Signed Inspection Report (Fri Aug 5, 2022 at 814 AM)INSPECTION WORKSHEET (BINS-020073-2022)
CC-0783-2021Case Number:Case Module:Permit Management
08/04/2022 Partial PassInspection Status:Inspection Date:
Building InsulationInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:21 Manor Dr
Queensbury, NY 12804
301.8-1-30.3
Company Name NameContact Type
Applicant Clute Enterprises, Inc.
Contractor Clute Enterprises, Inc.
Engineer Hutchins Engineering
Granted Permission Laphatt Holdings, Inc.
Primary Owner Laphatt Holdings, Inc.
Checklist Item CommentsPassed
August 05, 2022 Page 1 of 3
INSPECTION WORKSHEET (BINS-020073-2022)
Checklist Item CommentsPassed
Building Inspector Notes False 4/21/22 partial approval for insulation Please have approved
plans on site for inspections.
- insulation at mechanical room at west end of building verified. R
21.
- mechanical room at east end of building has been sheet rocked
on on side, insulation must be verified before Sheetrock is
completed
- ok to Sheetrock one side of remaining mechanical rooms,
insulation must be verified before completing sheet rock.
4/26/22 partial approval for insulation
- insulation and poly behind tub enclosure at exterior walls verified
4/27/22 partial approval for insulation
- sound insulation at stairwell's verified, ok to Sheetrock these
areas only so that the stairs can be installed.
5/9/22 partial approval for insulation
- thermal insulation at unit A only approved, R 38 in ceilings, R 21
in walls
- window insulation not completed at this time
5/18/22 partial approval for insulation
- thermal and sound insulation approved in unit B.
R 38 in ceilings R 21 in walls
6/7/22 partial approval for insulation
Insulation at unit C approved walls and ceilings only, R 38 in
ceilings R21 in walls
None of the windows have spray foam insulation at this time.
6/23/22 partial approval for insulation
- spray foam insulation verified at unit A two windows at back of
building first floor
Spray foam insulation at unit B entry door
6/28/22 partial approval for insulation
- thermal insulation at unit D partially approved.
- complete missing insulation at garage wall and ceiling
- corner near mechanical room in garage is un insulated.
- front door and large window at front of building not installed.
- spray foam at windows not completed.
7/6/22 partial approval for insulation
- spray foam insulation at window used to load Sheetrock unit C
verified
8/4/22 partial approval for insulation
- remaining windows have been installed at unit D spray foam
insulation verified
U Factors = .3 cfm for windows, .5 cfm for doors True .32
Insulation under bow & bay window(s)False
Tub Shower R-20 with Vapor Barrier False
Air Seal all Plates and Sills True
Exterior wall outlets sealed True Unit A only
All Return Air Hard Duct Work False
Duct work sealed properly / No duct tape True
August 05, 2022 Page 2 of 3
INSPECTION WORKSHEET (BINS-020073-2022)
Checklist Item CommentsPassed
Duct Testing Outside Conditioned Space False
House Wrap Taped at all Seams False
Air Sealing all Joints Before Insulation True
Door / Window Sealed (No Insulation)True Windows not insulated at this time
8/4/22 partial approval for insulation
- remaining windows have been installed at unit D spray foam
insulation verified
Air Seal Outside Penetrations True Unit A only
All Ductwork Sealed Return and Supply False
Air Barrier behind Knee Walls False
Blower Door Test False
Duct Insulation - if required in unheated spaces False
15 min thermal barrier/intumescent paint applied False
Tyvek or Similar Exterior Sealant True
Combustion Air Supply for Furnace True
Fresh air supply 3' from grade True
Window Sealing True Tape a exterior of windows verified, the 4 big windows at the front
of the building will be installed after Sheetrock is loaded
Duct Blaster Test for duct work, R-8 False
Permit Card Visible From Road False Please have green card displayed at front of building.
Proper Vent, Attic Vent True
Insulation Residential Check Commercial Check False
August 05, 2022 Page 3 of 3