Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2002-1016
TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development-Building&Codes (518) 761-8256 BUILDING PERMIT Permit Number: a20021016 Application Number: a20021016 Tax Map No: 523400-301-008-0001-032-000-0000 Permission is hereby granted to: JONES. RIOT-TARD For property located at: 339 AVIATION Rd in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: BARBARA JOKES 339 AVIATION Rd Commercial Alteration&Addi 105,000.00 Total Value 105,000.00 QUEENSBURY,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency V & N CONSTRIJCTION_INC. 746-1520 PO BOX 126 FORT F,DWARD_NY Plans&Specifications 2002-1016- Business: Glens Falls National Bank Renovation of office space, linked to BP#2002=974,per plot plan and specifications. j� �r^.' $50.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday,Decemiwber 19,2003 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Tow eensb r a December 19,2002 SIGNED BY for the Town of Queensbury. Director of Building&Code Enforcement r Building Permit Application Town of Queens bury—Dept of Community Development,742 Bay Road,Queensbury,NY (518)761-8256 A permit must be obtained before beginning construction. Permit File No. .,Z_.. (3 6 No inspection will be made until applicant has received a Fee Paid $ .�- valid building permit. All applicants' spaces on this Rec.Fee Paid $ application must be completed and must appear on the Reviewed By: application form. Applicant: 1Z1G1aAfLt? f- J6tg0Gi A6!i"6. Owner: P-AA Apt,A N• c�r�rd g�-i � t v Address: 334f AL)tA al 4 t2aAe;, Address: pg3SuJ ly✓tZtA/L 1�A,J . 2v'O4' r- -11 Phone# G'1 Phone# iq� Email Address: Email Address: Property Location: Lot Number: / House Number - I 33� k,)lA--f kzJ r4,0t 0 C2 114, 1 Subdivision Name: Tax Map Number: I. -1 -3 2- a New Building: residence /commercial Estimated Market Value of Construction: $ 41515;'19 OeZ Addition: residence/ commercial If an Addition,what will use of new addition be? 0 Alteration: residence/ commercia a No change to exterior size: residence/com'l a Other work(describe ) •az ,3rr1E� Check OccupancyInformation I"Floor. &V966for Other floor Total Below sq.ft. sq.ft. sq.ft. Square Feet Ea Single family dwelling a Two family dwelling ❑ Townhouse a Multifamily dwelling #of units ' � Office o� �{Pi` t<,7 vTF1L . a Mercantile ,� ❑ Manufacturin• a 1.car detached garage E ❑ 2 car detached garage a 3 car detached garage D E C a 1 car attached garage a 2 car attached garage ircmiq or I&JEEtlU BURIY Mal III MIKOr A AB % a 3 car attached garage CI* Storage building- commercial a Storage building- residential a Other What is the proposed height of the structure - 23 feet inches Will any second-hand or ungraded lumber be used? If so,for what? t4 ev Type of Heating System: electric/ oil ! gas wood forced hot ai / baseboard/othet: Number of Fireplaces to be installed C'�' Number of Woodstoves to be installed List below the person(s)responsible for supervision of work as regards to building codes: Name Address Phone Number Builder Gunk, © © 7-6Fall- w 746,- yO Plumber aA u.- 0 4 v ppJ 1,4tgo" 71am - ?of U Mason MAC,,V2J J Nam• 01 V1 1 1h o A Jr1 -141,- 13,71 Electrician 6E4u• tlo -Z- o 5 3- err S76 Declaration: please sign below after you have carefully read the statement: To the best of my knowledge the statements contained in this application,,together with the plans and specifications submitted,are a true and complete statement of all proposed work to be done on the described premises and that all provisions of the Building Code,the Zoning Ordinance and all other laws pertaining to the proposed work shall be complied with,whether specified or noted,and that such work is authorized by the owner. Further,it is understood that Uwe shall submit,prior to a Certificate of Occupancy or Certificate of Compliance being issued,as requested by the Zoning Administrator or Director of Building and Codes,an As Built Survev by a licensed surveyor;drawn to scale,showing actual location of all now construction. Signature:J�"�,` z 'Y/��� owner,owner's agen architect, ontractor l!h,1�Z Application for Permit=Septic Disposal System Town of Queensbury 742 Say Road Queensbury NY 12804 (518) 761-8256 1. OWNER INFORMATION: :.............. ................. ..,......................................................................... :.......:•....... Office Use Location of installation: 273q A o tATialj rL-0110 r�8 File Permit No._2, 6 C Tax Map No. Fee Paid Owner's Name: CzA 12-1bA V--A I-) Jd>J E4, Address: 2. INSTALLER'S NAME jG�J/ L � }l�� �-� PHONE NO. `Zq 2, - 3. RESIDENCE INFORMATION: (circle year of dwelling, indicate#bedroom(s) and multiply#of bedrooms with applicable gallons per bedroom to equal total daily flow) Year of House: No. of Bedrooms x Computation = Total Daily Flow 1980 or older x 150 gal/bdrm = 1980-1991 x 130 gal/bdrm = _ 1991 -present x 110 gal/bdrm = 6� Garbage Grinder Installed yes_ / no Spa or Hot Tub Installed yes / no DEC 1 2 2002 TOWN OF Q1IEENSBt1RY 4. PARCEL INFORMATION: (circle applicable information&indicate measuremc Bis�-DING AND C'nn>= Topography Soil Nature Ground Water Bedrock or Impervious Material Domestic Water Supply Eat: san at what depth at what depth unici al Rolling loam feet feet well Steep slope clay /� l� if well, water supply %slope other ! from any septic-system depth: absorption is ft. other Percolation Test: (To be completed by licensed professional engineer or architect) Rate: 5 WjtJ- minute per inch +�'Ioti6G 5. PROPOSED SYSTEM: For New Construction: All individual sewage disposal systems must be designed by a licensed professional engineer or architect(unless installed in a Planning Board approved subdivision). Add 250 gallons to the size of the septic tank and leach field for each Garbage Grinder,Spa or Whirlpool Tub. Septic Tank: Oct gallon(min. size 1,000 gal.) t4A Tile Field: each trench ft. Total System Length: ft. Seepage Pit(s): number of y= size of each: ft. by ft. 'r► Size of Stone to be used: # 2. / depth or thickness I 1 O feet IJA Bed System Size: x NA Alternative System: length and/or size 6. HOLDING TANK SYSTEM: (if required) tJA Number of tanks: / Size of each: gallons /TOTAL Capacity: gallons Rote: Alarm System and associated electrical work must be inspected by a Town approved electrical inspection agency. 