir Extinguishers ESTABLISHMENT AS DIRECTED BY LAW. 21.(X) 1163.13c Fire Alarm SYSTEMS VIOLATIONS 22.cue 1163.13d Fire and Smoke tection xx.( ) 1163.13e Foam-Chemical Ex.Systems +/ -((��� xx.j 1163.14 Elevator Equipment "J el -CK --e?✓ , Il 4 r! G, 101eckl--.) cn 29.( ) 1164.2 Assembly Spaces ` 30.( ) 1164.3 Self-Serve Regular Serve dr�ge ) keI�YY) Y ',\C OT d 31.( ) 1164.5 Abandon,Remove,Stora•e Tan 12 32.( ) 1164.6 Dry Cleaning Plants 1 `tad Ykr-1, 'YlU lee) m 33.( ) 1164.8 Lumber Yards l\ 34.( ) 1164.9 Tents,Air Supported tructures J.J A"j ,.(CI 0 it rc 35.( ) 1164.11 Vehicle Wrecking a/d Junk Yards � � • 36.( ) 1164.14 Marinas and Boat/Yards V Y16 4-Q J ee_t c N.(1 not --fry t e�i r T 37.( ) 1171.1 General Requirer�fents ` / L J a 63- E. ( ) Storage5, ` V'iq C. t I i`k.)i� i ici.- . �1 S. 3 38. 1171.2 Tanks + � � a. m 39.( ) 1171.3 Portable Tanks'and Containers � 40.( ) 1171.4 Dip Tanks t+ 00 1 1 t4-1 L1x, n 41.( ) 1171.5 Spray Finis ?ng 0 � ��� j� 3F 42.( ) 1171.6 Electrostafc Apparatus 7 - . }"a y,14 1�11 ti-PF/lLy- 43.( ) 1171.7 Dry Cleaning (' ! v 0 44.( ) 1172.1 General'Requirements 8) 1+�-I(;jjt_, w� (, tz, FDCI c clJ , �,5 li' , `CD c 45.( ) 1172.2 LoosefStorage 46.( ) 1172.3 Baled Storage (/).0 WIT l v°' dte (/ ,11 'at. oa" 6 l_, 47.( ) 1173.1 Dust General Requirements `�//��_� �� L ,(( �, ���� = 48.( ) 1174.1 General Requirements and Signs (0) 5'prt'-tV c1J -- 1 Q VD rice" 9-0-.CIA. 49.( ) 1174.2 Corrosive Liquids c 50.( ) 1174.3 Flammable Solids H 51.( ) 1174.4 Highly Toxic Materials 3 52.( ) 1174.5 Oxidizing Materials A 53.( ) 1174.6 Poisonous Gases d 54.( ) 1174.7 Radioactive Materials \, in 55.( ) 1174.8 Unstable Chemicals \ c0, 0 56.( ) 1175.1 General Requirements '^ 3 57.( ) 1175.3 Hydrogen • 58.( ) 1175.4 Flammable Anesthetics 59.( ) 1175.5 Nonflammable Medical Gases __ _ 60.( ) 1176.1 Explosives General Requirements 2 61.( ) 1178.2 Welding-arid-Cutting- - _-- - -_ _ � ___-_ ` _ o. 62.( ) 1178.3 Oxy-Fuel Welding and Cutting - - -- - - _ _ _ __ R0 63.( ) 1178.4 Electric Arc-Welding and Cutting _^. 64.( ) 1191.1 General Precautions r. `D 65.( ) 1191.2 Exterior Protection it..........." ee, 66.( ) 1191.3 Interior Protection co 4. 67.( ) 1191.3b Combustible Decorations 68.( ) 1191.3d Portable Heaters 69.( ) 1192.1 I-lame Producing Uevices 70.( ) 1192.2 Asphalt Kettles 71.( ) 1193.1 Fire Safety Equipment /1( ) 1194.1 Fire Safety Signs Instructions FIRE INSP ION K OK TO UE C.O. 73.( ) 1195.1 Fire Safety Training White-Office C pi s(2) Yellow-Business Copy Pink- D Copy 74.( ) 1196.1 Fire Department Notification comdev:chrisj:excelfireinspectionreport08022001 FINAL — COMMERCIAL INSPECTION REPORT Request received: Town of Queensbury (518) 761-8256 ARRIVE ;• a pin• %EPART ar pn�1 Ice Use 742 Bay Road Rea I dly t Queensbal,. , NY 12804 Inspector's Initials IV 1 1\11•Ifif ___ NAME t�! I ) �D 0PERMIT# 1`�j S� At time: LOCATION ' t TYPE OF STRUCTURE M . - s,_ INS' CT ON(date): ,g-1 5 O�- Notes: N/A YE' NO Chimney/"B"Vent/Direct -nt location W/ Plumbing Vent WM Roof Complete Allill11111111111111111.11111111r, COMMENTS Exterior finish gra. complete , e.„ (,cs-i&e. VIIIu �t�Ge� _CR►-6 sPIP PL Lt Interior/exterior Q ardrails 42 in.platform/decks r,� Interior/exterior .alusters 4 in. spacing platform/decks P O 0 bT -OCR,LQ Fi\._. 6 c ee_U Q-CCLAIf -� �L Stair handrail 3 in. -38 in. MOO 1 F 1 CA-C'\b Ft ) Step risers 7 3/4 in. Main door 44 in irD 1_ 11_-6 o All others 36 in. V - .i i.EK) Cam ' T F-Da--ZIA Lever handles Exits at grade or pl:tform A bTpR4-1�� Q 0FC= G [Q��� L Canopy to cover req. exit doors I ©�.oc2 L9_ �J. ELF Gas valve shut-off ex..sed&regulator(18 in.) above gram �AiJ�� Floor bathroom waterti:it Other floors okay —� 0. �1 ��A� , 'c€�C��b P��K� Hot water relief valve M " PU Cx7( co . _ 5 Q Boiler/furnace enclosure Z � � � <250,000 BTU N/R �� tiCb N � "L� i2E O � G--- tic \. 250,000 BTU to 1,000,000 : U's(1 hour) >1,000,000 BTU's(2 hour) 11=111 6 •-fie e- c-' - c j_- Gas furnace shut off within 30 ft. or ' hin line a Oil furnace shut off at entrance to furna - area - • C �\---\ J b—� , — Stockroom enclosure(1 hour),'/4 hour doo _ ���/ �� ' Storage/receiving/shipping room(2 hour)Ars �M � 1 'A hour doors and closers %hour corridor doors and closers 0 Firewalls/fire separation,2 hour,3-hour omplete — • � \ Fire dampers,2-hour fire wall/separati.li or greater — �P` S3kVicpo b ) VcSa Fire door/shutters 1 'A hour,3 hour _- - 2j -1- (1_D0c, Ceiling fire stopping 3,000/5,000 sq. .t. 11 Fan shutdown,smoke vents or fan 1 1 Exit door/panic bars assembly har. are `�r, Vm Elevators • Elevator signage Mr& Handicapped b- ..t..m grab ba ./sinks/toilets 0'� Handicapped .. . ,parking lotj MEMO Handicapped service counters 4.in.,checkout 36 in. Handicapped ramp/handrails ontinuous/ 12 in.beyond r Active listening system an44ignage assembly space . Final Electrical /W `\r41 Q,ao„ Site Plan/Variance required T� Final Survey,new structures Mir - As-built septic system layout required Okay to issue TEMPORARY C/O-Certificate of Occupancy yes no i Okay to issue PERMANENT C/O-Certificate of Occupancy yes no Okay to issue C/C-Certificate of Compliance yes no U` ` n FINAL - COMMERCIAL INSPECTION 7ORT ,' l Request received: Z i Office Use 11)7) Town of Queensbury (518) 761-8256 ARRIVE 1 am 12 DEPART s2�/c an 742 Bay Road Re..y at time: I �QI � Quee toy, NY 12804 Inspector's Initials e6 p- _�,: NAME �`) .. PERMIT# 0/ -`�j� 1 At ti ee • �'is LOCATION TYPE OF STRUCTURE Ma INSPECT ON(date):,(,-)5 to, Notes: N/A YES NO Chimney/"B"Vent/Direct Vent location Plumbing Vent Roof Complete COMMENTS ' Exterior finish grade complete 0 f 2 Interior/exterior guardrails 42 in.platform/decks * t � Interior/exteriorStair38 handrail 34 in. - in. Step risers 7 3A in. Main door 44 in. 02-1 All others 36 in. Lever handles (/ Exits at grade or platform Canopy to cover req. exit doors Gas valve shut-off exposed&regulator(18 in.)above grade Floor bathroom watertight Other floors okay Hot water relief valve Boiler/furnace enclosure <250,000 BTU N/R 250,000 BTU to 1,000,000 BTU's(1 hour) >1,000,000 BTU's(2 hour) Gas furnace shut off within 30 ft. or within line of site Oil furnace shut off at entrance to furnace area • Stockroom enclosure(1 hour),3/4 hour door Storage/receiving/shipping room(2 hour), 1 %z doors 1 '/z hour doors and closers 3/4 hour corridor doors and closers Firewalls/fire separation,2 hour,3-hour complete Fire dampers,2-hour fire walllseparation or great r Fire door/shutters 1 '/z hour,3 hour Ceiling fire stopping 3,000/5,000 sq. ft. Fan shutdown, smoke vents or fan Exit door/panic bars assembly hardware Elevators Elevator signage Handicapped bathroom grab bars/sinks/toilets Handicapped bath/parking lot signage Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/ 12 in.beyond Active listening system and signage assembly space /oral Electrical \,'Site Plan/Variance required Final Survey,new structures As-built septic system layout required Okay to issue TEMPORARY C/O-Certificate of Occupancy yes no Okay to issue PERMANENT C/O-Certificate of Occupancy yes no Okay to issue C/C-Certificate of Compliance yes no GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept. of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive Ar6karrilpm Depart am/pm Inspector's Initials , it NAME: PERMIT# LOCATION: 4 II? 14,6 g(' DATE : Z Jam?L TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form I \ Reinforcement in Place \ The contractor is responsible for ; } providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site Foundation/Wallpour r r Reinforcement in Place Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing 1 Heating Rough-In ; Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent, Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration B rrier Fire Separatio , 3,hour n6r c Penetration Sealed Fire Wall 2,3,4 hour Firestopping A 1 2 i_ GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept. of Community Development Date inspection request received:0 S r�- Building& Code Enforcement 742 Bay Road 01-> Queensbury,NY 12804 Arrive .tU/6 am/pm Depart am/pm Inspector's Initials fill/ �j NAME: 01/ C- t�Cr J l C/'J — , GGt1/4' PERMIT# 3 6 LOCATION: j 3 3 DATE : 1 TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site Foundation/Wallpour Reinforcement in Place Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- \ Floors R- ,I Walls R- Ceiling R- A Duct work or piping in unheated spaces R- Proper Vent, Attic Vent J Framing Jack Studs/Headers I Bracing/Bridging Joist Hangers Jack Posts/Main Beam / I Air Infiltration Barrier Fire SeparatiopI,2, 3,hour t/ ` � i-Astfra_( a� - ,' P netatiau�Sealed 1- 3,4 hour irestoppingN --- -..... .._ (:)").--- GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury \) Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road ,-- Queensbury,NY 12804 Arrive �pnr— Depar Inspector's Ini da NAME:Pc `)i CA PERMIT# - O I`S LOCATION: M� (� 0m Z (c DATE : f —So_ 0-�' TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS 4 - Footings 'ers - \ I l—i,�,Q;' ' �� � Cis ��tE �'--��' Monolithic/Pi our Form Reinforcem .it in Place 0, The contra ktor is responsible for '� _ '`-`�`L t-�' � G�x%St`S providing p otection from freezing viFF '��:i for 48 hours �c lowing the placement of the concrete. Materials for this p rpose on site i A3�Ac2 3 --tkM ` ��NJ\ p �i e-he13- FoundationlWallpou Reinforcement in Pla �V L! Pt Fp 6.�h Lt-- PtL,___ Foundation/Dampproo' g Backfill Approval _ -ET ., p �� o Plumbing Under Slab Plumbing Vent/Vents in P .•- Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior '- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent, Attic Vent Framing Jack Studs/Headers Bracing/Bridging , Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fi�/Separation 1,2,3,hour F� � � °� , /ps� Fes, a tio� JJ-�'F1'i6 P etration Sealed 2 o V re Wall 2, 3,4 hour f�`L c--F A.