Loading...
2000-088 ff I + ,:k Ynr r YI Uert-ificate e Town of Queensbury Warren County; New Yark Date May 15 e' 2000 This 's to cc icy th{at work requested to be done as shown by Permit No, 'has,been completed. This structure inay be occupied as a SELF STORAGE BUILDING ,, Location 32 HORTHWAY LANE Owner .. .�_... ORTHWAY SELF STORAGE, TAX HAP NO,. 116, a 1-1 By Order Town Board TOWN OF QUEEN BURY e or�ofQwFade Enforcement BUILD DING PERMIT Town of Queensbury, 742 Bay Road, Queensbury,NY 12804 County of Warren (518)761-8256 VALUE $ 25000 2000088 TAX MAP NO. 116 . -1-1 Building Permit No. NORTHWAY SELF STORAGE, Permission is hereby granted to j 2 NORTHWAY 1, Owner of property located at SELF STORAGE BUILDING #5 in the Town of Queensbury;to construct or place a at the above location in accordance to application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Owl;aMdres$32 NORTHWAY LANE QUEENSBURY, NY 12804 Contractor or Builder's Address: Electrical Inspection Agency: Type of Construction: FREE/STANDING/UNHEATED BLDG. P'T78V%3cW09EF STORAGE BUILDING AS PER PLOT PLAN SPECIFICATIONS Proposed Use: SELF STORAGE BUILDING #5 70 March 17 2002 $ PERMIT FEE PAID—THIS PEMUT EXPIRES (If a longer period is required,an application for an extension must be made to the Code Enforcement Officer of the Town of Queensbury before the expiration date.) 17 March 2000 Dated at the Town of Queensbury this Pay of SIGNED for the Town of Queensbury Ry- o Enforcement Officer Building Pen-hit .Application Town Of Queensbury - Dept. of Community Development, 742 Bay Road, Queeitsbuty, NY 12804 1761-82561 BUILDING & CODE ENFORCEMENT . Requirements prior to issuance A permit must be obtained before of this permit: PERMIT FILE NOr_ 8 beginning construction. No inspections PERMIT FEE PAID$ will be made until applicant has received Q Zoning Board Action a VAL ID BUILDING PERMIT. All Area /Use RECREATION FEE PAID$ applicants' spaces on this application MUST be completed aad•the signature Planning Board Action REVIEWED BY.•_ ��- of the applicant'must appear on the SPR / Subdivision /Other Building Inspector a Iication form. ,a. Recreation Fee Payment Applicant' __,Northway Self 'Storage LLC Owner' Larry J. Cleveland & John R. Shine Address: 32 Northway Lane,• Queensbury, NYAddress- 54 Autumn Ln, Queensbury, NY 12804 Phone # ( 518 -) -745- - - 7500 - Phone # ( 518--) -745-_ 7500�-_ Property Location: 32 Northway Lane None Tax Map Number lls / 1 / 1 Subdivision Name: - Section Block I.ot NATURE OF PROPOSED WORK: ESTIMATED MARKET VALUE OF THE XXX .New Building: ------a_ CONSTRUCTION: $ 25,000 residence j ommereial Addition to 'Buildi residence j commercial OCCUPANCY INFORMATION: Alteration to Building: Primary Building - residence / commercial Single Family Dwelling Residence / Commercial Two Family Dwelling no change to exterior size Family Dwelling Office Other Work (describe below) Mercantile -- D Manufacturing XXX Other MAR 11 2000 GROSS AREA OF PROPOSED STRUCTURE: 1st Floor. . . . . . . . 2700 s ft. If ADDITION, whavElUw�Zl +use ,��i q• of new addition be? . 2nd -Floor. . . . . . . sq. ft. Other Floors. . . . sq. .ft. (not unfinished cellar or basement) ACCESSORY BUILDINGS: Detached Garage 1, 2 car TOTAL FLOOR AREA: 2700 SQ. FT. Attached Garage 1, 2 car Private Storage Building SIZE OF NEW STRUCTURE: Commercial Storage Building 135 FEET X 20 FEET Other Foundation. Type: Slab Will any second-hand or ungraded Number of Stories: One (1) lumber be used? If so, for what? (habitable space only) Height (grade to ridge) : ` 9 feet TYPE OF HEATING SYSTEM: Number of fireplaces and/or woodstove (circle• all which applies) to be installed: 0 Electric / Oil / Gas / Wood Forced Hot Air ,J Baseboard j Other Person responsible for supervision of work as regards to building codes is: James Minnick, Glens Falls Insulation Name Addresss Phone Builder: James Minnick, Glens Falls Insulation -793-8254 Plumber: Mason: Electrician: DECLARATION Please sign below after you have carefully read the statement. To the best of my knowledge the statements contained in this application, together with the plans and specifications submitted, are a true and complete statement of all proposed work to be done on the described premises and that all provisions of the Building Code, the Zoning Ordinance and all other laws pertaining to the proposed work shall be complied with, whether specified or noted, and that such work is authorized by the owner. Further, it is understood that Uwe shall submit prior to a Certificate of Occupancy''or Certificate Compliance being issued, an AS BUILT PLOT PLAN by a licensed s eyor; rawn ale, s ng actual location of project on premises. 