Loading...
RC-0722-2020 i F PRINCIPLE STRUCTURE Office Use Only PERMIT APPLICATION:, Permit#: 9C 202 Tattim afQueens6ury Permit Fee:$_ 3 -r�"O -1'8 742 Bay Road,Queensbury, NY 12804 *Rec. Fee:.$ P: 518-761-8256 www.queensburynet Invoice#: Project Location: 2'O� zctZi� Tax Map #: Z � /�- ►�Z f- Subdivision Name: - TOWN BD.RESOLUTION 86-2013:$850 recreation fee for new dwell(n�g urnts:.;single;family,,tlup exes/two-family, s 1 , multiple.family, apartments,condominiums, townhouses,and/or manu , uFed-&-modularhomesIj but not mobile homes. This is in addition to the permit fee(s). NOV 20 2020 r k I ". - CONTACT INFORMATION: OWN • Applicant: r.•�Js!_�? 4„c} ,,� �. Name(s): Mailing Address, C/S/Z: e- IL i> Cell Phone: 7r Z Land Line: Email• >,�.r�_ r2�_rZcE7Tl.Vic.»—r • Primary Owner(s): . Name(s): . -n� 8-� ? c3E��- l�v�,�-�z �•�:. Mailing Address,-C/S/Z:_j Cell Phone: (.�, ) ,_C-`7- g7�1-7 Land Line:. . O Email: ❑ Check if all work will be performed by homeowner only • Contractor(s): Workers' Comp documentation must be submitted with this application Contractor Name(s): tae_, C'� S Contractor Trade: Mailing Address, C/S/Z: rzvi rr 4 011 Cell Phone: ( )_��7--�'�'CZ Land Line: ( ) . Email:__ -b.4a-r "List all additional contractors on-the back of this.form • Arch itect(s)/Engineer(s): Business Name: rive , Z �/ t� -�.•��-�r ��C �.L Contact Name(s):. Mailing Address; C/S/Z: f? v 3c>>C . ��lT� 46=tz.f ly ;'f Lr 1 7 �c Cell Phone: (ri ) "a Zg,_ oS7`z Land Line: . ( ) Email: Contact Person for Building& Code Compliance: A'n,X/4_ Cell Phone: S-r v ) S C7--e 7�C? Land Line: ( ) Email: Principle Structure Packet PROJECT INFORMATION: TYPE: Commercial ;Residential WORK CLASS: 4-S-ingle-Family Two-Family _Multi-Family(#of units ) _Townhouse _Business Office _Retail —Hotel/Motel —industrial/Warehouse —Garage(#ofcars ) _ Other(describe STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1ST floor 7 1ST floor: Jr t 21d floor: 2"1 floor: 31 floor: Basement(habitable space): I Total square feet: Total square feet: S--c Z— ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ "2,Cw Ud 2. Proposed use of the building: - 3. If Commercial or Industrial, indicate-the name of the business: 4. Source of Heat: Gas Oil Solar Other: (Fireplaces need a separate ing Appliances&Chimney Application,one per appliance) 5. Are there any structures not shown on the plot plan? -YES (]NO xplain: 6. Are there any easements on the property? YES NO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? b. Is this a corner lot? �asa NO c. Will the grade be change result of the construction? ES NO d.What is the water source? PRIVATE e. Is the parcel on SEWER or PRIVATE SEPTIC ystem? Principle Structure Packet _-_- i i DECLARATION: I. 1 acknowledge that no construction shall commence prior to issuance of a valid building permit and work will be completed within a 12 month period. 2. If the work is not completed by the 1year expiration date the permit may be renewed, subject to fees and department approval. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. 1 understand that We are required to'provide an as-buiksurvey by a licensed land surveyor of. all newly constructed facilities prior to issuance of certificate of occupancy. I have read and agree to the above: F- PRINT NAME: TJi4 c>�r Z SIGNATURE: DATE: Principle Structure Packet Revised February 2019 Office Use OnIV Tom ofQgmisl5my Permit#: SEPTIC DISPOSAL PERMIT APPLICATION Permit Fee:$ Invoice#: Septic Variance? Yes No 742 Bay Road,Queensbury,NY 12804 P:518-762-8256 www.gueensbury.net PlIf C Tax Map ID#: 7—.q2j� �ypv �9 202g ,, �( �'� , �, ��;�t Project Location: te-L-2 CIV OIL), fir• • Applicant Name(s): Vic) Mailing Address, C/S/Z: Cell Phone: _( 5-10 ) e r)-V,-7 rZ Land Line: Email: �tzc - cct, • Primary Owner(s): Name(s): 45-y, t,,e-) Mailing Address, C/S/Z: 4f�., Cell Phone: �t ) QS- Land Line: J Email: 4 7--, l - if!r= - El Check if all work will be performed by homeowner only • Contractor: Workers' Comp documentation must be submitted with this application Contact Name(s): 7a�c45�z, Contractor Trade: Mailing Address, C/S/Z: /Zca - 21?c,,Ll .C— F,>,t--> Cell Phone: _(_jn Land Line: Emaik • Engineer(s): Name(s): /7/ Mailing Address, C/S/Z: /69 Cell Phone: Land Line: '74-iS--a :Xo'7 Email: Contact Person for Building & Code Compliance: A',-M Z(R;N1A-t1 r-z,c Cell Phone: (��) I-- L Land'Line: J Email: A-,-l->A+-,l 6-;' x6 ns-i seEz- e--r.� Principle Structure Packet Revised February 2019 RESIDENCE INFORMATION: Year Built Gallons #of bedrooms: X gallons per =total daily flow per day bedroom Garbage Grinder Ye No 1980 or older 150 Installed? (circle one) 1981-1991 130 Spa or Hot Tub Yes No- Installed? (circle one) 1992-Present 110 3 ((U 3 v PARCEL INFORMATION: Topography Flat Rolling Steep Slope %Slope Soil Nature _Sand _Loam _Clay _Other(explain: j Groundwater At what depth? Bedrock/Impervious material At what depth? Domestic Water Supply _Municipal ell(if well,water supply from any septic system absorption is L6Oft.) Percolation Test Rate: per minute per inch(test to be completed by licensed engineer/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: Tank size Q EV gallons(min.size 1,000 gallons,add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field with#2 stone Total length '?_�ft.; Each Trench ft. Seepage Pit with#3 stone How many: ;Size: Alternative System Bed or other type: Holding Tank System Total required capacity?____;tank size ;#of tanks NOTES: 1. Alarm system and associated electrical work must be inspected by a Town approved electrical inspection agency; 2. We will no longer allow systems to be covered until such time as an as-built plan is received and approved.The installed system must match the septic layout on file—no exceptions. 3.As-built drawings must be submitted prior to the inspection, if there has been a change to the submitted plans. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: 1 Cli z DATE: " 4 z�Zd SIGNATURE: DATE: Principle structure Packet Revised February 2019 F Office Use Only FUEL BURNING APPLIANCE & Permit#: a 4-& 202.b CHIMNEY APPLICATION Permit Fee:$ Invoice#: 742 Bay Road,Queensbury,NY 12804 P:518-7618256 www.queensburynet Project Location: Tax Map ID: Z 8 c7, l/— —I Z, / Room of Install: Planned Install Date: f **ONE APPLICATION PER APPLIANCE** CONTACT INFORMATION: �.