�. C 7 '. Firestopping \—C_ t'- z � �G� l_�t.Rt �, GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept. of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive Depart spector's Initi NAME: �0,1t-Pl -V-- c4Ct- Y1L C3C)c, PERMIT# LOCATION: A\}1 ATl RcvA-O DATE : j`p� TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS 2- Footings/Piers Monolithic Pour Form cEQtA A-b Reinforcement in Place .The contractor is responsible for providing protection from fr 'ng 6 l for 48 hours following the p ce enter oG� of the concrete. Materials for this purpose on si e _ poL€ Foundation/Wallpour Reinforcement in Place Foundation/Dampproofing \ TA G � ���� � \ Backfill Approval t� Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing F L,� Heating Rough-In Insulation Founddatiot Int i r R _ Foundation Walls Exterior R 5 ,-YF� Floors R- Walls R- �1�� ;�L,L�� . Ceiling R- Duct work or piping in C� unheated spaces R- wiykR. Proper Vent,Attic Vent �v`4 � Y- •31� F��:C Framing Jack Studs/Headers Bracing/Bridging 6 1✓ Pki Joist Hangers �Q Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2, 3,hour CCQRAp sAl.L Fenetration Sealed ire Wall 2, 3 4 hour t= �� �`� Firestopping t c-\\ _) _ ':N�\b .00 rI,Vi; 2 GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept. of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive pm Depart m • Inspector's(nit NAME: PRm Pao- t r PERMIT# LOCATION: Ft N 1 V ' R f7 ash DATE : -OZ TYPE OF STRUCTURE: C.0 NA RECHECK N/A YES NO COMMENTS FoMonolithic hic s T I STA—T-766 Monolithic Pour Form Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the pl ement of the concrete. Materials for this purpose o site Foundation/Wallpour Reinforcement in Place _ Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing Heating Rough-In Insulation t=__��� � — Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- ti v Ceiling R- Duct work or piping in unheated spaces R- Proper Vent, Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2, 3,hour / �T L L\��(� OF Penetration Sealed Z�•Q �_ Fire Wall 2,3,4 hour C Firestopping 9cL .. ' 1.,_.. .\\ .\.c:4�C:ZS:; ,,,V ,_. GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspectionnrequest received:1‘,-- t7 0/ Building&Code Enforcement . 742 Bay Road Queensbury,NY 12804 Arrive Depar Inspector's Initial NA.11 6/ Z �' t-- PERMIT# /—3 P S LOCATION: ( ''Id 77/ S-7121tr DATE : _ 7 C/ TYPE OF STRUCTURE: s'C J.\d z)L_ RECHECK \ N/A YES NO COMMENTS \ .— Footings/PiersI I I Monolithic Pour Fo \ Reinforcement in P1 ce \ The contractor is sponiible for providing protecti n from freezing for 48 hours folio 'ng the placement of the concrete. Materials for this pu ,'.se on site Foundation/Wallpou Reinforcement in Pla,e Foundation/Damppro 4 ng Backfill Appro' al- lumbing Under Slab Plumbing Vent/Vents i• Place C�wSi.`� ?S )(:\SI-C\ a� ough Plumbing c L, LAVA w6 wR o/ Heatin:Rough-In Insulatio k - ` jS(Yc 'T ay Foundation Walls Inte •r R- Foundation Walls Extern R- Floors R Walls R- , let ,✓ Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2, 3,hour Penetration Sealed Fire Wall 2,3, 4 hour Firestopping TOWN OF QUEENSBURY .BUILDING._& CODE ENFORCEMENT060/1/\ 742 Bay Road Queensbury NY 12804 iv\ (518) 761-8256 SEPTIC DISPOSAL SYSTEM INSPECTION Name 0, h l ( ;,4,67: ___ Location all,A7W— At l0 1. Permit # 090 — 30 VJ° SOIL TYPE: a d-Loam-Clay- Results of Percolation Test- (if applicable) Rate-Minute/Inch TYPE OF SYSTEM: ABSORPTION FI LD: Total Length k Length of eac trench / . ° ' Depth of tren h s V Q Size of stone � �;� � SEEPAGE PITS: Number- Size - t. x ft. Stone size PIPING: Size Type Bldg. to Ta Tank. to Dist. Box • Dist. Box to Field/Pit Openings Sealed • Yes No Partial LOCATION/SEPARA IONS: Foundation to T nk feet • Foundation to Absorption feet Separation of Pits feet Conforms as per (Plot Plan Yes No LOCATION OF SYSTEM ON PROPERTY: (circle one) Front - Rear - Left Side - Right Side Middle Front - Middle Rear COMMENTS: ' C)3' 'S\)\' \1 f SYSTEM USE APPROVED: ES NO Arrived: Depar Building Insp or. C2, 06 11 t TOWN OF QUEENSBURY �1, ; BUILDING &_CODE ENFORCEMENT 742 Bay Road Queensbury NY 12804 • (518) 761-8256 SEPTI POSAL SYSTEM INSPECTION '54 Name I S4r,LSo Location )14C4X1YJ Date a " gjOiPermit/,(/� # " SOIL-TYP : San-Lo ay- Results of Per 1 ion Test- (if applicable) Rate- 1 ute/Inch TYPE OF SYSTEM: 1 ABSORPTION FIELD: To al Length ,66 —0, .. Length of each trenc 4 U. • Depth of trenches C � � Size of stone • SEEPAGE PITS: Number Size - ft. x ft. Stone size PIPING: Size Type Bldg. to Tank 1 Tank to Dist :ox e.-A" pJC Dist. Box to Field/Pi 1-4" R) - h L1"QED Openings Sealed? Ye. No Partial LOCATION/SEPARATIONS: Foundation to Tank 1,p feet Foundation to Absorption --cl feet Separation of Pits feet Conforms as per Plot Plan �Ye�s No LOCATION OF SYSTEM ON PROPERTY: (circle one) Front - Rear ft Si fight Side Middle Front - Middle Rear COMMENTS: — -- f'‘k--A1C 10 \k \ �X__. k___C15\ T' e L`e j SYSTEM USE APPROVED: YES NO Arriv • G Dep t / --- Building In q tor. 7-- 1)ab\-t7E_Lit\ ,! _b 41'1 GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept. of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive lOaCipm Depart • _ 1 Inspector's Initia s c) NAME: Y�,SQ ,4 �Ci��GOL cC+'?C PERMIT# / LOCATION: \ j �� �� DATE : ( ,7).-g-�1.00 I TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers I I Monolithic Pour Form () E-1G\t3EE1 6 A R f-)k)9L 1 MV Reinforcement in Place 1 1__L S3 a OCEE F c The contractor is responsible for P� providing protection from freezing P c E(D I iNLC__C bF2 E v3TEEL for 48 hours following the p r meet E-R 1C)i r REcit,V1CR _ pt of the concrete. Materials for this purpose on ite r\( t3 F\C1 hT1b l Foundation/Wallpour 1 Reinforcement in Place j E T) C�6.