Loading...
2002-974 T0'WN OF QUEENSBURY 742 Bay Road,Queensbury NY 12804-5902 (518)761-8201 Community Development-Building&Codes (518)761-8256 CERTIFICATE OF OCCUPANCY Permit Number: a2002O974 Date Issued: Tuesday,July 01,2003 This is to certify that work requested to be done as shown by PermitNumber a2002O974 has been completed. Tax Map Number: 523400-301-008-0001-032.000-0000 Location: 339 AVIATION Rd Owner: MOUNTAINVIEW COMMONS,L.L.C. Applicant: MOUNTAINVIEW COMMONS?LLC This structure may be occupied as a: By Order of Town Board Commercial Alteration&Addition TOWN OF QUEENSBURY Director of Bdding&Code Enforcement TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development-Building&Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20020974 Application Number: A20020974 Tax Map No: I 523400-301-008-0001-032-000-0000 Permission is hereby granted to: RTCHARDJONES ASSOC. For property located at: 339 AVIATION Rd in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Consttuction Value Owner Address: BA"ARA JONES Commercial Addition 350,000.00 339 AVIATION Rd Commercial Alteration 100,000.00 QUEENSBURY,NY 12804 Total Value 450,000.00 Contractor or Builder's Name Address Electrical Inspection Agency 641� Plans&Specifications 2002-974 3,426 sq ft commercial alteration of and 1,460 sq ft addition to existing structure per plot plan and specifications. $654.84 PERMIT FEE PAID-THIS PERMIT EXPIRES: Tuesday,November 25,2003 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the To ember 25,2002 SIGNED BY 77:V4 for the Town of Queensbury. Director of Building&Code Enforcement Building Permit Application Town of Queensbury—Dept of Community Development,742 Bay Road,Queensbury,NY . (518)761-8256 A permit must be obtained before beginning construction. Permit File No. 2.0 Q&�7 Ir No inspection will be made until applicant has received a Fee Paid $ valid building permit. All applicants' spaces on this Rec. Fee Paid $ application must be completed and must appear on the Reviewed By: application form. Applicant: IZIQUIZ 0 f. clip 40,5;i aG. Owner: P_-Aj&12A" 1 a• jar 49_ly Address: •73,311 A0tA-nzPk4 12z7Ab Address: 0 5u3 =?t21Afl_ LA; � av 16yA--111 )4-( 1291a¢ . . Phone#(51-a } -5 Phone Email Address: Email Address: Property Location: Lot Number: / House Number I tl�t --7- Subdivision Name: Tax Map Number: '�jL'%).41j— - 3 Z ❑ New Building: residence /commercial Estimated Market Value of Construction: $ 5p }s( . Addition: residence/ commercial If an Addition,what will use of new addition be? S Alteration: residence/ commercia G?T-�1✓1G1!i ❑ No change to exterior size: residence/com'1 f ❑ Other work(describe } •'tz. lE� Check OccupancyInformation 1s`Floor Other floor Total Below sq.ft. sq.ft. sq.ft. Square Feet ❑ Single family dwelling ❑ Two family dwelling ❑ Townhouse ❑ Multifamily dwelling " #of units OfficeAgo AW 441&7 ❑ Mercantile ❑ Manufacturing ❑ 1 car detached garage ❑ 2 car detached garage ❑ 3 car detached garage " ❑ 1 car attached garage . ❑ 2 car attached garage ❑ 3 car attached garage TOWN OF 01 1 ❑ Storage building- BUILDING AND CODE commercial ❑ Storage building- residential ❑ Other What is the proposed height of the structure - Z� feet inches Will any second-hand or ungraded lumber be used? If so,for what? Type of Heating System: electric/ oil t gas)1 wood forced hot ai / baseboard t othet: Number of Fireplaces to be installed G Number of Woodstoves to be installed G� List below the person(s)responsible for supervision of work as regards to building codes: Name Address Phone Number Builder 4.414 Ctyr. pe,bO ZG F614 '4 7�is- 1 SZ,G' Plumber ray Mason FiAt t9t�n1 r lc. Vi G W l t �i p hrl -fq Z - 13 Z 1 Electrician 6E41L1� tb&x 1-104, s 2ai 3- S SoG Declaration; please sign below after you have carefully read the statement: To the'best of my knowledge the statements contained in this application,together with the plans and specifications submitted,are a true and complete statement of all proposed work to be done on the described premises and that all - provisions of the Building Code,the Zoning Ordinance and all other laws pertaining to the proposed work shall be complied with,whether specified or noted,and that such work is authorized by the owner. Further,it is understood that 1/we shall submit,prior to a Certificate of Occupancy or Certificate of CompliancQ being issued,as requested by the Zoning Administrator or Director of Building and Codes,an As Built Survey by a licensed surveyor;drawn to scale,showing actual location of all new construction. Signature: `z'` owner,owner's ages architect, ontractor Application for Permit-Septic Disposal System Town of Queensbury 742 Bay Road Queensbury,"NY 12804 (518) 761-8256 1. OWNER INFORMATION: Office Use Location of installation: :;231 A J(,4"(Ia File Permit No. 7 Tax Map No. �0'/ J Owner's Name: (jA IMA �-�• &/J 647 Fee Paid V-A Address: L�ATJf-i at t-r-j\)r7 by 2. _ INSTALLER'S NAME D aJ/ 8L 60 t,)4 rLge— PHONE NO. :71 S —S 7 07 3., RESIDENCE INFORMATION: (circle year of dwelling,indicate#bedroom(s) and multiply#of bedrooms with applicable gallons per bedroom to equal total daily flow) Year of House: No. of Bedrooms x Computation = Total Daily Flow 1980 or older x 150 gal/bdrm = 1980— 1991 x . 130 gal/bdrm = 1991 —present x 110 gal/bdrm = Garbage Grinder Installed yes_ / no NOV 2 q �002 Spa or Hot Tub Installed yes_ / no TOWN OF QUEENSBURY BUILDING AND CODE 4r PARCEL INFORMATION: (circle applicable information&indicate measurements) Topography Soil Nature Ground Water Bedrock or Impervious Material Domestic Water Supply Flat sand at what depth ai what depth munici al Rolling loam feet feet well Steep slope clay M/A 1A if well;water supply %slope other 1` from any septic-system depth: absorption is ft. other Percolation Test: (To be completed by licensed professional engineer or architect) Rate: 5 V-41tJ minute per inch �loy6G 5. PROPOSED SYSTEM: For New Construction: All individual sewage disposal systems must be designed by a licensed professional engineer or architect(unless installed in a Planning Board approved subdivision). Add 250 gallons to the size of the septic tank and leach field for each Garbage Grinder, Spa or Whirlpool Tub. Septic Tank: JOCO gallon(min. size 1,000 gal.) 4,A Tile Field: each trench ft. Total System Length: ft, Seepage Pit(s): number of 'L size of each:' p ft. by Qtj ft. Size of Stone to be used: # 2 / depth or thickness 1 19 it feet PA Bed System Size: x PA Alternative'System: length andlor size 6. HOLDING TANK SYSTEM: (if required) t-)A Number of tanks: /_Size of each:_ gallons /.TOTAL_Capacity:_ _ _ gallons Note: Alarm System and associated electrical work must be inspected by a Town approved electrical inspection agency. 7. SIGNATIJRE &INFORMATION FOR RESPONSIBLE PERSON(please read) For your protection,please note that pursuant to Section 136-29 of the Code of the Town of Queensbury,any permit or approval granted which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. I have read the regulations with respect to this application and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance.. Signature of pons�e person Date -'I'(.)Wtt of QX14--ellslnti-y St:�vci•�t :txul t.•'�c5�vstJ;c I)i�t�ra�:tl t:ltst{t[t t• Appvtittlix t SIi:I'ARA'I'ION ILI;tZi.IilLlli�ll�11�1'1`:; a - t� r Sttt J�ON D ILI G . E C'1 Kttt:.ttttr•t t Afi�,�t�Rt'tt�t t t. ?. SIGNATURE &INFORMATION FOP,I��Ytir�aursi:��r.�.�vi��►w�a,:•:•;:; TOWN OUEENSBURY HIGHWAY E6 Highway A.Missita g y Superintendent DEPA RTMEN APR Home(518)798-5127 742 Bay Road • Queensbury,'NY 12804 TOW.N OF 00 Midiad F. Travis t7ce Phone: ($18) 764-8241f '-r .i �, `Y Deputy Highway Superintendent Fax: (518) 745 4466 �� (518)798-0413 4ENS' DRIVEWAY PERMIT DATE: _t(•h'lOL APPLICANT NAME: CLOG Aw✓,! So IrJ07 TELEPHONE NO tj!8- 113. 101.� 33q AO iat- Ab ADDRESS TO BE INSPECTED: . ArrJV KA19,011, RETURN ADDRESS: ' -53 1 A01ndtJ 111,vA'0 0ye `�Sot w-/ Applicant must show exact location and width of driveway(s)to be connected to the highway by placing stakes at the specified location. The Superintendent of Highways-of theTown of Queensbury has reviewed this application. The following action leas been taken: STEP 1: Preiiminar Approval V) . , ;pig; . 