� C' 2 I C `S ,f . • Applicant: �) Names : L �v 11 NOV 19 2020 ►� Mailing Address, C/S/Z: Y.S—,��Src��-( �i2 �� �i-r��-c-ntn+ =; .rL= =ca�:r..�ir�•J Cell Ph. Land Line: Email: • Primary Owner(s): Name(s): Mailing Address, C/S/Z: Cell Ph.: _�) Land Line: _( ) Email: ❑ Check if all work will be performed by homeowner only • Installer/Builder: Workers' Comp documentation must be submitted with this application Contact Name(s): Contractor Trade: Mailing Address, C/S/Z: T7&..,Lr rz-(10 Cell Phone:_(. w ) c�>5-7— �� c2 Land Line: _( ) Email:— A\--w k -c czG-?—o 5:z5- `/• �i-� Contact Person for Building & Code Compliance: A-C�> Lc5C-2 +rz CX Cell Ph.:_(C —9`7 t"Z Land Line: Email: , -moo Principle Structure Packet Revised February 2019 FUEL BURNING APPLIANCE INFORMATION, TYPE OF DEVICE: Stove _ Fireplace Insert Fireplace Fuel Fired Equipment (Garage Only, 18" clearance per IMC 304.3) �ireplace,factory built** (*,*Manufacturer's name: Model #: TI dt S SOURCE OF HEAT: Wood _Coal _Pellet �as CHIMNEY INFORMATION: Masonry (require plans to be submitted): block brick stone _Flue: tile —steel —size, in inches _Material*: double-wall —triple-wall _insulated (*Manufacturer's name: Model #: ) ADDITIONAL INFORMATION: 1. Two inspections are required. A rough-in inspection, prior to installation and a final inspection, after installation. 2. Manufacturer's installation manual must be available at the time of inspection. 3. Masonry fireplaces & chimneys require plans to be submitted. 4. Twenty-four(24) hour notification is required for inspections. 5. Workers' Comp insurance information is required with this application. Declaration:Construction/installation must conform to NYS Fire Prevention&Building Code and/or manufacturer requirements. The applicant or owner agrees to comply with all applicable laws,ordinances, regulations and all conditions that are part of these requirements and also will allow the inspector to enter the premises to perform the required inspections. I have read and agree to the above: PRINT NAME: �c SIGNATURE: DATE: /r 4 v2ci Principle Structure Packet Revised February 2019 Y' '6 Generated by REScheck-Web Software Compliance Certificate FILE COPY Project 0 Barber Road Energy Code: 2018 I EC, EBYEECC D Location: Glens Falls, New York Construction Type: Single-family JAN 2 b 2022 Project Type: New Construction COPY Conditioned Floor Area: 1,726 ft2 tz TOWN OF QUEENSBURY Glazing Area 17% -' BUILDING&CODES Climate Zone: 6 (7635 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 0 Barber Road Adam Leonardo Walter VanDeLoo, PE Glens Fall, NY New York Walter VanDeLoo, P,E., P.C. 518-857-8712 PO Box 5412 adam@rgrosetti.com Albany, NY 12205 518-229-0567 waltervandeloo.pe@gamil.com Compliance: Passes using UA trade-off Compliance: 4.6%Better Than Code Maximum UA: 347 Your UA: 331 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelope Assemblies Prop.Gross Area Cavity Cont. Perimeter Ceiling: Raised or Energy Truss 1,726 38.0 0.0 0.025 0.026 43 45 Basement Walk Out Framed Wall:Wood Frame, 16" 423 21.0 0.0 0.057 0.045 18 14 O.C. Walkout SGD: Glass Door(over 50%glazing) 42 0.290 0.300 12 13 Walkout Window:Vinyl Frame 66 0.250 0.300 17 20 Main Floor Rim:Wood Frame, 16" o.c. 203 21.0 0.0 0.057 0.045 12 9 Main Floor Walls:Wood Frame, 16"D.C. 1,827 21.0 0.0 0.057 0.045 83 66 Garage to House Door:Solid Door(under 50% 21 0.200 0.300 4 6 glazing) Floor Front Entry: Solid Door(under 50%glazing) 35 0.200 0.300 7 11 Sliding Glass Door: Glass Door(over 50%glazing) 126 0.290 0.300 37 38 Window:Vinyl Frame 183 0.250 0.300 46 55 Frost Wall Area: Slab-On-Grade(Unheated) 49 10.0 0.480 0.480 0 0 Insulation depth:4.0' Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 1 of10 Prop.Gross Area Cavity Unt. Prop. Perimeter Basement Wall:Solid Concrete or Masonry Wall height: 9.0' 1,404 0.0 19.0 0.037 0.050 52 70 Depth below grade:8.0' Insulation depth: 9.0' Compliance Statement. The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 2 of10 REScheck Software Version REScheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.lD 103.1, ;Construction drawings and ; ;❑Complies 103.2 ;documentation demonstrate ; {❑Does Not [PR1]1 ;energy code compliance for the ; 14" :building envelope.Thermal ❑Not Observable ;envelope represented on i I❑Not Applicable ;construction documents. ; 103.1, ;Construction drawings and ', {❑Complies 103.2, ;documentation demonstrate pDoes Not 403.7 ;energy code compliance for [PR3]1 ;lighting and mechanical systems. ; ❑Not Observable Systems serving multiple ; }❑Not Applicable dwelling units must demonstrate ;compliance with the IECC i ;Commercial Provisions. ; 302.1, ;Heating and cooling equipment is, Heating: j Heating: ;❑Complies 403.7 I sized per ACCA Manual S based Btu/hr Btu/hr E❑Does Not [PR2]2 !on loads calculated per ACCA ; Cooling: Cooling: I Manual J or other methods Btu/hr Btu/hr ❑Not Observable approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 3 of10 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.2 ;Slab edge insulation R-value. R- R- E]Complies ;See the Envelope Assemblies [FO111 ❑ Unheated ;❑ Unheated ;❑Does Not ;table for values. b?' ❑ Heated ❑ Heated ;❑Not Observable ❑Not Applicable 402.1.2 ;Slab edge insulation ft ; ft ;❑Complies ;See the Envelope Assemblies [F0311 (depth/length. Does Not table for values. :❑ ❑Not Observable ' ❑Not Applicable 402.1.1 ;Conditioned basement wall ', R- R- ;❑Complies ;See the Envelope Assemblies [FO411 linsulation R-value.Where interior R- 1 R- ;❑Does Not table for values. insulation is used,verification 101 ' ' ;may need to occur during '❑Not Observable Insulation Inspection. Not ;❑Not Applicable ;required in warm-humid locations; in Climate Zone 3. 303.2 ;Conditioned basement wall ❑Complies [FO511 insulation installed per } ❑Does Not ,9) ;manufacturer's instructions. []Not Observable , ❑Not Applicable 402.2.9 ;,Conditioned basement wall ft ft ;❑Complies ;See the Envelope Assemblies 1 ;insulation depth of burial or ; ;table for values. [FO6] p ,❑Does Not !distance from top of wall. ; ;❑Not Observable , ❑Not Applicable 303.2.1 ;A protective covering is installed ; j❑Complies [FO11]2 ;to protect exposed exterior 3ODoes Not ;insulation and extends a ;minimum of 6 in. below grade. bNot Observable ❑Not Applicable 403.9 ;Snow-and ice-melting system ; �❑Complies [FO12]2 'controls installed. j❑Does Not y }❑Not Observable j ;❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 4 of10 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, !Door U-factor. U- U- ;❑Complies ;See the Envelope Assemblies 402.3.4 QDoes Not ;table for values. [FR111 ;❑Not Observable ' !