�1 � �J lLL Foundation/Dampproofing / v Ep , Backfill Approval / Plumbing Under Slab O (��Ct�EG� 6 R okJ� Q 1 Q Plumbing Vent/Vents in Place / 0/ 'A,-V-R\_ B A�`k)RG m, 'oug Plumbing Heating Rough-In ;' Insulation `-)9taT1. dP----P d`10v ZA v-hD _ Foundation Walls Interior R- C)EV— Foundation Walls Exterior R- Floors pL�1 0 Floors R- ` Walls -►.3 R- 1 �/ —A 'T u7 E 5 7 Ji t t),�,T 1-k Z F U4) Ceiling R- Duct work or piping in unheated spaces R- Pr r Vent,Attic Vent I raining EiTROC k. AL Jack Studs/Headers \ Bracing/Bridging I ✓ Joist Hangers I' Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1, 2, 3,hour _ Penetration Sealed Fire Wall 2, 3,4 hour Firestopping FIRE MARSHAL TOWN OF QUEENSBURY ;0-*-11111114;-%j QUEENSBURY, NY 12804 (518) 761-8205 FIRE MARSHAL INSPECTION REPORT REQUEST RECEIVED PERMIT# I t' NAME rf 0 j e.-A. 5 c,\-)00 I f..iiIA LOCATION SCHEDULE INSPECTION ON Z. D 3', A PM ANYTIME j APPROVED N/A YES NO ' EXITS AISLE WIDTHS EXIT SIGNS EMERGENCY LIGHTING FIRE EXTINGUISHERS FIRE ALARM SYSTEM FIRE SPRINKLER SYSTEM )<#. FIRE SUPPRESSION SYSTEM HOOD INSTALLATION INTERIOR FINISHES STORAGE: CLEARANCE TO SPRINK ERS CLEARANCE TO HEATIN UNITS REQUIRED SIGNAGE CHIMNEY WOOD STOVE FIREPLACE-MASONRY FIREPLACE-FACTORY BUILT I 1 REMARKS: ) ❑ OK TO THIS DATE 'rIrgiti ' 3y(kCm `aaS lyin i f S+ai Led vlo cci f( - a.. NU rk orJ c ' mod Tc) Cthn olu A INSPSLIP,PUB SP R 0 GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive/A c'yam/pm Depart j Inspector's Initials—� m NAME: 91(('` Q\('A PERMIT# r 31 LOCATION: DATE : TYPE OF STRUC • RECHECK N/A YES NO COMMENTS Footings/Piers I-1— 1 Monolithic Pour Form Reinforcement in Place The contractor is responsible r providing protection from fr in for 48 hours following the pl Int of the concrete. Materials for this purpose on si Foundation/Wallpour , Reinforcement in Place Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Plac Rough Plumbing Heating Rough-In Insulation Foundation Walls Inte . r R- Foundation Walls Ext -or R- Floors R- Walls R- Ceiling R- D ct work or pipi in unheated spat R- Pr per Vent, Attic Vent / / �/ / naming V �Pi/z jfT✓Ct' o.vl Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2, 3,hour Penetration Sealed Fire Wall 2,3, 4 hour Firestopping GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive .3 Depart ' Inspector's Initial NAME: Pl'� vEt /iC.lMc-A__. (f,t,.1-Tvv9 PERMIT# vLOCATION: R t Pt-n;t� �e,nDATE : - - TYPE OF STRUCTURE: RECHECK • N/A YES NO t\ COMMEN f A Footings/Piers Monolithic Pour Form b._A OA .T%-\ Ov3 Reinforcement in Place The contractor is responsible for providing protection from freezing /� 1"` \f' t-k � L- CALL_ �U for 48 hours following the placement/ 1 t -1- of the concrete. ! F�yj�(� ¢ Ptvt-W, vi=6 �� -�- Materials for this purpose on site Foundation/Wallpour Reinforcement in Place Foundation/Dampproofing Backfill Approval /J Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing Heating Rough-In ' Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent, Attic Vent Framing j Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2, 3,hour Penetration Sealed Fire Wall 2,3,4 hour • Firestopping / 0 . GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road _ Queensbury,NY 12804 Arrive n-- Depa - II , em Inspector's In ': — ' NAME: c31\--Ca_S:vec\-- c, ii� `SC) \ PERMIT#LOCATION: )J ' 1 J ip a' DATE, : i • •Tf v TYPE OF STRUCTURE: -)*1. (c -1 RECHECK gs N/A YES✓�NO COMMENTS in /Piers F o`2 2 i-,ct p) 1ff Monolithic Pour Form // Reinforcement in Pla e'---, / 1 The contractor is r nsib a for providing protection from fr zing for 48 hours followin the acement'r of the concrete. f Materials for this purpos on'site Foundation/Wallpour , Reinforcement iniP.Jace Foundation/Dampproofin L. Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Pl.ce _ Rough Plumbing Heating Rough-In Insulation Foundation Walls Interio R- Foundation Walls Exteri a r R- Floors '- Walls '- Ceiling /R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam_ Air Infiltration Barrier Fire Separation 1,2, 3,hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping , a,61.0/)7" GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept. of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY_12804 Arrive\\V pm Depar'' Inspector's InitiaWP* NAME: • 6 PERMIT# (i9 4 LOCATION: — DATE : — C TYPE OF STRU TURE: RECHECK N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is respo sible for providing protection fr m freezitt for 48 hours following he place' „nt of the concrete. Materials for this purpose n site Foundation!Wallpour Reinforcement in Place Foundation/Dampproofing BacVall Approvl. L.Beinbing Under S1a (1lr. -)nI Plumbing VentNents in Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior - Floors R- Walls R Ceiling Duct work or piping in unheated spaces - Proper Vent, Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2, 3,hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping GENERAL INSPECTION REPORT (518 ) 761-8256 Town of Quecnsbury Dept.of Community Development Date inspection request received: Building& Code Enforcement • 742 Bay Road Queensbury, NY 12804 Arrive am/pm Depart AZ..i Inspector's Initi< /(- - NAME: __PR )PFci L PERMIT# Allo la LOCATION: iniv)I RI-1()t l DATE : Or—�'-0 TYPE OF STRUCTURE: Pnr)\-- RECHECK N/A YES NO COMMENTS Fjootings/Piers [ y lA.onolithic Pour Form _ Reinforcement in Place t °_ �� --.)