1,�, NEED: ( )Slight swale O Level with the road ( )Deep swale Size pipe to be used(if necessary)" ( )12" ( )15" ( )18" ( )24" (.)36" Preliminary inspection completed by-7 V65 DATE ip2 O Approval by Highway Supt. %,!..--" Deputy Supt Upon completion,please resubmit this approved permit for a final approval. STEP 2: ( )Final Approval RECEIVED ( )Rejected' DATE: NOV �" 0 2002 TOWN OF QUEENSBURY BUILDING AND CODE Richard A. Missita,Highway Superintendent @Pcji iP lWProject Name. BP# Address: Building Pe?eck�lhisst M le-D�rz# All items below must be checked either yes,no or not applicable prior to submission of any building permit to the Town of QueensburyBuilding Department. If any of the below items are lacking,the permit . will not be accepted until such time as the application is deemed complete for submission.. 1. Building Permit Application Completed...... ... ... ...... ... ... ...... ... ...... yes [:]no ❑n/a 2. Energy Forin or Checl�Mate Energy Code Compliance Forms.Complete .. [:]no ❑n/a 3. Energy Code Inspector's Report from.Checkmate Program.. ... ... s [-]no ❑n/a 4. Septic application completely filled.out(if applicable)...... ... ....:.... ... ❑no. ❑n./a 5. Electrical Inspection Form.......:..... .......... ............ ... .......... :: yes ❑no Qn/a 6. Two(2)sets of plans showing the following: ..::.:... Ono ❑ 6a. Floor plan(s)... ... ... ............ ...... ... ............ ... ..:... ... ... Dyes Ono Qn/a 6b. Foundation plan............. ....... ...... :.. ........................ ........❑yes Ono ❑n/a 6c. Crass se .................. ...... ... ... ........: ... ......... ... ...,.: Qyes Ono Qia/a 6d. Elevations ......... ............ ... ......... .... ...... ...... :..... ... . yes Ono Qn/a 6e. Design loads including floor,snow load,and wind load....... Dyes Ono ❑n/a 6f. Seismic design(required after jar:1,2003 ....:....... ..) .... ... ... ... Ayes Ono Qn/a � , 6g. Plans signed by registeredarchitect or engineer,signed:..... ... . Dyes [:]no ❑n/a and sealed bya registered architect or engineer 6h. Window and door schedule... ............ ... ...... ............ ... ... ❑yes Qno ❑n/a 7. Two(2)site plans showing location of the structure to be built,...... ... Ono ❑n/a location of well or water lines,location of septic system or sewer line with all setbacks and separation distances.shown,and all improvements to the property. 8. Solid Fuel Burning or Gas Appliance Form(if applicable)................ Dyes Qno 9. DrivewayPermit... ... ............ ......... ...... ...... .... ... ............ .... ❑no n/a Date: Staff Initial• L:\SueHewingway\B " rnut.FORMS\Generic Checklist.doc T a 1 i Envelope Compliance liance Report ort P P New York State Energy Conservation Construction Code COMcheck-EZ Software Version 2.4 Release 1 Data filename:P:\01 -Projects\2002\0203\Energy Code\0202-Mountain View Commons.cck Section 1: Project Information Project Name: Mountain View Commons REJA Architects&Glens Falls National Bank Designer/Contractor: Richard E.Jones Associates Document Author: Craig Jones Notes: Storage,Industrial and Commercial Areas are Basement/Mechanical Spaces. Section 2: General Information Building Location: Warren,New York Climate Zone: 15 Beating Degree Days(base 65 degrees F): 7635 N O V 2 0 20OZ Cooling Degree Days(base-65 degrees F): 380 Building Use Method of Compliance: Activity Type Method TOWN OF QUEENSBURY , BUILDING AND CODE Activity Tvtiets) Floor Area Bank/Financial Institution 2100 Office 2160 Office 400 Storage,Industrial and Commercial 513 Storage,Industrial and Commercial 1631 Project Description(check one): New Construction _Addition Alteration _Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Air Leakage,Component'Certification,and Vapor Retarder Requirements Inspection Approved Initial Date (Y/N) All joints and penetrations are caulked,gasketed, weather-stripped,or otherwise sealed Fireplaces installed with tight fitting non-combustible fireplace doors Dampers integral to the building envelope are equipped with motorized dampers Cargo doors and loading dock doors are weather sealed Recessed lighting fixtures are sealed or gasketed Windows,doors,.and skylights certified as meeting leakage requirements Component R-values&U-factors labeled as certified Vapor retarder installed a r Climate-Specific Requirements Gross Cavity Cont. Proposed Budget Component Name/Description Area R-Value R-Value U-Factor U-Factor NORTH: REJA-North Wall:Wood Frame,Any Spacing 713 21.0 0.0 0.062 0.074 Stair Windows:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 36 --- -- 0.290 0.520 Conference Room Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 27 --- --- 0.310 0.520 Employee Entrance: Solid 28 --- --- 0.700 0.120 REJA-North Basement Wall: Solid Concrete or-Masonry>8" Furring:Wood,Wall Ht 10.0,Depth B.G.9.0 415 11.0 0.0 0.110 0.098 EAST: Bank-East Wall:CMU<=8"with Empty Cells,Furring:Metal 580 0.0 10.0 0.079 0.074 Lobby Window 1:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 70 --- --- 0.290 0.520 Office Window 1:Wood Frame,Double Pane with Law-E Clear,shgc 0.36 70 --- --- 0.290 0.520 Vestibule Window 1:Wood Frame,Double Pane with Law-E Clear,shgc 0.36 9 --- --- 0.290 0.520 Vestibule Window 2:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 9 --- --- 0.290 0.520 Main.Entrance:Glass,Clear,shgc 0.56 42 --- --- 0.920 0.520 REJA-East Wall:Wood Frame,Any Spacing 634 21.0 0.0 0.062 0.074 Conference Room Window:Wood Frame,Double Pane with Low-E - Clear,shgc 0.36 27 --- --- 0.290 0.520 Corridor Window#1:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 26 --- --- 0.290 0.520 Corridor Window#2:Wood Frame,Double Pane with Law-E Clear,shgc 0.36 26 --- --- 0.290 0.520 Waiting Window#1:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 15 --- --- -0.290 0.520 Waiting Window#2:Wood Frame,Double Pane with Law-E Clear,shgc 0.36 15 --- --- 0.290 0.520 Workstation Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 27 --- --- 0.290 0.520 Main Entrance:Glass,Clear,shgc 0.87 28 --- --- 0.920 0.520 REJA-East Basement Wall: Solid Concrete or Masonry>8" Furring:Wood,Wall Ht 10.0,Depth B.G.9.0 803 11.0 0.0 0.110 0.098 SOUTH: Bank-South Wall:Wood Frame,Any Spacing, 435 21.0 0.0 0.062 0.074 Work Room Window:Wood Frame,Double Pane with Law-E Clear,shgc 0.34 52 --- --- 0.310 0.520 REJA-South Wall:Wood Frame,Any Spacing 42 21.0 0.0 0.062 0.074 REJA-South Basement Wall: Solid Concrete or Masonry>8" Furring:Wood,Wall Ht 10.0,Depth&G.9.0 140 11.0 0.0 0.110 0.098 WEST: Bank-West Wall:CMU<=8"with Ernpty Cells,'Furring:Metal 610 0.0 10.0 0.079 -0.074 Lobby Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 27 --- --- 0.310 0.520 Office Window:Wood Frame,Double Pane with Law-E Clear,shgc 0.34 27 --- --- 0.310 0.520 Conference Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 , 27 --- --- 0.310 0.520 Teller Window:Metal Frame with Thermal Break,Double Pane Clear,shgc 0.66 - 28 --- --- 0.630 0.520 REJA-West Wall:Wood Frame,Any Spacing 712 21.0 0.0 0.062 0.074 Toilet Window#1:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 4 --- --- 0.310. 0.520 Toilet Window#2:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 4 --- 0.310 0.520 Large Office Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 78 --- --- 0.290 0.520 Work Station Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 27 --- --- 0.310 0.520 REJA-West Basement Wall:Solid Concrete or Masonry>8" Furring:Wood,Wall Kt 10.0,Depth B.G.9.0 803 11.0 0.0 0.110 0.098 UNSPECIFIED ORIENTATION: REJA Roof.All-Wood Joist/Rafter/Truss 4380 30.0 0.0 0.035 0.051 Skylight 1:Wood Frame,Double Pane with Low-E Clear,shgc 0.41 12 --- --- 0.440 0.051 Skylight 2:Wood Frame,Double Pane with Low-E Clear,shgc 0.41. 