7. SIGNATURE &INFORMATION FOR RESPONSIBLE PERSON(please read) For your protection,please note that pursuant to Section 136-29 of the Code of the Town of Queensbury, any permit or approval granted which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. I have read the regulations with respect to this application and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. Signature of ponsVe-person Date Envelope Compliance Report New York;State Energy Conservation Construction Code COMcheck EZISoftware Version 2.4 Release 1 Data filename:P:\01 -ProjectA2002\0203\Energy Code\0202-Mountain View Commons.cck. C O V D Section 1: Project Information DEC 12 2002 Project Name: Mountain View Commons TOWN OF QUEENSBURY REJA Architects&Glens Falls National Bank' CODE Designer/Contractor: Richard E.Jones Associates BU1L UIfyO AN� Document Author: Craig Jones Notes: Storage,Industrial and Commercial Areas are Basement/Mechanical Spaces. Section 2: General Information Building Location: Warren,New York Climate Zone: 15 Heating Degree Days(base 65 degrees F): 7635 Cooling Degree Days(base 65 degrees F): 380 Building Use Method of Compliance: Activity Type Method Activity Type(s) Floor Are Bank/Financial Institution 2100 Office 2160 Office 400 Storage,Industrial and Commercial 513 Storage,Industrial and Commercial 1631 Project Description(check one): New Construction _Addition _Alteration _Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Air Leakage,Component Certification,and Vapor Retarder Requirements Inspection Approved Initial Date (Y/N) All joints and penetrations are caulked,gasketed, weather-stripped,or otherwise sealed Fireplaces installed with tight fitting non-combustible fireplace doors Dampers integral to the building envelope are equipped with motorized dampers .Cargo doors and loading dock.doors'are weather sealed Recessed lighting fractures are sealed or gasketed Windows,doors,and skylights certified as meeting leakage requirements Component R-values&U-factors labeled as certified r Vapor retarder installed i Climate-Specific Requirements Gross Cavity Cont. Proposed Budget CgMonent Name/Desgdption Area R-Valu R-Value UFactor U-Facto NORTH: REJA-North Wall:Wood Frame,Any Spacing 713 21.0 0.0 0.062 0.074 Stair Windows:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 36 --- --- 0.290 0,520 Conference Room Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 27 --- --- 0.310 0.520 Employee Entrance: Solid 28 --- --- 0.700 0.120 REJA-North Basement Wall: Solid Concrete or Masonry>8" Furring:Wood,Wall Ht 10.0,Depth B.G. 9.0 415 11.0 0.0 0.110 0.098 EAST: Bank-East Wall:CMU<--8"with Empty Cells,Furring:Metal 580 0.0 10.0 0.079 0.074 Lobby Window 1:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 70 --- --- 0.290 0.520 Office Window 1:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 70 --- --- 0.290 0.520 Vestibule Window 1:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 9 --- --- 0.290 0.520 Vestibule Window 2:Wood Frame,Double Pane with Law-E Clear,shgc 0.36 9 --- --- 0.290 0.520 Main Entrance: Glass,Clear,shgc 0.56 42 --- --- 0.920 0.520 REJA-East Wall:Wood Frame,Any Spacing 634 21.0'. 0.0 0.062 0.074 Conference Room Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 27 --- --- 0.290 0.520 Corridor Window#1:Wood Frame,Double Pane with Law-E .. Clear,shgc 0.36 26 --- --- 0.290 0.520 Corridor Window#2:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 26. --- --- 0.290 0.520 Waiting Window#1:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 15 --- --- 0.290 0.520 Waiting Window#2:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 15 --- --- 0.290 0.520 Workstation Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 27 --- --- 0.290 0.520 Main Entrance:Glass,Clear,shgc 0.87 . 28 --- --- 0.920 0.520 REJA-East Basement Wall:Solid Concrete or Masonry>8" Furring:Wood,Wall Ht 10.0,Depth B.G.9.0 803 11.0 0.0 0.110 0.098 SOUTH: Bank-South Wall:Wood Frame,-Any Spacing 435 21.0 0.0 0.062 0.074 Work Room Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34' 52 --- --- 0.310 0.520 REJA-South Wall:Wood Frame,Any Spacing 42 21.0 0.0 0.062 0.074 REJA-South Basement Wall: Solid Concrete or Masonry>8" Furring:,Wood,Wall Ht 10.0,Depth B.G.9.0 140 11.0 0.0 0.110 0.098 WEST: Bank-West Wall:CMU<=8"with Empty Cells,Furring:Metal-610 0.0 10,0 0.079 0.074 Lobby Window:Wood Frame,Double Pane with Law-E Clear,shgc 0.34 27 --- --- 0.310 0.520 Office Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 27 --- --- 0.310 0.520 Conference Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34 27 --- --- 0.310 0.520 Teller Window:Metal Frame with Thermal Break,Double Pane Clear,shgc 0.66 ' 28 --- --- O:630 0.520 REJA-West Wall:Wood Frame;Any Spacing 712 21.0 0.0 0.062 0.074 Toilet Window#1:Wood Frame,Double Pane with Law-E Clear,shgc 0.34 4 --- --- 0.310 0.520 Toilet Window#2:Wood Frame;Double Pane with Low-E Clear,shgc 0.34 4 --- 0.310 0.520 Large Office Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.36 78 --- --- 0.290 A520 Work Station Window:Wood Frame,Double Pane with Low-E Clear,shgc 0.34, 27 --- --- 0.310 0.520 REJA-West Basement Wall:Solid Concrete or Masonry>8" Furring:Wood,Wall Kt 10.0,Depth B.G.9.0 803 11.0 0.0 0.110 0.098 UNSPECIFIED ORIENTATION: REJA Roof-All-Wood Joist/Rafter/Truss 4380 30.0 0.0 0.035 0.051 Skylight 1:Wood Frame,Double Pane with Low-E Clear,shgc 0.41 12 --- --- 0.440 0.051 Skylight 2:Wood Frame,Double Pane with Low-E Clear,shgc 0.41 12 --- --- 0.440 0.051 Skylight 3:Wood Frame,Double Pane with Low-E Clear,shgc 0.41 12 --- --- 0.440 0;051 Skylight 4:Wood Frame,Double Pane with Low-E Clear,shgc 0.41 12 --- --- 0.440 0.051 Bank Roof-All-Wood Joist/Rafter/Truss 4894 30.0 0.0 0.035 0.051 Bank 7 Existing Floor Slab:Unheated Slab-On-Grade Vertical 4 ft. 130 -- 0.0 --- - --- - (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. Envelope PASSES: Design 22%better than code Section 4: Compliance Statement The.proposed envelope design represented in this document is consistent with the building plans -specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the New York State Energy Conservation Construction Code requirements in COMcheck-EZ Version 2.4 Release 1. When a Registered Design Professional•has stamped and-signed this page,they are attesting that to the best of his/her knowledge,belief,and prof6ssional judgment such plans or specifications are in compliance with this Code. Principal Envelope Designer-Name Signature Date Lighting and Power Systems Compliance Certificate' . New York-State Energy Conservation Construction Code COMcheck-EZ Software Version 2.4 Release 1 Data filename:P:\01 -Projects\2002\0203\Eli6rgy Code\0202-Mountain View Commons.cck Section 1: Project Information, Project Name: Mountain View Commons Designer/Contractor: REJA Architects&Glens Falls National Bank Richard E.Jones Associates Document Author: Craig Jones Notes: Storage,Industrial and Commercial Areas are Basement/Mechanical Spaces., Section 2: General Information Building Location: Warren,New York Climate Zone: 15 Heating Degree Days(base 65 degrees F): 7635 Cooling Degree Days(base 65 degrees F): 380 Building Use Method of Compliance: Activity Type Method Activity Type(s) Floor Area Bank/Financial Institution 2100 Office 2160 Office 400 Storage,Industrial and Commercial. 