\ V — The contractor is respon ' c for providing protection fro cuing --1---E i ' \A , for 48 hours following is placement of the concrete. Materials for this purpose on the 9)6[0 tFoundation/Wallpour__ f� Reinforcement in Place_ Fou ndation/Dampproofi n; Backfill Approval Plumbing Under Slab Plumbing VenUVenls ' F lace Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Extc dor R- . . Floors R- Walls R- Cei l i ng R- Duct work or piping in unheated spaces R- Proper Vent, Attic Vent . Framing_— `— Jack Studs/Headers Bracing/Bridging Joist Hangers . Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1, 2, 3, hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping I�G'-15- \ \ GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive IV, ,,Igt,;)• .. Depart •pector's Initi NAME: PR 6..APB CT PERMIT# LOCATION: tc r ot) V4l$ic) DATE: I —O TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is responsi. e for providing protection from -ezing for 48 hours following the .lacement of the concrete. Materials for this purpose on 'te Foundation/Wallpour Reinforcement in Place Foundation/Damp.roofing iBackfill Approval VPlumbing Under Slab kIR 'Q-'tt f J ca t 1Y i E --- -VEV'\ Plumbing Vent/Vents in Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- • Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- f Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping r GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road R rt Queensbury,NY 12804 Arrive Depart . f,n'"t spector's Initialsn,Ir. NAME: / PERMIT If 0 i /,r- a LOCATION: ) DATE : q — /3 TYPE OF STRUC RECHECK Footin /Pie N/A YES COMMENTS 1 on tchemsenotuirnFPolrmace 7The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete Materials for - pu .0 se on site �+ Foundation/Wa pour V c� Reinforcement i n Place IV. yvls E�� � 6. Foundation/Dam.proofinr .\\ RR_ rBackfill Approv. / _ V n t \00 d Plumbing Under 'lab' • t i64/ 1ft Plumbing Vent/Ve is i 'lace Rough Plumbing Hearing Rough- / `Z 4 j Insulation °` >=� �,1, Z PT\5� CF Foundation Walls nterior R- v� L:�7 V-t_e0V.__ Foundation Walls I erior R- I Fo Pti-1 x kl 1 iDt,_\ Floors R Ceiling R- DVDOL__ Do63\(-)\ \B9. v3 1ik-l_____ Duct work or piping i unheated spaces R- `t3 b 0 U\ \ 1 O 0 Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Tnfiltration Barrier Fire Separation 1,2,3,hour _ Penetration Sealed Fire Wall 2,3,4 hour Firestopping GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: t J a N Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive re( Depart 4n �"' 'pector's InitI N : PERMIT# LOCATI N: o+- DATE: TYPE OF STRUCTURE: c J ao C --- RECHECK N/A S NO COMMENTS Footirr •ers ��, l Monolit our Form Reinforcement' ce The contrac r is re nsible for providing pr tection om freezing for 48 hours llowin the placement of the concret . Materials for this urpos on site Foundation/Wall ur Reinforcement in lace Foundation/Dampp o g Bac pproval Plumbing r S1�j Plumbing Vent/Vents in Place Rough Plumbing 1 Heating Rough-In Insulation Foundation Walls nterior R- Foundation Walls xterior R- Floors R- Walls R- Ceiling R- Duct work or pipin in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping j r (36,,C) GENERAL INSPECTION REPORT ( 518 ) 761-8256 / Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive ',lib epart Cspector's Initials , NAME: QCOS Qom- Scir �-• 0 PERMIT# 9 LOCATION: tc -� DATE : _ O TYPE OF STRUCTURE: r�c'l ,O� / RECHECK N/A YES/NO COMMENTS Footings ' 101. ✓� I Mono ' •our Form / f-(� 7-- E \ ': orcement in Place The contractor is re ,+nsible ..r 6Lrcb\ sjc- E5 providing protection from free 'ng for 48 hours followi g the pla ent of the concrete. Materials for this purpo• on site Foundation/Wallpour Reinforcement in Plac- Foundation/Dampproo i Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Pla t Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R Foundation Walls Exterior R Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing J Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1, 2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping 094 -3'4) GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive f y am/pm Depart ai pm Inspector's Initials(s f NAME: 7 &I2€ic PERMIT# LOCATION: DATE : u• TYPE OF STRUCTURE: RECHECK N/A YE/NO COMMENTS Footings/Piers l/ I Monolithic Pour Form f Reinforcement in Place (73100/ `47JL,The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on s to 1 Foundation/WallPo ur Reinforcement in Place Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing V nt/Vents in Place Rough Plum ing Heating Rou -In • Insulation Foundation Walls Interior R- - Foundation Walls Exterior R- _ Floors R- Walls Rr Ceiling Duct work or piping in unheated spaces Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,ho Penetration Sealed Fire Wall 2,3,4 hour