12 --- 0.440 0.051 Skylight 3:Wood Frame,Double Pane With Low-E 'Clear,shgc 0.41 12 --- --- 0.440 0.051 Skylight 4:Wood Frame,Double Pane with Low-E Clear,shgc 0.41 12 --- --- 0.440 0.051 Bank Roof.All-Wood Joist/Rafter/Truss 4894 30.0 0.0 0.035 0.051 Bank-Existing Floor Slab:Unheated Slab-On-Grade Vertical 4 ft. 130 --- 0.0 --- --- (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. Envelope PASSES: Design 22%better than code Section 4: Compliance Statement The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculation's submitted with this permit application. The proposed envelope system has been designed to meet the New York State Energy Conservation Construction Code requirements in COMcheck-EZ Version 2.4 Release 1. When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of his/her knowledge,belief,and professional judgment such plans or specifications are in.compliance with this Code. Principal Envelope Designer-Name Signature Date Lighting and Power Systems Compliance Certificate New York State Energy Conservation Construction Code COMcheck-EZ Software Version 2.4 Release 1 Data filename:P:\01 -Projects\2002\0203\Energy Code\0202-Mountain View Commons.cck Section 1: Project Information Project Name: Mountain View Commons REJA Architects&Glens Falls National Bank Designer/Contractor: Richard E.Jones Associates Document Author: Craig Jones Notes: Storage,Industrial and Commercial Areas are Basement/Mechanical Spaces. Section 2: General Information Building Location: Warren,New York Climate Zone: -15 Heating Degree Days(base 65 degrees F): 7635 Cooling Degree Days(base 65 degrees F): 380 Building Use Method of Compliance: Activity Type Method Activity Twe(sl Floor Area Bank/Financial Institution 2100 Office 2160 Office 400. Storage,.Industrial and Commercial 513 Storage,Industrial and Commercial 1631 Project Description(check one); New Construction -Addition Alteration _Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Inspection Approved Initial Date (Y/N) Controls,Switching,and Wiring Independent controls for each space(switch/occupancy sensor) Exceptions: Security lighting,building lobby/retail store/mall Master switch at entry to hotel/motel guest room Individual dwelling units separately metered Two switches,dimmer,or occupancy sensor,in-each space providing a uniform illumination pattern Exceptions.- Only one luminaire in space; An occupant-sensing device controls the area; The area is a corridor,storage,restroom,or lobby Automatic lighting shutoff control in spaces greater than 250 sq.ft in buildings larger than 5,000 sq.ft Photocell/astronomical time switch on exterior lights Exceptions: Large covered areas requiring lighting during daylight hours' Tandem wired one-lamp and three-lamp ballasted luminaires Exceptions: Electronic high4requency ballasted luminaires not on same switch Transformers meet minimum efficiencies listed in Table 805.6.1 or 805.6.2 Interior Lighting Total actual watts must be less than or equal to total allowed watts Allowed Watts Actual Watts Complies(Y/N) 10184 7531 YES Exterior Lighting Type(s)of exterior lighting sources: Fluorescent Metal Halide —High-Pr.Sodium Exceptions: Specialized signal,directional,and marker lighting;lighting highlighting exterior features of historic buildings; advertising signage;safety or security lighting;low-voltage landscape lighting. Section 4: Compliance Statement The proposed lighting design represented in this document-is consistent with the building plans,specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the New York State Energy Conservation Construction Code requirements in COMcheck-EZ Version 2.4 Release 1. When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of his/her knowledge,belief,and professional judgment,such plans or specifications are in compliance with this Code. Principal Lighting Designer-Name Signature Date Lighting Application Worksheet New York State Energy Conservation Construction Code COMcheck-EZ Software Version 2.4 Release I Section 1: Allowed Lighting Power Calculation A B C D Total Floor Allowed Allowed Area Watts Watts Area Catego13 (ft2 watts ft2j (B.x CQ Bank/FinancialInstitution 2100 2 4200 Office 2160 1.5 3240 Office 400 1.5 600 Storage,Industrial and Commercial 513 1 513 Storage,Industrial and Commercial 1631 1 1631 Total Allowed Watts= 10184 Section 2: Actual Lighting'Power Calculation A B C D E F Fixture Fixture Description/ Lamps/ #of Fixture ID Lamp Description/Wattage Per Lamp/Ballast Fixture Fixtures Watt. x E Al 42"Indirect Pendant/Twin Tube 50W/Electronic 4 5 240 1200 A2 36"Indirect Pendant/Triple 4-pin 26W 1 Electronic 4 1 130 130 B 1 8'Wall Mounted Indirect/48"T8 32W/Electronic 4 2 120 240 B2 12'Indirect Pendant/48"T8 32W/Electronic 6 1 180 180 B3 8'Indirect Pendant/4V T8 32W/Electronic 4 5 120 600 ' B4 4'Indirect Pendant/48"T8 32W/Electronic 2 3 60 180 C 6"Downlight/Triple 4-pin 26W/Electronic 1 8 26 208 Cl 6"Downlight l Triple 4-pin 26W/Electronic 1 -17 26_ 442 D1 6"Downlight I Twin Tube 18W I Electronic 1 4 17 68 D2 6"Downlight/Twin Tube.18W/Electronic 1 1 17 17 ' E Round Low Profile Ceiling/Twin Tube 24/26/27W/Electronic 3 3 64 192 F 4'Wrap/48"T8-32W/Electronic 2 22 59 1298 H3 2x4 Parabolic/48"T8 32W/Electronic 2 18 62 1116, H4 2x4 Parabolic/48"T8 32W/.Electronic 3 7 86 602 H5 2x4 Parabolic Surface/48"T8 32W/Electronic 3 3 86 258 M Low Voltage Pendant/Other 1 3" 50 150 N Low Voltage Sconce/Other' 1 13 50 650 Total Actual Watts= 7531 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Actual Watts is greater than or equal to zero,the building complies. Total Allowed Watts= 10184 Total Actual Watts= 7531 Project Compliance= 2653 Lighting PASSES: Design 26%better than code Mechanical Compliance Report New York State Energy Conservation Construction Code COMcheck--EZ Software Version 2.4 Release 1 Data filename:P:\01 -Projects\2002\0203\Energy Code\0202-Mountain View Cominons.cck Section 1: Project Information Project Name: Mountain View Commons REJA Architects&Glens Falls National Bank Designer/Contractor: Richard E.Jones Associates Document Author: Craig Jones Notes: Storage,Industrial and Commercial Areas are Basement/Mechamcal Spaces. Section 2: General Information Building Location: Warren,New York Climate Zone: 15 ' Heating Degree Days(base 65 degrees F): 7635 Cooling Degree Days(base 65 degrees F): 380 Building Use Method of Compliance: Activity Type Method Project Description(check one): New Construction _Addition _Alteration _Unconditioned Shell(File Affidavit) Section 3: Mechanical Systems List uanti1y System TWe&Description 1 Bank HVAC Unit#3: Heating:Central Furnace,Gas/Cooling:Split System,Capacity<65 kBw/h, Air-Cooled Condenser/Single Zone 1 REJA Office-HVAC Unit#1: Heating:Central Furnace,Gas/Cooling: Split System,Capacity<65 kBtu/h,Air-Cooled Condenser/Single Zone 1 REJA Office-HVAC Unit#2: Heating:Central Furnace,Gas/Cooling:Split System,Capacity<65 kBtu/h,Air-Coaled Condenser/Single Zone 1 BANK-Water Heating 2: Service Water Heater 1 REJA OFFICE-Water Heating 1: Service Water Heater Section 4: Requirements Checklist Requirements Specific To:Bank-HVAC Unit#3 1. Newly purchased heating equipment will meet,the heating efficiency requirements [ ] 2. Equipment minimum efficiency: Split System: 10.0 SEER Requirements Specific To:REJA Office-HVAC Unit#1 [ ] 1 Newly purchased heating equipment will meet the heating efficiency requirements [ ] 2. Equipment minimum efficiency: Split System: 10.0 SEER Requirements Specific To:REJA Office-HVAC Unit#2 [ ] 1. Newly purchased heating equipment will meet the heating efficiency requirements [ ] 2. Equipment minimum efficiency: Split System: 10.0 SEER Requirements Specific To:BANK-Water Heating 2 [ ] 1. Heat traps in inlet/outlet fittings [ ] 2. 1/2-in.insulation on 8 ft of inlet/outlet piping if no integral heat traps Requirements Specific To:REJA OFFICE-Water Heating 1 [ ] 1. Heat traps in inlet/outlet fittings [ ]: 2. 