❑Not Applicable 402.1.1, ;Glazing U-factor(area-weighted ', U- U- Complies ;see the Envelope Assemblies ;❑ 402.3.1, `average). ;❑Does Not ;table for values. 402.3.3, ;❑Not Observable 402.5 ; :❑Not Applicable [FR2]1 303.1.3 ;U-factors of fenestration products 10Complies [FR4]1 f are determined in accordance f❑Does Not :with the NFRC test procedure or ; ;❑Not Observable ;taken from the default table. ` j❑Not Applicable ; 402.4.1.1 :Air barrier and thermal barrier ❑Complies [FR23]1 installed per manufacturer's IE]Does Not instructions. R � 1 �❑Not Observable ; f ;❑Not Applicable 402.4.3 ;Fenestration that is not site built ; ;❑Complies ; [FR20]1 is listed and labeled as meeting ;❑Does Not ` } AAMA/WDMA/CSA 101/I.S.2/A440 1 ❑Not Observable ; or has infiltration rates per NFRC 1 {❑Not Applicable ; :400 that do not exceed code limits. 1 402.4.5 !IC-rated recessed lighting fixtures; ;❑Complies [FR16]2 sealed at housing/interior finish T❑Does Not and labeled to indicate :52.0 cfm f ' ;leakage at 75 Pa. ;❑Not Observable; I ❑Not Applicable , 403.3.1 ;Supply and return ducts in attics ;❑Complies ; [FR12]1 insulated >= R-8 where duct is 1 '�❑Does Not >=3 inches in diameter and >= I❑Not Observable ;R-6 where< 3 inches.Supply and! ;❑Not Applicable return ducts in other portions of , :the building insulated >= R-6 for diameter>= 3 inches and R-4.2 :for< 3 inches in diameter. 1 403.3.2 ;,Ducts,air handlers and filter yIy ❑Complies ; [FR13]1 !boxes are sealed with i i❑Does Not joints/seams compliant with ! I❑Not Observable , I International Mechanical Code or ; ❑Not Applicable !International Residential Code,as f iii ;applicable. 1 I 403.3.5- ;Building cavities are not used as 1 1❑Complies [FR15]3 {ducts or plenums. ;❑Does Not ;[:]Not Observable ! �❑Not Applicable ' 11 High Impact(Tier 1) 12 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 5 of10 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 403.7 jDucts declared to be within the i ❑Complies [FR2,8]3 yconditioned space are either 1) 1 ;❑Does Not (completely within the continuous ` ;air barrier and within the building ❑Not Observable ithermal envelope,2) buried { ❑Not Applicable within ceiling insulation in laccordance with Section j R403.3.6 and the air handler is I located completely within the ; continuous air barrier and within } 'the building thermal envelope I and the duct leakage is<= 1.5 I 1 cfm/100 square feet of I ;conditioned floor area served by I !the duct system, or 3)the ceiling insulation R-value installed against and above the insulated I duct>=to the proposed ceiling insulation R-value, less the R_ 'value of the insulation on the 1 403.4 HVAC piping conveying fluids R- R- ;❑Complies [FR17]2 (above 105°F or chilled fluids I E❑Does Not ;below 55°F are insulated to >_R- 3. ❑, Not Observable ; , ❑Not Applicable 403.4.1 ;Protection of insulation on HVAC ; S❑Complies [FR24]1 I piping. ❑Does Not tt❑Not Observable 1❑Not Applicable 403.5.3 ;Hot water pipes are insulated to R- R- LIComplies [FR18]2 >_R-3. j❑Does Not ' ;❑Not Observable ❑Not Applicable 403.6 ;Automatic or gravity dampers are; 1❑Complies [FR19]2 (installed on all outdoor air ;❑Does Not ;intakes and exhausts. {❑Not Observable I ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 6 of10 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 ;All installed insulation is labeled ❑Complies [IN13]2 or the installed R-values f ❑Does Not �V) provided. {{❑Not Observable I S❑Not Applicable 402.1.1, ;Wall insulation R-value. If this is a; R- R- ;❑Complies ;See the EnvelopeAssemblies 402.2.5, (mass wall with at least 1/2 of the ❑ Wood ❑ Wood :❑Does Not ;table for values. 402.2.6 :wall insulation on the wall ;❑ Mass ❑ Mass ❑Not Observable [IN3]1 ;exterior,the exterior insulation requirement applies(FR10). ;❑ Steel ❑ Steel ❑Not Applicable 303.2 ;Wall insulation is installed per ; O[Does Complies [IN4]1 manufacturer's instructions. Not i i J❑Not Observable ; I i❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, ;,Ceiling Insulation R-value. ; R- R- ;❑Complies ;See the Envelope Assemblies 402.2.1, ❑ Wood ;❑ Wood ;❑Does Not ;table for values. 402.2.2, ;❑ Steel ❑ Steel i❑Not Observable 402.2.E 1 ❑Not Applicable [FI1] :� , ; ; ; 303.1.1.1, ;Ceiling insulation installed per I❑Complies 303.2 ;manufacturer's instructions. i )❑Does Not [FI2]1 Blown insulation marked every + ; 300 ft2. !❑Not Observable ❑Not Applicable 402.2.3 ;Vented attics with air permeable } ,❑Complies [FI22]2 ;insulation include baffle adjacent j❑Does Not !to soffit and eave vents that R extends over insulation. I ,❑Not Observable ; ; J❑Not Applicable 402.2.4 ;Attic access hatch and door R- R- ;❑Complies [FI3]1 insulation >_R-value of the ; !❑Does Not adjacent assembly. ❑Not Observable ; ;❑Not Applicable 402.4.1.2 ;Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ;❑Complies [FI17]1 each in Climate Zones 1-2, and PDoes Not <=3 ach in Climate Zones 3-8. ; ,❑Not Observable ; ;❑Not Applicable 403.3.3 ;Ducts are pressure tested to cfm/100 cfm/100 ;❑Complies [FI27]1 ;determine air leakage with ; ft2 ; ft2 ❑Does Not ;either: Rough-in test:Total ;leakage measured with a ; ❑Not Observable ;pressure differential of 0.1 inch ;❑Not Applicable ;w.g.across the system including ;the manufacturer's air handler enclosure if installed at time of ;test. Postconstruction test:Total ;leakage measured with a !pressure differential of 0.1 inch ;w.g.across the entire system ; ;including the manufacturer's air ;handier enclosure. 