Firestopping 0_---: t ,-,D sgb GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive r am/pm Depart am/pm Inspector's Initials g1i NAME: QV()S c� � �/ � PERMIT if 3C LOCATION: Pr' -t'1, - DATE: 3 o -e;C:::,� TYPE OF STRUCTURE: Pra )( ) 1_, RECHECK N/A COMMENTS Footings/Piers ' M 'thic Pour Form kV ��enforcement m Placed/j/ rIle j� The contractor is re nsible r providing protection om freez'ng �� �//T for 48 hours followin the pla ment ?al of the concrete. Materials fo this purpose n site Foundatio ur Reinforcement in Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Plac Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exteric R- Floors Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive ff 10 am/pm Depart pm Inspector's Initials': NAME: yvS 652.PG PERMIT#DO/ 3 LOCATION: ) DATE: TYPE OF STRUCTURE: RECHECK • _ N/A YE,S/�TO COMMENTS Footin,,:i ''ers �/ I Mo lithic Pour Form /' f«I /s,/ L1// einforcement in Place v V The contractor is responsible or providing protection from ezin ��� c/ for 48 hours following the ace if ent T+�r. ,� of the concrete. �� a % � ;of j- Materials for this purpose on its Foundation/Wallpour Reinforcement in Place Foundation/Dampproofing Backfill Approval Plumbing Under Si Plumbing Vent/Vents in Pla+e Rough Plumbing Heating Rough-In Insulation Foundation Walls Inte or R- Foundation Walls Ext- 'or R- Floors R- Walls Ceiling R- Duct work or piping n unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping GENERAL INSPECTION REPORT ( 518 ) 761-8256 a F/y\ Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive—2•riLy am/pm Depart am/pm v Inspector's Initials �c / NAME:QY S Cyr`��L� PERMIT 400 LOCATION: (AM l 1 DATE: %— a TYPE OF STRUCTURE: c"•-Ac RECHECK N/A YES NO COMMENTS Footings/Piers 7 Mono ithic Pour Form J a 7��� / / )4 f� a Jk c� l nforcement m Place VV �/ ( li✓ The contractor is responsible for ,� / providing protection from freezing /1)ejr d`.r19' for 48 hours following the placement of the concrete. Materials for this purpose on si Sift. V (•z 0 C- c h al Foundation/Wallpour Reinforcement in Place Foundation/Dampproofing Backflll Approval Plumbing Under Slab Plumbing Vent/Vents in Piaci- Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterio R • - Floors Walls R Ceiling Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing I Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping z r� / J V�4 'a.rai— VV GENERAL INSPECTION ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: a-do Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive am/pm Depa ("Ti _ Inspector's Initial , .� NAME: i/DS t�C-1��-, �I PERMIT# C vI —3 LOCATION: DATE: TYPE OF STRUCTURE: _ot, RECHECK N/A YYESSYO- COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is responsible for providing protection fro fr zing for 48 hours following th pla ment of the concrete. Materials for this purpose o site Foundation/Wallpour I �/ Reinforcement in Place I Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Ven`h. ' ' a.- Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior !'- Foundation Walls Exterior '- Floors R Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers BracingBridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping Aki : 11) GENERAL INSPECTION REPORT r ( 518 ) 761-8256 Town of Queensbur OLA y Dept.of Community Development Date inspection request received:41-)/ II Building& Code Enforcement 742 Bay Road LI Queensbury,NY 12804 Arrive '-Op an, Depart Inspector's • • _ NAME: PIDicpe61--OLN kl- PERMIT 3P LOCATION: /3 3 %2.54,--- /2.1 DATE : TYPE OF STRUCTURE: /— RECHECK 1,0-74 Fz-T7d N/A YE:i-(1<0 COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Pla•- • The contractor is r;spo 'ble for providing protectio from, -ezing for 48 hours folio' ng the • .cement of the concrete. Materials for this pu ••se on s' - Foundation/Wallpour Reinforcement in Plac: Foundation/Dampproo'ng Backfill Approval Plumbing Under_Sla• Plumbing Vent/Vents in t'lace Rough Plumbing Heating Rough-In Insulation Foundation Walls Interi• R- Foundation Walls Exteri t r R- • Floors t- Walls "- Ceiling •- Duct work or piping in • unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping GENERAL INSPECTION REPORT ( 518 ) 761-8256 61Town � of Queensbury / /^` Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive� m Depa c. Inspector's Initials (a ( �"'° - PERMIT# 3 E5 NAME: �' � (` LOCATIO Tl 3 --) DATE : 3 r TYPE OF S UC RECHECK N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is responsible for providing prote• '• freezing for 48 hours fs owing the .lacement of the concrete Materials for this urpose on si.e Foundation/Wall p ur Reinforcement in ace V;oedatiAon/Dampp 'ofing pproval Plumbing Under Slab Plumbing Vent/Vents' 'lace Rough Plumbing Heating Rough-In Insulation Foundation Walls Interio R- Foundation Walls Exterio R- • Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Rbad Queensbury,NY 12804 Arrive 7Z m Depart A 14n.p i spector's Initial Wig►,- ^� 1 NAME: r PERMIT# [�Ii LOCATION: 0 DATE : o — --01 TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is responsible for providing protection o s eezing for 48 hours followii g the • acement