ApplicationArea Variance [ZBA approved: 1RYHPEHU]
General Information
Tax Parcel ID Number: ____________________
Zoning District: ____________________
Detailed Description of Project [include current & proposed use]:
Location of Project: _______________________________________________________________
Applicant Name: Mailing Address
Home Phone City, State, Zip
Work Phone Cell Phone
E-Mail: FAX No.
Agent’s Name:Mailing Address
Home Phone City, State, Zip
Work Phone Cell Phone
E-mail FAX No.
Owner’s Name Mailing Address
Home Phone City, State, Zip
Work Phone Cell Phone
E-mail FAX No.
Page 1
296.5-1-17
MDR
Maintain 192 Sq Ft shed 1 ft from property line
23 Highpoint Drive
Russell Thomas PO BOX 54
Lake George NY 12845
518-361-1104
rpthomas98@yahoo.com
Russell Thomas same
Area Variance [ZBA approved: 1RYHPEHU]
Site Development Data
Area / Type Existing sq. ft. Proposed
Addition sq. ft.
Total sq. ft.
A. Building footprint
B. Detached Garage
C. Accessory Structure(s)
D. Paved, gravel or other hard surfaced area
E. Porches / Decks
F. Other
G. Total Non-Permeable [Add A-F]
H. Parcel Area [43,560 sq. ft. / acre]
I. Percentage of Impermeable Area of Site [I=G/H]
Setback Requirements
Area Required Existing Proposed
Front Yard [1]
Front Yard [2]
Shoreline
Side Yard [1]
Side Yard [2]
Rear Yard [1]
Rear Yard [2]
Travel Corridor
Height [maximum]
Permeability
Number of parking spaces
Page 2
2717 with porches 2717 with porches
192 192
6757 6757
9666 9666
50966 50966
19% 19%
30 >30 ft house no changes
10 North > 10 ft shed no changes
10 South 0 ft 1 ft
30 >30 ft shed no changes
50% 81% 81%
Area Variance [ZBA approved: 1RYHPEHU]
Additional Project Information
1. Will the proposal require a Septic Variance from the Town Board of Health? _______________
2. If the parcel has previous approvals, list application number(s): _________________________
3. Does this project require coverage under the New York State Pollutant Discharge Elimination System (SPDES) Permit
Program? __ Yes / __ No
4. Estimated project duration: Start Date: __________ End Date: __________
5. Estimated total cost of project: _______________
6. Total area of land disturbance for project: _______________
Floor Area Ratio Worksheet
FLOOR AREA RATIO (FAR) -- The relationship of building size to lot size, derived by dividing the total building floor
area by the lot size in square feet, yielding a percentage.
Zoning District Symbol Floor Area Ratio [FAR]
Waterfront Residential WR 0.22
Commercial Moderate / Commercial
Intensive
CM / CI 0.3
A. The combined area of all square footage, as measure from exterior walls of all structures on the property, including all
floors of the structures, garages, basements and attics with more than five (5) feet of ceiling height and covered
porches. Building square footage does not include: Open deck, docks and that portion of covered docks extending
over water and one storage shed of one hundred twenty (120) square feet or less. Any additional sheds will be
included. (See “FLOOR AREA RATIO”).
B. Commercial or industrial: the total area in square feet as measured from the exterior of the outside walls of a building
or structure, and when applicable, the sum total of all floor areas of the principal and accessory buildings or structures
on the project site.
Parcel Area ___________________________ sq. ft.
Existing Floor Area ___________________________ sq. ft. [see above definition]
Proposed Additional Floor Area ___________________________ sq. ft.
Proposed Total Floor Area ___________________________ sq. ft.
Total Allowable Floor Area ___________________________ (Area x _____) [see above table]
Page 3
NA
Spr2023
NA
X
Area Variance [ZBA approved: 1RYHPEHU]
Compliance with Zoning Ordinance
Requesting relief from SECTION: ________________________________
Need relief from the requirement(s) listed below which can not be met by the project as proposed.
[Check all that apply]
The following questions reflect the criteria for granting this type of variance. Please complete them; use additional sheets if
needed.
1. Whether an undesirable change will be produced in the character of the neighborhood or a detriment to
nearby property will be created by the granting of this area variance?
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
2. Whether the benefit sought by the applicant can be achieved by some method, feasible for the applicant
to pursue, other than an area variance?
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
3. Whether the requested area variance is substantial?
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
4. Whether the proposed variance will have an adverse effect or impact on the physical or environmental
conditions in the neighborhood or district?
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
5. Whether the alleged difficulty was self-created?
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Page 4
179-5-020 Accessory Structure
No
No
No
No
No in 2006 when the shed was moved to that location there were surveyors stakes that Mr BruceFrank verified which is why
it was put there.