513 Storage,Industrial and Commercial 1631 Project Description(check-one): New Construction —Addition Alteration Unconditioned Shell(File Affidavit) Section 3:.Requirements Checklist Inspection. Approved Initial Date (Y/N) Controls,Switebihg,and Wiring Independent controls for each space(switch/occupancy sensor) Exceptions: Security lighting,building lobby/retail store/mall Master switch at entry to hotel/motel guest room Individual dwelling units separately metered Two switches,dimmer,or occupancy sensor in each space providing a uniform illumination pattern Exceptions: Only one luminaire in space; An occupant-sensing device controls the area; The area is a corridor,storage,iestroom;or lobby Automatic lighting shutoff control in spaces greater than 250 sq.ft in buildings larger than 5,00.0.sq.ft - Photocell/astronomical time switch on exterior lights Exceptions: Large covered areas requiring lighting during daylight hours Tandem wired one-lamp and three-lamp ballasted luminaires Exceptions: Electronic high-frequency ballasted luminaires not on same switch Transformers meet minimum efficiencies listed in Table 805.6.1 or 805.6.2 Interior Lighting Total actual watts must be less than or equal to total allowed watts Allowed Watts Actual Watts Complies(YIN) 10184 7,531 YES Exterior Lighting Type(s)of exterior lighting.sources: Fluorescent WMetal Halide ^High-Pr.Sodium Exceptions: Specialized signal,directional,and marker lighting;lighting highlighting exterior features of historic buildings; advertising signage;safety or security lighting;low-voltage landscape lighting. Section 4: Compliance Statement The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the New York State Energy Conservation Construction Code requirements in COMcheck-EZ Version 2.4 Release 1. When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of his/her knowledge,belief,and professional judgment;such plans or specifications are in compliance with this Code. 0 2- Principal Lighting Designer-Name Signature Date Lighting Application.Worksheet New York State Energy Conservation Construction Code COMcheck EZ Software Version 2.4 Release 1 Section 1: Allowed Lighting Power Calculation A B C D Total Floor Allowed Allowed Area Watts Watts Area Category. _ watts ft2 W x Q Bank/FinancialInstitution 2100 2 4200- -Office 2160 1.5 3240 Office 400 1.5 600 Storage,Industrial and Commercial 513 1 513 Storage,Industrial and Commercial 1631 1. 1631 Total Allowed Watts= 10184 - Section 2: Actual Lighting Power Calculation A B C D E F Fixture Fixture Description/ Lamps/ .#of Fixture ID, ,Lamp Description/Wattage Per Lamp/Ballast Fixture Fixtures Watt. D x E) Al 42"Indirect Pendant/Twin Tube 50W t Electronic 4 5 240 1200 A2 36"Indirect Pendant/Triple 4-pin 26W/Electronic 4 1 130 130 B 1 8'Wall Mounted Indirect/48"T8 32W t Electronic 4 2 120 240 B2 12'Indirect Pendant/48"T8 32W/Electronic 6 1 180 180 B3 8'Indirect Pendant/48"T8 32W/Electronic. 4 5 120 600 B4 4'Indirect Pendant/48"T8 32W/Electronic 2 3 60 180 C 6"Downlight/Triple 4-pin 26W/Electronic, 1 8 26 208 Cl 6"Downlight/Triple 4-pin-26W/Electronic: 1 17 26 442 D1 6"Downlight/Twin Tube 18W/Electronic 1 4 17 68 D2 6"Downlight/Twin Tube 18W/Electronic 1 .l 17 17 E Round Low Profile Ceiling/Twin Tube 24/26/27W/Electronic 3 3 64 192 F 4'Wrap/48"T8 32W/Electronic 2 22 59 1298 H3 2x4 Parabolic/48"T8 32W/Electronic 2 18 62 1116 H4 2x4 Parabolic/48"T8 32W/Electronic 3 7 86 602 H5 2x4 Parabolic Surface/48"T8 32W/Electronic 3 3 86 258 M Low Voltage Pendant/Other 1 3 50 150 N Low Voltage Sconce/Other 1' 13 50 650 Total Actual Watts= 7531 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Actual Watts is greater than or equal to zero;the building complies. Total Allowed Watts= 10184 Total Actual Watts= 7531 Project Compliance= 2653 Lighting PASSES: Design 26%better than code Mechanical Compliance Report New York State Energy Conservation Construction Code COMcheck-EZ Software Version 2.4 Release 1 Data filename:P:\O1 -Projects\2002\0203\Energy Code\0202-Mountain View Commons.cck Section l: Project Information Project Name: Mountain View Commons REJA Architects&Glens Falls National Bank Designer/Contractor: Richard E.Jones Associates Document Author: Craig Jones Notes: Storage,Industrial and Commercial Areas are.Basement/Mechanical Spaces. Section 2: General Information Building Location: Warren,New York Climate Zone: 15 Heating Degree Days(Base 65 degrees F): 7635 Cooling Degree Days(base 65 degrees F): 380 Building Use Method of Compliance: Activity Type Method Project Description(check one): New Construction _Addition _Alteration _Unconditioned Shell(File Affidavit) Section 3: Mechanical Systems List uantity System Type&Description 1 Bank-HVAC Unit#3: Heating: Central Furnace,Gas/Cooling:Split System,Capacity<65 kBtu/h, Air-Cooled Condenser/Single.Zone.. 1 REJA Office-HVAC Unit#1: Heating:.Central Furnace,Gas/Cooling:Split System,Capacity<65 kBtu/h,Air-Cooled Condenser/Single Zone 1 REJA Office-HVAC Unit#2: Heating:Central Furnace,Gas/Cooling:Split.System,Capacity<65 kBtu/h,Air-Cooled Condenser/Single Zone 1 BANK-Water Heating 2: Service,Water Heater 1 REJA OFFICE-Water Heating 1: Service Water Heater Section 4: Requirements Checklist Requirements Specific To:Bank-HVAC Unit#3 [ ] 1. Newly purchased heating equipment will meet the heating efficiency requirements [ ] 2. Equipment minimum efficiency: Split System: 10.0 SEER Requirements Specific To:REJA Office-HVAC Unit#1 [ ] 1. Newly purchased heating equipment will'meet the heating efficiency requirements [ ] 2. Equipment minimum efficiency: Split System: 10.0 SEER Requirements Specific To:REJA Office-HVAC Unit#2 [ ] 1. Newly purchased heating equipment will meet the heating efficiency requirements [ ] 2. Equipment minimum efficiency: Split System: 10.0 SEER Requirements Specific To:BANK-Water Heating 2 . [ ] 1. Heat traps in inlet/outlet fittings [ ] 2. - 1/2-in. insulation on 8 ft of inlet/outlet piping if no integral heat traps Requirements Specific To:REJA OFFICE-Water Heating 1 [ ] 1. Heat traps in inlet/outlet fittings [ ] 2. 1/2-in.insulation on 8 ft of inlet/outlet piping if no integral heat traps Generic Requirements: Must be met by all systems to which the requirement is applicable [ ] 1. Load calculations per 1997 ASHRAE Fundamentals [ ] 2. Plant equipment and system capacity no greater than needed to meet loads -Exception:Standby equipment automatically off when primary system is operating -Exception:Multiple units controlled to:sequence operation as a function of load [ ] 3. Minimum one temperature control device per system [ ] 4. Minimum one humidity control device per installed humidification/dehumidification system [ ] 5. Thermostatic controls must have 5 deg.F deadband -Exception:Thermostats requiring manual changeover between heating and cooling [ ] 6. Automatic Controls:Setback to 55 deg.F(heat)and 85 deg.F(cool);7-day clock,2-hour occupant override, 10-hour backup -Exception:Continuously operating zones -Exception:2 kW demand or less,'submit calculations [ ] 7. Automatic shut-off dampers on exhaust systems and supply systems with airflow>3,000 cfm [ ] 8. Outside-air source for ventilation;system capable of reducing OSA to required minimum [ ] 9. R-5 supply.and return air duct insulation in unconditioned spaces R 8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly -Exception:Ducts located within equipment -Exception:Ducts with interior and exterior temperature difference not exceeding 15 deg.F.' [.] 