'Signature: caner owner's agent, architect, contractor) r GENER4L MSPECTION REPORT (518) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804. ArriveZ, � In ax In ector's Initial NAME: C _- PERMIT# LOCATION: DATE , ''r o u TYPE OF STRUCTURE.- RECHECK N/A.-YE COMMENTS tings/Piers I Monolithic Four Form Reinforcement in Place The contractor is re ible for providing protection fr m freezing for 48 hours following a placemen ! of the concrete. Materials for this purpose n site Foundation/Wall ur I Reinforcement in Place - — Foundation/Dampproo g - - - - Backfill Approval Plumbing Under Slab Plumbing Vent/Vents in PI ce Rough Plumbing Heating Rough In Insulation Foundation Walls IntenRFoundation Walls E Floors Walls CeilingDuct work or pipingunheated spacesProper Vent, Attic Vent Framing Jack Studs/Headers Bracing/Bridging - - Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2, 3,4 hour Firestopping I 1 COMMERCIAL FINAL INSPECTION REPORT Building& Code Enforcement Date inspection request received: l �� Office No. (518)761-8256 Dept. of Community Development Town of Queensbury Arrive am/pm Depart am/pm 742 Bay Road Inspector's Initials .� Queensbury,NY 1 804 NAME G) 1.,1 � f PERMIT# -DcP,P LOCATION Z� DATE d- TYPE OF STRUCTURE N/A YJ NO CON RENTS ChimneyP'B"Vent/Dired Vent location Plumbing Vent Roof Complete Exterior finish grade complete � hnerior/exterior guardrails 42 in.pladbr6Vdecks Interior/exterior ballads 4 in.spacing latform/ Stair handrail 34 in.-38 in. Step risers 7 3/4 m. Main door 44 in. All others 36 in. Lever handles Exits at grade or pla Canopy to cover req.exit doors Gas valve shut-off exposed&regulator 18 in.)above gra Floor bathroom watertight Other floors okay Hot water relief valve Boiler/fumace enclosure <250,000 BTU N/R 250.000 BTU to 1,000,000 BTU's I hour) >I,000,000 BTU's(2 hour) Gas furnace shut off within 301 or within line of site Oil furnace shut off at erutranceto fum area _ Stockroom enclosure(I hour),%hour oor Storage/receiving/shipping room(2 ho r), 1 '/z doors 1 14 hour doors and closers '4 hour corridor doors and closers Firewalls/frre separation,2 hour,3 hour complete Fire dampers,2 hour fire wall/separation or greater Fire door/shutters 1 '/2 hour,3 hour Ceiling fire stopping 3,000/5,000 sq.ft. Fan shutdown,smoke vents or fan Exit door/panic bars assembly hardware Elevators Elevator signage Handicapped bathroom grab bars/sinkshoilets Handicapped bath/parking lot siguage Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/12 in.beyond Vdive listening system and signage assembly space inal Electrical Site Plan/Variance required Final Survey,new structures As-built septic system layout required Okay to issue temp.C/O(Certif.of Occupancy) Okay to issue permanent C/O(Certif.of Occupancy)_ Okav to issue C/C(Certif.of Compliance) _�;(/';/��^ COMMERCIAL FINAL INSPECTION REPORT . , ,t Building& Code Enforcement Date inspection request received:, D Office No. (518)761-8256 G� IDepL of Community Development 7��3rs Town of Queensbury Arrive. am/pm Depart pM 742 Bay Road Inspector's Initials(17 tlueensbury,NY �12804 6,s �r NAME PERMIT# LOCATION DATE f 103- -^ TYPE OF STRUCTURE !"a7e, = y N/A YES N S � Chimueyf'B"Vent/Direct Vent location Plumbing Vent I [� � t^2j/f � c u Roof Complete t Exterior finish grade complete clUSS latesriior/exterior guardrails 42 in.platf Interior/exterior ballasters 4 in.spacing atf decks Stair handrail 34 in.-38 in. Step rises 7 3/4 in. ?Main door 44 in. All others 36 in. Lever handles Exits at grade or platform Canopy to cover req.exit doors Gas valve shut-off expo &regulator 8' .)above grad Floor bathroom watertight Hot Other floors okay Hat water relief valve Boiler/furnace enclosure <250,000 BTU N/R 250.000 BTU to 1,000,000 BA(lr} >17000,000 BTU's(2 hour) Gas furnace shut off within 30 ft.or within ine of site Oil furnace shut off at entrance to furnace a ea Stockroom enclosure(I hour),3/a hour door Swragelreceivingf shipping room(2 hour), '/z doors I G,z hour doors and closes ',hour corridor doors and closers Firewalls/fire separation,2 hour,3 hour 0,6mlcte Fire dampers,2 hour fire wall/separation or greater Fire door/shutters 1 '/2 hour,3 hour Ceiling fire stopping 3,000/5,000 sq.ft. Fan shutdown,smoke vents or fan +- Exit door/panic