✔
$UHD9DULDQFH3UH6XEPLVVLRQ&RQIHUHQFH)RUP6HFWLRQ
$SSOLFDQW1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
7D[0DS,'BBBBBBBBBBBBBBBB /RFDWLRQBBBBBBBBBBBBBBBBBBBBBBB
=RQLQJ&ODVVLILFDWLRQ BBBBBBBBBB
5HDVRQIRU5HYLHZ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
=RQLQJ6HFWLRQ BBBBBBBBBBBBBBBBBBBBBBBB
3UH6XEPLVVLRQ0HHWLQJ1RWHV 3URYLGHG2XWVWDQGLQJ3OHDVHSURYLGHE\
'HHGBBBB BBBBBBBBBBBBB
*HQHUDO,QIRUPDWLRQFRPSOHWH BBBB BBBBBBBBBBBBB
6LWH'HYHORSPHQW'DWD&RPSOHWH BBBB BBBBBBBBBBBBB
6HWEDFN5HTXLUHPHQWV&RPSOHWH BBBB BBBBBBBBBBBBB
$GGLWLRQDO3URMHFW,QIRUPDWLRQ&RPSOHWH BBBB BBBBBBBBBBBBB
)$5DGGUHVVHGBBBB BBBBBBBBBBBBB
&RPSOLDQFHZLWK=RQLQJ2UGLQDQFH BBBB BBBBBBBBBBBBB
&KHFNOLVWLWHPVDGGUHVVHG BBBB BBBBBBBBBBBBB
(QYLURQPHQWDO)RUPFRPSOHWHG BBBB BBBBBBBBBBBBB
6LJQDWXUH3DJHFRPSOHWHG BBBB BBBBBBBBBBBBB
6WDII5HSUHVHQWDWLYH BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
$SSOLFDQW$JHQW BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 'DWHBBBBBBBBBBB
3DJH
5XVVHOO 7KRPDV
+LJKSRLQW 'ULYH
0'5
0DLQWDLQ 6T IW 6KHG IW IURP WKH SURSHUW\ OLQH
DFFHVVRU\ VWUXFWXUH
;
;
;
;
1$
;
;
1$
;
;
/DXUD 0RRUH PHHWLQJ
$SSOLFDQW UHTXHVWV WR PDLQWDLQ VT IW VKHG LQ FXUUHQW ORFDWLRQ RI IW IURP SURSHUW\ OLQH 7KH H[LVWLQJ
KRPH RI VT IW ZLWK SRUFKHV LV WR UHPDLQ LQ WKH VDPH ZLWK QR FKDQJHV 7KH VKHG UHFHLYHG D SHUPLW LQ
IRU ORFDWLRQ GLIIHUHQW WKDQ FXUUHQW $UHD YDULDQFH UHTXLUHG IRU DFFHVVRU\ VWUXFWXUH ORFDWLRQ
,WHPV UHYLHZ DUHD YDULDQFH DSSOLFDWLRQ SUHYLRXV EXLOGLQJ SHUPLW VXUYH\ RI SURSHUW\ VHFWLRQ RI VXUYH\ RI
DGMRLQLQJ SURSHUW\
,WHPV WR EH XSGDWHG RU SURYLGHG
GHHG
VXUYH\ ZDLYHU UHTXHVW
Area Variance [ZBA approved: 1RYHPEHU@
Section 179-14-030
Application materials and site plan drawing is to include sufficient information for the Board to review and provide a decision. The
applicant is to provide a site plan drawing(s) – a survey showing existing conditions, a proposed conditions map (see page 00 for
specific criteria) and include any other attachments that address A - D as applicable to the proposed project.
A.General Shown on Sheet #
1 Title, Name, Address of applicant & person responsible for preparation of drawing
2 Deed
3 North arrow, Tax Map ID, date prepared and scale [minimum: 1 inch = 40 feet ]
4 Boundaries of the property plotted to scale, zoning boundary
5 Principal structures, accessory structures with exterior dimensions
6 Site improvements incl. outdoor storage areas, driveways, parking areas, etc.: existing &
proposed
7 Setbacks for all structures and improvements: existing & proposed
8 Elevations and floor plans of all proposed and affected structures
B.Water & Sewer Shown on Sheet #
1 Project sewage disposal facilities, design details, construction details, flow rates, and number of
bedrooms proposed
2 Water supply [i.e. well] & septic on adjoining lots with separation distances to existing or
proposed on-site water supply and septic
3 Separation distances for proposed sewage disposal system to well and water bodies
4 Existing public or private water supply [well, lake, etc.]. Method of securing public or private
water, location, design and construction of water supply including daily water usage
5 Percolation test location and results
C.Parking / Permeable Areas Shown on Sheet #
1 Number of spaces required for project including calculations and justification: existing &
proposed
2 No. of existing parking spaces, number to be removed, number to maintain and type of surfacing
material [e.g., gravel, paved]
3 Provision for pedestrian and handicap access and parking: existing & proposed
4 Design details of ingress, egress, loading areas and cutting: existing & proposed
5 Location and character of green areas [existing and proposed], modification to green area, buffer
zone to remain undisturbed
6 Lighting, location and design of all existing and proposed outdoor lighting
D.Additional Site Development and Miscellaneous Shown on Sheet #
1 On-site & adjacent watercourses, streams, rivers, lake and wetlands
2 Utility / energy distribution system [gas, electric, solar, telephone]: existing & proposed
3 Location, design and construction details of all existing and proposed site improvements
including: drains, culverts, retaining walls, fences, fire & emergency zones and hydrants, etc.
4 Square footage of bldg. area proposed for office, manufacturing, retail sales or other commercial
activities: existing & proposed
5 Signage: Location, size, type, design and setback: existing &proposed
6 Waiver Request: provide letter with application requesting any waivers: please reference
specific items
7 Commercial / Industrial Development requires submission of Landscaping, Stormwater
Management, Grading & Lighting Plans
8 Identification of Federal, State or County permits required for the project together with a record
of application for all necessary permits
Page 5
see survey
see attached
see survey
"
"
"
"
see building permit
NA
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"