1/2-in.insulation on 8 ft of inlet/outlet piping if no integral heat traps Generic Requirements: Must be met by all systems to which the requirement is applicable [ ] 1. Load calculations per 1907 ASHRAE Fundamentals [ ] 2. Plant equipment and system capacity no greater than needed to meet loads -Exception:Standby equipment automatically off when primary system is operating -Exception:Multiple'unit"s controlled to sequence operation as a function of load [ ] 3. Minimum one temperature control device per system [ ] 4. Minimum one humidity control device per installed huniidification/dehumidification system [ ] 5. Thermostatic controls must have 5 deg.F deadband -Exception:Thermostats requiring manual changeover between heating and cooling [ ] 6. Automatic Controls: Setback to 55 deg.F(heat)and 85 deg.F(cool);7-day clock,2-hour occupant override, 10-hour backup -Exception:Continuously operating zones -Exception:2 kW demand or less,submit calculations [.] 7. Automatic shut-off dampers on exhaust systems and.supply systems with airflow>3,000 cfm [ ] 8. Outside-air source for ventilation;,system capable of reducing OSA to required minimum [ ] 9. R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly -Exception:Ducts located within equipment -Exception:Ducts with interior and exterior temperature difference not exceeding 15 deg.F. [.] 10. Ducts sealed-longitudinal seams on rigid ducts;transverse seams on all ducts;UL I81A or 181B tapes and mastics [ ] 11. Mechanical fasteners and sealants used to connect ducts and air distribution equipment [ ] 12. Hot water pipe insulation: 1 in.for pipes<=1.5 in.and 2 in.for pipes>1.5 in. Chilled water/refrigerant/brine pipe insulation: 1 in..for pipes<=1.5,in.and 1.5 in.for pipes>1.5 in. Steam pipe insulation: 1.5 in.for pipes<=1.5 in.and 3 in.for pipes >1.5 in. -Exception:Piping within-HVAC equipment -Exception:Fluid temperatures between 55 and 105 deg.F -Exception:Fluid not heated or cooled -Exception:Runouts<4 ft in length [ ] 13. Operation and maintenance manual provided to building owner [ ] 14. Balancing devices provided in accordance with 603.15 of Mechanical Code for New York State [ ] 15. Newly purchased service water heating equipment will meet the efficiency requirements [ ] 16. Water heater temperature controls: 110 deg.F for dwelling units or 90 deg.F for other occupancies [ ] 17. Gravity dampers,stair and elevator shaft vents equipped with motorized dampers ] 18. Exhaust air heat recovery required for systems 5,000 cfm or greater with more than 70%outside air fraction or specifically exempted [ ] 19. Kitchen hoods>5,000 cfm provided with 50%makeup air that is uncooled and heated to no more than 60 deg.F unless specifically exempted [ ] 20. Buildings with frame hood systems must have variable air volume hood design,exhaust heat recovery,or seprate'makeup air supply meeting the following: a)75%make up air quantity,and/or b)within 2°F of room temperature and/or c)no humidification d)no simultaneous heating and cooling Section 5:'Compliance Statement The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the New York State Energy Conservation Construction Code requirements in COMcheck-EZ Version 2.4 Release L The design professional shall provide to the code enforcement official a written certification that the required HVAC tests,system balancing,etc.,have been performed and the system is operating as designed. The design professional shall retain copies of the test reports to be provided to the code enforcement official,if requested. When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of his/her knowledge,belief,and professional judgment,such plans or specifications are in compliance with this Code. «� J�c45 ll-t S`-oz. Principal Mechanical Designer-Name Signature Date Mechanical Requirements Description New York State Energy Conservation Construction Code COMcheck EZ Software Version 2.4 Release 1 Data filename:•P:\01 -Projects\2002\0203\Energy Code\0202=Mountain View Commons.cck The following list provides more detailed description of the requirements in Section 4 of the Mechancal Compliance Requirements Specific.To:Bank-HVAC Unit#3 1. The specified heating equipment is covered by Federal minimum efficiency requirements.New equipment of this type can be assumed to meet or exceed New York State Energy Conservation Code requirements for equipment efficiency. 2. The specified heating and/or cooling equipment is covered by New York State Energy Conservation Code and must meet the following minimum efficiency: Split System: 10.0 SEER Requirements Specific To:REJA Office-HVAC Unit#1 1. The specified heating equipment is covered by Federal minimum efficiency requirements.New equipment of this type can be assumed to meet or exceed New York State Energy Conservation Code requirements for equipment efficiency. 2. The specified heating and/or cooling equipment is covered by New York State Energy Conservation Code and must meet the following minimum efficiency: Split System: 10.0 SEER Requirements Specific To:REJA Office-HVAC Unit#2 1. The specified heating equipment is covered by Federal minimum efficiency requirements.New equipment of this type can be assumed to meet or exceed New York State Energy Conservation Code requirements for equipment efficiency. 2. The specified heating and/or cooling equipment is covered by New York State Energy Conservation Code and must meet the following minimum efficiency: Split System: 10.0 SEER Requirements Specific To:BANK-Water Heating 2 1. Heat traps are required on noncirculating water heating systems on both inlet and outlet connections. Heat traps may be purchased or field-fabricated by creating a loop or inverted U-shaped arrangement on the inlet and outlet pipes. 2. Pipe insulation for the specified noncirculatuig service hot water system is required for all piping in the following categories:a)the first 8 ft of outlet piping from any constant-temperature,noncirculating storage systemb)the inlet piping between the storage tank and a heat trap in a noncirculating storage systemPipe insulation must be at least 1/2 in.and have a conductivity no>0.28 Btu-W(h•ft2•°F). Requirements Specific To:REJA OFFICE-Water Heating 1 1. Heat traps are required on noncirculating water heating systems on both inlet and outlet connections. Heat traps may be purchased or field-fabricated by creating a loop or inverted U-shaped arrangement on the inlet and outlet pipes. 2. Pipe insulation for the specified noncirculating service hot water system is required for all piping in the following categories:a)the first 8 ft of outlet piping from any constant-temperature,noncirculating storage systemb)the inlet piping between the storage tank and a heat trap in a noncirculating storage systemPipe . insulation must be at least 1/2 in.and have a conductivity no>0.28 Btu-in/(h-ft2-°F). Generic Requirements: Must be met by all systems to,which the requirement is applicable 1. Design heating and cooling loads for the building must be determined using procedures equivalent to those in Chapters 27 and 28 of the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure. 2. All equipment and systems must be sized to be,no greater than needed to meet calculated loads. A single piece of equipment providing both heating and cooling must satisfy this provision for one function with the capacity for the other function as small as possible,within available equipment options. -Exception: The equipment and/or system capacity may be greater than calculated loads for standby purposes.Standby equipment must be automatically controlled to be off when the primary equipment and/or system is operating. -Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated load are allowed if they are provided with controls to sequence operation of the units as the load increases or decreases. 3. Each heating or cooling system serving a single zone must have its own temperature control device. 4. Each humidification system must have its own humidity control device. 5. Thermostats controlling both heating and cooling must be capable of maintaining a 5 degree F deadband(a range of temperature where no heating or cooling is provided). Exception: Deadband capability is not required if the thermostat does not have automatic changeover capability between heating and cooling. 