10. Ducts sealed-longitudinal seams on rigid ducts;transverse seams on all ducts;UL 181A or 181E tapes and mastics [ ] 11. Mechanical fasteners and sealants used to connect ducts and air distribution equipment [ ] 12. Hot water pipe insulation: 1 in.for pipes<=1.5 in.and 2 in.for pipes>1.5 in. Chilled water/refrigerant/brine pipe insulation: 1 in,for pipes<=1.5 in.and 1.5 in.for pipes>1.5 in. Steam pipe insulation: 1.5 in.for pipes<=1.5 in.and 3 in.for pipes >1.5 in. -Exception:Piping within HVAC equipment -Exception:Fluid temperatures between 55 and 105 deg.F -Exception:Fluid not heated or cooled -Exception:Runouts<4 ft in length [ ] 13. Operation and maintenance manual provided to building owner [ ] 14. Balancing devices provided in accordance with 603.15 of Mechanical Code for New York State ] 15. Newly purchased service water heating equipment wilt meet the efficiency requirements [ ] 16. Water heater temperature controls:.110Aeg.F for dwelling units or 90 deg.F for other occupancies [ ] 17. Gravity dampers,stair and elevator shaft vents equipped with motorized dampers [ ] 18. Exhaust air heat recovery required for systems 5,000 cfin or greater with more than 70%outside air fraction or specifically exempted [ ] 19. Kitchen-hoods>5;000 cfm provided with 50%makeup air that is uncooled and heated to no more than 60 deg.F unless specifically exempted [ ] 20. Buildings with fume hood systems must have variable air'volum' a hood design,.exhaust heat recovery,or .seprate makeup air supply meeting the following: a)75%make up air quantity,and/or b)within 2°F of room temperature and/or c)no humidification d)no simultaneous heating and cooling Section 5: Compliance Statement The proposed'mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the New York State Energy Conservation Construction Code requirements in COMcheck-EZ Version 2.4 Release 1. The design professional shall provide.to the code enforcement,official a written certification that the required HVAC tests,system balancing;etc.,have been performed and the system is operating as designed. The design professional shall retain copies of the test reports to be provided to the code enforcement official,if requested. When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of his/her knowledge,belief,and professional judgment,such plans or specifications are in compliance with this Code. (op ltl VLO 0,Jlr1-7 a-� -�-� 1, 1,7.v�- Principal Mechanical Designer-Name Signature Date Mechanical Requirements Description New York State Energy Conservation Construction Code COMcheck EZ Software Version 2.4 Release 1 Data filename:P:\01 -Projects\2002\0203\Energy Code\0202-Mountain View Commons.cck The following list provides more detailed description of the requirements in Section 4 of the Mechancal Compliance Requirements Specific To:Bank-HVAC Unit#3 1. The specified heating equipment is covered by Federal minimum efficiency requirements.'New equipment of this type can be assumed to meet or exceed New York State Energy Conservation Code requirements for equipment efficiency. 2. The specified heating and/or cooling equipment is covered by New York State Energy Conservation Code and must meet the following minimum efficiency: Split System: 10.0 SEER Requirements Specific To:REJA Office-HVAC Unit#1 1. The specified heating equipment is covered by Federal minimum efficiency requirements.New equipment of this type can be assumed to meet or exceed New York State Energy Conservation Code requirements for equipment efficiency. 2. The specified heating and/or cooling equipment is covered by New York State Energy Conservation Code and must meet the following minimum efficiency: Split System: 10.0 SEER Requirements Specific To:REJA Office-HVAC Unit#2 1. The specified heating equipment is covered by Federal minimum efficiency requirements.New equipment of this type can be assumed to meet or exceed New York State Energy Conservation Code requirements for equipment efficiency. 2. The specified heating and/or cooling equipment is covered by New York State Energy Conservation Code and must meet the following minimum efficiency: Split System: 10.0 SEER Requirements Specific-To:BANK-Water Heating2 1. Heat traps are required on noncirculating water heating systems on both inlet and outlet connections. Heat traps may be purchased or field-fabricated by creating a loop or inverted U-shaped arrangement on the inlet and outlet pipes. 2. Pipe insulation for the specified noncirculating service hot water system is required for all piping in the following categories:a)the-,first 8•ft of.outlet.piping from any constant-temperature,noncirculating storage systemb)the inlet piping between the storage tank and a heat trap in a noncirculating storage systempipe insulation must be at least 1/2 in.and have a conductivity no>0.28 Btu-in/(h?ft2-0F). Requirements Specific To:REJA OFFICE-Water Heating 1 I. Heat traps are required on noncirculating water heating systems on both inlet and outlet connections. Heat traps may be purchased or field-fabricated by creating-a loop or inverted U-shaped arrangement on the inlet and outlet pipes. 2. Pipe insulation for the specified noncirculating service hot water system is required for all piping in the following categories:a)the first 8 ft of outlet piping from any constant-temperature,noncirculating storage systemb)the inlet piping between the storage tank and a heat trap in a noncirculating storage systemPipe insulation must be at least 1/2 in.and have a conductivity no>0.28 Btu-in/(h•ft2-°F). Generic Requirements: Must be met by all systems to which the requirement is applicable 1. Design heating and cooling loads for the building must be determined using procedures equivalent to those in Chapters 27 and 28 of the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure. 2. All equipment and systems must be sized to be no greater than needed to meet calculated loads. A single piece of equipment providing both heating and cooling must satisfy this provision for one function with the capacity for the other function as small as possible,within available equipment options. -Exception: The equipment and/or system capacity may be greater than calculated loads for standby purposes. Standby equipment must be automatically controlled to be off when the primary equipment and/or system is operating. -Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated load are allowed if they are provided with controls to sequence operation of the units as the load increases or decreases. 