Signed Inspection Report (Fri Aug 5, 2022 at 814 AM)INSPECTION WORKSHEET (BINS-020073-2022) CC-0783-2021Case Number:Case Module:Permit Management 08/04/2022 Partial PassInspection Status:Inspection Date: Building InsulationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:21 Manor Dr Queensbury, NY 12804 301.8-1-30.3 Company Name NameContact Type Applicant Clute Enterprises, Inc. Contractor Clute Enterprises, Inc. Engineer Hutchins Engineering Granted Permission Laphatt Holdings, Inc. Primary Owner Laphatt Holdings, Inc. Checklist Item CommentsPassed August 05, 2022 Page 1 of 3 INSPECTION WORKSHEET (BINS-020073-2022) Checklist Item CommentsPassed Building Inspector Notes False 4/21/22 partial approval for insulation Please have approved plans on site for inspections. - insulation at mechanical room at west end of building verified. R 21. - mechanical room at east end of building has been sheet rocked on on side, insulation must be verified before Sheetrock is completed - ok to Sheetrock one side of remaining mechanical rooms, insulation must be verified before completing sheet rock. 4/26/22 partial approval for insulation - insulation and poly behind tub enclosure at exterior walls verified 4/27/22 partial approval for insulation - sound insulation at stairwell's verified, ok to Sheetrock these areas only so that the stairs can be installed. 5/9/22 partial approval for insulation - thermal insulation at unit A only approved, R 38 in ceilings, R 21 in walls - window insulation not completed at this time 5/18/22 partial approval for insulation - thermal and sound insulation approved in unit B. R 38 in ceilings R 21 in walls 6/7/22 partial approval for insulation Insulation at unit C approved walls and ceilings only, R 38 in ceilings R21 in walls None of the windows have spray foam insulation at this time. 6/23/22 partial approval for insulation - spray foam insulation verified at unit A two windows at back of building first floor Spray foam insulation at unit B entry door 6/28/22 partial approval for insulation - thermal insulation at unit D partially approved. - complete missing insulation at garage wall and ceiling - corner near mechanical room in garage is un insulated. - front door and large window at front of building not installed. - spray foam at windows not completed. 7/6/22 partial approval for insulation - spray foam insulation at window used to load Sheetrock unit C verified 8/4/22 partial approval for insulation - remaining windows have been installed at unit D spray foam insulation verified U Factors = .3 cfm for windows, .5 cfm for doors True .32 Insulation under bow & bay window(s)False Tub Shower R-20 with Vapor Barrier False Air Seal all Plates and Sills True Exterior wall outlets sealed True Unit A only All Return Air Hard Duct Work False Duct work sealed properly / No duct tape True August 05, 2022 Page 2 of 3 INSPECTION WORKSHEET (BINS-020073-2022) Checklist Item CommentsPassed Duct Testing Outside Conditioned Space False House Wrap Taped at all Seams False Air Sealing all Joints Before Insulation True Door / Window Sealed (No Insulation)True Windows not insulated at this time 8/4/22 partial approval for insulation - remaining windows have been installed at unit D spray foam insulation verified Air Seal Outside Penetrations True Unit A only All Ductwork Sealed Return and Supply False Air Barrier behind Knee Walls False Blower Door Test False Duct Insulation - if required in unheated spaces False 15 min thermal barrier/intumescent paint applied False Tyvek or Similar Exterior Sealant True Combustion Air Supply for Furnace True Fresh air supply 3' from grade True Window Sealing True Tape a exterior of windows verified, the 4 big windows at the front of the building will be installed after Sheetrock is loaded Duct Blaster Test for duct work, R-8 False Permit Card Visible From Road False Please have green card displayed at front of building. Proper Vent, Attic Vent True Insulation Residential Check Commercial Check False August 05, 2022 Page 3 of 3