of the concrete. Materials for this pu •n se on si - Foundation/Wallpour 3►. J/, Reinforcement in Plac+ Foundation/Dampproo i ng Back:ill :pproval Plumbing ► der S .. Plumbing Vent/Vents it Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Int rior R- Foundation Walls Ext rior R- Floors R- Walls R- Ceiling R- Duct work or piping it unheated spaces / R- Proper Vent, Attic Vent Framing Jack Studs/Headers Bracing/Bridging • Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2, 3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping 1 "Iv__ GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: a71# Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive��Ky�i �Depart \ 50 � aspector's 1 , NAME: Pra `' c (cid "'"��� Cam„ PERMIT# LOCATION. sv-11n,-ti ln, (Lfh. DATE : TYPE OF STRU TURF: RECHECK N/A YES NO COMMENTS Footings/Piers C, Monolithic Pour Form Reinforcement in Place The contractor is respon:ible for providing protection fro i freezin;. for 48 hours following - placement of the concrete. Materials for this purpose o site Foundation/Wallpour Reinforcement in Place kj"-,Q,-Ti" i/ 6 Q L'k Foundation/Dampproofing ` \ Backfill Approval Plumbing Under Slab (j Plumbing Vent/Vents in • .ce Rough Plumbing- Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R Walls R Ceiling Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping TOWN OF QUEENSBURY BUILDING & CODE ENFORCEMENT 742 Bay Road Queensbury NY 12804 (518) 761-8256 SEPTIC DISPOSAL SYSTEM INSPECTION Name Wig 06 _ 1— 4C}�IN-A Location 0\)eRT100 ,p Z Date — • ,, Permit # 7 -k 3 9 SOIL TYPE: San. Loam-C ay- Results of Percolation Test- (if applicable) Rate-M nute/Inch TYPE OF SYSTEM: ABSORPTION FIELD T. al Length Length of -: . •-nch . Depth of trenche- Size of stone SEEPAGE PITS: Nu ber- Size - ft. x ft. Stone size PIPING: Size Type Bldg. to Tank Tank to Dist. Box Dist. Box to Field/P • Openings Sealed? Y-s No Partial LOCATIOti/SEPARAT . Foundation to Tank feet Foundation to Absorption feet Separation of Pits feet Conforms as per Plot Plan Yes No LOCATION OF SYSTEM ON PROPERTY: (circle one) Front - Rear - Left Side - Right Side Middle Front - Middle Rear y_\ COMMENTS: " � "40 \b\ Pt \)E a_R @- u • PiLL SYSTEM USE APPROVED: ES NO Arrive•• i /� � De• ted: .C, c /�i./ ��«/ 'wilding I -spe- .or GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive :13- Depa Inspec or s Ini • NAME: W c:r. e jC` ApCt, PERMIT# LOCATION: (t\1 t 6:46-C.p Rc) DATE : -c� TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hot : : lowing the placement of the co rete. terials f. this p + •.se on site hinforceentinPL /e f Foundatio 9ampprr+ofing V-Z-CE1-C-V 1)Cot J O1 V \\1 Backfill A .royal Plumbing nder SI.b Plumbing ent/V: is in Place Rough Plu I bin: Heating Ro -In Insulation Fount.do Walls Interior R- Fo datio Walls Exterior R- oors R- • Walls R- Ceiling R- Duct work or i.iping in unheated I, ces R- Proper Vent,Atti. Vent Framing Jack Studs/Heat .rs BracingBridgin: Joist Hangers Jack Posts/Main•:earn Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping /6---/o) GENERAL INSPECTION REPORT4/ni ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive'I Witig4m Depart *.iii m Inspector's NAME: (t PERMIT LOCATION: DATE: TYPE OF STRUCTURE: RECHECK N/A YES NO • COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Plac; \ The contractor is re•ponible for providing protectio ,fron\freezing for 48 hours followi g thel placement of the concrete. Mate :d s for this purpo.e on site enforcement in Place 0UT- `� Foundation/Dampproofin Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Phi - Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping 2-,1,SC; GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road 'X ki(mj, Queensbury,NY 12804 Arrive am/pm Depart C,, Inspector's Initials NAME: �L'(� < �J J PERMIT O I 3? LOCATION: \ u;c I DATE: ?-i 7'c9-C'O 1 I TYPE OF STRUCTURE: Cl rl RECHECK N/A YE/NO COMMENTS gs/Piers C: 1 M olithic Pour Form p enforcement in Pia,a (2- 4r 1J +' The contractor is r:sponsib e for providing protectio from fr-ezing for 48 hours folio ng the pl.cement of the concrete. Materials for this p ••se on si Foundation/Wailpour Reinforcement in Plac; Foundation/Dampproo •g Backfill Approval Plumbing Under Slab Plumbing Ven eats'• 'lace Rough Plumbing Heating Rough-In Insulation Foundation Walls Iate or R- Foundation Walls Exte or R- Floors '- Walls °- Ceiling - Duct work or piping in unheated spaces R Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping 'O GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: ! I Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive am/pm Depart/0• a Inspector's InitialsaQi t/ NAME: ? pt JAB( PERMIT# LOCATION: f 33 11--v1 4 2Le_.