3. Each heating or cooling system serving a single zone must have its own temperature control device. 4. Each humidification system must have its own humidity control device. 5. Thermostats controlling both heating and cooling must be capable of maintaining a 5 degree.F deadband(a range of temperature where no heating or cooling is provided). -Exception: Deadband capability is not required if the thermostat does not have automatic changeover capability between heating and cooling. 6. The system or zone control must be a programmable thermostat or other,automatic"control meeting the following criteria:a) capable of setting back temperature to 55 degree F during heating and setting up to 85 degree F during coolingb) capable of automatically setting back or shutting down systems during unoccupied hours using 7 different day schedulesc) have an accessible 2-hour occupant overrided) have a battery back-up capable of maintaining programmed settings for at least 10 hours without power. -Exception:A setback or shutoff control is not required on thermostats"that control systems serving areas that operate continuously. -Exception: A setback or shutoff control is not required on systems with total energy demand of 2.kW (6,826 Btu/h)or less. 7. Outdoor-air supply systems with design airflow rates>3,000 cfm of outdoor air and all exhaust systems must have dampers that are automatically closed while the equipment is not operating. 8. The system must supply outside ventilation air as required by Chapter 4 of the Mechanical Code for New York State.If the ventilation system is designed to supply outdoor-air quantities exceeding minimum required levels, the system must be capable of reducing outdoor=air flow to the minimum required levels. 9. Air ducts must be insulated to the following levels:a) Supply and return air ducts for conditioned air located in unconditioned spaces(spaces neither heated nor cooled)must be insulated with a minimum of R-5. Unconditioned spaces include attics,crawl spaces,unheated basements,and unheated garages.b) Supply and return air ducts and plenums must be insulated to a`minimurn of R 8"when located outside the building.c) When ducts are located within exterior components(e.g.,floors or roofs),nih iznum R-8 insulation is required only between the duct and the building exterior. -Exception: Duct'insulation is not required on ducts located within equipment. -Exception: Duct insulation is not required when the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15 degree F. 10. All joints,longitudinal and transverse seams,and connections in ductwork must be securely sealed using weldments;mechanical fasteners with seals,gaskets,or mastics;"mesh and mastic sealing systems;or tapes. Tapes and mastics must be listed and labeled in accordance with UL 18IA or UL 181B. 11. Mechanical fasteners and seals,mastics,or gaskets must be used when connecting ducts to fans and other air distribution equipment,including multiple-zone terminal units. 12. All pipes serving space-conditioning systems must be insulated as follows: Hot water piping for heating systems: 1 in,for pipes<=I 1/2-in.nominal diameter 2 in.for pipes>1 1/2-in.nominal diameter. Chilled water,refrigerant,!and.brine:piping•systems:.: 1 in.insulation-forpipes,<=1 1/2-in:riominal•diameter. 1 1/2 in.insulation-for pipes>1 1/2-in.nominal diameter. Steam piping: 1 1/2 in.insulation for pipes <=1 1/2-in.nominal diameter 3 in:insulation for pipes>1 1/2-in.nominal diameter. -Exception: Pipe insulation is not required for factory-installed piping within HVAC equipment." -Exception: Pipe insulation is not required for piping that conveys fluids having a design operating- temperature range between 55 degrees F and 105 degrees F. -Exception: Pipe insulation is not required for piping that conveys fluids that have not been heated or cooled 'through the use of fossil fuels or electric power. -Exception: Pipe insulation is not required for'runout piping not exceeding 4 ft in length and 1 in.in diameter between the control valve and HVAC coil. 13. Operation and maintenance documentation must be provided to the owner that includes at least the following information:a) equipment capacity(input and output)and required maintenance actionsb) equipment operation and maintenance manualsc) HVAC system control maintenance and calibration information,including wiring diagrams,schematics,and control sequence descriptions;desired or field-determined set points must be permanently recorded on control drawings,at control devices,or,for digital control systems,in programming commentsd) complete narrative of how each system is intended to operate. 14. Each supply air outlet or diffuser and each zone terminal device(such as VAV or mixing box)must have its own balancing device.Acceptable balancing devices include adjustable dampers located within the ductwork, terminal devices,and supply air diffusers, 15. Service water heating equipment must meet minimum Federal efficiency requirements included in the National Appliance Energy Conservation Act and the Energy Policy Act of 1992,which meet or exceed New York State Energy Conservation Code. New service water heating equipment can be assumed to meet these requirements. 16. Water-heating equipment.niust be provided with controls that allow the user to set the water temperature to 110 IF for dwelling units and 90 IF for other occupancies:Controls must limit output temperatures of lavatories in public facility restrooms to 110 OF. 17. Stair and elevator shaft vents must be equipped with motorized dampers capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. All gravity outdoor air supply and exhaust hoods,vents,and ventilators must be equipped with motorized dampers that will automatically shut when the spaces served are not in use. Exceptions: -Gravity(non-motorized)dampers are acceptable in buildings less than three stories in height above grade. -Ventilation systems serving unconditioned spaces. 18. Individual fan systems with a design supply air capacity of 5000 cfm or greater and minimum outside air supply of 70%or greater of the supply air capacity must have an energy recovery system with at least.a 50% effectiveness. Exceptions: -Systems serving spaces that are not cooled and heated to<60'F. -Commercial kitchen hoods(grease)classified as Type 1 by NFPA 96 " -Systems exhausting toxic,flammable,paint,or corrosive fumes or dust If an air economizer is also required,heat recovery must be bypassed or controlled to permit air economizer operation. 19. Individual kitchen exhaust hoods larger than 5000 cfm must be provided with make-up air sized for at least 50%.of exhaust air volume that is uncooled and either unheated or heated to no more than 60°F Exceptions: -Where hoods are used to exhaust ventilation air that would otherwise exfiltrate or be exhausted by other fan systems. -Certified grease extractor hoods that require a face velocity no>60 fpm. 20. Buildings with fume hood systems having a total exhaust rate>15,000 cfm must either have variable air volume hood design,exhaust air heat recovery,or separate make up air supply. �.'OLrJN OF QUEENSF3URY BUILL7ING !� COL7E ENFORCEiwiENT 742 SAY ROAn QUEENSSURY NY 12604 (51$} 761-8256 �sRF2IVE DEPAFZT r SNSP F'ifiT�l.L iF*7SQECxiON REPORT COt�iEFtCiAL ------ MVLTiPLE Z�WELLiNf3 (hotel, mOte2. apt_ complex) D71TE SNSP S� ���UE RE ES -- NAME DI1TE � Q RM I'I' i TYPE C EF FI'FLU `Z U I2 E F'OCITINGS BACFCZ�'ILL FRAMING P Xj7aM F3ZNC3 ZNSL7LATION N1A YES NC) CH IMNEY/ •• B " VENTIFiE IGFiT PLUMBING VEN I'1FIXTURES �tO C7 F S Id Ca W EXTERIOR FINISH HEZiT=NGIFiOT WATER RELIEF` VALVES FLOORS FOUNi.�ATION SNSULATSON INTERIOR STAIRSIRAILINGS STOCKROOM ENCLOSURE F'IIin. /DEMSSE WI1L.L.S PENETRATION F I RE DAMPERS CE=LSNG FIRE STOPPING FIRE DOC3RS CLC?SERS EXST DOOR f;21RLaWARE EKS 1.' ST1lIRS/RAILS PLATFORM ELEVATOFL HANDICAPPED .ACCESS . HANDICAPPED BATHS HANDICAPPED PARKING FINAL ELECTRSCAL r^ 'v S �TE PLAN/VARIANCE R�O . �'-.-'�`.•�' �J F2NAL SURVEY PLOT PLAN IF' RE OK TO ISSUE C O CAR C C L0 -�► MAP REFERENCE: MAP OF A SURVEY OF THE LANDS OF HENRY A. SLEIGHT, HENRY J. SLEIGHT & FLOYD SLEIGHT DATED: DECEMBER 20, 1966 LAST REVISED: DECEMBER 3, 1982 BY: JOHN B. VAN DUSEN LANDS N/F OF HELEN SLEIGHT 237/125 W o fN� T• N Z 19.92' 19.99' LANDS N/F OF COLLEEN RUSSELL 885/92 S58°53'00"E 85.47' AREA 33,930 sq.ft. 0.78 acres F J ", i II L_ — I �I i --I i I I I I PORTS-COCHERL-1 — �I �I 1-- ---- I 139.90' FrITOTM AVIATION ROAD S62053100 E 53.Ga 53.33' LEGEND: OIPF = IRON PIPE FOUND DEED REFERENCE: O IRF = IRON ROD FOUND WILLIAM W. MAILLE Ca.) = UTILITY POLE TO o = CHAIN LINK FENCE BARBARA H. JONES ❑CB = CATCH BASIN DATED: NOVEMBER 11, 1988 4& = WATER SHUTOFF BOOK 733 PAGE 295 M 1 i LANDS N/F OF BARBARA JONES I 760/107 1 i 10 3 0 o _ • " z � y Y N Q a J Q 2 Q wo"'Ll GuTTM LANDS N/F OF DAKE BROTHERS, INC. 689/643 NOTE: NOT ALL IMPROVEMENTS SHOWN. O O CQ th "{ V! � z W Cr b 0 a -0 rl ko Dato JUPE A 2000 scale r-w S-1 SHEET 1 OF 1 D225 N - 00 0 Cq 00 i 00 r- 0- 1 -O.O/ JV 1 .0- 1 -JL COMMERCIAL FINAL INSPECTION REPORT Building& Code Enforcement Date inspection request received: Office No. (518)761-8256 Dept of Community Development Town of Queensbury Arrive A) am/pm Depart am/pm 742 Bay Road Inspector's Initial Queensbury,NY 12804 NAMEC:-3-1C PERMIT C� 1l�/ LOCATION DATE >—CZ3 TYPE OF STRUCTURE N/A YES NO CON04ENTS Chimney/'U'Vent/Dired.Vert location Plumbing Vent Roof Complete Exterior finish grade complete hueior/exterior guardrails 42 in.platform/decks lrierior/exterior ballasters 4 in.spacing platform/decks Stair handrail 34 in.-38 in. Step rises 7 3/4 in. Alain door 44 in. All others 36 in. Lever handles Exits at grade or platform Canopy to cover req.exit doors Gas valve shut-off exposed®ulator(18 in.)above gra Floor bathroom watertight Other floors okay Hat water relief valve BoilenTurnace enclosure <250,000 BTU N/R 250,000 BTU to 11000,000 BTU's(1 hour) >1,000,000 BTU's(2 hour) Gras furnace shut off within 30 fl.or within line of site Oil furnace shut off at entrance to furnace area Stockroom enclosure(1 hour),3/<hour door Storage/receiving/shipping room(2 hour), 1 '/x doors I 'i hour doors and closes '.hour corridor doors and closers Firewalis/fire separation,2 hour,3 hour complete Fire dampers,2 hour fire wall/separation or greater Fire door/shutters 1 '/2 hour,3 hour Ceiling fire stopping 3,000/5,000 sq.ft. Fan shutdown,smoke vents or fan Exit door/panic bars assembly hardware Elevators Elevator signage Handicapped bathroom grab bars/sinks/toilets Handicapped bath/parking lot signage Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/12 in.beyond active listening system and signage assembly space Final Electrical Site Plan/Variance required Final Survey,new structures .ks-built septic system layout required Okay to issue te np.CIO(Certif.of Occupancy) Okay to issue permanent C/O(Certif.of Occupancy) Okay to issue C/C(Ccrtif.of Compliance) Town of Queensbury Fire Marshal's Office 742 Say Road Queensbury, NY 12804 Phone (518) 761-8205 Fax(518)745-4437 Fire Marshal's Inspection Report Request SCHEDULE 0 Received: Permit# INSPECTION ON: c2— 14 Name: C--.3-(e, PM ANYTIME ti PIC\, Location: APPROVED N/A YES NO COMMENTS EXITS AISLE WIDTHS ag J),96w2(A- EXIT SIGNS-NORMAL UUA ow 1 1 - BATTERY EMERGENCY LIGHTING I FIRE EXTINGUISHERS 1 alb . I FIRE ALARM SYSTEM FIRE SPRINKLER SYSTEM FIRE SUPPRESSION SYSTEM HOOD INSTALLATION INTERIOR FINISHES STORAGE COMPRESSED GAS Al ouvv( I CLEARANCE TO SPRINKLERS CLEARANCE TO HEATING UNITS CLEARANCE TO ELECTRICAL REQUIRED SIGNAGE EMERGENCY PLAN Ell MAXIMUM OCCUPANCY SIGN— CHIMNEY MASONRY ROUGH IN ~ FINAL 14 01) W CHIMNEY FACTORY BUILT ROUGH IN WOOD FINAL STOVE ROUGH IN FINAL VENTED GAS APPLIANCE ROUGH IN Ott FINAL FIREPLACE MASONRY ROUGH IN OK THIS ATE K FOR CO NOT OK FIREPLACE FINAL FACTORY BUILT ROUGH IN F INSPECTED BY FINAL COMDEVICHRISJANORDILETTERS200I/FIREMARSHALINSPECTIONREPORT11022001 WHITE-BUILDING DEPARTMENT COPY YELLOW-OCCUPANT COPY COMMERCIAL FINAL INSPECTION REPORT s� Building& Code Enforcement Date inspection request received: v {Office No. (518)761-8256 Dept, of Community Development Town of Queensbury Arrive:31 axn/pm Depart am/pm 742 Day Road Inspector's InitialsQ)4— Queensbury,NY 12804 NAME C\ ` PERMIT LOCATION `c DATE TYPE OF STRUCTURE NIA YES NO COMMENTS ChimmeyP'B"VenUDirect Vent location Plumbing Vent Roof Complete Exterior finish grade complete lmerior/exterior guardrails 42 in.platform/decks hazior/exteriorballasters 4 in.spacingplatfommldecks Stair handrail 34 in.