403.3.4 ;Duct tightness test result of<=4 ; cfm/100 ; cfm/100 ;❑Complies [FI4]1 lcfm/100 ft2 across the system or ; ft2 ft2 :❑Does Not <=3 cfm/100 ft2 without air handier @ 25 Pa. For rough-in �❑Not Observable 'tests,verification may need to ; ;❑Not Applicable ; ;occur during Framing Inspection. ; 403.3.2.1 ;Air handler leakage designated ;❑Complies [FI24]1 :by manufacturer at<=2%of {❑Does Not design air flow. ; ;❑Not Observable ❑Not Applicable 403.1.1 :.Programmable thermostats j❑Complies [FI9]z :installed for control of primary ;❑Does Not heating and cooling systems and ; initially set by manufacturer to ❑Not Observable code specifications. ; ;❑Not Applicable ; 403.1.2 !Heat pump thermostat installed ; {❑Complies [FI10]z ;on heat pumps. i❑Does Not ❑Not Observable ❑Not Applicable 403.5.1 ;Circulating service hot water {❑Complies [Fl11]2 ;systems have automatic or ❑Does Not accessible manual controls. ❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 8 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 ;All mechanical ventilation system ( ;❑Complies (FI25]2 fans not part of tested and listed UDoes Not :HVAC equipment meet efficacy i , ;and airflow limits per Table ❑Not Observable , R403.6.1. ;❑Not Applicable 403.2 ;Hot water boilers supplying heat ; ;❑Complies ' [FI2( through one-or two-pipe heating s j❑Does Not ;systems have outdoor setback 1 ; 'control to lower boiler water ❑Not Observable { ;temperature based on outdoor 1 i❑Not Applicable :temperature. 403.5.1.1 Heated water circulation systems ; ;❑Complies [F128]2 !have a circulation pump.The 1 i❑Does Not ;system return pipe is a dedicated return pipe or a cold water supply; I❑Not Observable :pipe.Gravity and thermos- ; ❑Not Applicable ; syphon circulation systems are not present. Controls for !circulating hot water system I pumps start the pump with signal ;for hot water demand within the !occupancy.Controls ! automatically turn off the pump when water is in circulation loop ,is at set-point temperature and 1 i no demand for hot water exists. 403.5.1.2 ;Electric heat trace systems ;❑Complies [F129]2 !comply with IEEE 515.1 or UL {❑Does Not 515.Controls automatically ;adjust the energy input to the ; f❑Not Observable ; 1 heat tracing to maintain the ; ;❑Not Applicable :desired water temperature in the I piping. ! 403.5.2 ;Demand recirculation water ; EComplies [F130]2 ;systems have controls that i❑Does Not ;manage operation of the pump I and limit the temperature of the ; {❑Not Observable water entering the cold water !❑Not Applicable I piping to<= 1049F. 403.5.4 ;Drain water heat recovery units ! {'❑Complies [FI31]2 :tested in accordance with CSA f❑Does Not B55.1. Potable water-side I❑Not Observable ,pressure loss of drain water heat : ;recovery units<3 psi for } {❑Not Applicable j individual units connected to one or two showers. Potable water- i side pressure loss of drain water I heat recovery units<2 psi for j ;individual units connected to I : three or more showers. I ! 404.1 ;90%or more of permanent 10Complies [F16]1 fixtures have high efficacy lamps.I 1❑Does Not ❑Not Observable ❑Not Applicable 404.1.1 ?Fuel gas lighting systems have ;❑Complies [FI23]3 !no continuous pilot light ;❑Does Not 3❑Not Observable : ❑Not Applicable 401.3 ;Compliance certificate posted. i ;❑Complies I [F17]2 : ;❑Does Not ❑Not Observable ! ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 0 Barber Road Report date: 01/25/22 Data filename: Page 9 of10 S Req.ID ection Plans Verified Field Verified & # Final Inspection Provisions Value Value Complies? Comments/Assumptions 3033". Manufacturer manuals for ❑Complies [FI18]3 #mechanical and water heating ' ❑Does Not systems have been provided. ❑Not Observable ; ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) ' 2 1 Medium Impact(Tier 2) JYJUow Impact(Tier 3) Project Title: 0 Barber Road Report date: 01/25/22 Data filename:. Page 10 of10 2018 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 10.00 Ceiling /Roof 38.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0.25 Door 0.29 CoolingHeating & Heating System• Cooling System: Water Heater: Name• Date: Comments Truss ID Signage required at Electrical Meter for all 2017 Residential and Duplex Permits. FILE COPY 6 inch circle with white reflective background and red letters and red striping. Circle one to be used by "} et} f Y. i• l�f lti!. t•( 1. F' li i re�". r i Leonardo Residence [FILE C®PY HVAC Load Calculations for Adam Leonardo D C E 9 V E 2_10,eBarber Road Queenbury, NY FEB 11 2021 TOWN OF QUEENSBURY BUILDING&CODES .a" 7 c Prepared By: Arthur Pakatar The Pakatar Group, LLC 120 Defreest Drive Troy, NY 12180 518-874-1604 Tuesday, February 09,2021 Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D. 'Elite.So Rhvac-Residential 8�L gfif.Comme_rcial H_VAC Loads... Soft we Developmentjric. ` Stonehenge Associate's... Leonardo Residence _ `.,.. Troy.NY.12180 : `. ;:,: °'.` ' 5 - Page 2 Project Report General Pro ect Information Project Title: Leonardo Residence Designed By: Art Pakatar Project Date: Tuesday, February 09, 2021 Client Name: Adam Leonardo Client Address: 0 Barber Road Client City: Queenbury, NY Client Phone: 518-857-8712 Client E-Mail Address: adam@rgrosetti.com Company Name: The Pakatar Group, LLC Company Representative: Arthur Pakatar Company Address: 120 Defreest Drive Company City: Troy, NY 12180 Company Phone: 518-874-1604 Company E-Mail Address: art@thepakatargroup.com Design Data Reference City: Glens Falls, New York Building Orientation: Front door faces North Daily Temperature Range: Medium Latitude: 43 Degrees Elevation: 328 ft. Altitude Factor: 0.988 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: -4 -4.56 n/a 30% 70 29.33 Summer: 85 71 51% 50% 75 27 Check'Fi ures Total Building Supply CFM: 884 CFM Per Square ft.: 0.266 Square ft. of.Room Area: 3,329 Square ft. Per Ton: 1,839 Volume(ft3): 31,331 Buildin Loads Total Heating Required Including Ventilation Air: 55,313 Btuh 55.313 MBH Total Sensible Gain: 19,639 Btuh 90 % Total Latent Gain: 2,092 Btuh 10 % Total Cooling Required Including Ventilation Air: 21,731 Btuh 1.81 Tons(Based On Sensible+Latent) Notes Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021,2:44 PM Rhvac_-Residential&Light Commercial HV_AC:Loads;,_: ` _: : - _ __ _ __Elite,Softwa[e Development,Inc:: .Stonehenge Associates : Leonardo Residence Tro NY 12180 - pa`e.3' Miscellaneous Report System 1 Main House-,. Outdoor.':. -Outdoor, :Outdoor.'