-- DATE: ' I ' urs. TYPE OF STRUCTURE: RECHECK (Pe Q r () N/A YE/NO COMMENTS Footings/Piers Gj e-suG - APARd v Monolithic Pour Form Reinforcement in Place — Lc -c r DA) S The contractor`s respo ible or providing prote on fr m ezing 'l)--) -6 for 48 hours foll e placement of the concrete. Materials for this purpose n site Foundation/Wallpour r� Reinforcement in Place Foundation/Dampproofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing C L =�C�T I 6Y.0 E e r Heating Rough-In Insulation — L) 171 711g 0 1 Foundation Walls Interior R- Foundation Walls Exterior R- tJ a� -'WIC Floors R Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing, Jack Studs/Headers Bracing/Bridging • Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: 7 020 / Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive\2�Zba m Depart Adir- or's 1•:ew NAME: ice' PERMIT'• / 3,(1 LOCATION: /3 3 pATE: 7 10 . Ob TYPE OF STRUCTURE: 404e( uZ— RECHECK ?‹- rA'2 N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is -sponsible for providing protec 'on from freezing for 48 hours foil•wing the placement of the concrete. JMaterials for this p ••se on site Foundation/Wallpo r c .,3 f1 fbl2-- Pyr- / Reinforcement in P1.ce Foundation/Damppr•ofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents n Pla-e Rough Plumbing Heating Rough-In Insulation Foundation Walls Inte 'or R- Foundation Walls Exte.'or R- Floors '- Walls - Ceiling Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers . Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping \--A \ TOWN OF QUEENSBURY . 1 BUILDING &_.CODE ENFORCEMENT piIy1. 742 Bay Road Queensbury NY 12804 (518) 761-8256 SEPTIC DISPOSAL SYSTEM INSPECTION Name . 0r05(Cr-- L(, •.) . ?- — - \1 C -N Location \ g A,, ,„_'t c' (t‘'. Date `-A/Of Permit # .2acrt ---3847 SOIL TYPE: Sand-Loam-Clay- Results of Percol ati n T�est- (if applicable) Rat -Minta\te/Inch TYPE OF SYSTEM: ABSORPTION FIELD: T tal Length Length of each trench Depth of trenches Size of stone SEEPAGE PITS: NumbeA- Size - ft. x 1 ft. Stone size PIPING: Size Type Bldg. to Tank i CAD1 Tank• to Dist. Box 1- 4 Dist. Box to Field/Pit Openings Sealed? Yes No Partial LOCATION/SEPARATIONS: Foundation to Tank feet Foundation to Absorptio feet Separation of Pits _ feet . Conforms as per Plot Plan Yes No LOCATION OF SYSTEM ON ROPERTY: (circle one) Front - Rear - Left S de - Right Side Middle Front - Middl Rear COMMENTS: -A �. �,, "T-Pc \1 1co C qv\v‘-'‘' F 111 SYSTEM USE APPROVED: r4rm~w NO ,- Arrived: Depart, . iv 4001.11 AO ' 400" /*.t7' -7.--- - :uilding ectdr V � . GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive • II in !.• 'art a Inspector's Initials NAME: c `__ v PERMIT# LOCATION: •• 15YN. DATE: — TYPE OF STRUCTURE: RECHECK N/A YES-NO COMMENTS F orings/Piers Vt_eS ATtg_ ' / Monolithic Pour Form Reinforcement in Place � \1 The contractor is response e\for providing protection fro freezing p k for 48 hours following the placement of the concrete. Mate:•s for t • purpo e or isf r' all 'einforcemen 'n Place Foundation/Dam..t•ofing Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Pla - Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping V`RC-- - ‘ A__ TOWN OF QUEENSBURY BUILDING & CODE ENFORCEMENT 742 Bay Road Queensbury NY 12804 (518) 761-8256 SEPTIC DISPOSAL SYSTEM INSPECTION Name QcocôL Location NliCk \i'd•c— gj Date S '/(Permi t #40__LIEE) SOIL TYP Sand- cam-Clay- Results of Pe elation Test- (if applicab e) 'ate-Minute/Inch TYPE OF SYST M: ABSORPTION F ELD: ital Length Length of ea trenc Depth of tren, hes Size of stone SEEPAGE PITS: umber- Size - \O_ t. x j: ft. Stone size '�- PIPING: .' Size Type Bldg. to Tank _ Tank to Dist: O.: Dist. Box to Field/"it Openings Sealed? Yes No Partial LOCATION/SEPARATIONS Foundation to Tank feet Foundation to Absorp ion _ feet . . Separation of Pits feet Conforms as per Plot Plan Yes No LOCATION OF SYSTEM 0 PROPER . e (rircle one) Front - Rear - Left/Side - Right Side Middle Front - Middle Rear COMMENTS 0 ice ' S'i d e_- , o` d • Vc\-- cat\ lam` n SYSTEM USE APPROVED: YES (:111117) / Arrive. . = 1,- Depa, 'ed: -$ i) LaillA___, ALA_ if:u i rdi §rush , A4111GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive an m Depart ►a '. �/m S? spector's Initi -Fr_ _ NAME: C PERMIT# , II LOCATION: 1, � DATE : gre TYPE OF STRUC1 RECHECK N/A YES)'TO COMMENTS oo ' gs/Piers E t,EJiR Q cc +� nolithic Pour Form Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following e p ment of the concrete. Materials for this purpose on site Foundation/Wallpour Reinforcement in Place Foundation/Dampproofi g Backfill Approval Plumbing Under lab Plumbing Vent/Ve ace Rough Plumbing Heating Rough-In Insulation Foundation Walls Inte 'or R- Foundation Walls Extetior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping GENERAL INSPECTION REPORT v \.--\0 ( 518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive if of Depart a_ Inspector's Initi NAME: l / _c?caitEls- �(� PERMIT#LOCATION: V 1 CCM DATE : - - TYPE OF STRUC RECHECK N/A YES NO COMMENTS Footings/Piers I Monolithic Pour Form Reinforcement in Plac- The contractor is r •nsible for providing protecrio from freezing for 48 hours followi 1 g the placem: t of the concrete. Ma194d,s for this pu •••eon site // oundation/Wallpour V ;; Reinforcement in Place Foundation/Dam proo t�✓ �'i�i Backfll Approval Plumbing Under Slab Plumbing Vent/Vents in PI.ce Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior Foundation Walls Exterior R Floors R Walls R Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridging Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping