08-25-2022 (Queensbury Planning Board OS/25/2022) QUEENSBURYPLANNINGBOARD MEETING SECOND REGULAR MEETING A UGUST251r,2022 INDEX Site Plan No. 34-2022 Par 27,LLC 1. ACCEPT LEAD AGENCY Tax Map No.290.5-1-50.1,290.6-1-11 RE-AFFIRM SEQR T.B. RECOMMENDATION Site Plan No.51-2022 Brett&Pamela West(Main House) 3. FWW 10-2022 Tax Map No.226.15-1-17 Site Plan No.54-2022 James Brown 4. Tax Map No.253.-1-23;253.-1-22 (access road) Site Plan No.51-2022 Jeffrey Randles 6. Tax Map No.239.12-2-11 Site Plan No.5S-2022 Dark Bay Lane,LLC 7. Tax Map No.239.1E-1-37 Site Plan No. 35-2022 Morgan Gazetos/Greg Francis 9. Tax Map No.239.20-1-19 Site Plan No.53-2022 Adirondack Winery,LLC 12. Tax Map No. 309.17-1-14 Site Plan No.52-2022 Dan Hunt 14. Rezoning 3-2022 Tax Map No. 30S.15-1-5S Site Plan No.50-2022 Brian Hogan 20. Tax Map No.239.12-2-37 THESE ARE NOT OFFICIALLY ADOPTED MINUTES AND ARE SUBJECT TO BOARD AND STAFF REVISIONS. REVISIONS WILL APPEAR ON THE FOLLOWING MONTH'S MINUTES(IF ANY)AND WILL STATE SUCH APPROVAL OF SAID MINUTES. 1 (Queensbury Planning Board OS/25/2022) QUEENSBURY PLANNING BOARD MEETING SECOND REGULAR MEETING AUGUST 25TK,2022 7.00 P.M. MEMBERS PRESENT STEPHEN TRAVER,CHAIRMAN DAVID DEEB,VICE CHAIRMAN MICHAEL DIXON,SECRETARY WARREN LONGACKER BRAD MAGOWAN BRADY STARK NATHAN ETU,ALTERNATE LAND USE PLANNER-LAURA MOORE STENOGRAPHER-MARIA GAGLIARDI MR.TRAVER-Good evening,ladies and gentlemen. Welcome to the Town of Queensbury Planning Board meeting for Thursday,August 25`h,2022. This is our second meeting for the month of August and our 1S`h meeting so far for 2022. If you'll please note the illuminated exit signs. In the event that we have an emergency and we need to leave,that is the way out. If you have a cell phone or other electronic device if you would either turn it off or turn the ringer off so as not to interrupt our proceedings, and we also ask that during the meeting if you wish to converse amongst yourselves,if you would go to the anteroom to do that. Other than the public hearing we'd like to keep it silent so that we can be sure and have accurate minutes for the meeting. The minutes are important to transcribe. And we have one administrative item this evening,before we get to our regular agenda, and that is Site Plan 34-2022 for Par 27,LLC. ADMINISTRATIVE ITEM: SITE PLAN 34-2022 PAR 27,LLC ACCEPT LEAD AGENCY&z REAFFIRM SEQR MR. TRAVER-Laura? MRS.MOORE-So this application had to proceed to be re-noticed in reference to notifying the APA of the change of zone. The APA came back and said it's okay. You can be Lead Agency. Move forward. It's unfortunate that we didn't do it originally,but we're all good now. So at this point this Board will look at re-affirming Lead Agency status and. MR. TRAVER-Re-affirming SEQR. MRS. MOO RE-Re-affirming SEQR and re-affirming your recommendation back to the Town Board. MR. TRAVER-Okay. All right. So basically we're re-affirming the actions that we've already taken basically. Right? So is everyone understanding that? That we acted on this but we needed to do it again. So we're re-affirming, let's see, we have draft resolutions to that effect. So we have a resolution to acknowledge Lead Agency status. RESOLUTION ACKNOWLEDGING LEAD AGENCY SP#34-2022 PZ 1-2022 PAR 27,LLC WHEREAS, the applicant proposes a change of zone for a 10.56 acre parcel at 170 Sunnyside Road and a 2.44 acre parcel at 0 Sunnyside Road(Vacant) from MDR to RR3A and to add Golf course to the list of allowed uses in the Rural Residential zone with site plan review. The project includes construction of an addition of 1,613 sq.ft.to the existing 2,300 sq.ft.building.Pursuant to chapter 179-3-040,179-15-040,site plan review,petition of zone change, Town Board referral, SEQR for petition of zone change and building expansion, and Planning Board recommendation to Town Board. Site plan shall be subject to Planning Board review and approval. WHEREAS, the Planning Board of the Town of Queensbury has determined to begin an environmental review process under the State Environmental Quality Review Act(SEQRA). WHEREAS, in connection with the project, the Town of Queensbury Planning Board, by resolution, previously authorized the Community Development Office to notify other involved agencies of the desire of the Town Board to conduct a coordinated SEQR review, WHEREAS, the Zoning Administrator has advised that other involved agencies have been notified and have consented to the Town of Queensbury Planning Board being lead agency; 2 (Queensbury Planning Board OS/25/2022) NOW,THEREFORE BE IT RESOLVED: MOTION TO ACKNOWLEDGE LEAD AGENCY STATUS IN CONNECTION WITH SITE PLAN 34-2022&z PZ 1-2022 PAR 27,LLC,Introduced by Michael Dixon who moved for its adoption,seconded by Brad Magowan: As per the draft resolution prepared by staff. Duly adopted this 25`h day of August 2022 by the following vote: MRS. MOORE-I'm just going to have you make sure that you mention the PZ number for that. MR. TRAVER-Okay. MRS. MOORE-It's PZ 1-2022. MR. TRAVER-PZ 1-2022. Okay. AYES: Mr. Deeb,Mr. Dixon,Mr. Longacker,Mr. Stark, Mr. Magowan,Mr. Etu,Mr. Traver NOES: NONE MR.TRAVER-Next we also have to re-affirm our SEQR resolution under the State Environmental Quality Review Act, and we also have a motion to that effect. RESOLUTION REAFFIRMING A NEGATIVE SEQR DEC. SP#34-2022 PZ 1-2022 PAR 27,LLC WHEREAS, the applicant proposes a change of zone for a 10.56 acre parcel at 170 Sunnyside Road and a 2.44 acre parcel at 0 Sunnyside Road(Vacant) from MDR to RR3A and to add Golf course to the list of allowed uses in the Rural Residential zone with site plan review. The project includes construction of an addition of 1,613 sq.ft.to the existing 2,300 sq.ft.building.Pursuant to chapter 179-3-040,179-15-040,site plan review,petition of zone change, Town Board referral, SEQR for petition of zone change and building expansion, and Planning Board recommendation to Town Board. Site plan shall be subject to Planning Board review and approval. The Planning Board has determined that the proposed project and Planning Board action is subject to review under the State Environmental Quality Review Act; The proposed action considered by this Board is Type I in the Department of Environmental Conservation Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of Queensbury; No Federal or other agencies are involved; Part 1 of the Long EAF has been completed by the applicant; Whereas, the Planning Board adopted a SEQR Resolution on 6/23/2022 adopting SEQRA determination of non-significance, and Upon review of the information recorded on the EAF, it is the conclusion of the Town of Queensbury Planning Board as lead agency reaffirms that this project will result in no significant adverse impacts on the environment, and,therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. MOTION TO REAFFIRM NEGATIVE DECLARATION FOR THE PROPOSED SITE PLAN 34-2022 &z PZ 1-2022 PAR 27, LLC, Introduced by Michael Dixon who moved for its adoption, seconded by Warren Longacker; Duly adopted this 25`h day of August 2022 by the following vote: AYES: Mr. Dixon,Mr. Longacker,Mr. Stark,Mr. Magowan, Mr. Etu,Mr. Deeb,Mr. Traver NOES: NONE MR. TRAVER-And last but not least we re-affirm our recommendation to the Town Board regarding the zoning change from MDR to RR-3A. We have a motion to the effect. RE-AFFIRM TOWN BOARD RECOMMENDATION FOR ZONE CHANGE SP # 34-2022 PZ 1-2022 3 (Queensbury Planning Board 08/25/2022) WHEREAS, the applicant proposes a change of zone for a 10.56 acre parcel at 170 Sunnyside Road and a 2.44 acre parcel at 0 Sunnyside Road(Vacant) from MDR to RR3A and to add Golf course to the list of allowed uses in the Rural Residential zone with site plan review. The project includes construction of an addition of 1,613 sq.ft.to the existing 2,300 sq.ft.building.Pursuant to chapter 179-3-040,179-15-040,site plan review,petition of zone change, Town Board referral, SEQR for petition of zone change and building expansion, and Planning Board recommendation to Town Board. Site plan shall be subject to Planning Board review and approval. WHEREAS,the Town of Queensbury Town Board is proposing a zoning change to RR3A and to add Golf course to the list of allowed uses in the Rural Residential zone with site plan review. The Town Board referred this proposed change to the Planning Board for an advisory recommendation pursuant to Section 179-15-020,resolution number 210,2022 dated on 5/16/2022-1 MOTION FOR RECOMMENDATION TO THE TOWN BOARD AS FAVORABLE FOR ZONING CHANGE FROM MDR TO RR3A ADD GOLF COURSES TO USE IN RR ZONE; Introduced by Michael Dixon who moved for its adoption. The Planning Board based on limited review has not identified any significant adverse impacts that cannot be mitigated with this proposal. Motion seconded by Brad Magowan. Duly adopted this 25`h day of August 2022 by the following vote: MR. TRAVER-Any discussion? MRS. MOORE-You need to add allowing golf courses in the RR zone, adding a golf course as a use in the RR zone. MR. TRAVE R-Specifically? Okay. Yes. AYES: Mr. Longacker,Mr. Stark,Mr. Magowan,Mr. Etu,Mr. Deeb,Mr. Dixon,Mr. Traver NOES: NONE MR. TRAVER-All right. Thank you, and next we move to our regular agenda. The first section being tabled items,and the first item is Brett&r Pamela West for the Main House. SITE PLAN NO. 51-2021 SEQR TYPE: TYPE 11. BRETT &z PAMELA WEST (MAIN HOUSE). AGENT(S): EDP. OWNER(S): SAME AS APPLICANTS. ZONING: WR. LOCATION: 106 BAY PARKWAY. (REVISED 611 512 0 2 2)APPLICANT PROPOSES TO DEMO EXISTING HOME AND SHED TO CONSTRUCT A NEW 2 STORY HOME WITH A 5,436 SQ. FT. FOOTPRINT WITH A GARAGE. ALSO, INCLUDED IS INSTALLATION OF PERMEABLE PAVERS FOR PATIO AND DRIVEWAY AREAS, AND A COVERED WALKWAY BETWEEN THE TWO PROPERTIES. THE NEW FLOOR AREA WILL BE 8,670 SQ. FT. WHERE THE MAXIMUM ALLOWED IS 8,687 SQ.FT. THE PROJECT INCLUDES SITE WORK FOR NEW LANDSCAPING SHORELINE AND RESIDENTIAL HOUSE, SEPTIC AND STORMWATER MANAGEMENT. ADDITIONALLY WORK TO BE DONE IS WITHIN 100 FEET OF A DESIGNATED WETLAND. PURSUANT TO CHAPTER 179-3-040,179-6-065,CHAPTER 147,SITE PLAN FOR NEW FLOOR AREA IN A CEA,WORK ADJACENT TO WETLAND,AND HARD SURFACING WITHIN 50 FT. OF THE SHORELINE SHALL BE SUBJECT TO PLANNING BOARD REVIEW AND APPROVAL. VARIANCE: RELIEF IS SOUGHT FOR SETBACKS TO WETLANDS. PLANNING BOARD SHALL PROVIDE A RECOMMENDATION TO THE ZONING BOARD OF APPEALS. CROSS REFERENCE: 53-2017 SEPTIC VAR.;AV 47-2007&z SP 39-2007—BOATHOUSE;SP PZ 89-2016&z SP PZ 210-2016 &z AV 95-2016 — ADDITION; SP 37-2009; AV 57-2021; SP 52-2021, AV 30-2022. WARREN CO.REFERRAL: AUGUST 2021,FEBRUARY 2022 (STORMWATER DEVICE);JULY 2022(FWW). SITE INFORMATION: APA,CEA,LGPC. LOT SIZE: 091 ACRE. TAX MAP NO. 226.15-1-17. SECTION: 179-3-040;179-6-065,147. MR.TRAVER-And we understand this has been tabled and will be tabled until the September 27 meeting, Laura? MRS. MOORE-No. They're tabled to the first meeting in September because they still have to do the Planning Board recommendation. MR. TRAVER-Okay. All right. I stand corrected. So this also would be not the 27`h,but the 20`h MRS. MOORE-Correct. 4 (Queensbury Planning Board OS/25/2022) MR. TRAVER-Okay. All right. So I stand corrected. Tabled to 9/20 and is the public hearing already open on this? Or we'll hold on the public hearing until after we do our recommendation anyway. All right. So just a straight tabling motion. RESOLUTION TABLING SP#51-2021&FWW 10-2022 BRETT&PAMELA WEST (Revised 6/15/2022) Applicant proposes to demo existing home and shed to construct a new two story home with a 5,436 sq.ft.footprint with a garage.Also included is installation of permeable pavers for patio, driveway areas and a covered walkway between the two properties. The new floor area will be 5,670 sq.ft. where the maximum allowed is S,6S7 sq. ft. The project includes site work for new landscaping shoreline and residential house, septic, and stormwater management. Additionally, work to be done is within 100 feet of a designated wetland.Pursuant to chapter 179-3-040,179-6-065,Chapter 94,Chapter 147,site plan for a new floor area in a CEA,work adjacent to wetland, and hard surfacing within 50 ft. of the shoreline shall be subject to Planning Board review and approval.Variance: Relief is sought for setbacks to wetland. Planning Board shall make a recommendation to the Zoning Board of Appeals. MOTION TO TABLE SITE PLAN 51-2021 &z FRESHWATER WETLANDS 10-2022 BRETT &z PAMELA WEST. Introduced by Michael Dixon who moved for its adoption,seconded by Brad Magowan. Tabled until the September 20,2022 Planning Board meeting pending Zoning Board decision. Duly adopted this 25`h day of August 2022 by the following vote: AYES: Mr. Stark,Mr. Magowan,Mr. Etu,Mr. Deeb,Mr. Dixon,Mr. Longacker, Mr. Traver NOES: NONE MR. TRAVER-Next we move to Old Business, and the first item is James Brown. This is Site Plan 54- 2022. OLD BUSINESS: SITE PLAN NO. 54-2022 SEQR TYPE: TYPE 11. JAMES BROWN. AGENT(S): JARRETT ENGINEERING. OWNER(S): SAME AS APPLICANT. ZONING: LC-10A. LOCATION: 1918 RIDGE ROAD, SHOP ROAD. APPLICANT PROPOSES TO CONSTRUCT A NEW SINGLE FAMILY HOME WITH A 1,936 SQ.FT.FOOTPRINT. THE ACCESS DRIVE TO THE NEW HOME IS FROM AN EXISTING PRIVATE ROAD ("SHOP ROAD") THROUGH AN ADJOINING PROPERTY TO THE NEW HOME. THE REMAINING DRIVEWAY AREA IS LOCATED ON THE APPLICANT'S PROPERTY USING SOME PORTIONS OF PREVIOUS LOGGING ROADS. THE PROJECT INCLUDES DISTURBANCE OF AN ACRE AND WILL REQUIRE A MAJOR STORMWATER PERMIT. PURSUANT TO CHAPTER 179-3-040,179-4-050,CHAPTER 147,179- 6-060,SITE PLAN FOR CONSTRUCTION OF A NEW HOME WITHIN THE LC10 ZONE IN THE APA,A NEW STRUCTURE WITHIN 15% SLOPES SHALL BE SUBJECT TO PLANNING BOARD REVIEW AND APPROVAL. CROSS REFERENCE: SP 32-2018, DISC 6-2021, AV 41-2022. WARREN CO. REFERRAL: AUGUST 2022. SITE INFORMATION: APA. LOT SIZE: 15.75 ACRES. TAX MAP NO. 253.-1-23,253.-1-22(ACCESS ROAD). SECTION: 179-3-040,179-4-050, CHAPTER 147,179-6-060. TOM JARRETT, REPRESENTING APPLICANT,PRESENT;JAMES BROWN,PRESENT MR. TRAVER-Laura? MRS. MOORE-This is an application to construct a new single family home. The project requires an access drive to the newhome from an existing private road called Shop Road through an adjoining property to the new homeowner's lot. The applicant received a variance the other evening in reference to an access. MR. TRAVER-Okay. Thank you. Good evening. Welcome back. MR.JARRETT-Good evening. For the record Tom Jarrett of Jarrett Engineers. With me,as last week,is Jim Brown,the owner of the two parcels,and Mrs.Stark,the owner of the parcel to the north. We broadly reviewed the project last week, but for purposes of the public hearing, Mr. Brown wishes to build one single family house on his two parcels that total about 45 acres together. Access would be via Shop Road which is owned by the Starks because access off of 9L for these two parcels would be troublesome to say the least. The Zoning Board agreed with that assessment. They liked the solution of using Shop Road and they approved the variance last night. The access from Shop Road to the south to the building site would be via largely an existing logging road with some trails and the house site is actually on an old log landing. So very few trees have to be cut. There are two or three at most. We're planning an on-site 5 (Queensbury Planning Board OS/25/2022) wastewater disposal system, an on-site well, and stormwater management for both house site and the driveway. We can zero in on any issues or concerns that the Board might have. MR. TRAVER-Okay. Were there any changes from when we looked at this previously after your discussion with the ZBA? MR.JARRETT-No. MR. TRAVER-All right. Thank you. Questions, comments from members of the Board? We do have a public hearing on this application. Is there anyone in the audience that wanted to address the Planning Board on this application? I'm not seeing any. Are there any written comments,Laura? PUBLIC HEARING OPENED MRS. MOORE-There are no written comments. MR. TRAVER-Okay. Thank you. Therefore we will go ahead and close the public hearing. PUBLIC HEARING CLOSED MR. TRAVER-Last call for any questions, comments. We did look at this previously. It's fairly straightforward. All right. Then I believe we have a draft resolution. RESOLUTION APPROVING SP#54-2022 JAMES BROWN The applicant has submitted an application the Planning Board: Applicant proposes to construct a new single family home with a 1,936 sq. ft. footprint. The access drive to the new home is from an existing private road("Shop Road")through an adjoining property to the new home. The remaining driveway area is located on the applicant's property using some portions of previous logging roads. The project includes disturbance of an acre and will require a major stormwater permit. Pursuant to chapter 179-3-040,179-4- 050,Chapter 147,179-6-060,site plan for construction of a new home within the LC10 zone in the APA, a new structure within 150/o slopes shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-OSO, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on S/16/2022; the ZBA approved the variance on S/17/2022; The Planning Board opened a public hearing on the Site plan application on S/25/2022 and continued the public hearing to S/25/2022,when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including S/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE SITE PLAN 54-2022 TAMES BROWN; Introduced by Michael Dixon who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted: g. site lighting, h. signage, n traffic, o. commercial alterations/ construction details,q.soil logs,r.construction/demolition disposal s.snow removal as these items are typically associated with commercial projects; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1)year time frame has expired. 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; 6 (Queensbury Planning Board OS/25/2022) d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity"prior to the start of any site work. b. The project NOT(Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site,for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan)when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit,or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Motion seconded by Brady Stark. Duly adopted this 25`h day of August 2022 by the following vote: AYES: Mr. Magowan,Mr. Etu,Mr. Deeb,Mr. Dixon,Mr. Longacker,Mr. Stark,Mr. Traver NOES: NONE MR. TRAVER-You're all set. MR.JARRETT-Thank you very much. MR. TRAVER-The next item on our agenda, also under Old Business,is Jeffrey Randles. This is Site Plan 51-2022. SITE PLAN NO. 51-2022 SEQR TYPE: TYPE II. JEFFREY RANDLES. AGENT(S): EDP. OWNER(S): SAME AS APPLICANT. ZONING: WR. LOCATION: 42 OLD ASSEMBLY POINT ROAD. APPLICANT PROPOSES ALTERATIONS TO AN EXISTING SINGLE FAMILY HOME WITH A SECOND STORY ADDITION AND AN ATTACHED GARAGE. NEW FLOOR AREA TO BE 6,968 SQ.FT.AND THE TOTAL FOOTPRINT OF THE NEW HOUSE TO BE 3,348 SQ.FT.THE ADDITIONS INCLUDE ADDITIONAL BASEMENT AREA. THE MAIN FLOOR WOULD ALTER THE NORTH SIDE WITH A NEW DINING AREA AND A NEW GARAGE. THE SOUTH SIDE BEDROOM AREAS TO BE ADDED TO THE FOOTPRINT OF THE STRUCTURE. THE SECOND FLOOR WOULD INCLUDE ADDITIONAL LIVING SPACE AND STORAGE. THE PROJECT INCLUDES STORMWATER MANAGEMENT AND SHORELINE PLANTINGS. PURSUANT TO CHAPTER 179-4-030, 147, SITE PLAN REVIEW FOR NEW FLOOR AREA AND ALTERATIONS TO THE EXISTING HOME SHALL BE SUBJECT TO PLANNING BOARD REVIEW AND APPROVAL. VARIANCE: RELIEF IS SOUGHT FOR SETBACKS. PLANNING BOARD SHALL PROVIDE A RECOMMENDATION TO THE ZONING BOARD OF APPEALS. CROSS REFERENCE: AV 36-2022. WARREN CO.REFERRAL: AUGUST 2022. SITE INFORMATION: APA, LGPC, CEA. LOT SIZE: .83 ACRES. TAX MAP NO. 239.12-2-11. SECTION: 179-3-040, CHAPTER 147. MR. TRAVER-Laura? MRS. MOORE-So this application is being tabled this evening for the Randles. They need to do an additional variance or a new variance type in reference to the shoreline setback. I'm having the Board table it to the first meeting in September. My understanding is there'll be a Planning Board recommendation. If that changes then I'll let the Board know what that process is,but right now we're going to have it tabled for a Planning Board recommendation to the first meeting in September. MR. TRAVER-Okay, and that would be September 20? Any questions regarding that tabling? I understand that the variance that they requested turned out to be inaccurate measurement and that's why they have to re-submit,Laura? 7 (Queensbury Planning Board 08/25/2022) MRS. MOORE-Yes. MR. TRAVER-Okay. All right. Well we have a draft resolution I believe. RESOLUTION TABLING SP#51-2022 JEFFREY RANDLES Applicant proposes alterations to an existing single family home with a second story addition and an attached garage. New floor area to be 6,968 sq. ft. and the total footprint of the new house to be 3,348 sq. ft.. The additions include additional basement area. The main floor would alter the north side with a new dining area and a new garage. The south side bedroom areas to be added to the footprint of the structure. The second floor would include additional living space and storage. The project includes stormwater management and shoreline plantings. Pursuant to chapter 179-3-040, 147, site plan review for a new floor area and alterations to the existing home shall be subject to Planning Board review and approval. MOTION TO TABLE SITE PLAN 51-2022 JEFFREY RANDLES. Introduced by Michael Dixon who moved for its adoption,seconded by Brad Magowan. Tabled until the September 20,2022 Planning Board meeting. Duly adopted this 25`h day of August 2022 by the following vote: MRS. MOORE-Do you want to leave the public hearing open? MR. TRAVER-Well,if they're coming back for a recommendation,don't we? MRS. MOORE-You're right. Thank you. AYES: Mr. Etu,Mr. Deeb,Mr. Dixon,Mr. Longacker,Mr. Stark,Mr. Magowan,Mr. Traver NOES: NONE MR. TRAVER-Okay. Next on our agenda is Dark Bay Lane,LLC. This is Site Plan Site Plan 58-2022. SITE PLAN 58-2022 SEQR TYPE: TYPE II. DARK BAY LANE, LLC. AGENT(S): EDP. OWNER(S): SAME AS APPLICANT. ZONING: WR. LOCATION: 40 DARK BAY LANE. APPLICANT PROPOSES TO DEMOLISH AN EXISTING 2,000 SQ. FT. HOME TO CONSTRUCT A NEW HOME WITH A FOOTPRINT OF 2,658 SQ.FT. THE NEW FLOOR AREA IS TO BE 4,378 SQ. FT. THE PROJECT INCLUDES A NEW SEPTIC SYSTEM, UPDATE TO PARKING AND SHARED ACCESS ARRANGEMENT, SHORELINE PLANTING AREAS, AND STORMWATER MANAGEMENT. PURSUANT TO CHAPTERS 179-3-040,179-6-050,179-4-010,179-6-065,NEW FLOOR AREA IN A CEA AND HARD SURFACING WITHIN 50 FT. OF SHORELINE SHALL BE SUBJECT TO PLANNING BOARD REVIEW AND APPROVAL. CROSS REFERENCE: AV 43- 2022. WARREN CO. REFERRAL: AUGUST 2022. SITE INFORMATION: APA, LGPC, CEA. LOT SIZE: .43 ACRES. TAX MAP NO. 239.18-1-37. SECTION: 179-3-040,179-6-050,179-4-010, 179-6-065. BRANDON FERGUSON,REPRESENTING APPLICANT,PRESENT MR. TRAVER-Laura? MRS. MOORE-So this application is demolishing an existing home and constructing a new home. Footprint is 2,658 with anew floor area of 4,378. The project includes new septic system,updated parking and shared access arrangement, shoreline planting areas and stormwater management. The project is similar to a previous project done in 2021, in reference to building an addition on top of an existing or building additions on to the existing home. At this point this applicant is taking an opportunity to see if they can demo the building and at last night's meeting for the variance they received those variances. MR. TRAVER-Okay. Thank you. Good evening. Welcome back. MR. FERGUSON-Good evening. Brandon Ferguson from Environmental Design Partnership. I'm here representing the Chases tonight. So as Laura kind of said this project you guys have seen before. This site plan is the same site plan that was approved last year. The big difference being that we were proposing to renovate and use a portion of the existing building. Now it's a complete demolition because when the builder came,looked at the foundation,he saw a number of issues and he said he wasn't willing to build on that structure and that he'd go back to the architects and have a re-design with the foundation. So that was what was done. So the plan in front of you today is the same one you guys approved last year. It's the proposed house. We got the variances last night for shoreline setback, side yards, as well as stormwater to the lake. So we received those variances. This is a minor stormwater. We did get LaBella's signoff the 8 (Queensbury Planning Board OS/25/2022) other day. We are doing stormwater on the site. There is none now. As part of this project we're also installing a brand new septic system that's going to have a BTU unit. We got Board of Health variances last year for that. So overall this is a big upgrade to this property. I'll turn it back to you if you have any questions. MR. TRAVER-So when we looked at this before and then you made a recommendation to the ZBA, you visited the ZBA,you got your variances. As a result of those discussions, are there any changes to your plan from what we saw previously? MR. FERGUSON-No. MR. TRAVER-Questions, comments from members of the Board? We do have a public hearing on this application as well. Is there anyone in the audience that wanted to address the Planning Board on Dark Bay Lane,LLC? I'm not seeing any. Are there written comments,Laura? PUBLIC HEARING OPENED MRS. MOORE-There are no written comments. MR. TRAVER-Okay. Then we will close the public hearing. PUBLIC HEARING CLOSED MR. TRAVER-If there's no further questions, further clarification needed from the Board, we have a resolution. We can proceed. RESOLUTION APPROVING SP#55-2022 DARK BAY LANE,LLC The applicant has submitted an application the Planning Board: Applicant proposes to demolish an existing 2,000 sq. ft.home to construct a new home with a footprint of 2,65E sq. ft. The new floor area is to be 4,37E sq. ft. The project includes a new septic system, update to parking and shared access arrangement,shoreline planting areas, and stormwater management.Pursuant to chapters 179-3-040,179- 6-050,179-4-010, 179-6-065,new floor area in a CEA and hard surfacing within 50 ft. of shoreline shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-OSO, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on S/16/2022; the ZBA approved the variance on S/17/2022; The Planning Board opened a public hearing on the Site plan application on S/25/2022 and continued the public hearing to S/25/2022,when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including S/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE SITE PLAN 58-2022 DARK BAY LANE,LLC;Introduced by Michael Dixon who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted: h. signage, n traffic, r. construction/demolition disposal s. snow removal as these items are typically associated with commercial projects; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1)year time frame has expired. 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; 9 (Queensbury Planning Board 08/25/2022) d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity"prior to the start of any site work. b. The project NOT(Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site,for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan)when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit,or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Motion seconded by Warren Longacker. Duly adopted this 25`h day of August 2022 by the following vote: AYES: Mr. Deeb,Mr. Dixon,Mr. Longacker, Mr. Stark,Mr. Magowan,Mr. Etu,Mr. Traver NOES: NONE MR. TRAVER-You're all set. MR. FERGUSON-Thank you very much. MR. TRAVER-The next section of our agenda is Old Business. This is also Unapproved Development. This is Morgan Gazetos and Greg Francis, Site Plan 35-2022. SITE PLAN NO. 35-2022 SEQR TYPE: TYPE II. MORGAN GAZETOS/GREG FRANCIS. AGENT(S): MORGAN GAZETOS. OWNER(S): GREGORY R.FRANCIS TRUSTEE. ZONING: WR. LOCATION: 2930 STATE ROUTE 9L. (REVISED) APPLICANT REQUESTS APPROVAL FOR CONSTRUCTION OF A DECK ADDITION NOT CONSTRUCTED PER APPROVAL. ADDITIONALLY, THE APPLICANT HAS COMPLETED ADDITIONAL WORK WITHOUT APPROVAL INCLUDING DECK AREA NEAR SHORELINE,SHORELINE PATHWAY DECKING, AND A RECONSTRUCTED SHED/CHANGING ACCESSORY STRUCTURE NEAR THE SHORE. THE EXISTING HOUSE FOOTPRINT OF 1,285 SQ.FT.TO REMAIN THE SAME. THE EXISTING DECKING AREA TODAY IS 1,508 SQ. FT. WHERE A PREVIOUS APPROVAL WAS FOR 1,116 SQ. FT. THE SITE WORK WITH THE ADDITIONAL WOODEN WALKWAY HAS AN EXISTING SQUARE FOOTAGE OF 2,384 WHERE THE PROPOSED IS 2,074 SQ. FT. UPDATED PLANS SHOW OVERLAY OF EXISTING AND PREVIOUSLY APPROVED. PURSUANT TO CHAPTER 179-3-040,179-13-010,SITE PLAN FOR HARD SURFACING WITHIN 50 FT.OF THE SHORELINE AND EXPANSION OF A NON-CONFORMING STRUCTURE SHALL BE SUBJECT TO PLANNING BOARD REVIEW AND APPROVAL. CROSS REFERENCE: SP 72-2014,AV 85-2014, AV 25-2022. WARREN CO.REFERRAL: JUNE 2022. SITE INFORMATION: CEA,APA,LGPC. LOT SIZE: 92 ACRES. TAX MAP NO.239.20-1-19. SECTION: 179-3-040,179-13-010. MORGAN GAZETOS, REPRESENTING APPLICANT,PRESENT; GREG FRANCIS,PRESENT MR. TRAVER-Laura? MRS. MOORE-This application is in reference to construction of decking along the shoreline. The applicant was before the Zoning Board last night and received the variance for that work, for setback issues. The note that I highlighted is that at the moment it's 82 square feet overbuilt. MR. TRAVER-Okay. Thank you. Good evening. Welcome back. MR. FRANCIS-Good evening. 10 (Queensbury Planning Board OS/25/2022) MR. TRAVER-So here we are after quite a bit of discussion and re-design and a lot of effort on your part which we appreciate. MR. MAGOWAN-A lot of measuring. MR. TRAVER-A lot of measuring,yes,probably measuring twice. So you had your discussion with the ZBA. Were there any changes from what we last saw as a result of that? MR. GAZETOS-No,sir. It's the same drawing. That version doesn't have the pink,but that was with the walkways and by the deck and the deck on the boathouse. So it's the same drawing that you guys saw. MR. DEEB-Morgan,did you introduce yourself. MR. GAZETOS-Sorry. Morgan Gazetos from Lake George Docks with Greg Francis. MR. TRAVER-Okay. So back to us again we've seen this a few times. Any follow up questions from members of the Board regarding this? MR. MAGOWAN-Again, I'd just like to thank you both for all your hard work and measuring and calculating,and your kindness and understanding and enlightening us as to why this happened. So thank you both. MR. GAZETOS-Thankyou,Mr. Magowan. MR. TRAVER-Okay. Let's see,we also have a public hearing on this application as well. Is there anyone in the audience that wanted to address the Planning Board on this application? I'm not seeing any. Written comments,Laura? PUBLIC HEARING OPENED MRS. MOORE-I have written comments. MR. TRAVER-Okay. MRS.MOO RE-This is addressed to the Zoning Board,but was put in the Planning Board's file. "The Catlin property abuts Mr. Francis's property on the south side—close to his boathouse. My experience over the period of his ownership of this property is that Mr.Francis is an excellent steward of the land and the lake. The Shoreline pathway from the dock to the boathouse provides a safe, unobstructed pathway. It has little if any impact on the environment. It is a great safety measure as it prevents walking on the rocky, rooted landscape with little foot support. The previous rooted, rock path was unsafe at best and in the past has caused many falls. In my opinion the new decking is a great safety measure as it is and should not be disturbed. Sincerely,Jude H. Catlin" 5 Grey Ledges Drive. MR. FRANCIS-She's actually on the north side,not the south side. MRS. MOORE-This one's from the Scrim's. "I am writing on behalf of my neighbor, Gregory Francis, in regard to his property located on 2939 Route 9L. I am aware of Mr. Francis's plans to replace his existing deck structures. The proposed plan and construction will not cause any disturbance to me or any of the surrounding area. I look forward to the improvements and the positive effects it will have on my property and the Town of Queensbury. Thank you for your kind consideration in this matter. Sincerely, Sharon Scrim" MR. TRAVER-Okay. Thank you. Any comments or discussion following that public comment? Okay. We'll go ahead and close the public hearing,then. PUBLIC HEARING CLOSED MR. TRAVER-Are members comfortable proceeding? Okay. We have a draft resolution. RESOLUTION APPROVING SP#35-2022 MORGAN GAZETOS/GREGORY FRANCIS The applicant has submitted an application the Planning Board: Applicant requests approval for construction of a deck addition not constructed per approval. Additionally, the applicant has completed additional work without approval including deck area near shoreline, shoreline pathway decking, and a reconstructed shed/changing accessory structure near the shore. The existing house footprint of 1,255 sq. ft.to remain the same. The decking areas of 2,270 sq.ft.to be reduced to 1,930 sq.ft.;original approval was for 1,40E sq. ft. Pursuant to chapter 179-3-040,179-13-010, site plan for hard surfacing within 50 ft. of the 11 (Queensbury Planning Board OS/25/2022) shoreline and expansion of a non-conforming structure shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-OSO, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board made a recommendation to the Zoning Board of Appeals on S/16/2022; the ZBA approved the variance on S/17/2022; The Planning Board opened a public hearing on the Site plan application on S/25/2022 and continued the public hearing to S/25/2022,when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including S/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE\SITE PLAN 35-2022 MORGAN GAZETOS/GREG FRANCIS,- Introduced by Michael Dixon who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted:g.site lighting,h.signage,j.stormwater,k.topography,1.landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal as these items are typically associated with commercial projects; 2) The approval is valid for one (1) year from the date of approval. Applicant is responsible for requesting an extension of approval before the one (1)year time frame has expired. 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current "NYSDEC SPDES General Permit from Construction Activity"prior to the start of any site work. b. The project NOT(Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site,for review by staff: i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan)when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit,or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans Motion seconded by Warren Longacker. Duly adopted this 25`h day of August 2022 by the following vote: AYES: Mr. Dixon, Mr. Longacker,Mr. Stark,Mr. Magowan,Mr. Etu,Mr. Deeb,Mr. Traver 12 (Queensbury Planning Board OS/25/2022) NOES: NONE MR. TRAVER-You are all set. MR. FRANCIS-Thank you. MR.TRAVER-The next section of our agenda is New Business. And the first item is Adirondack Winery, LLC,Site Plan 53-2022. NEW BUSINESS: SITE PLAN NO.53-2022 SEQR TYPE: TYPE II. ADIRONDACK WINERY,LLC. OWNER(S): 395 BIG BAY ROAD LLC. ZONING: CLI. LOCATION: 395 BIG BAY ROAD. APPLICANT PROPOSES TO INSTALL 180 SQ.FT.OF PRIVACY FENCING WIT A 6 FT.HEIGHT ALONG THE ENTIRE LENGTH. THE FENCE IS TO BE PLACED ON THE SOUTHERN PROPERTY LINE. THE SITE CONTAINS AN EXISTING 17,750 SQ. FT. WINE MANUFACTURING FACILITY WITH WINE TASTING. THE APPLICANT RECEIVED SITE PLAN APPROVAL IN 2020 FOR AN ADDITION TO THE BUILDING TO ASSIST WITH MANUFACTURING SPACE. PURSUANT TO CHAPTER 179-3-040, 179-5-020, SITE PLAN FOR FENCE INSTALLATION FOR AN EXISTING BUSINESS SHALL BE SUBJECT TO PLANNING BOARD REVIEW AND APPROVAL. CROSS REFERENCE: SP 24-95,WP 26-2020. WARREN CO.REFERRAL: AUGUST 2022. LOT SIZE: 2.07 ACRES. TAX MAP NO. 309.17-1-14. SECTION: 179-3-040,179-5-020. MIKE PARDY, REPRESENTING APPLICANT,PRESENT MR. TRAVER-Laura? MRS. MOORE-So the applicant proposes to install a ISO foot of privacy fence at six foot in height along the southern property line and actually not the entire length. It doesn't extend the entire length. I'll just say that,and because it's commercial property,fences require Site Plan Review. MR. TRAVER-Interesting. Okay. Good evening. Welcome. MR. PARDY-Hi. My name's Mike Pardy. I'm the owner of Adirondack Winery with my wife. We're proposing to put up a ISO foot fence. Pretty much the way she just described. It doesn't go quite all the way back, you can see up there. It goes about 2/3rds of the way up our property with the intention of giving us a little privacy with our neighbors who we like very much and they're great neighbors to have, but they have a lot of big trucks and it doesn't quite fit with the wine motif. It's just a six foot high fence. I believe there's a picture included with that. It's just a standard vinyl fence that hopefully will last forever because they're expensive. MR. TRAVER-Okay. It seems fairly straightforward. Thank you. Questions,comments from members of the Board? MR.DEEB-I did go over and look at it yesterday. You're not going to put it on the warehouse side? You're just going to put it on the south side,right? MR. PARDY-Yes. MR. DEEB-And you're going to go to the back of the building? MR. PARDY-Yes. It goes,the easiest way to picture it is if you start at the back of the property,it starts right out where I guess it's a retention pond, not enough water these days. It starts there and works its way to the front,and so it's used more towards the back of the property,just about where the front of our building starts. So if you stand in front you wouldn't really see the parking lot. MR. DEEB-It does look good. You've got your tables out there. And it's interesting the comment you made in the beginning. An industrial zone,that's a bold move. It looks good. MR. TRAVER-Other questions,comments? We do have a public hearing on this application as well. Is there anyone in the audience that wanted to address the Planning Board on Adirondack Winery,Site Plan 53-2022? I'm not seeing any takers. Are there any written comments? PUBLIC HEARING OPENED MRS. MOORE-There are no written comments, but I did want to make a quick comment. This application has an as-built to it. So if we can have the fence placed on the as-built drawing that was completed for the site,that would be better. This is an old,this is like the original drawing. 13 (Queensbury Planning Board OS/25/2022) MR. TRAVER-We can add that MRS. MOORE-Yes,if you could. And we can go over that information. MR. TRAVER-Okay. MRS.MOORE-There's an as-built site plan for this site because it's a new building and Bruce had done an inspection on the site and this should be added to that plan. That way it's a complete as-built plan for future use if you need it. You need to close your public hearing. MR. TRAVER-I'm sorry. I'll close the public hearing. My apologies. PUBLIC HEARING CLOSED RESOLUTION APPROVING SP#53-2022 ADIRONDACK WINERY,LLC The applicant has submitted an application the Planning Board: Applicant proposes to install ISO ft. of privacy fencing with a Eft height along the entire length.The fence is to be placed on the Southern property line. The site contains an existing 17,750 sq. ft. wine manufacturing facility with wine tasting. The applicant received site plan approval in 2020 for an addition to the building to assist with manufacturing space. Pursuant to chapter 179-3-040, 179-5-020, site plan for fence installation for an existing business shall be subject to Planning Board review and approval. Pursuant to relevant sections of the Town of Queensbury Zoning Code-Chapter 179-9-OSO, the Planning Board has determined that this proposal satisfies the requirements as stated in the Zoning Code; As required by General Municipal Law Section 239-m the site plan application was referred to the Warren County Planning Department for its recommendation; The Planning Board opened a public hearing on the Site plan application on S/25/2022 and continued the public hearing to S/25/2022,when it was closed, The Planning Board has reviewed the application materials submitted by the applicant and all comments made at the public hearing and submitted in writing through and including S/25/2022; The Planning Board determines that the application complies with the review considerations and standards set forth in Article 9 of the Zoning Ordinance for Site Plan approval, MOTION TO APPROVE SITE PLAN 53-2022 ADIRONDACK WINERY; Introduced by Michael Dixon who moved for its adoption. According to the draft resolution prepared by Staff with the following: 1) Waivers requested granted:g.site lighting,h.signage,j.stormwater,k.topography,1.landscaping, n traffic, o. commercial alterations/ construction details, p floor plans, q. soil logs, r. construction/demolition disposal s. snow removal as these have been addressed in Site Plan 26- 2020 and the project is for a fence; 2) The waivers requested—Staff finds it reasonable to request a waiver The approval is valid for one (1)year from the date of approval. Applicant is responsible for requesting an extension of approval before the one(1)year time frame has expired. 3) Adherence to the items outlined in the follow-up letter sent with this resolution. a) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed around these areas and field verified by Community Development staff, b) If applicable, the Sanitary Sewer connection plan must be submitted to the Wastewater Department for its review, approval,permitting and inspection; c) If curb cuts are being added or changed a driveway permit is required. A building permit will not be issued until the approved driveway permit has been provided to the Planning Office; d) If application was referred to engineering then Engineering sign-off required prior to signature of Zoning Administrator of the approved plans; e) Final approved plans should have dimensions and setbacks noted on the site plan/survey, floor plans and elevation for the existing rooms and proposed rooms in the building and site improvements;- f) If required,the applicant must submit a copy of the following to the Town: a. The project NOI (Notice of Intent) for coverage under the current 'NYSDEC SPDES General Permit from Construction Activity"prior to the start of any site work. b. The project NOT(Notice of Termination)upon completion of the project; c. The applicant must maintain on their project site,for review by staff: 14 (Queensbury Planning Board OS/25/2022) i. The approved final plans that have been stamped by the Town Zoning Administrator. These plans must include the project SWPPP (Storm Water Pollution Prevention Plan)when such a plan was prepared and approved; ii. The project NOI and proof of coverage under the current NYSDEC SPDES General Permit,or an individual SPDES permit issued for the project if required. g) Final approved plans, in compliance with the Site Plan, must be submitted to the Community Development Department before any further review by the Zoning Administrator or Building and Codes personnel; h) The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any site work; i) Subsequent issuance of further permits, including building permits is dependent on compliance with this and all other conditions of this resolution; j) As-built plans to certify that the site plan is developed according to the approved plans to be provided prior to issuance of the certificate of occupancy. k) This resolution is to be placed in its entirety on the final plans 1) Fence to be placed on as built site plan on the final plans. Motion seconded by Brad Magowan. Duly adopted this 25`h day of August 2022 by the following vote: AYES: Mr. Longacker,Mr. Stark,Mr. Magowan,Mr. Etu,Mr. Deeb,Mr. Dixon,Mr. Traver NOES: NONE MR. TRAVER-You are all set. MR. PARDY-Thank you. MR. TRAVER-Next under New Business is Dan Hunt. This is application Site Plan 52-2022 and Re- zoning 3-2022. SITE PLAN NO. 52-2022 REZONING 3-2022 SEQR TYPE: UNLISTED. DAN HUNT. OWNER(S): SAME AS APPLICANT. ZONING: MDR. LOCATION: 3 PINELLO ROAD. APPLICANT PROPOSES TO OPERATE A 6 UNIT MANUFACTURED HOME PARK. THE PROJECT PROPOSES 4 NEW UNITS TO BE INSTALLED WITH ASSOCIATED GRASS, PLANTINGS,BLACKTOP ROADWAY AND NEW UNDERGROUND UTILITIES. TWO UNITS WERE APPROVED FOR THE EXISTING SITE;THE PARK WOULD CONTAIN 6 TOTAL. THE PROJECT IS PART OF REZONING WHERE THE MOBILE HOME OVERLAY ZONE IS PROPOSED FOR THIS PARCEL. PURSUANT TO CHAPTER 17-9-040 REFERRAL FROM THE TOWN BOARD WHERE THE PLANNING BOARD IS TO COMPLETE SEQR AND PROVIDE RECOMMENDATION TO THE TOWN BOARD. PURSUANT TO CHAPTER 113-17, 173-3-040, SITE PLAN FOR MANUFACTURED HOMES SHALL BE SUBJECT TO PLANNING BOARD REVIEW AND APPROVAL UPON COMPLETION OF REZONING. WARREN CO.REFERRAL: AUGUST 2022. LOT SIZE: .8 ACRES. TAX MAP NO. 308.15-1-58. SECTION: 179-9-040,113-17. DAN HUNT, PRESENT MR. TRAVER-Laura? MRS. MOORE-Okay. So this applicant is proposing to go to the Town Board. We received a recommendation referral from the Town Board. It has to go through a SEQR process with the Planning Board and at this point the applicant is seeking to add Manufactured Home Overlay zone to this particular parcel. What I included in your packet was the Mobile Home Overlay zones. They're not all containing mobile home parks. So what we did was we labeled the areas that did have parks so you would know that there was a portion of that overlay zone in each area that had a park. It's hard to describe, and so this applicant is proposing to add that to this one parcel. In the past this applicant had,not this applicant but previous approval back in'64 was an approval for seven mobile homes on that lot. It ended up being eight. This applicant is only proposing six. Two of them at this point in time are approved because that was what was approved through building permit process and existed previously. So the applicant is now asking,once the mobile home overlay gets approved,the applicant will be before the Board in reference to placing these six mobile homes,or four mobile homes on the lot. MR. TRAVER-Okay. So the actions that we would take tonight are basically to seek Lead Agency? MRS. MOORE-Correct,it has to wait the 30 days, and then the Board, after they seek Lead Agency,they can accept Lead Agency and proceed with the SEQR and a recommendation. MR. TRAVER-Okay. So that would happen next month or the month after? 15 (Queensbury Planning Board OS/25/2022) MRS. MOORE-Supposedly next month. It should be the second meeting because if I time out 30 days from now,I think it ends up being past the first meeting. MR. TRAVER-So if we pass a resolution to seek Lead Agency, would we also do a tabling motion until September 27th? MRS.MOORE-It's seek Lead Agency status within the 30 days. I mean the process dictates the time clock. MR. TRAVER-So it'll take care of itself. All right. Thank you for that clarification. Good evening. Welcome. Tell us about your project. MR. HUNT-Yes, sir. Daniel Hunt, owner of 3 Pinello Road. The project is, like Laura said it's been a mobile home park since 1960 early sixties,and it was seven units and then it was eight,and it was eight for years, and years and years. I purchased it like four years ago with two units on it. I basically cleared everything off the property and started over and got all my approvals through the Department of Health for the six unit layout, all brand new septics, brand new water lines, brand new lighting, brand new landscaping,brand new blacktop, 100%of the park is going to be transferred brand new. So I currently have two building permits from the Town of Queensbury for the two,there's six. There's going to be two on the eastern side of the property. So basically I guess part of the process is to get the zoning, that property to be included in the Mobile Home Overlay zone. MR. TRAVER-So if it was,was it re-zoned,Laura,since it had the permit for eight? MRS. MOORE-No. So it didn't fall into getting re-zoned when there was I guess the mass re-zoning process. That property failed to get the necessary approvals at that time. MR. TRAVER-Okay. So it's like a pre-existing,nonconforming? MRS. MOORE-Correct. MR.TRAVER-I see. So now we're seeking the clarification and the identification of it as an identified and approved mobile home overlay? MRS. MOORE-Yes. MR. TRAVER-And also for the six mobile homes. MRS.MOO RE-It'll be four. It's six total,but four,it needs to be noted as a mobile home overlay,and then you would look at it for the mobile home park. MR. TRAVER-So first the overlay, and then the specifics of the site plan. MRS. MOORE-Correct. MR. TRAVER-I see on our agenda it says public hearing,but if we're just seeking Lead Agency. MRS.MOO RE-It just starts a clock. You can listen to public comment if you wish to. The public hearing will remain open. MR. TRAVER-Okay. All right. Very good. MRS. MOORE-That way you have some information ahead of time as part of your review process. MR. TRAVER-Okay. So tonight then our only,just for members of the Board,you heard from Laura,but basically our action,our primary action tonight is to seek Lead Agency. We'll have a motion to that effect, but we can take public comment,and we can certainly ask Mr. Hunt questions if you have them. So why don't we start with that. We'll let members of the Board ask some initial questions, comments to Mr. Hunt as he seeks to make this overlay zone. MR. MAGOWAN-Mr. Chairman,I've got a few questions. MR. TRAVER-Yes,sir. MR. MAGOWAN-Mr.Hunt,who's going to own these mobile homes? MR.HUNT-The tenants that move into the lots. MR. MAGOWAN-So the tenants are going to own them. 16 (Queensbury Planning Board OS/25/2022) MR.HUNT-Correct. Yes. MR. MAGOWAN-And they're all going to be new? MR.HUNT-Brand new. MR. MAGOWAN-Now they're going to maintain them? MR.HUNT-That is correct. MR. MAGOWAN-Okay. The next question I have is on your print there you have 24 by 24 inch pads, parking lot pads. Right? MR.HUNT-That's an error. That's going to be 20 by 20. Because it's 20 feet distance between each home. MR.MAGO WAN-Right. So you're going right up against the trailer,the mobile home,to the other mobile home. MR.HUNT-Pretty close. MR. MAGOWAN-If you're 20 feet apart and you're 20 by 20. MR.HUNT-I think we might have changed them again. MR. MAGOWAN-So,I mean if you're starting to make them smaller. MR.HUNT-The parking spaces? MR. MAGOWAN-Yes. Now you're going to get into really one car. MR. HUNT-So I just want to clarify. The target for this mobile home park is going to be for seniors. So pretty much I'm thinking most of them are going to want smaller cars. So that's the plan, to market to seniors. MR.MAGO WAN-Okay,and that brings up another question,because I did read that. Now what happens if you get two seniors and you can't get anymore? MR. HUNT-I don't foresee that being a problem at all. I am very good friends with Gabriel Williams of Lamplighter, and he has people in constantly for that need and he said it would be no problem to fill that up. MR. MAGOWAN-See I guess my concern is because I visited the lot, and I'm looking at the design with the trees and the growing, and I have, I personally have a problem with six. With the driveways and everything else that really gives nothing, and 20 feet apart,you know, so many feet deep. You've got to figure at least a car and a half if not two cars. I mean 55,you've still got people working. So there's going to be two cars., So you've got to figure two cars. MR. HUNT-Yes, we talked about that a little bit and if we had to we could increase it in the front of the homes,too,the parking area. MR. MAGOWAN-Now that changes everything,or if you go down to four spaces you can go with a little wider driveway and it gives it a little bit more distance. Twenty feet isn't much. MR.HUNT-All right,but it meets the criteria,though. It is legal to do that. MR. MAGOWAN-I'm not saying that it isn't. I'm saying that, you know, for planning purposes, we're doing and overlay and we've got to do site plan review, I don't feel comfortable with that,looking at the overview of the rest of the street,which is primarily single family homes,but that was the questions that I saw. I saw the 24 pad and the 20 feet across. It wasn't adding up. So I took a closer and kind of walked it,you know, on the road, and really if you could feasibly do it with the four, I think it would be a nicer looking and more appealing lot for 55 and over. Some people would like a little bit more yard. MR. HUNT-I was thinking just the opposite. The older they are there's a lot of snow in the yard to maintain. MR. TRAVER-Well you have something to think about as we move forward. Eventually we'll be doing site plan review. So you've had some comment for that. Are there other questions, comments from members of the Board? Does anyone have any concerns about accepting Lead Agency status? 17 (Queensbury Planning Board OS/25/2022) MR. DEEB-How many pads are out there now? MR.HUNT-There's six. MR. DEEB-There are six. It's laid out nicely from what I can see. My original concern was six might be too many. MR.HUNT-Did you drive right in and pull right in to one of those spots? MR. DEEB-I thought four would be the right number for that myself, but after looking at it, I mean, it might be able to be done with six,but I'm still up in the air on that,but I did see that the rest of,down the street,the rest of the homes in that area were mostly manufactured mobile homes. MR.HUNT-Right. MR. DEEB-It fits in with the area itself. Which is one of my first concerns. MR. TRAVER-So even if we go through site plan review and you were to,hypothetically let's say,reduce the number,we'd still have to deal with creation of the overlay zone. MR.HUNT-Yes. MR. DIXON-We do have someone who wants to make public comment. MR. TRAVER-Sure. Okay. I will open the public hearing on this application and is there someone in the audience that wanted to comment on this? Yes,sir. PUBLIC HEARING OPENED GARY BANTA MR. BANTA-Hello, Board. My name is Gary Banta. I'm representing Raymond W. Butler, a property owner who has been there for 60 years, the adjacent property owner to the east, and he owns property now. Ray was interested in buying the property but his health is very bad. Heart surgery. I'm his POA. The issue being,originally we were told perhaps four trailers,but not more than four and the property line is where the trailer would be is as close as from you to me. Ray's hedge that he and I put in 45 years ago, and when Dan bought it,he didn't intend it to happen,but they skinned the whole west side toward the mountain of those trees that were total privacy. That's not the big issue. The big issue is for years there were unoccupied trailers there that were falling apart. With the help of his,Ray's,Town Councilman. To begin with,we were told three to four trailers maximum,and that Dan was going to own the property and the trailers and maintain them, and we know he's a very particular man and does everything beautifully, and we like it,but to have six trailers. If any one of you folks lived this close, especially Ray who's now S4. Would you want that to happen? We had a big problem to get rid of the existing trailers that were previously there. They were having rats and snakes and woodchucks and everything living in there. MR. TRAVER-Well he's represented that these will be brand new trailers. MR.BANTA-Yes. MR. TRAVER-It sounds like your issue is the number of trailers, not allowing the trailers, but rather having,you believe that six is too many for this site? MR. BANTA-Yes. And I believe anybody else that would want to be their neighbor wouldn't want that either, and I believe these gentlemen visited the property. So you know, and Ray lives in the house right adjacent which is always maintained beautifully. I've helped him since I was a child and his wife. We were always very close,but anyway, to make a long story short, 60 years ago the folks that owned it had little trailers,kind of like what we'd call a camping trailer on that parcel,that was different because it was a different time,people were respectful and there were two owners since then. We had to get help through Bill Vanness to get those trailers that were housing, and the grass wasn't cut. It was this tall. It was a horrible mess,but Bill Vanness came to our rescue because at the time he was Ray's Ward person. He was great. Ray was going to buy the lot. I'm probably his best friend in the world and we've been together for years,but I convinced him not to buy that lot. He wanted to keep it as a park,but his health wasn't well enough for what needed to be done and he would become frustrated with his inability to do those things and had tree men that didn't come and workers that didn't,at the time when Dan bought it,it was a pit. I mean the two worst trailers were gone,but the two terrible ones were left. One had a tree down through the middle of the trailer. The guy had been living in it for a year with a tarp over it, and we contacted to get help,but nobody helped. I mean the poor guy,I felt sorry for him,but I mean who would live like that? And then in the back was a double wide that was,we couldn't even go in our backyard or Ray's backyard 1S (Queensbury Planning Board OS/25/2022) to do work out there without becoming ill because of the dog feces and the smell of animals. They had a fish pond that went to. MR. TRAVER-Well that's very interesting, sir, but would you mind confining your comments to the application that we have in front of us. MR.BANTA-I'll do my best. MR. DEEB-I mean the lot looks good now. Do you agree? It looks really good. MR.BANTA-I have no doubt about that,but that number of trailers. If any of you lived next to that. MR. TRAVER-We understand your concern. So thank you very much. MR.BANTA-Well this is for Raymond Butler. Now I'm not quite finished. The original park was called Groom's Trailer Park. That was like 60 years ago, and then after that it was owned by two other people and you should have that in all the records. I'm sure you do,but they neglected it so bad, and Almy was the second owner after the Grooms who owned it as the first trailer park. Well Almy didn't do anything but let it go downhill and then someone named Mohammed owned it last,and I believe he went to Canada, but anyway his daughter sold the property,and anyway that's neither here nor there,but it's important to tell you this. The old trailers,they weren't livable because the septic was running underground. MR. TRAVER-And they're now gone. MR.BANTA-But still,like I said,if any of you lived in that house where Ray lives,you wouldn't want that many trailers on the other side of your fence and very close to your lot. MR. TRAVER-We understand your concern with the number of trailers,sir. Any other specific concerns regarding the application that we're looking at this evening? MR. BANTA-Well originally we were told he was going to own the park,not sell the lots to individuals. There would be seniors in there. The issue of cars wasn't discussed because there were only to be four units. MR. MAGOWAN-He's owning the lot. He is renting out the. MR. TRAVER-The land. MR.MAG OWAN-The land or the sites to place the,the people moving in will bring in their manufactured home and set it up,but he's going to own the lot and make sure that the septic and the mowing is kept up. He might not be doing the mowing, or that might be something that's built in. I'm not sure what's built in to his agreement there. So this is going to be something. MR.BANTA-Further down the road a little. MR. MAGOWAN-Yes,further down the road, and Dan has, Mr. Hunt does have other parks if you want to visit and see how they look. MR.BANTA-I understand. MR. TRAVER-You should also be aware, sir,that we will be leaving the public hearing open. So as this project moves through our system and you continue to get information as well we will with regard to what specifically ends up until we get to site plan when we specifically talk about the number of trailers and that level of detail, you will be aware of, you'll be advised and be aware of all of that and have another opportunity to comment. MR. BANTA-That's Raymond Butler, 449 Corinth Road, which is exactly adjacent and I think Dan's a great guy and I want everything to go good for Ray and Dan. I have no objection,other than I'd like to be friends with Dan. I've only recently met him in the last few years,but Ray I've known for over 50 years so you know what I mean. He doesn't deserve to pay the kind of taxes he does. He's always paid his taxes. MR. TRAVER-Unfortunately we can't control people's taxes. MR. BANTA-But if you change what is a valuable property by allowing multiple trailers to go in there,it does change the value of the property. You can't tell me any differently because I know. Any of you that own a home would not want that to happen. Am I right? 19 (Queensbury Planning Board OS/25/2022) MR.DEEB-I grew up in Glens Falls,and the house that I lived in was 10,15 feet from the house next to me. So there are proximity issues,but it doesn't mean it creates a negative impact on the whole situation. And also all the septic is new. Everything is new that he's put in there is new,which is a good thing. MR.MAGOWAN-And also before there were trailers,they actually looked like you could put them on the hitch of a car and drive them down the road. They were just a little bigger, you know, but they have changed, too. Instead of a metal look, they've gone to vinyl siding,you know, nicer windows. So a lot more appealing to the eyes. MR.BANTA-But that doesn't mean that a house that was built back in 1950 by a mason. MR. MAGOWAN-And I can understand that, but you'll have your chance at the site plan. Right now we're just trying to establish the Lead Agency. MR. BANTA-But because Ray can't make it in here and said multiple houses,but I just wanted to go on record that it needs to be addressed and so I came. And I don't want to make anyone upset or angry,but I want to make them aware. MR. DEEB-And you'll have a chance to talk later also. MR.BANTA-Thank you. You all have a good evening. MR. MAGOWAN-You,too. Thanks for coming. MR. TRAVER-Is there anyone else in the audience that wanted to address this application for Dan Hunt, Site Plan 52-2022 and Re-zoning 3-2022. I'm not seeing any. Are there written comments,Laura? So in any case we'll leave the public hearing open on this and the only action that we're taking tonight if the Board approves is to seek Lead Agency status with regard to this zoned site plan. Does anyone have any concerns about seeking Lead Agency on this application? MR. DIXON-Not specific to this. MR. TRAVER-Okay. Did you find anything,Laura? MRS. MOORE-There are no written comments. MR.TRAVER-Okay. All right. Well we'll leave the public hearing open in any case and we can entertain that motion for Lead Agency. MR. MAGOWAN-Mr. Chairman,I just have a question,because I get lost in these resolutions. Does this go back to the Town Board,Laura? MRS. MOORE-This will ultimately go back to the Town Board,but you need to complete the SEQR. In September you would complete the SEQR Lead Agency acceptance or acknowledgement, and then you can complete SEQR itself and then you can provide a recommendation to the Town Board. The Town Board would then schedule their public hearing, potentially change the zone or whatever they deem necessary in reference to a public hearing,then it would come back to this Board complete that Site Plan Review process. It's along process. MR. MAGOWAN-So tonight it's just a? MRS. MOORE-Literally it's seek Lead Agency. MR. MAGOWAN-And no recommendation to the Town Board yet. MRS. MOORE-There's no recommendation. MR. MAGOWAN-Okay. Wow. MR. TRAVER-All right. So are we ready to entertain that? Go ahead,please. RESOLUTION TO SEEK LEAD AGENCY STATUS SP#52-0222 DAN HUNT WHEREAS,the applicant proposes to operate a 6 unit manufactured home park. The project proposes 4 new units to be installed with associated grass, plantings, blacktop roadway and new underground utilities. Two units were approved for the existing site;the park would contain 6 total. The project is part of rezoning where the mobile home overlay zone is proposed for this parcel pursuant to Chapter 179-9-040 referral from the Town Board where the Planning Board is to complete SEQR and provide recommendation 20 (Queensbury Planning Board OS/25/2022) to the Town Board. Pursuant to Chapter 113-17, 179-3-040, site plan for manufactured homes shall be subject to Planning Board review and approval upon completion of rezoning. WHEREAS, the Planning Board of the Town of Queensbury has determined to begin an environmental review process under the State Environmental Quality Review Act(SEQRA). WHEREAS,the Planning Board of the Town of Queensbury has identified the project to be a Type I action for purposes of SEQR review pursuant to 6 NYCRR 617. WHEREAS,the Planning Board is the agency most directly responsible for approving the action because of its responsibility for approving the land uses for the property. NOW,THEREFORE BE IT RESOLVED,the Planning Board of the Town of Queensbury hereby indicates its desire to be lead agency for SEQRA review of this action and authorizes and directs the Zoning Administrator to notify any other potentially involved agencies of such intent. That Part I of the SEQRA form will be sent to the following agencies: NY State Department of Health MOTION TO SEEK LEAD AGENCY STATUS IN CONNECTION WITH SITE PLAN 52-2022 DAN HUNT,Introduced by Michael Dixon who moved for its adoption,seconded by Warren Longacker: As per the draft resolution prepared by staff. Duly adopted this 25`h day of August 2022 by the following vote: AYES: Mr. Deeb,Mr. Dixon,Mr. Longacker, Mr. Stark,Mr. Magowan,Mr. Etu,Mr. Traver NOES: NONE MR. TRAVER-All right. So we have initiated the first step which is seeking Lead Agency. If none of the other involved agencies object and we become Lead Agency, the next step would be the State Environmental Quality Review Act which is a SEQR resolution for environmental impacts, and then a recommendation on the overlay zone to the Town Board which they would then act upon, and once they act upon that,hypothetically it would come back to us for the very specific Site Plan where we talk about the number of trailers and the details of the actual site. So with that for tonight we are all set. MR.HUNT-All right. Thank you guys very much. I appreciate it. MRS. MOORE-The next item would be tabled. MR. TRAVER-Yes. So the next section of our agenda is New Business. This is Unapproved Development for Brian Hogan, Site Plan 50-2022. NEW BUSINESS UNAPPROVED DEVELOPMENT: SITE PLAN NO. 50-2022 SEQR TYPE: TYPE 11. BRIAN HOGAN. OWNER(S): SAME AS APPLICANT: ZONING: WR. LOCATION: 33 HOLLY LANE. APPLICANT PROPOSES TO COMPLETE A 529 SQ. FT. PAVILION AT 15 FT. 2 INCHES TO BE CONSTRUCTED NEAR THE VICINITY OF THE COTTAGE THAT HAS BEEN DEMOLISHED. THE EXISTING HOME OF 1,460 SQ. FT. IS TO REMAIN WITH NO CHANGE. THE PROJECT INCLUDES A LOT LINE ADJUSTMENT WITH THE TOWN I REGARDS TO HOLLY LANE WHERE 916 SQ.FT.OF HARD SURFACE IS TO BE ADDED TO THE APPLICANT'S SITE. ADDITIONALLY, THE PROJECT INCLUDES A 1,568 SQ. FT. PICKLE BALL COURT UNDER REVIEW FOR MINOR STORMWATER MANAGEMENT. PURSUANT TO CHAPTER 179-3-040,SITE PLAN REVIEW FOR A NEW PAVILION IN THE WATERFRONT RESIDENTIAL ZONE SHALL BE SUBJECT TO PLANNING BOARD REVIEW AND APPROVAL. CROSS REFERENCE: AV 68-2021. WARREN CO. REFERRAL: AUGUST 2022. SITE INFORMATION: APA, LGPC, CEA. LOT SIZE: .79 ACRES. TAX MAP NO.239.12-2-37. SECTION: 179-3-040. MR. TRAVER-And this,Laura,is going to be tabled? MRS. MOORE-It's going to be tabled at this point. You're going to table it to the first meeting in September. The applicant was not able to make it due to other issues with himself, and so he asked for it to be tabled. MR. TRAVER-So we'll have quite a meeting the first meeting in September. MRS. MOORE-Yes,it is. 21 (Queensbury Planning Board OS/25/2022) MR.TRAVER-And we have a public hearing on this,and this is not a variance. We should open the public hearing and leave it open. MRS. MOORE-Yes. MR. TRAVER-And there is no one in the audience. I guess we can wait,if there are written comments,to hear them,when we hear the actual application. MRS. MOORE-That sounds good. PUBLIC HEARING OPENED MR. TRAVER-So with that we can entertain that tabling motion. Just note that the public hearing has been opened. RESOLUTION TABLING SP#50-2022 BRIAN HOGAN Applicant proposes to complete a 529 sq. ft. pavilion at 15 ft. 2 inches to be constructed near the vicinity of the cottage that has been demolished. The existing home of 1,460 sq. ft. is to remain with no changes. The project includes a lot line adjustment with the Town in regards to Holly Lane where 916 sq.ft.of hard surface is added to the applicant's site. Additionally, the project includes a 1,56E sq. ft. pickle ball court under review for minor stormwater management.Pursuant to chapter 179-3-040,site plan review for a new pavilion in the Waterfront Residential zone shall be subject to Planning Board review and approval. MOTION TO TABLE SITE PLAN 50-2022 BRIAN HOGAN. Introduced by Michael Dixon who moved for its adoption,seconded by Nathan Etu. Tabled until the September 20,2022 Planning Board meeting at the request of the applicant. Duly adopted this 25`h day of August 2022 by the following vote: AYES: Mr. Longacker,Mr. Stark,Mr. Magowan,Mr. Etu,Mr. Deeb,Mr. Dixon,Mr. Traver NOES: NONE MR. TRAVER-That concludes our regular agenda. Is there any other business before the Planning Board this evening? I did note,I got an e-mail or something,that the Saratoga Planning conference is February 1. MRS.MOORE-So if you wish to attend please send me an e-mail note or fill out the registration and bring that in,or e-mail that to us and we'll put you on the list to be registered for that. MR. TRAVER-Okay. Thank you. I will definitely plan on going, and for those who have not attended, that is probably the best Planning Board meeting,at least at the local level,that we have. So if you're free, I highly recommend that you make an effort to attend. There is a fee, but the Town will cover it if you shoot an e-mail to Laura,she'll make sure that we're registered. It's a daylong event and you'll get a whole packet of information and there are various classes of different topics that you can choose which ones of interest that you wish to go to and it's excellent,but you'll see more about it later. MR. DEEB-Lunch is included,too. MR. TRAVER-Yes, it is. Yes, we do get lunch. But it also applies for, I think it even provides the credit that we need for the annual training requirement. MR. DEEB-Four hours. MRS. MOORE-Four hours is the requirement,. It definitely covers it. MR. TRAVER-But aside from that,it's a very quality experience. If there's nothing else,we'll entertain a motion to adjourn. MR. DEEB-So moved. MOTION TO ADJOURN THE QUEENSBURY PLANNING BOARD MEETING OF AUGUST 25Tx 2022 BY THE FOLLOWING VOTE, Introduced by David Deeb who moved for its adoption, seconded by Michael Dixon: Duly adopted this 25`h day of 2022,by the following vote: 22 (Queensbury Planning Board OS/25/2022) AYES: Mr. Deeb,Mr. Dixon,Mr. Longacker, Mr. Stark,Mr. Magowan,Mr. Etu,Mr. Traver NOES: NONE MR. TRAVER-We stand adjourned,everybody. Thank you very much. We'll see you next month. On motion meeting was adjourned. RESPECTFULLY SUBMITTED, Stephen Traver,Chairman 23