-" " 'Indoor .Indoor Grains Input Data - Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb "Difference Winter: -4 -4.56 80% 30% 70 29.33 Summer: 85 71 51% 50% 75 27.41 Duct Sizing Inputs - Main Trunk Runo dtS Calculate: Yes Yes Use Schedule: No No Roughness Factor: 0.00300 0.01000 Pressure Drop: 0.1000 in.wg./100 ft. 0.1000 in.wg./100 ft. Minimum Velocity: 0 ft./min 0 ft./min Maximum Velocity: 900 ft./min 750 ft./min Minimum Height: 0 in. 0 in. Maximum Height: 0 in. 0 in. i Outside Air Data Winter Summer Infiltration Specified: 0.215 AC/hr 0.100 AC/hr 112 CFM 52 CFM Infiltration Actual: 0.216 AC/hr 0.102 AC/hr Building Volume: X 31,331 Cu.ft. X 31,331 Cu.ft. 6,769 Cu.ft./hr 3,211 Cu.ft./hr X 0.0167 X 0.0167 Total Building Infiltration: 113 CFM 54 CFM Total Building Ventilation: 38 CFM 38 CFM ---System 1--- Infiltration&Ventilation Sensible Gain Multiplier: 10.87 = (1.10 X 0.988 X 10.00 Summer Temp. Difference) Infiltration&Ventilation Latent Gain Multiplier: 18.42 = (0.68 X 0.988 X 27.41 Grains Difference) Infiltration&Ventilation Sensible Loss Multiplier: 80.44 = (1.10 X 0.988 X 74.00 Winter Temp. Difference) Winter Infiltration Specified: 0.190 AC/hr(99 CFM), Construction: Semi-Tight, Fireplaces: 1, 13 CFM, Semi-Tight Summer Infiltration Specified: 0.100 AC/hr(52 CFM), Construction: Semi-Tight C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rhvac_Residential-B:Lidht Commercial HVAC.Loads' __ = _ = _` . Elite Software_Dedelopment,_Inc. :Stonehenge Associates ,Leonardo Residence Troy,NY 12180 _ Page 4 Load Preview Report I Ne' ft. Sen� La N et Seni Sy Sy� CF Sys Duct Scope Ton /T0 Are ' Gain. Gain Gains Los' Htg Chg1 Ac SIZE Building 1.81 1,839 3,329 19,639 2,092 21,731 55,313 686 884 884 System 1 1.81 1,839 3,329 19,639 2,092 21,731 55,313 686 88 I 884 11x1 Ventilation 416 706 1,122 3,081 Humidification 2,966 Zone 1 3,329 19,223 1,386 20,609 49,266 686 884 11x1 1-Master Bath 55 477 47 524 1,261 18M 22 1- 2-Master Suite 247 2,814 94 2,908 5,034 70 1 129 2-- 3-Dininq Room 140 2,579 100 2,679 4,062 57w 119 1-- 4-Kitchen 229 1,149 400 1,549 1,281 18 M 53 1- 5-Great Room 227 1,316 40 1,356 2,724 38®6 1 61 1-- 6-Bedroom 2 161 1,264 75 1.339 2,990 42M 58 1- 7-Main Bath 62 445 24 469 899 13M 20 1-- 8-Bedroom 3 138 808 69 877 2,564 36M 37 1-- 9-Foyer 40 506 21 527 1,788MM 23 25 1-- 10-Laundry9. 53 271 27 298 954=I 12 13 1- 11-Mudroom 91 317 17 334 729 10®I 15 1-- 12-Stair 35 139 29 168 501®I 6 7 1-- 13-Walk In Closet 42 126 0 126 236 3® 6 1-- 14-Hall 67 203 0 203 376 5E 9 1-- 15-Basement 1,742 6,806 443 7,249 23,867= 313 333 3- Sum of room airflows may be greater than system airflow because system room airflow option uses the greater of heating or cooling. CA...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rhvac-Residential&Light Commercial HVAC Loads__ = Elite:Software:Development,Inc. -Stonehenge Associates_ - Leonardo.Residence Troy,NY 12180 : .. ' Page 5 Duct Size Preview Room or Minimu Maximus+ Rough Design SP Duc Duc Htg Clg Act. Duct I Reg Source Duct Name -,-�_ Velocity Velocity Factor L/1 Los _ Veloci Lengt Flow -F1a �FJo Sjzze_ Size System 1 Supply Runouts Zone 1 1-Master Bath Built-In 0 750 0.01 0.1 251.7 18' 22 22 1--4 2-Master Suite Built-In 0 750 0.01 0.1 329.6 70 ll 12 ; 129 2-6 3-Dininq Room Built-In 0 750 0.01 0.1 443.9 57 119. 119 1-7 4-Kitchen Built-In 0 750 0.01 0.1 387.6 18 53. 53 1--5 5-Great Room Built-In 0 750 0.01 0.1 444 38 69': 61 1--5 6-Bedroom 2 Built-In 0 750 0.01 0.1 426.5 42 5811 58 1-5 7-Main Bath Built-In 0 750 0.01 0.1 234.8 13 W2 20 1--4 8-Bedroom 3 Built-In 0 750 0.01 0.1 272.5 .36 11 371 37 1-5 9-Foyer Built-In 0 750 0.01 0.1 285.5 2 23 25 1--4 10-Laundry9. Built-In 0 750 0.01 0.1 270.8 ME 12 13 1--3 11-Mudroom Built-In 0 750 0.01 0.1 297.3 low 51, 15 1-3 12-Stair Built-In 0 750 0.01 0.1 320 6 7 1--2 13-Walk In Closet Built-In 0 750 0.01 0.1 265.9 3 q, 6 1-2 14-Hall Built-In 0 750 0.01 0.1 190.4 5 9.! 9 1-3 15-Basement Built-In 0 750 0.01 0.1 414.8 333 313 333 3-7 Other Ducts in System 1 Supply Main Trunk Built-In 0 900 0.003 0.1 771.7 686R 68 884 11x15 --- ------------- Summary --- - ----- ------- System 1 Heatinq Flow: 686 Cooling Flow: 884 CA...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rhvac--Residential B Light Commercial_HVACLoads ;•. ' ` Elite Software.Development;Inc. _. _9 - - Stonehenge Associates Leonardo_Residence �'-Troy,NY 12180 Pa e 6 Total BuiIding Summa Loads Component Area, Sen `. Lat . . =Seri Total Description Ouan- Loss Gain_ _ Gain Gain- Harvey: Glazing- 366.8 7,598 0 7,141 7,141 CustomDoor1: Door-My first example custom door, U- 35 1,295 0 368 368 value 0.5 CustomDoor2: Door-My second example custom door, U- 14 50 0 25 25 value 0.36 CZ 6:Wall- 1552.7 4,367 0 851 851 CZ 6: Part-Frame, Custom, R-21 Insulation in 2x6 Stud 127.3 48 0 24 24 Cavity, 1 in Rigid Continous, U-value 0.038 Conc FG: Wall-Basement, Custom, Concete Wall w R-13 382.5 8,718 0 1,461 1,461 FG, U-value 0.071, above grade U-value 0.308 Conc FG: Wall- 537.3 2,839 0 825 825 16B-38: Roof/Ceiling-Under Attic with Insulation on Attic 3329.4 6,405 0 3,895 3,895 Floor(also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-38 insulation, U-value 0.026 Stand Floor: Partition Floor(STD=5,WTD=10)-Over 1769.2 6,511 0 3,255 3,255 enclosed crawl space, Custom, R-13 insulation on exposed walls, U-value 0.368 Stand Floor: Floor-Over enclosed crawl space, Custom, 1742 2,358 0 319 319 _ R-13 insulation on exposed walls,"U-value-0.368 Subtotals for structure: 40,189 0 18,164 18,164 People: 2 400 460 860 Equipment: 0 0 0 Lighting: 0 0 0 Ductwork: 0 0 0 0 Infiltration:Winter CFM: 113, Summer CFM: 54 9,077 986 581 1,567 Ventilation:Winter CFM: 38, Summer CFM: 38 3,081 706 416 1,122 Exhaust:Winter CFM: 50, Summer CFM: 50 Humidification (Winter)8.09 gal/day : 2,966 0 0 0 AED Excursion: - --... 0 - -- 1$ - - 18 Total Building Load Totals: 55,313 2,092 19,639 21,731 Check Ficiures Total Building Supply CFM: 884 CFM Per Square ft.- 0.266 Square ft. of Room Area: 3,329 Square ft. Per Ton: 1,839 Volume(ft?): 31,331 Building Loads Total Heating Required Including Ventilation Air: 55,313 Btuh 55.313 MBH Total Sensible Gain: 19,639 Btuh 90 % Total Latent Gain: 2,092 Btuh 10 % Total Cooling Required Including Ventilation Air: 21,731 Btuh 1.81 Tons(Based On Sensible+Latent) Notes - . Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021,2:44 PM Rhvac=Resideniial&Light_Commercial HVAC'-Loads Elite Software Development;Inc. Istonehenge Associates LTrov.NY 12180 - _ Leonardo Residence Page 71 Buildinq Pie Chart Humidification 5% Floor 16% Ventilation 6% "? Infiltration 16% Roof 12% Door 2% Glass 14% Wall 29% AED Excursion 0% Ventilation 5% Floor 16% Infiltration 7% People 4% Door 2% Roof 18% k. Glass 33% Wall 15% CA...