Loading...
IM Inspection Worksheet_12-09-2022_12-16-37INSPECTION WORKSHEET (019674-2022) RC-0697-2021Case Number:Case Module:Permit Management 09/12/2022 PassedInspection Status:Inspection Date: Zoning-PermitInspection Type:Inspector:Bruce Frank Job Address:Parcel Number:11 Moon Hill Pl Lake George, NY 12845 289.7-2-2 Company Name NameContact Type Contractor FOOTHILLS BUILDERS, LLC Engineer Daniel Ryan Granted Permission FOOTHILLS BUILDERS, LLC Primary Owner Maria Leuci Dave Radloff Checklist Item CommentsPassed Code Compliance Notes False September 12, 2022: all deficiencies now corrected. All per approval and with Matt Huntington, PE as-built site certification / plan (September 12, 2022). Good for sign-off of both zoning permits. July 12, 2022: the proposed and approved site development has not been completed. The numerous deficiencies were discussed with Joe Leuci on site during the inspection. Mainly, the stormwater system has not been installed: SW basin, roof gutters and downspouts and pipes to basin not installed; swale around septic not installed and the swale on the north side of the driveway and the associated nyloplast drain basin / storm pipe to SW basin has not been installed. The approved section of the old driveway pavement, to be removed, has not been removed, and the sections of the new driveway are not in the approved location. None of the exposed soils have been stabilized with topsoil, seed and straw (or hydroseed). The design engineer's as-built certification will need to be provided once all of the site development is completed and all areas have been at least temporarily stabilized. September 12, 2022 Page 1 of 1