6. The system or zone control must be a programmable thermostat or other automatic control meeting the following criteria:a) capable of setting back temperature to 55 degree F during heating and setting up to 85 degree F during coolingb) capable of automatically setting back or shutting down systems during unoccupied hours using 7 different day schedulesc) have an accessible 2-hour occupant overrided) have a battery back-up capable of maintaining programmed settings for at least 10 hours without power. -Exception:A setback or shutoff control is not required on thermostats that control systems serving areas that operate continuously. -Exception: A setback or shutoff control is not required on systems with total energy demand of 2 kW (6,826 Btu/h)or less. 7. Outdoor-air supply systems with design airflow rates>3,000 cfxn of outdoor air and all exhaust systems must have dampers that are automatically closed while the equipment is not operating. 8. The system must supply outside ventilation air'as required by Chapter 4 of the Mechanical Code for New York State.If the ventilation system is designed to supply outdoor-air quantities exceeding minimum required levels, the system must be capable of reducing outdoor-air flow to the minimum required levels. 9. Air ducts must be insulated to the following levels:a) Supply and return air ducts for conditioned air located in unconditioned spaces(spaces neither heated nor cooled)must be insulated with a minimum of R-5. Unconditioned spaces include attics,crawl spaces,unheated basements,and unheated garages.b) Supply and return air ducts and plenums must.be insulated to a minimum of R 8 when located outside the building.c) When ducts are located within exterior components(e.g.,floors or roofs),minimum R-8 insulation is required only between the duct and the building exterior. -Exception:-Duct insulation is not required on ducts located within equipment. -Exception: Duct insulation is not required when the design temperature difference between the interior and exterior of the duct or plenum does not.exceed 15 degree F. 10. All joints,longitudinal and transverse seams,and connections in ductwork must be securely sealed using weldments;,mechanical fasteners with seals,gaskets,or mastics;mesh and mastic sealing systems;or tapes. Tapes and mastics must be listed and labeled in accordance with UL 181A or UL 18113. 11. Mechanical fasteners and seals,mastics,or gaskets must be used when connecting ducts to fans and other air distribution equipment,including multiple-zone terminal units. 12. All pipes serving space-conditioning systems must be insulated as follows: Hot water piping for heating systems: 1 in.for pipes<=1 1/2-in.nominal diameter 2 in.for pipes>1 1/2-in.nominal diameter. Chilled water,refrigerant,and brine piping systems- 1 in.insulation for pipes<=1 1/2-in.nominal diameter 1 1/2 in.insulation for pipes>1 1/2-in.nominal diameter. Steam piping: 1 1/2 in,insulation for pipes<=1 1/2-in.nominal diameter 3 in.insulation for pipes>1 1/2-in.nominal diameter. -Exception: Pipe insulation is not required for factory-installed piping within HVAC equipment. -Exception: Pipe insulation is not required for piping that conveys fluids having a design operating temperature range between 55 degrees F and 105 degrees F. -Exception: Pipe insulation is not required for piping that conveys fluids that have not been heated or cooled through the use of fossil fuels or electric power. -Exception: Pipe insulation is not required for runout piping not exceeding 4 ft in length and 1 in.in diameter between the control valve and HVAC coil. 13. Operation and maintenance documentation must be provided to the owner that includes at least the following information:a) equipment capacity(input and output)and required maintenance actionsb) equipment operation and maintenance manualsc) HVAC system control maintenance and calibration information,including wiring diagrams,schematics,and control sequence descriptions;desired or field-determined set points must be permanently recorded on control drawings,at control devices,or,for digital control systems,in programming commentsd) complete narrative of how each system is intended to operate. 14. Each supply air outlet or diffuser and each zone terminal device(such as VAV or mixing box)must have its own balancing device.Acceptable balancing devices include adjustable dampers located within the ductwork, terminal devices,and supply air diffusers. 15. Service water heating equipment must meet minimum Federal efficiency requirements included in the National Appliance Energy Conservation Act and the Energy Policy Act of 1992,which meet or exceed New York State Energy Conservation Code. New service water heating equipment can be assumed to meet these requirements. 16. Water-heating equipment must be provided with controls that allow the user to set the water temperature to 110 OF for dwelling units and 90 OF for other occupancies.Controls must limit output temperatures of lavatories in public facility restrooms to 110 OF. 17. Stair and elevator shaft vents must be equipped with motorized dampers capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. An gravity outdoor air supply and exhaust hoods,vents,and ventilators must be equipped with motorized dampers that will automatically shut when the spaces served are not in use. Exceptions: -Gravity(non-motorized)dampers are acceptable in buildings less than three stories in height above grade. . -Ventilation systems serving unconditioned spaces. 18. individual fan systems with a design supply air capacity.of 5000 cfm or greater and minimum outside air supply of 70%or greater of the supply air capacity must have an energy recovery system with at least a 50% effectiveness: Exceptions: -Systems serving spaces that are not cooled and heated to<60 OF. -Commercial kitchen hoods.(grease)classified as Type 1 by NFPA 96 -Systems exhausting toxic,flammable,paint,or corrosive fumes or dust. If an air economizer is also required,heat recovery must be bypassed or controlled to permit*air economizer operation. 19. Individual kitchen exhaust hoods larger than 5000 cfrn must be provided with make-up air sized for at least 50%of exhaust air volume that is uncooled and either unheated or heated to no more than 60 OF Exceptions: -Where hoods are used to exhaust ventilation air that would otherwise exfiltrate or be exhausted by other fan systems. -Certified grease extractor hoods that require a face velocity no>60 fpm. 20. Buildings with flume hood systems having.a total exhaust rate>15,000 cfnx must either have variable air volume hood design,exhaust air heat recovery,or separate make up air supply. i• T7cRECEI VE® yu� DRAFT COPY NOV O 2002 (7/29/02) TOWN OF QUEENSf3URY BUILDIfVO��fD CODE CHECKLIST NYS BUILDING CODE (BC) Building:, NYS,FIRE CODE (FC),NYS PLUMBING CODE (PC) Location: 3�j . A)"At, So k Z NYS MECHANICAL CODE (MC) NYS FUEL GAS CODE (FGC) Date: NYS ENERGY CODE (ECC) Reviewer: Publication Date: May 2002 COMMERCIAL& MULTIPLE DWELLING OCCUPANCIES No. Topic Code Page Required Actual Section No. or Allowed 1 Jurisdiction BC-101.2 1 t . 2 Floodplain_ BC-1603.1;6 '285 3 Occupancy BC-302 17 ' 4 Type of Construction BC-Table 601 81 5%3 5 No.-of Sleeping Units/Level BC-202 14 & �� No. of Units—Total 31 No. of Occupants BC=Table 1003.2.2.2 201 6 ' Atriums BC-404 37 7 Basement Definition BC-502.1 71 8 Heights & Building Areas Maximum Tabular Area BC-Table 503 7.2 � Maximum Tabular Height BC-Table 503 72 Maximum Aggregate Area BC-503.3 73 (Max.Tab. Area x 3) Legend: NR= Not Required NS = Nat Shown NA= Not Applicable NOTE: SPACE FOR NOTES ON LAST PAGE JAM Page 1 of 6 No. Topic Code Page , Required Actual Section No. or Allowed 9. , Sprinkler System BC-903 168. Basement Sprinkler BC-903.2.10.1 170 Water Source, BC-903.3.5 172 10 Frontage&'Sprinkler BC-506 74 1A Area Modifications (6610 11 Distance Separation BC-Table 602 82 12. Fire Rated Construction Incidental Use Areas BC-Table 302.1.1 17 Mixed Occupancy BC-Table 302.3.3 19 Fire Walls BC-705 89 Fire Barrier BC-706 91 Shaft Enclosure BC-707 92 Fire Partition (Tenant Sep.) . BC-708 �edllakl 95 Smoke Barriers BC-709 96 Opening protectives BC Table 714.2 101 Fire Blocking BC-716 107, Draft Stopping BC-716.3 108 2�e ;4. . 