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rhvac ResdentialB,Light Commercial HVAC.Loads. -_ = exit,Inca Eli4e Software eonafd pm `Stonehenge Associates __ Leonardo Residence Tro NY 12180 Pa e 8 Detailed Room Loads - Room 9 - Master Bath Avera e Load Procedure General _ _ Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 11.0 ft. System Number: 1 Room Width: 5.0 ft. Zone Number: 1 Area: 55.0 sq.ft. Supply Air: 22 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 2.7 AC/hr Volume: 495 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 22 CFM Percent of Supply.: 4 % Runout Duct Size: 4 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 252 ft./min. Percent of Supply: 4 % Runout Air Velocity: 252 ft./min. Actual Winter Infil.: 5 CFM Actual Loss: 0.073 in.wg./100 ft. Actual Summer Infil.: 3 CFM Item Area: -U- Htg Sen CIg- Lat Sen Description QuantityValue HTM Loss HTM Gain Gain N-Wall-CZ 6 5 X 9 45 0.038 2.8 127 0.2 0 10 E-Wall-CZ 6 11 X 9 92.6 0.038 2.8 260 0.8 0 76 E-GIs-Harvey shgc-0.3 0%S 6.4 0.280 20.7 133 30.9 0 198 UP-Ceil-1613-38 11 X 5 55 0.026 1.9 106 1.2 0 64 Floor-Part-Stand Floor 5 X 11 _ 55_ __ 0.368 ._ 3.7 _202__ ---------_1_8____ ___ 0_ 101 Subtotals for Structure: 828 0 449 Infil.:Win.: 5.4, Sum.: 2.6 144 3.007 433 0.194 47 28 AE_D_Excursion: - 0- Room Totals:- -- - 1,261 47 477 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rhvac-Residential&-Light,Commercial HVAC Loads Elite Software Development,Inc. 'Stonehenge Associafes _ _ `Leonardo Residence Fa Teo NY 12180 - - - - e 9 Detailed Room Loads - Room 2 - Master Suite Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 18.3 ft. System Number: 1 Room Width: 13.5 ft. Zone Number: 1 Area: 247.5 sq.ft. Supply Air: 129 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 3.5 AC/hr Volume: 2,227 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Writer Vent.: 4 CFM Runout Air: 65 CFM Percent of Supply.: 3 % Runout Duct Size: 6 in. Actual Summer Vent.: 6 CFM Runout Air Velocity: 330 ft./min. Percent of Supply: 4 % Runout Air Velocity: 330 ft./min. Actual Winter Infil.: 11 CFM Actual Loss: 0.070 in.wg./100 ft. Actual Summer Infil.: 5 CFM Item Area =U= Htg. Sen Clg Lat Sen Description Quanti Value' HTM Loss HTM Gain Gain E-Wall-CZ 6 18.3 X 9 133.8 0.038 2.8 376 0.2 0 28 S-Wall-CZ 6 13.5 X 9 79.5 0.038 2.8 224 0.8 0 65 E-GIs-Harvey shgc-0.3 0%S (2) 31.2 0.280 20.7 646 30.9 0 964 S-GIs-Harvey shgc-0.3 18%S 42 0.280 20.7 870 14.7 0 619 UP-Ceil-16B-38 18.3 X 13.5 247.5 0.026 1.9 476 1.2 0 290 Floor-Part-Stand_Floor 13.5 X 31.8_________429_3________0.368_____ _3.7_-__ ___1 580 _ _ -1.8 _0 790 Subtotals for Structure: 4,172 0 2,756 Infil.: Win.: 10.7, Sum.: 5.1 286 3.009 862 0.192 94 55 AED Excursion_ _ _ _ Room Totals: 5,034 94 2,814 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM _Rhvac-R_esidentiaLB Light Commercial HVAC Loads ' _;���''` ,` _ _ ,,._'Elite_Software DevelopmenCinc.. Stonehenge AssociatesMf�_ Leonardo Residence .Tro NY 12180 Pa e_10 Detailed Room Loads - Room 3 - Dining Room Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 10.0 ft. System Number: 1 Room Width: 14.0 ft. Zone Number: 1 Area: 140.0 sq.ft. Supply Air: 119 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 5.6 AC/hr Volume: 1,260 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 3 CFM Runout Air: 119 CFM Percent of Supply.: 3 % Runout Duct Size: 7 in. Actual Summer Vent.: 5 CFM Runout Air Velocity: 444 ft./min. Percent of Supply: 4 % Runout Air Velocity: 444 ft./min. Actual Winter Infil.: 11 CFM Actual Loss: 0.101 in.wg./100 ft. Actual Summer Infil.: 5 CFM Item Area -U- Htg Sen Clg Lat Sen Description Quantity Value HTM Loss HTM Gain Gain E-Wall-CZ 6 10 X 9 90 0.038 2.8 253 0.2 0 19 S-Wall-CZ 6 14 X 9 84.4 0.038 2.8 237 0.8 0 69 W-Wall-CZ 6 10 X 9 48 0.038 2.8 135 0.8 0 39 S-GIs-Harvey shgc-0.3 0%S 41.6 0.280 20.7 862 16.1 0 671 W-GIs-Harvey shgc-0.3 0%S 42 0.280 20.7 870 30.9 0 1,298 UP-Ceil-16B-38 10 X 14 140 0.026 1.9 269 1.2 0 164 Floor-Part-Stand Floor 14 X 10 140 _ _ 0.368 __ 3.7 _-_- __ _ _ 51.5-_. _ 1.8 0 _ __ _258_ Subtotals for Structure: 3,141 0 2,518 Infil.: Win.: 11.4, Sum.: 5.4 306 3.010 921 0.193 100 59 AED Excursion: Room Totals: 4,062 100 2,579 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021,2:44 PM v_ac.-Residential&"Li ht-Commercial HVAC Loads' ,;-.: ,, - -9 _. . - ,. _ Elite:Softwiare Development,Ilnc, TRrfio Stonehenge Associates_--'. "° - = - - - - - - - - :Leonardo Residence Pa a 11 Detailed Room Loads - Room 4 - Kitchen (Average Load Procedure General � .. - Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 16.3 ft. System Number: 1 Room Width: 14.0 ft. Zone Number: 1 Area: 228.6 sq.ft. Supply Air: 53 CFM Ceiling Height: 12.0 ft. Supply Air Changes: 1.2 AC/hr Volume: 2,743 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 53 CFM Percent of Supply.: 2 % Runout Duct Size: 5 in. Actual Summer Vent.: 2 CFM Runout Air Velocity: 388 ft./min. Percent of Supply: 4 % Runout Air Velocity: 388 ft./min. Actual Winter Infil.: 0 CFM Actual Loss: 0.124 in.wg./100 ft. Actual Summer Infil.: 0 CFM Item Area -U Htg Sen Clg tat Sen Description Quantity Value' HTM Loss HTM Gain Gain UP-Ceil-1613-38 16.3 X 14 228.6 0.026 1.9 440 1.2 0 267 Floor-Part-Stand Floor 14 X 16.3 228.6 0.368_ _ _3.7841 1_8 0 421 Subtotals for Structure: 1,281 0 688 Infil.: Win.: 0.0, Sum.: 0.0 0 0 0 0 0 0 AED Excursion: 1 People: 200 Iat/per,_230 sen/per: 2__ __ 400________460 - ----- - ------- --------- - ------ Room Totals: 1,281 400 1,149 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rh4ac-Residential&Light Cominercial.HYAC,Loads __ Elite"Softwaie Degelopment,Mcc. Associates . Leonardo Residence Stonehenge A Troy.NY 12180 Pade 12 Detailed Room Loads - Room 5 - Great Room Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 16.8 ft. System Number: 1 Room Width: 13.5 ft. Zone Number: 1 Area: 226.8 sq.ft. Supply Air: 61 CFM Ceiling Height: 12.0 ft. Supply Air Changes: 1.3 AC/hr Volume: 2,722 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Writer Vent.: 2 CFM Runout Air: 61 CFM Percent of Supply.: 3 % Runout Duct Size: 5 in. Actual Summer Vent.: 3 CFM Runout Air Velocity: 444 .ft./min. Percent of Supply: 4 % Runout Air Velocity: 444 ft./min. Actual Winter Infil.: 5 CFM Actual Loss: 0.162 in.wg./100 ft. Actual Summer Infil.: 2 CFM Item Area -U- Htg Sen Clg. Lat . Sen Description Quantity Value HTM Loss HTM _ Gain Gain S-Wall-CZ 6 13.5 X 9 79.9 0.038 2.8 225 0.2 0 17 S-GIs-Harvey shgc-0.3 24%S 41.6 0.280 20.7 862 14.3 0 593 UP-Ceil-16B-38 16.8 X 13.5 226.8 0.026 1.9 436 1.2 0 265 Floor-Part-Stand Floor 13.5_X 16_8-_____226.8 0.368___- ____3.7_____".