Signed Inspection Report (Mon Aug 1, 2022 at 339 PM)INSPECTION WORKSHEET (RPLUM-019894-2022)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0591-2021 Case Module:Permit
Inspection Date:Mon Aug 1, 2022 Inspection Status:Partial Pass
Inspector:Smith, Mark Inspection Type:Rough Plumbing
Job Address:Parcel Number:26 WHITBECK DR
Queensbury, NY, 12804
289.19-1-27
Contact Type Company Name Name
Contractor BBL Construction Services
Granted Permission BBL Construction Services
Architect HCP Architects, LLP
Applicant BBL Construction Services
Primary Owner Rosetti Acquisitions LLC
Checklist Item Status
Permit Card Visible From Road Failed
Building Inspector Notes Failed
4/26/22 partial approval for rough plumbing
- plumbing under slab approved.
7/15/22 partial approval for rough plumbing
- duct sealing verified, two units at east end of building, second floor not completed, call for recheck when ready.
8/1/22 partial approval for rough plumbing
- plumbing for domestic water supply approved
- sanitary drains and vents approved
- install missing nail plates as discussed on site, call for recheck
Plumbing Under Slab Passed
Aug 01, 2022 Page (1)
INSPECTION WORKSHEET (RPLUM-019894-2022)
Checklist Item Status
4/26/22 partial approval for rough plumbing
- plumbing under slab approved. Sanitary plumbing tested with air head test, holding 5 psi for 15 minutes.
Rough Plumbing / Nail Plates Failed
Install missing nail plates as discussed on site, call for recheck
Plumbing Vent Vents in Place Passed
3" Vent Through Roof - 18" min Passed
1 ½ inch minimum Drain Size Passed
Washing Machine Drain 2 inch minimum Passed
Washing Machine Trap: 18"-42" discharge Passed
5 psi or 10 ft. above highest conn. for 15 minutes Passed
Sanitary plumbing verified with water head test.
Water Supply Piping Passed
Air Head Passed
50 P.S.I for 15 minutes Passed
Holding 60 psi for 15 minutes
Air Test Gas Piping 10 psi for 10 Minutes Failed
Aug 01, 2022 Page (2)
INSPECTION WORKSHEET (RPLUM-019894-2022)
Checklist Item Status
All Return Air Hard Duct Work Passed
Duct Insulation - if required in unheated spaces Failed
Duct work sealed properly Passed
7/15/22 partial approval for rough plumbing
- duct sealing verified, two units at east end of building, second floor not completed, call for recheck when ready.
Aug 01, 2022 Page (3)
Smith, Mark