3 4'r 13 Space Min. Rm. Dimensions BC-1207.1 251 -7/ I Min. Ceiling Height BC-1207.2 251' BC-1202.1 249 14 Ventilation (Net. or Mech..) Aeu 1 4,r, 15 Light(Net. or Mech.) BC-1204.1 250 0 16 Exits < ne Exit Permitted. BC Table1005.2.2 224 Emergency Egress BC-1 009.1 - 235 Distance of Travel BC-Table 1004.2.4 220 7r Corridor Wall Fire Rating BC-Table1004.3.2.1 222 Corridor Width BC71004.3.2.2 221 Door Width BC-1003.8.1.1 208 66 Door Swing BC-1 003,.3.1.2 208 C) Panic Hardware BC-1 003.3.1.9 213 Dead End Corridors BC-1 004.3.2.3 222 JAM Page 2 of 6 No. Topic Code Page Required Actual Section No. or Allowed 17 Stairs Riser BC-1003.3.3.3 213 7 Tread BC-1003.3.3.3 213 11 Width BC-1003.3.3.1 213 Headroom BC=1003.3.3.2 213 Vertical Rise BC-1003.3,3.E 215 Handrails BC-1003.3.3.11 215 18 Structural Snow Loading---Ground BC Fig .1608.2 296 Snow Loading---Roof-(calc.) ASCE 7-98 Drifting Snow BC-1608.7 295 , Ponding BC-1608.3.5 295 ' Floor Loading BC Table 1607.1 291 Balcony Loading BC-Table 1607.1 291 Wind Loading BC-1609 297 Seismic Loading (calc.) BC-1614 315 Foundation Depth BC-1805.2 398 .— -19 Interior Finishes BC-Table 803.4 161 j d.S C rss . . 20 Exterior Wall Coverings BCTable 1405.2 1257 Exterior Finishes BC Table 1406.2 261 Combustible 21 Swimming Pools BC-3109 629 22 Sun Rooms. BC Appendix 1 693 23 Electrical Exit'Lights or Signs BC-1003.2.10 203 Emergency Lights BC-1003.2.11.2 204 -Ok Emergency Power BC-2702 611 24 HC ACCESS Exempt Buildings BC-1104.4 238 Parking BC-Table 1106.1 239 Route BC-1104.1 238 Entrance BC-1105.1 239 #of Sleeping Rooms BC-Table-1107.6.1.1 241 #of Dwelling Units BC-1107.6.2 241 Toilet Facilities BC-1109.2 . 244 Ok . Service Counters BC-1109.12.3 246 Supplemental HC Req'mts [Appendix E 681 JAM Page 3 of 6 No Topic Code Page: Required Actual Section No. or Allowed 25 Fire Protection Equipment f Sprinkler Systems FC-903 55 Extingushing Syst. FC-904 . 59 Standpipe Systems FC-905 62 Fire Extingushers FC-906 64 Fire Alarm Systems FC-907 65 Smoke Detection FC-907 65 Hi-Rise Fire"Safety FC-907.2.12 69 .Visible Alarms FC-Table 907.10.1.2 73 ' Smoke Control . FC-909 75 Smoke Vents FC-910' 82 Fire Pumps FC-91.3 85 Kitchen Hood Extinguisher FC-609.8 41 26 Plumbing Code Fixture Count PC-Table 403.1 21 611C Water Supply Service Pipe Size PC-603'. 33 Fixture,Pipe Size PC7603.1 33 Pipe Material 'PC-Tapie 605.4 $6 , Labor Law Art. 10-A UFPBC-904.6 12,340 Pipe Insulation See Energy Code -Lawn Irrigation PC-608.16.5 44 Pipe Freezing PC-305.6 14 Sanitary Drainage 54 Drain-Pipe Size PC-Table 709.1 47 ` Drain Pipe Material PC402 63 Vent Size PC-Table 910:4 17 Pipe Hangers PC-Table 308.5 67 Air Admittance Valves PC-917 r E/r1�K JAM Page 4 of 6 No Topic, Code Page Required Actual Section No. or Allowed 27 Mechanical Code. Ventilation Rates MC-Table 403.3 24 Propane Below Grade MC-502.8.10.1 31 Dryer Exhaust MC-504 33 Kitchen Exhaust MC-506 34 Kitchen Hoods MC-507 37 Kitchen Make-Up Air MC-508 '39 Chimney Terminationi MC-Table 511.2 41 Air Plenums MC-602' 47 . Fire & Smoke Dampers MC-607.5.1 52 Combustion Air MC-701. 55 Confined Spaces—Def.. MC-202 5 28 Fuel Gas Cade Appliance Location FGC-303 18 Combustion Air FGC-304 19 Clearance to Combust. FGC-Table 308.2 25 Pipe Material FGC-403 46 Shut Off Valves FGC-409 53 Chimney Termiinatiop FGC-Fig. 503.5.4 63 Gas Vent Termination FGC-Fig. 503.6.6 65 .Exit Terminal Location FGC-503.8 68 Clothes Dryer Exhaust FGC-613 96 Unvented Room Heaters FGC-620 99. 29 Energy Code C.�m a4ez - Prescriptive Method ECCC=Table 602.1(1)- 50 High Truss Credit ECCC-602.1.2 51 t Pipe Insulation—Heating ECCC-Table 503.3.3.1 44 Duct Insulation—Heating ECCC-Table 503.3.3.3- 45 Pipe lnsulation=Hat Water ECCC-Table 504.2 .47 HWH Heat Trap ECCC-504.7 47 MECcheck Computer Software Compliance Report Required JAM Page 5 of 6 COMMONWEALTH ELECTRICAL INSPECTION SERVICE, INCO Main Office 176 Doc Run Road - Manheim, PA 114 MUNICIPAL CERTIFICATE - ELECTRICAL APPROVAL Cut-in Card No,Pemit Not lffffllullluff/}f}}}}f}f#}}u}}f#NI#*��+•# 80267 Owner,,,,,,,too#ffiffif Mfffff}fflff To ffNfffffffff##fliflll iif}ififffff fif#ffif}fff iff4ifflNf}{{{If4flffffiff/f1Yff1}fl}If}Iff fiflNH Ito lfl/1f}ffflf{.}Naafi..lff HfflH R a / LocationIlia iffff fsM# fffffff • #f#fffff#ff f111f11II/#}III##If1111#If{ff#ff#tf{f#alu!{ff�fflffflwll!#1{Ilfff sofa.#. ffeflfll Nllfffff.ffffrlfll#flfNa## Installation ConsistingI of,,,,,, afff#ff#}{#II r�k fI111#46111af I101t ofiafll7lf.ffffff•fif##ffffff. tll1q4 /Z fffffllfl/ lfflff.f.f.#.ffstaf111f11111ffff#1 lfff uff fff11l11fff.ff# Ifl}p11IIfaH#1#fn#flffflfl Iff I#46441006 # # ####$aof1#$#*####}#llfHlll NI 1 all aprl!}} 19#1uf}}}I}I1fft##Iff#ff11l1 11{Nf#Ifq#}!}•1 adR, iiI1 ]]rr #11# ifffilf#!#f111lNif#fff##ffl111#!fl#affilfffll!# #if f f#11#if.1fffffl#!f##f{#if#ff logo flff{#ffiflf•fait.ffflf##ff#//fI}flNii###f#fllfffllff ii#IHi! No. Installed By#fffff a ff}fl#ff # ###11 #f !.f at. f##{#ff#/#llf#1 f##Nlsfs.#.u#fas!#af..f.u.!#f!Li } The conditions following governed the issuance of this certificate, and any certificate previously issued i, cancelled. - This certificate only covers the electrical equipment and installation conditions as of date, Upon th{ introduction of additional equipment or alterations, application shall be promptly made for inspection. Inspectors of this Company shall have the privilege of making ' sp coons at any time, and if it rules are Violated, the Company shall have the right to v ke this c te. le 0 �0044111 sells late!#ffufu{f1flllfllfffnfuufl/##fHiIIIINsa#1!1 INSPECTOR #lall#fiH.w#!#Ilf1##f#af#H#ff#fflif#!f#fff#ff##1.111If#ff.fffflq#ff/4ffallf/af#}Iff11#f Member USA,I.A.E.If Commercial Final Inspection Report Office No.: (518) 761-8256 Date Inspection requ rec Z�r f Queensbury Building&Code Enforcement Arrive: ` ° a ' Depart: �' 742 Bay Road,Queensbury,NY 12804 Inspector's Initi s: NAME: U-" PERMI #: LOCATION: ��-� d11/f�'f`t;���'� DATE: J C3 COMMENTS: Y N NA Chimney/"B"Vent/Direct Vent Location Plumbing Vent Through Roof 6"/Roof Complete � •r�� � Exterior Finish Grade Complete 6"in 10' or Equivalent Interior/Exterior Guardrails 42 in. Platform/Decks Interior/Exterior Ballisters 4 in. Spacing Platform/Decks Stair Handrail 34 in.—38 in./Step Risers 7"[Treads 11" Vestibules For Exit doors>3000 sq. ft. All Doors 36 in.w/Lever Handles/Panic Hardware,if required Exits At Grade Or Platform 36(w)x 44"(1)/Canopy or Equiv. Gas Valve Shut-off Exposed&Regulator I8" Above Grade Floor Bathroom/Watertight/Other Floors Oka Relief Valve,Heat Trap/Water Temp. 110 Degrees Maximum Boiler/Furnace Enclosure 1 hr. or Fire Extinguishing System Fresh Air Supply for Occupancy/Ventilation Combustion Low Water Shut Off For Boilers Gas Furnace Shut Off Within 30 ft. or Within Line Of Site Oil Furnace Shut Off at Entrance to Furnace Area Stockroom/Storage/Receiving/Shipping Room(2 hr.), 1 f2 doors > 10%> 1000 s .ft. 3/4 Hour Corridor Doors &Closers Firewalls/Fire Separation,2 Hour, 3 Hour Complete/Fire Dampers/Fire Doors Ceiling Fire Stopping, 3,000 s . ft. Wood Frame Attic Access 30"x 20"x 30"(h), Crawl Space Access 18"x 24" Smoke Vents Or Fan, if required Elevator Operation and Si a e/Shaft Sealed Handicapped Bathroom Grab Bars/Sinks/Toilets Handicapped Bath/Parking Lot Si na e Public Toilet Room Handicapped Accessible Handicapped Service Counters, 34 in., Checkout 36" v74- Handicapped Ram /Handrails Continuous/12 in. Beyond Active Listening System and Signage Assembly Space Final Electrical Site Plan/Variance required Final Survey,New Structure/Flood Plain certification,if req. As-built Septic System Layout Required or On File --A/— Building Number or Tenant Address on Building or Driveway Water Fountain or