__835 1.8 _0 417. Subtotals for Structure: 2,358 0 1,292 Infil.: Win.:4.5, Sum.: 2.2 122 3.012 366 0.189 40 23 AED Excursion_ - _ ---- ---- --- -------- --- Room Totals: 2,724 40 1,316 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rhvac-Residential.B.Li ht Commercial HVAC_Loads•• ..:' _ _ _ . ..,._- - 9 _ _. _ , - - _ _ _._Elite.Software,Developmerit;Inc: .Stonehen a Associ es g at_ _ _ _ _ _Leona[do Residence 'Troy,NY 12180 - - Pa a 13 Detailed Room Loads - Room 6 - Bedroom 2 Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 14.0 ft. System Number: 1 Room Width: 11.5 ft. Zone Number: 1 Area: 161.0 sq.ft. Supply Air: 58 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 2.4 AC/hr Volume: 1,449 cu.ft. Req.Vent. CIg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 2 CFM Runout Air: 58 CFM Percent of Supply.: 4 % Runout Duct Size: 5 in. Actual Summer Vent.: 3 CFM Runout Air Velocity: 426 ft./min. Percent of Supply: 4 % Runout Air Velocity: 426 Urnin. Actual Winter Infil.: 9 CFM Actual Loss: 0.149 in.wg./100 ft. Actual Summer Infil.: 4 CFM Item Area -U- Htg Sen` Clg -Lat� - Sen Description Quantity, Value HTM - Loss' HTM Gain Gain S-Wall-CZ 6 11.5 X 9 61.5 0.038 2.8 173 0.2 0 13 W-Wall-CZ 6 14 X 9 126 0.038 2.8 354 0.8 0 103 S-GIs-Harvey shgc-0.3 18%S 42 0.280 20.7 870 14.7 0 619 UP-Ceil-1613-38 14 X 11.5 161 0.026 1.9 310 1.2 0 188 Floor-Part-Stand Floor 11_5 X 14 161 _ _0.368 3.7 592 1.80 296_ Subtotals for Structure: 2,299 0 1,219 Infil.: Win.: 8.6, Sum.:4.1 230 3.011 691 0.192 75 44 AED_Excursion:_ --- ------ -- - Room Totals: 2,990 75 1,264 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rh6ac r Residential i. 'Light Commercial HVAC_Loads `'.:,_; ; ;'= __ Elite Softiroare Development,Inc: Stonehenge Associates Leonardo Residence Trov.NY 12180. -Pa- a 14 Detailed Room Loads - Room 7 - Main Bath (Average Load Procedure Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 8.0 ft. System Number: 1 Room Width: 7.8 ft. Zone Number: 1 Area: 62.0 sq.ft. Supply Air: 20 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 2.2 AC/hr Volume: 558 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 20 CFM Percent of Supply.: 3 % Runout Duct Size: 4 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 235 ft./min. Percent of Supply: 4 % Runout Air Velocity: 235 ft./min. Actual Winter Infil.: 3 CFM Actual Loss: 0.064 in.wg./100 ft. Actual Summer Infil.: 1 CFM Item _ Area. _u Htg Sen Clg _ Lat Sen Description Quantity Value HTM. Loss HTM Gain Gain W-Wall-CZ 6 8 X 9 64.5 0.038 2.8 181 0.2 0 14 W-GIs-Harvey shgc-0.3 0%S 7.5 0.280 20.7 154 30.8 0 230 UP-Ceil-16B-38 8 X 7.8 62 0.026 1.9 119 1.2 0 73 Floor-Part-Stand Floor 7.8_X 8 __-- 62 0.368 - ___3.7 228 1.8 0 114_ Subtotals for Structure: 682 0 431 Infil.: Wn.:2.7, Sum.: 1.3 72 3.014 217 0.194 24 14 AED Excursion: Room Totals: 899 24 445 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM 124vac.7 Residential A,Ught Commeecial HVAC Loads.=: = . _ _ _ Elie Software,Development;Inc. Stonehenge Associate"s: leona�do Residence Tro NY 12180 Pa a 15 Detailed Room Loads - Room 8 - Bedroom 3 (Average Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 12.0 ft. System Number: 1 Room Width: 11.5 ft. Zone Number: 1 Area: 138.0 sq.ft. Supply Air: 37 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 1.8 AC/hr Volume: 1,242 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 2 CFM Runout Air: 37 CFM Percent of Supply.: 5 % Runout Duct Size: 5 in. Actual Summer Vent.: 2 CFM Runout Air Velocity: 272 ft./min. Percent of Supply: 4 % Runout Air Velocity: 272 ft./min. Actual Winter Infil.: 8 CFM Actual Loss: 0.062 in.wg./100 ft. Actual Summer Infil.: 4 CFM Item- - Area -U= Htg Seri Cig -Lat Sen Description Quantity Value HTM Loss HTM Gain - Gain W-Wall-CZ 6 11.5 X 9 103.5 0.038 2.8 291 0.2 0 22 N-Wall-CZ 6 12 X 9 76.8 0.038 2.8 216 0.8 0 63 N-GIs-Harvey shgc-0.3 100%S 31.2 0.280 20.7 646 8.5 0 266 UP-Ceil-1613-38 12 X 11.5 138 0.026 1.9 266 1.2 0 161 Floor-Part-Stand-Floor 11.5 X 12 1.38 _ 0.368.____ 3.7 508 _ 1.8 0 254 Subtotals for Structure: 1,927 0 766 Infil.: Wn.:7.9, Sum.: 3.8 212 3.012 637 0.194 69 41 AED Excursion_ - --- -- -- - - -- -- �- Room Totals: 2,564 69 808 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021,2:44 PM Rhvac.-Residential 8 l ighf Commercial HVAC Loads. _ Elite Softwrare.Development,Inc: Stoneheng As e sociate_s Leonard_o Residence Tro NY 12180 Page 16 Detailed Room Loads - Room 9 - Foyer Avers e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 5.7 ft. System Number: 1 Room Width: 7.0 ft. Zone Number: 1 Area: 39.9 sq.ft. Supply Air: 25 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 4.2 AC/hr Volume: 359 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 25 CFM Percent of Supply.: 6 % Runout Duct Size: 4 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 285 ft./min. Percent of Supply: 4 % Runout Air Velocity: 285 ft./min. Actual Winter Infil.: 2 CFM Actual Loss: 0.081 in.wg./100 ft. Actual Summer Infil.: 1 CFM Item Area -U- Htg Sen Cig Lat Sen Description Quantity Value HTM Loss HTM Gain - Gain N-Wall-CZ 6 7 X 9 28 0.038 2.8 79 0.2 0 6 N-Door-CustomDoor1 5 X 7 35 0.500 37.0 1,295 10.5 0 368 UP-Ceil-16B-38 5.7 X 7 39.9 0.026 1.9 77 1.2 0 47 Floor-Part-Stand Floor 7 X 5.7 __- __ 39.9 0.368 _--..-------- ____ 147 1.8 _0 73_ Subtotals for Structure: 1,598 0 494 Infil.:Wn.:2.4, Sum.: 1.1 63 3.016 190 0.190 21 12 AED Excursion_ _ Room Totals: 1,788 21 506 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rhvac-Residential&Light Commercial HVAC Loads Elite Softwa_re_:Development,Inc.. • Stonehenge Associates::: . Leonardo Residence Tro NY 12180 : _ Page 17 Detailed Room Loads - Room 10 - Laund 9. (Average Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 5.7 ft. System Number: 1 Room Width: 9.3 ft. Zone Number: 1 Area: 53.2 sq.ft. Supply Air: 13 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 1.7 AC/hr Volume: 479 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 13 CFM Percent of Supply.: 6 % Runout Duct Size: 3 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 271 ft./min. Percent of Supply: 4 % Runout Air Velocity: 271 ft./min. Actual Winter Infil.: 3 CFM Actual Loss: 0.110 in.wg./100 ft. Actual Summer Infil.: 1 CFM Item Area .