-38 in. Step risers 7 3/4 in. Main door 44 in. All others 36 in. Lever handles Exits at grade or platform Canopy to cover req.exit doors Gas valve shut-off exposed®ulator(18 in.)above gra Floor bathroom watertight Other floors okay Hot water relief valve Boiler/fumace enclosure <250,000 BTU N/R 250,000 BTU to 1,000,000 BTU's(1 hour) >1,000,000 BTU's(2 hour) Gas furnace shut off within 30 fL or within line of site Oil furnace shut off at entrance to furnace area Stockroom enclosure(1 hour),3/4 hour door Storagetreceiving/shipping room(2 hour), 1 1/z doors _— I 'z hour doors and closers 3 4 hour corridor doors and closers Firewalls/fire separation,2 hour,3 hour complete Fire dampers,2 hour fire wall/separation or greater Fire door/shutters 1 '/2 hour,3 hour Ceiling fire stopping 3,000/5,000 sq.I Fan shutdown,smoke vents or fan Exit door/panic bars assembly hardware Elevators Elevator signage Handicapped bathroom grab bars/sinks/toilets Handicapped bath/parking lot signage d Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/12 in.beyond �ciive listening system and sigiage assembly space Final Electrical Site Plan/Variance required Final Survey,new structures :As built septic system layout required_ Okay to issue temp.C/O(Cettif.of Occupancy) Okay to issue permanent C/O(Certif,of Occupancy) Okay to issue C/C(Certif.of Compliance) tip: PA FINAL - CONIMIERt-CILAIL U4SPIECTICYN PI,.IEP0IR_'r Request received: 00-zce use Tow" of Queensbuiy 761-8256 A P_Wv--A35_-�-n�-_-�_D_E_PA.R 742-Bay Road Ready at time: Queensbuj-y, ArY 12804 Inspector's Jlniti 1,1ADAE PERMIT# 0 >- Meet: At time: T_OCIk_rlO TYPE OF STRUCTURE 11,1SPECr ON(date): G-5 rates -VIES NO Chinmey/13" VentADirect'Vent location Plumbing Vent Roof Complete COMMENTS Exterior finish grade complete lnteriar/exterior guardrails 42 in. platform/decks Interior/exterior balusters 4 in. spacing platfbrm/decks Stair handrail 34 in. - 38 in. VX)r-, C-P"3;;z- Step risers 7 3/4 in. Main door 44 in. vv .All others 36 in. Lever handles Exits at grade or platfbi-rn Canopy to cover req. exit doors Gas valve shut-off exposed 8.-- regulator(18 in.) above grade Floor bathroom watertight Other floors okay Hot water relief-valve Doiler/furnace enclosure -250,000 13-rU-IZ/P- 250,000 13= to 1,000,000 BTU's (1 hour) -1,000,000 BTU's (2 hour} C3as furnace shut off within 30 ft. or-within line of site Oil furnace shut off at entrance to furnace area Stockroom enclosure (1 hour), :.14 hour door Storage/receiving/sliipping room (2 hour), 1 %doors I 'A hour doors and closers 3Z4 hour corridor doors and closers Firewalls/fire separation, 2 hour, 3-hour complete Fire dampers, 2-hour fire wall/separation or greater Fire door/shutters I '/z hour, 3 hour Ceiling fire stopping 3,00015,000 sq. ft. Fan shutdown, smoke vents or fan Exit door/panic bars assembly hardware ;k-A Elevators Elevator signage I-Tandicapped bathroom grab bars/sinks/toilets Handicapped bath/parking lot signage Handicapped service counters 34 in., checkout 36 in. Handicapped ramp/handrails continuous/ 12 in. beyond Active listening system and signage assembly space Final Electrical Site Plan/Variance required Final Survey, new structures As-built septic system layout required Okay to issue-rETvTP012_AJ;,I_-Y C/0— Certificate of Occupancy yes no Okay to issue PERINAA_TIZET-Z'r C/O — Certificate of Occupancy yes 110 Okay to issue C/C—Certificate of Compliance yes no Town of Queensbury r Fire Marshal's Office 742 Bay Road Queensbury, NY 12804 Phone (518) 761-8205 Fax(518) 745-4437 Fire Marshal's Inspection Re ort Request SCH DULE GL .3 Received: /0 --Permit# I SP CTION ON: Name: AM PM ANYTIME Location: _5�6 I I APPROV ! N/A YE iV -NO CQMMENTS EXITS AISLE WIDTHS lO� EXIT SIGNS-NORMAL - BATTERY EMERGENCY LIGHTING FIRE EXTINGUISHERS W JjL,(7 AJ 'FIRE ALARM SYSTEM FIRE SPRINKLER SYSTEM FIRE SUPPRESSION SYSTEM ^ 0 HOOD INSTALLATION INTERIOR FINISHES STORAGE COMPRESSED GAS- a/A �,D co I+t°. 1,."r-e, CLEARANCE TO SPRINKLE�RS CLEARANCE TO HEATING/ UNITS CLEARANCE TO ELECT ICAL tGE REQUIRED SIGNAGE EMERGENCY PLAN I t)ail+ eA,,L If k\ �0 o-�o 0_9 L MAXIMUM OCCUPANCY SIGN CHIMNEY � MASONRY UGH IN N(t,a �%Ivtv( =:! UGH ID L CHIMNEY 0mv FACTORY BUILT ROUGH IN va Cit. C-11, FINAL WOOD STOVE ROUGH IN FINAL VENTED GAS APPLIANCE ROUGH IN FINAL FIREPLACE MASONRY ROUGH IN OK THIS DA E OK FOR CO NOT OK FINAL FIREPLACE FACTORY BUILT ROUGH IN t NSPECTED BY FINAL COMDEV/CHFUSJMORD/LETTERS20011FIREMARSHALINSPECTIO REPORT11022001 WHITE-BUILDING DEPARTMENT COPY YELLOW-OCCUPANT COPY Framing / Firestopping Inspection Report. Office No. (518) 761-8256 Date Inspection reque ceived: Queensbury Building&Code Enforcement Arrive: '{ } a Depart: am/ 742 Bay Road, Queensbury,NY 12804 Inspector's Initia NAME: ��g U ^�" PERMIT# , LOCATION: ,ram i\ INSPECT. N: _03 TYPE OF STRUCTURE: T Y IN_ N/A O ENTS Framing c�r�reN � � Jack Studs/Headers Bracing/Bridging } Joist hangers Jack Posts/Main Bea s' ' Exterior sheeting nail d properly 12"O.C. Headroom 6 ft; 8 in Stairwells 36 in.or more Headroom 6 ft. 8 in. Notches/Holes T Be ring Walls Metal Strapping for otches Top Plate 1 12(w) 16 gauge O 16D nails each side. Draft stopping 1,000 q. ft. floor trusses Anchor Bolts 6 ft. or I ss on center Ice and snow shield 24 ches from wall Fire separation 1,2,3 ho Fire wall 2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in' cavity min. Garage Fire Separation House side %2 inch or 5/8'inch Type Garage side 5/8 inch Type X Ceiling/wall Windows-Habitable"Space/Bedroo s 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\SueHemingway\Buildinng.Codes.Inspectiod.FORMS\Framing Firestopping Inspection Rep\January2003 Framing / FirestOpp ng Inspecti6n;Report Office No. (5ry18) 761-825.6 Dat6 Inspection 4eeiv6d• I� Queensbury'Building&Code Enforcement Arrive:'742 Bay Road, Queensbury,NY 12$04 Inspector's Itia �1'�( NAME: PERMIT#: - 0 LOCATION:. ' INSPECT ON: TYPE OF STRUCT RE: I' N, N/A CQNIIVIENTS aming +� \ � i . r \ ' Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams 1 yam-, n• Exterior sheeting nailed properly ' �� 12"O.C. \ Headroom.6 ft.- 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate . 1 'l2(w) 16 gauge(8) 16D-nails each side Draft stopping 1,000-sq. ft. floor trusses _ r. 46knchor Bolts 6 ft. or Iess on center Ice and snow shield 24 inches from wall Fire separation 1,2, 3 hour Fire wall 2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in- cavity min. Garage Fire Separation House side f2 inch or 5/8 inch Type X. Garage side 5/8-inch,Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) ' 20 in.(W) 5.7 sf above/below grade t 5.0 sf grade I_:\SueHemingway\Buiiding.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 i Rough Plumbing/Insu%tion Inspection Report Office No, (518) 761-8256 Date Inspection req ce. ed:Inspection®reqce* Queensbury Building&Code Enforcement Arrive:-a pm epa iti 742 Bay Road,Queensbury,NY 12804 Inspector's Thiti s: ?b NAME: PERMIT LOCATION: INSPECT ON: TYPE OF STRUXTURE: A Y N N/A . PVC: R-1,R-2,R-3,R-4 Drain Vents Cast Iron, Copper Drain/Vent Comm. Plumbing Vent/Vents in Place\ Rough Plumbing/Nail Plates Head or Air Supply Test Drain and Vents 5 PSI or 10 ft. above highest Connection for 15 minutes Water Supply Piping Copper Commercial _CPVC,Pex One&Two Family Insulation/ esidential Check/Con-imercial Check -Proper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace .Duct Work Sealed Properly COMMENTS: L:\SuaHemingway\Building.Codes.Inspection,FORMS\Rough Plumbing Insulation Report.doc January 28,2003 Rough Plumbing Insulation Inspection Report Office No. (518)761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive:,�r epa . aml, ep ao, 742 Bay Road, Queensbury,NY 12804 Inspect MIT#. NAME: &11,k PPERMIT#: lJ LOCATION: r INSPECT ON: TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2,R-3,R-4 Drain Vents Cast Iron, CO Drain/Vent Comm. Plumbin ent/.Vents in Place Ro Plumbing/Nail Plates Head or Air Supply Test Dfain and Vents 5 PSI or 10 ft. above highest Connection for 15 minutes Water Supply Piping Copper Commercial Copper, CPVC,Pex One&Two Family Insulation/Residential Check/Commercial Check Proper Vent,Attic Vent Duct/Hot Water Piping-Insulation If required unheated spaces Combustion Air Supply for Furnace Duct Work Sealed Properly COMMENTS: �L:\SucHemingway\Building.Codes.inspection.FORMS\Rough Plumbing Insulation Report-doc January 28,2003 A04Framin / Firkppin' g Inspection Report Office No. (518) 761-8256 Date Inspection reque receiv Queensbury Building&Code Enforcement Arrive: a pm pa ' Q a p 742 Bay Road, Queensbury,NY 12804 Inspector's Init' s: NAME: PERMIT#: LOCATION' ti INSPECT ON:TYPE OF STRUCTURE: Y N N/A Framing COMMENTS Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses ������ ��� Anchor Bolts 6 ft. or less on center - F z- Ice and snow shield 24 inches from wall Fire separation 1, 2, 3 hour STL Fire wall 2,3,4 hour F topping ..VD7&rr` Penetration sealed 16 inch insulation in cavity min. 7�- Garage Fire Separation House side%2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\SueHemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 goFraminFgl--Firestopping lnspection-R�p Office No. (518) 761-8256 Date Inspection request received- Queensbury Building& Code Enforcement Arrive: a m D a an� 742 Bay Road, Queensbury, NY 12804 Inspector's Initia NAME: PERMIT#: LOCATION: INSPECT ON: TYPE OF STRUCTURE: (A t -t Y N N/A ; k —7-- COMME aming Jack Studs Headers Bracing Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate Cz-t Lj 1 V2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1,2, 3 hour Fire wall 2, 3,4 hour Firestopping Penetration sealed —16 inch insulation in cavity min. Garage Fire Separation House side 1/2inch or 5/8 inch Type'X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade LASueHernin gway\B ui Iding.Codes.Inspection.FORM S\Frami ng Firestopping Inspection Report.doc January 28,2003 Framing / Firestopping Inspection Report Office No. (518) 761-8256 Date Ins ection requgs4eceived: Queensbury Building& Code Enforcement Arrive- r a pn e art: T."a m 742 Bay Road, Queensbury,NY 12804 Inspector's Initi ppne NAME: PERMIT#: LOCATION: V INSPECT ON: LI-1 TYPE OF STRUCTURE:. 2 �Am X-a-ming Y N N/A COMMENTS Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 V2 (w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft.floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1, 2,3 hour Fire wall 2, 3, 4 hour KA"\-V) Firestoppinor7 V/ \ V-L Z U Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side V2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\SueHemingway\Building.Codes.Inspection.FORMS\Framing Firestopping,Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518)761-8256 Date Inspection requ r7,, ive Queensbury Building&Code Enforcement Arrive: a pm epart: ain 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initial : G� NAME: t4c_ #: LOCATION: INSPECT ON: t4 "' —d TYPE OF STRUCTURE: Comment Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofmg Foundation/Waterproofing Type of Dampproofmg/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under 1 Backfill Approval v! i Plumbing Under Slab-!- t'tEf\C PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. Framing / Firestopping Inspection Report Office No. (518) 761-8256 Date Inspection re e re I ed: Queensbury Building&Code Enforcement Arrive: p epart: _"A,�5Var& 742 Bay Road, Queensbury,NY 12804 Inspector's Initia s-, Inspe ction s Inspection ct n r r e ep e Infitia AID k NAME: ERMIT#: P C LOCATION: INSPECT ON: TYPE OF STRUCTURE: .000l Y N N/A a i COMMENTS —J-aWStuds/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate I V2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1,2, 3 hour Fire wall 2, 3, 4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side V2inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\SueF[emingway\Building.Codes.Inspection.FORMS\FramingFirestoppiiig Inspection Report.doc January 28,2003 Office Use GENERAL INSPECTION REPORT Inspector: Ready at time: I Town of Queensbury Dept, of Community Development Request received: Meet: Building& Code Enforcement At time: 742 Bay Road Queensbury, NY 12804 ARRIVE am/pm: DEPARTI-,'��amlpm Notes: (518) 761-8256 Inspector's Initials PERMIT# 2- -/(,Wv NAME: LOCATION: 6 klz� INSPECT ON(date): TYPE OF STRUCTURE: RECHECK N/A YES COMMENTS Footing iers V I - Monoli is P r Form & rm Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site Foundation/Wallpour Reinforcement in Place Foundation/Dampproofmg_ Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R- Duct work or piping in unheated spaces R- Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridgmig- Joist Hangers_ Jack PostsfMain Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Will 2,3,4 hour�_ Firestopping_ L:\SueHemiiigway\Building.Codes.Inspection.FORMS\GENERAL INSPECTION REPORT.doc Foundation Inspection R/q ( - Office No. (518)761-8256 Date Inspection : Queensbury Building&Code Enforcement Arrive: am/pm Depart: am/pm 742 Bay Rd.,queensbu ry,NY 12804 Inspector's Initials: - P(..,.�'� NAME: PERMIT#: ' LOCATION: INSPECT ON: _ TYPE OF STRUCTURE: -- Comments Y N N/A Foo ' s �tI P iers D Ito Slab ji Reinforcement in Place The contractor is responsible for j providing protection from freezing for 48 hours following the placement of the concrete. i Materials for this purpose on site. �jL EC Foundation/Wallpour Reinforcement-in Place Foundation Datnpproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 'inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under.Slab PVC!Cast/Copper- Foundation Insulation Interior/Exterior R-• Rough Grade 6 inch drop within 10 ft. Office Use GENERAL INSPECTION REPORT Inspector: Town of Queensbury Ready at time: Dept. of Community Development Request received: Meet: Building& Code Enforcement At time: 742 Bay Road Queensbury, AT 12804 ARRIVE IT- Notes: Inspector's(518) 761-8256 1 E's Initi T NAME: G1 eAA PERMIT# -90o Zn 2 LOCATION: INSPECT ON(date): TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers Monolithic Pour Form Reinforcement i e The contractor is res nsible for providing prate ion fr freezing for 48 hours folio ing placement r e 11 c c e n5ibl. or e f fre ezing 0 0 th p lacement of the concrete. site Materials for this purp se o site_ Foundation/Wal1po7r I u Re, nt "Iforcernent in Place ��694ation/Dam 0� 'p\Xckfill Approval k Plumbing Under Slab Plumbing Vent/Vents in PI c�_ Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Exterior R- Floors R- Walls R- Ceiling R Duct work or piping in unheated spaces R—, Proper Vent,Attic Vent Framing Jack Studs/Headers Bracing/Bridgi ing Joist Hangers—Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping__ L:\SueHemingway\Building.Codes.Inspection.FORMS\GENERAL INSPECTION REPORT.doo