Cooler Building Access All Sides by 20' /Driveable Surface 20' wide Okay To Issue Temp. or Permanent C/O Okay To Issue C/C Last printed 6/3/2003 9:27 AML:\PamW\Building&Codes\Commercial Final Inspection Report.doc Town of Queensbury Fire Marshal's Office 742 Bay Road Queensbury, NY 12804 Phone(518)761-8205 Fax(518) 74 5-4437 Fire Marshal's Inspection Report Request SCHEDULE Received Re rmit#: oa- INSPECTION -7 Nam A=61A e,� e q AM, PM ANYTIME Location: APPROVED N/A YES NO COMMENTS EXITS AISLE WIDTHS EXIT SIGNS-NORMAL BATTERY EMERGENCY LIGHTING FIRE EXTINGUISHERS FIRE ALARM SYSTEM OX, FIRE SPRINKLER SYSTEM FIRE SUPPRESSION SYSTEM-- .4 R HOOD INSTALLATION INTERIOR FINISHES STORAGE COMPRESSED GAS CLEARANCE TO SPRINKLERS CLEARANCE TO HEATING UNITS A/ CLEARANCE TO ELECTRICAL 00 0 AJ REQUIRED SIGNAGE EMERGENCY PLAN MAXIMUM OCCUPANCY SIGN CHIMNEY MASONRY ROUGHIN FINAL Pt !lf � CHIMNEY FACTORY BUILT ROUGH IN Ulf 14� FINAL WOOD \�o 0 STOVE' ROUGH IN FINAL VENTED GAS f� n 1 �Tllt� 0 APPLIANCE ROUGH IN FINAL jo MF FIREPLACE MASONRY ROUGH IN VOK THIS DATE ..0 . OR 0 CST OK FINAL FIREPLACE . -- I - ✓ — FACTORY BUILT ROUGH IN INSPECTE BY FINAL coMDEvicHRISiAVORDILETTERS200I/FIREMARSHALINSPECTIONREPORT11022001 WHITE-BUILDING DEPARTMENT COPY YELLOW-OCCUPANT COPY Commercial Final Inspection Report Off-ice No.: (518) 761-8256 ]Date Inspection reque Queensbury Building 8.-- Code Enforcement Arrive: a be p 742 Bay Road, Queensbury, N-Y 12804 Inspector's Initial -,NAME: PERM LOCATION: DATE-I-OCA IDA V NA, Chimney / "B" Vent Direct Vent Location Plumbing Vent Through Roof 6" / ]Roof Coniplete ri Exteor Finish Grade Complete 6" in 10' or Equivalent Interior/ Exterior Guardrails 42 in. Platform/ necks 4 Interior/ Exterior Ballisters 4 in. Spacing Platform/Decks Stair Handrail 34 in- — 38 in. / Step Risers 7" / Treads 11 Vestibules For Exit doors > 3000 sq. ft. All Doors 36 in. w/lLever Handles/ Panic Hardware, if re�quired Exits At Grade Or Platform 36 (w) x 44" (1)/Canopy or Rquiv. Gas Valve Shut-off Exposed 8r- P-egulator (18") Above Grade Floor Bathroom Water-tight/ Other Floors C31kay ]Relief Valve, Meat Trap /Water Temp. 110 ]Degrees Maximum Boiler/Furnace Enclosure I hr. or Fire Extinguishing System Fresh Air Supply for Occupancy/ Ventilation Combustion Low Water Shut Off For Boilers % Gas Furnace Shut Off Within 30 ft. or Within Line Of Site Oil Furnace Shut Off at Entrance to Furnace Area Stockroom/Storage/Receiving/Shipping Room(2 hr.), I '/� doors 10% > 1000 sq. ft. 3X4 Hour Corridor ]Doors &- Closers Firewalls I Fire Separation, 2 Hour, 3 Hour Complete/Fire nampers I Fire Doors Ceiling Fire Stopping, 3,000 sq. ft. Wood Frame Attic Access 30" x 20" x 30" (h), Crawl Space Access 18" x 24" Smoke Vents Or Fan, if required Elevator Operation and Signage / Shaft Sealed Handicapped Bathroom Grab Bars / Sinks /Toilets Handicapped Bath/ Parkin 'Lot Signage Public Toilet Room Handicapped Accessible Handicapped Service Counters, 34 in., Checkout 6" Handicapped Pamp / Handrails Continuous/12 in/IE3eyond Active Li stening System and Signage -Nssernb/Space an al Electrical VX Site Plan/Variance required NZ 04 Final Survey, New-Structure / Flood Plain 4/ertification, if req. As-built Septic Systern Layout acquired or On File Building Number or Tenant Address on Building or nriveway N tz� 'r � Water Fountain or Cooler 41, tl;> — Building Access All Sides by 20' /Driveable Surface 20' wide - Okay To Issue -rernp. or Permanent C/4D Okay To Issue C/C T-asit printed 6/3/2003 9-*27 AMr,:\3PaxiaW\13,Lxi1dirxg 8r, C,acles\0orrirrxercial Final Izinpe--ctia3m Town of Queensbury -3 Fire Marshal'sOffice 742 Bay Road :7 Queensbury, NY 12804 Phone (518)761-8205 Fax(518) 745-4437 Fire Marshal's Intpection Report Request / �-l� SCHEDULE -Q3 Received: Permit# 7(-j INSPECTION ON: Name: CAN r, 't 0 0- AM PM ANYTIME ,2 Location: APPROVED N/A YES NO COMMENTS EXITS oomp— AISLE WIDTHS X- - *167K;'r 516 tj t EXIT SIGNS-NORMAL x - BATTERY -c, k EMERGENCY LIGHTING /ovT\ wo (Kt�j - - CAI wtdk FIRE EXTINGUISHERS FIRE ALARM SYSTEM FIRE SPRINKLER SYSTEM FIRE SUPPRESSION SYSTEM HOOD INSTALLATION tw �"`}�'-j�.+1 INTERIOR FINISHES STORAGE COMPRESSED GAS x (A CLEARANCE TO SPRINKLERS CLEARANCE TO HEATING UNITS CLEARANCE TO ELECTRICAL x REQUIRED SIGNAGE EMERGENCY PLAN 61���( MAXIMUM OCCUPANCY SlGff— CHIMNEY WA MASONRY ROUGHIN V -- 7 FINAL C CHIMNEY T05-C FACTORY BUILT ROUGH IN +1 . FINAL WOOD STOVE ROUGHIN FINAL VENTED GAS APPLIANCE ROUGH IN 256 Uj f Jul 1 C C i� FINAL FIREPLACE CRtl 0 MASONRY ROUGH I---- N OKT Tl� ATE -nK FO NOT OK FINAL FIREPLACE FACTORY BUILT ROUGHIN I SPECTED BY/ FINAL COMDEV/CHRISJIWORDILETTERS20011FIREMARSHALINSPECTIONREPORT11022001 WHITE-BUILDING DEPARTMENT COPY YELLOW-OCCUPANT COPY 'Cad Rough Plumbing /Insulation Inspection Report Office No, (518)761-8256 Date Inspection request d• — Queensbury Building&Code Enforcement Arrive;:—a De x am/pm 742 Bay Road,Queensbury,NY 12804 Inspector's Initial NAME: 6e/dkkl� PERMIT#: LOCATION: AVIATION 19b INSPECT ON: TYPE OF STRUCTURE: _:F) Y N N/A PVC: R-1,R-2,R-3,R-4 Drain Vents Cast Iron,Copper Drain/Vent Comm. Plumbing Vent Vents in Place Rough Plumbing Nail Plates Head or Air Supply Test Dfain and Vents 5 PSI or 10 ft..above highest Connection for 15 minutes Water Supply Piping Copper Commercial Copper,CPVC,Pex One&Two EMil� Insulation/Residential Check/CC ercial Ch�e ba P� Cl Proper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct Work Sealed Properly t/I I � COMMENTS: :L:\SucHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc January 28,2003 Rough Plumbing/ Insulation Inspection Report KI Office No. (518) 761-8256 Date Inspection reel feceiv d. /�-3 Queensbury Building&Code Enforcement Arrive:_ ij.,La `p e a = a 742 Bay Road, Queensbury,NY 12804 Inspector's Initial NAME: -- P PERMIT#: LOCATION: a INSPECT ON: 44MOO TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2,R-3,R-4 Drain/Vents Cast iron, Copper Drain/Vent/Comm. Plumbing Vent/Vents in Place ` Rough Plumbing/Nail Plates Head.or Air Supply Test Drain and Vents 5 PST or 10 ft. above highest Connection for 15 minutes Water Supply Piping Copper Commercial Copper,CPVC,Pex One&Two Family Insulation/Residential Check/Commercial Check Proper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct Work;Sealed Properly COMMENTS: LaSueHemingway\Building.Codes.Inspection.FORMSIRough Plumbing Insulation.Report.doe January 28,2003 Rough Plumbing Insulation Inspection Rdport Office No. (518)761-8256 Date Inspection reque e iv d. Queensbury Building&Code Enforcement Arrive' 77- iD a In D art:_7L an - 742 Bay Road, Queensbury,NY 12804 Inspector's Initial . NAME: PERMIT#: z9oz=7 fi 0 LOCATION: 74 INSPECT ON: Ll —5z TYPE OF STRUCTURE: t Y N N/A PVC: R-1,R-2,R-3,R-4 Drain Vents Cast Iron Copper rain Vent Comm. Plumbing Vent Vents in Place ough Plumbing/Nail Plates Head or Air Supply Test k-) Dfain and Vents 5 PSI or 10 ft. above highest Connection for 15 minutes Water Supply Piping Xopper, CPVC,Pex One&Two Family -Insulation/Residential Check/Commercial Check Proper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct Work Sealed Properly............... 70 R4 COINMENTS: ,LaSueHeming%vay\Building.Codes.Inspection.FORMS\Rough Pluffibing Insulation Report.doc January 28,2003 Rough Plumbing/ Insulation Inspection Report Office No. (518) 761-8256 Date Inspection reques ce* d: Queensbury Building&Code Enforcement Arrive: a m e M: 742 Bay Road, Queensbury,NY 12804 Inspector's Initi s- NAME: 6C M(lC14TV= PERMIT#: -7 LOCATION: os) B-xx o ,-�en INSPECT ON: TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2,R-3,R-4 Drain Vents Cast Iron,Copper Drain/Vent Comm. Plumbing Vent/Vents in Place Rough Plumbing/Nail Plates Head or Air Supply Test Drain and Vents 5 PSI or 10 ft. above highest Connection for 15 minutes Water Supply Piping Copper Commercial r\t� Copper, CPVC,Pex One&Two Family /Insulation/Residential Check/Commercial Check Proper Vent,Attic Vent f Duct/Hot Water Piping Insulation If required unheated spaces --V-.,,1A V— Combustion Air Supply for Furnace Duct Work Sealed Properly CONEVIENTS: L:\Pamw\whiting\Rough Plumbing Insulation Report.doc Rough Plumbing / Insulation Inspection Report Office No. (518)761-8256 Date Inspection req st Quee'nsbury Building&Code Enforcement Arrive: pm rt: r a 742 Bay Road,Queensbury,NY 12804 Inspector's Initial NAME: PERMIT#: LOCATION: INSPECT ON: TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2,R-3,R-4 Drain Vents Cast Iron,Copper Drain/Vent Comm. Plumbing Vent Vents in Place Rough Plumbing/Nail Plates Head or Air Supply Test Drain and Vents 5 PSI or 10 ft. above highest Connection for 15 minutes Water Supply Piping Copper Commercial C <er, CPVC,Pex One&Two Family Al Lagulation/Residential Check/Commercial Check Proper Vent,Attie Vent Duct/Hot Water Piping Insulation If required unheated spaces fl Combustion Air Supply for Furnace Duct Work Sealed Properly COAEAENTS: ,L.-\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doo January 28,2003 Rough Plumbing 1 Insulation Inspection Report 1.2, Office No. (518)761-8256 Date Inspection reques eive Queensbury Building&Code Enforcement Arrive: a in D a a pm pm 742 Bay Road,Queensbury,NY 12804 Inspector's Initial NAME: PERMIT#: -97 CQ LOCATION: S rv2 t INSPECT ON: � - TYPE OF STRUCTURE: N N/A PVC: R-1,R-2,R-3,R-4 Drain Vents Cast Iron,Copper Drain]Vent/Comm. Plumbing Vent Vents in Place Rough Plumbing/Nail Plates Head or Air Supply Test Dfain and Vents 5 PSI or 10 ft. above highest Connection for 15 minutes Water Supply Piping Copper Commercial Copper,CPVC,Pex One&Two Family Insulation/Residential Check/Commercial Check oper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct Work Sealed Properly COMMENTS: -L:\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc January 28,2003 Framing / Firestopping 12peF16)JeApp ?b!�� Office No. (518) 761-8256 Date Inspection request receive, Queensbury Building& Code Enforcement Arrive: a a 742 Bay Road, Queensbury, NY 12804 Inspector's Init' s- NAME: PERMIT#: C)d,-97,V LOCATION: INSPECT ON: TYPE OF STRUCTURE Y N N/A Framing COMMENTS Jack Studs Headers Bracing Bridging Joist hangers /ONENTS Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in._or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate I V2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1,2,3 hour Fire wa 2, 3, 4 hour fl5restopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side V2inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\Suel-lemin-way\Btiilding.Codes.Iiispection.FOR.MS\Framing Firestopping Inspection Rcport.doc January 28,2003 Framing Firestopping Inspection a Office No. (518) 761-8256 Date Inspection e e eive . Queensbury Building.&Code Enforcement Arrive: a m D a� 742 Bay Road, Queensbury,'NY 12804 Inspector's Initi NAME: PERMIT#: -7q LOCATION: INSPECT ON: .TYPE OF STRUCTURE: Y: N : N/A aming COMMENTS _ .- Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts f_Main Beams -11 C-C L rzot� • Exterior sheeting nailed properly - 12"OC: Headroom6;ft. 8 in. , Stairwells 36 in. or-more Headroom 6.ft. 8 in. Notches)Holes t Bearing Walls Metal Strapping for Notches Top Plate . 1 %2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses ' J Anchor Bolts-6 ft.or less on center Ice and snow shield 24 inches from wall Fire separation 1,.2,-3 hour Fire wall 2, 3,4 hour Firestopping • ""��--�"a� -R- tat? '�"P-�P_�`� .G�1`ti.,.�ti��.J Penetration sealed 16 inch insulation in cavity min. -- V: tz_�k Garage Fire Separation House side %2 inch or 5/8 inch Type X �— = �\ Garage side 5/8 inch Type X � Ceiling/wall Windows Habitable Space%Bedrooms : 24 in. (H) , 20 in. (W): 5.1 sf above/.below grade 5.0 sf grade L:\SucHeming%vay\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc•January 28,2003 Office Use GENERAL INSPECTION REPORT Inspector: Town of Queensbury Ready at time: Dept. of Community Development Request received: Meet: Building& Code Enforcement At time: 742 Bay Road Notes: Queensbury, NY 12804 ARRIVE am R Y4 ;02 (518) 761-8256 Inspector's Initi s m NAME: X r ?PERMIT#T7 Alf I I Tz'T LOCATION: g=Z�A'S�> INSPECT ON(date): TYPE OF STRUCTURE: RECHECK N/A YEINO COMMENTS Footing /Pier irs Monolithic( onolit c our Form Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site Foundation/Wallpour Reinforcement in Place Foundation/Dampproofing_ Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing_ Heating Rough-In_ Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/BridgingJoist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping L:\SueHemiiigway\Building.Codes.inspection.FORMS\GENERAL INSPECTION REPORT.doc Office Use .GENERAL INSPECTION REPORT Inspector: Town of Queensbury Ready at Dept. of Community Development Request received., Meet: Building& Code Enforcement At time: 742 Bay Road Queensburj; NY 12804 ARRIVE am/p"` A"T -�a - Notes: (518) 761-8256 Inspector's Init NAME, PERMIT#DW�3-- q-74 LOCATION: INSPECT ON(date): TYPE OF.STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers Monolj'�k lci�our Form 1.� orcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site Foundation/Wallpour Reinforcement in Place Foundation/Dampproofing_ Backfill Approval,_ Plumbing UndeTSIab Plumbing Vent/Vents in Place Rough Plumbing_ Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R­ Floors R- Walls R­ Ceiling R- Duct work or piping in . unheated spaces R- Proper Vent,Attic Vent-_ Framing Jack Studs/Headers Bracing/Bridgig- Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4-hour--- Firestopping_ L:\SueHemiiigwaylBuildiiig.Codes.Insp.ection.FORMS\GENERAL INSPECTION REPORT.doc Office Use -GENERAL INSPECTION REPORT Inspector: Town of Queensbury Ready at time. Dept of Community Development Request received: -J- Meet: Building& Code Enforcement At tim�e. 742 Bay Road ur; Queensburj,, AT 12804 ARRl`VEjLtjea am�m %A 2 as(518) 761-8256 Inspector's Initia Z7 NAME: PERMIT# LOCATION: INSPECT ON(date): U t 410 TYPE OF STRUCTURE: RECHECK rt N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. 'Materials for this purpose on site "FoundationfWallpour Reinforcement in Place Foundation/Dampproofing__ Backfill Approval Plumbing Under Slab Plumbing Vent/VentsTn-Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing__ Jack Studs/Headers Bracing/Bridgmig- Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping_ L.\SueHemiiigway\Building.Codes.hisp.ection.FORMS\GENERAL INSPECTION REPORT-doc OffIce Use - ENERAL INSPECTION DEPORT Inspector: �Pll R ady at time, Town of Queensbur-y �,�� Dept. ofCommunity Development RR�received: ' e Met: Building& Cade Enforcement \b t time: 742 Bay Road Queensbury, NY 12804 ARRIVE f- a /p E ART J'.)arrz yra otes: (518) 761-82M Inspector's Init al NAME: lovx_el`>. PEwMI"I" LOCATION: f�l� c31-�S��L f�i`u, /��INSPECT ON(date): TYPE OF STRUCTURE: RECHECK N/A YE O COMMENTS Footings/Piers Monolithic Pour Form .-- Reinforcement in Place The contractor is responsible for a' providing protection from freezing for 48 hours following the placement of the concrete. 'Materials for this propose on site Foundation/Wallpour_ Reinforcement in Place Foundation/Dampproofing " Backfill Approval Plumbing Under Slab Plumbing Vent/Vents.in Place _ Rough Plumbing 116ating Rough-In Insulation _ Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- _ Walls It- ceiling R- Duct work or i m in piping g unheated spaces R- Proper Vent;Attic Vent Framing Jack Studs/Headers BracingBridging Joist Hangers _ Jack Posts/Main Beam Air Infiltration Barrier r Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4-hour Firestopping L:1SueHemingway',Building.Codes.Inspcction.FORMSiGENERAL INSPECTION REPORT.doc (� M( -J- 1 0 0 0 (D 0 0 V O -J- a -4 M CP 4, M-r,(D (D CO (D C 0) 0 0 a ( 6.. 0 . . nz "o c c m(D (A :3 V� o N MNt :3 (AT -hto H CF 0 9 m (D sv (D (D C+ c r 4 w 0 rh 0. m-h 0 � on v W o(A "rl - 20 W, -J. � ►� p ;1\0 o 0 0 %% x a N �T to . (A -J, 0 m 01 m � a G1 m 0 Oct TO) 0 & Z �tZ 0 0 "��qT to c� �r p -4, CTo Fim 0 `hz m C+ d 0 n -i mc IQ 022 00 Zr NOf � � V 3 " C+ 0 .jo (D (D (D 0. ;,*(D (D (D I fD (D 0 f c+ it W �' J '