--- -U- Htg Sen Clg Lat Sen Descri tion Quantity: Value HTM Loss HTM Gain- Gain N-Wall-CZ 6 9.3 X 9 74.7 0.038 2.8 210 0.2 0 16 N-GIs-Harvey shgc-0.3 100%S 9.3 0.280 20.7 193 8.5 0 79 UP-Ceil-16B-38 5.7 X 9.3 53.2 0.026 1.9 102 1.2 0 62 Floor-Part-Stand Floor 9.3 X 5.7 53.2-__ 0.368_ _-___ 3 7___ _196 1_8 0 _ 98 Subtotals for Structure: 701 0 255 Infil.: Win.: 3.1, Sum.: 1.5 84 3.013 253 0.191 27 16 AED.Excursion:____ Room Totals: 954 27 271 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM Rhvac-Residential 8 Light.Commercial HVAC:Loads,', _ _ =_Elite Software_yDevelopment,anc:. Stonehenge Associates., .. _- _ Leonardo Residen_ce Tro' NY 12180 Pa a 18 Detailed Room Loads - Room I I - Mudroom Avera e Load Procedure General i Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 16.0 ft. System Number: 1 Room Width: 5.7 ft. Zone Number: 1 Area: 91.2 sq.ft. Supply Air: 15 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 1.1 AC/hr Volume: 821 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 1 CFM Runout Air: 15 CFM Percent of Supply.: 4 % Runout Duct Size: 3 in. Actual Summer Vent.: 1 CFM Runout Air Velocity: 297 ft./min. Percent of Supply: 4 % Runout Air Velocity: 297 ft./min. Actual Winter Infil.: 2 CFM Actual Loss: 0.152 in.wg./100 ft. Actual Summer Infil.: 1 CFM Item Area', -U- Htg Sen Clg .- Lat Sen Descriptiori Quantity Value HTM Loss HTM Gain Gain N -Part-5*/10°-CZ 6 5.7 X 9 37.3 0.038 0.4 14 0.2 0 7 N -Door-CustomDoor2 2 X 7 14 0.360 3.6 50 1.8 0 25 UP-Ceil-16B-38 16 X 5.7 91.2 0.026 1.9 175 1.2 0 107 Floor-Part-Stand Floor 5.7 X 16_--_ 91.2 0.368 3.7 3361_8 Subtotals for Structure: 575 0 307 Infil.: Wn.: 1.9, Sum.: 0.9 51 3.002 154 0.195 17 10 AED Excursion: -___- . Room Totals: 729 17 317 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021,2:44 PM 9_ ds:_ Elite Softy re op Inc.: Rhvac=Residential&Li ht'Commercial HVAC Loa IIStonehenge Associates _ Leonardo Residence T*j NY 12180 Pa a 19 Detailed Room Loads - Room 12 - Stair Avera e Load Procedure General Calculation Mode: Htg. &clg. Occurrences: 1 Room Length: 3.5 ft. System Number: 1 Room Width: 10.0 ft. Zone Number: 1 Area: 35.0 sq.ft. Supply Air: 7 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 1.3 AC/hr Volume: 315 cu.ft. Req.Vent. Clg: 0 CFM Number of Registers: 1 Actual Winter Vent.: 0 CFM Runout Air: 7 CFM Percent of Supply.: 6 % Runout Duct Size: 2 in. Actual Summer Vent.: 0 CFM Runout Air Velocity: 320 ft./min. Percent of Supply: 4 % Runout Air Velocity: 320 ft./min. Actual Winter Infil.: 3 CFM Actual Loss: 0.275 in.wg./100 ft. Actual Summer Infil.: 2 CFM Item Area -U-. Htg Sen Clg Lat Sen Descri tion Quantity Value HTM Loss HTM Gain Gain N-Part-5°/10°-CZ 6 10 X 9 90 0.038 0.4 34 0.2 0 17 UP-Ceil-16B-38 3.5 X 10 35 0.026 1.9 67 1.2 0 41 Floor-Part-Stand Floor_1-0-XI-5- _ —_ 35 _0.368 ._- 3_7 129 -. 1_80 64 Subtotals for Structure: 230 0 122 Infil.: Win.: 3.4, Sum.: 1.6 90 3.011 271 0.189 29 17 AED Excursion___-___ - ----------------------------------------- -- ---------------------- -------- Room Totals: 501 29 139 C:\...\Leonardo, Barber Road.rh9 Tuesday, February 09, 2021, 2:44 PM 27 Cohoes Road Watervliet, New York 12189 | 518.874.1604 | Fax 212.731.0372| www.thepakatargroup.com May 6, 2022 Rosewood Homebuilders 1202 Troy Schenectady Road Bldg 3 Latham, NY 12110 RE: Energy Code Compliance Testing Verification PROECT: 0 Barber Road, Queensbury, NY Adam, As per your request we have conducted the following Energy Code Compliance Inspections and/or tests. ☐ Thermal Bypass Inspection, prior to insulation installation ☐ Duct Tightness Testing when applicable ☒ Infiltration and Air Leakage Testing (Blower Door Test) The purpose of our testing/inspections are to provide independent verification of as built conditions as they specifically relate to the applicable version of the adopted energy code. We are not in any way responsible for the means, methods, materials or equipment used in constructing this home and make no warranty as to their suitability for such. Our testing and/or inspections are in accordance with the applicable version of the International Energy Conservation Code, ASTM Testing Protocols, Building Performance Institute Standards, and Resnet Standards for these tests/inspections. Equipment used for this report includes: ü Retrotec Duct Tester, Model # 341 ü Retrotec Blower Door, Model # 5101 ü Flir Infrared Imager Model C6 All equipment used for these testing/inspections have current and valid calibrations as specified by the manufacturer. 120 Defreest Drive, Troy, NY 12180 | 518.874.1604 | Fax 212.731.0372| www.thepakatargroup.com All technicians completing this work hold current and valid certifications as noted on the report documents. Area and/or volume calculations based on drawings provided by the client representing the as constructed conditions at test location. Attached you will find verified results of the tests/inspections performed at the above noted project. Thank you for choosing The Pakatar Group, LLC for you energy consulting needs Respectfully submitted, The Pakatar Group, LLC By: Alexander Pakatar NEBB BET, BPI IDL Date 5/6/22 Time 2:00 PM Climate Zone 2012 2015 2020 Temperature Indoor (F)60 Outdoor (F)61 Building Type Single Family Detached 1 Fan Model/SN 2020 5 3542 34227 1711 1648 3 2.89 PASS ©Copyright 2017 The Pakatar Group, LLC, All Rights Reserved By my signature above, I hereby certify the accuracy of the test results ENVELOPE COMPLIANCE CALCULATOR (CFM 50 X 60/Building Volume) NOTE: Envelope Passes if ACH50 is less than ACH 50 Target Conditioned Floor Area (ft2): Climate Zone: Applicable Code: Envelope Target (CFM50) Envelope Target (ACH 50) PASS/FAIL: Envelope Test Results (CFM50)(ASTM E779-10) Envelope Test Results (ACH 50) Retrotec 5000 w/ DM32 Manometer, SN: 5FN100361 3 5 3 3 Building Volume (ft3 ) (P) 518-874-1604, (E) alex@thepakatargroup.com 6-May-22 IECC Envelope Thresholds (ACH50)Test Conditions Zones 3 thru 8 Zones 1 & 2 # of Stories COMMENTS Verifier Contact: Test Date: Verifier Certifying Signature: Envelope Tightness Code Compliance Report Client Name:Rosewood Home Builders Alex Pakatar, BPI ID 5047587, NEBB BET ID 24163 The Pakatar Group, LLC Verifier Name/ID: Verifier Company House Address:0 Barber Road, Queensbury, NY 120 Defreest Drive Troy, NY 12180 (518) 874 -1604 Building and Energy Consultants