bars assembly hardware Elevators j Elevator signagg Handicapped bathroom grab bars/sinksttoilets Handicapped bath/parking lot signage Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/12 in.beyond active listening system and signage assembly space Final Electrical Site Plan/Variance required Final Survey,new structures .As-built septic system layout required Okay to issue temp.C/O(Cettif.of Occupancy) Okay to issue permanent C/O(Certif.of Oocupancy) Okay to issue C/C(Certif.of Compliance) GENERAL INSPECTION REPORT (518) 761--8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay Road Queensbury,NY 12804. Arrive am/pm Depart m Inspector's Initials NAME: tPERMIT LOCATIO DATE: — d TYPE OF STRUCTURE: RECHECK. N/A YES NO COMMENTS Footings/Piers I Monolithic Pour Form _ Reinforcement in Place_ The contractor is responsi le for providing protection fro freezing for 48 hours following place men of the concrete. Materials for this purpose n site Foundation/Wallpour Reinforcement in Place Foundation/Dampproofin BackHll Approval Plumbing Under Slab___ Plumbing Vent/Vents i ce Rough Plumbing Heating Ron - Insulation Foundation Walls Injin Foundation Walls E _ Floors Walls Ceiling Duct work or pipingU9110ated spacesPro Vent, Attic Vent VPn Jack Studs/Headers l 0 J� (� Bracing/Bridging _ f� U� l I/a, Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier j Fire Separation 1,2, 3,hour Penetration Sealed e Fire Wall 2,3,4 hourrra�t7 /^- Firestoppin ,,ff'' RESIDENTIAL FINAL INSPECTION REPORT Office No.(518)761-8256 Date inspection request received: Building&Code Enforcement Dept of Community Development Anive j2�&fam/pm Depart m Town of Queensbury Inspector's Initials 742 Bay Road Queensbury,New York,12904 NAME PERMIT LOCATION DATE TYPE OF STRWTURE C2 25 N/A YES NO COMMENTS Chimney Heightp`B"Vent/Direct Vent Location Fresh Air Intake Plumb Vent through roof Roof Complete Exterior Finish Complete Interior/Exterior Railings 30"to 36" Exterior Handrails,balconies,landing 18 in.or more Interior Handrails stairs both sides 3 or more risers ,n Grade 2%away from foundation 8"clearance to sill p Gas Valve shut-off expo ator 18"a ve gra Gas Furnace shut-off within 30 n I' site Oil Furnace shut-off at entrance to furna area Furnace/Hot Water Heater operating Relief Valve(s)installed Headroom,6 ft.6 in.on stairs Basement stairs,6 ft.4 in. Handrail exterior stairs both sid more than.3 risers Interior privacy/trim/doors/ma' entrance 36" Floor Finish Bathroom/Kitchen waterti Interior Handrails Balconi /Landing 18 in.or more Railing across window r4airwells Smoke Detectors: every level a 0 within 0 entrance t furna are site a- 'a Heater operating t ope t g n stairs I in. both S�d more�Z 3 risers )Ors/ma e]ltmc window Detectors: every bedroom outside every be oom inter connected Bathroom fans' Plumbing fixtures Foundation insulation '/4 hom•fire door/door closer Garage fireproofing Garage penetrations sealed Furnace in separate room protected(in garage) Light ventilation per room Safety glazing 18"or less from floor Final Electrical Site PlanNariance required Final Survey Plot Plan As Built Septic System layout required Okay to issue C/C(Certif.of Compliance)_ Okay to issue temp.C/O(Certif.of Occupancy)_ Okay to issue permanent C/O(Certif.of Occupancy) GENERAL INSPECTION REPORT (518) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building&Code Enforcement 742 Bay'Road Queensbury,NY 12804. Arrive 17b am/pm Depart am/pm Inspector's Initials NAME: RMIT#= `l AS LOCATION: CAvlk,V ATE: --2000 TYPE OF STRUC RECHECK N/A YES NO COMMENTS Footings/Piers I Monolithic Pour Form Reinforcement in Place The contractor is responsible fo providing protection from free g for 48 hours following the pla elment of the concrete. Materials for this purpose on sit Foundation4allpour Reinforcement,n Place Foundation/Damp r fing Back ill Approval Plumbing Under Slab Plumbing Vent/Vents in Pla Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R Foundation Walls Exterio R Floors Walls Ceiling Duct work or piping in unheated spaces - Proper t,Attic Vent Jack Studs/Headers ! Bracing/Bridging _ Leo 61 ,1�T2�t� o Joist Hangers p/JackPosts/MainBeam Air Infiltration Barrier Fire Separation i,2, 3,hour ` Penetration Sealed' Fire Wall 2,3,4 hour Firestoppin COIO'31ERCIAL FINAL INSPECTION REPORT Building& Code Enforcement Date inspection request received: Office No. (518)761-8256 Dept of Community(Development Town of Queensbury Arrive A;b am/pm Depart am/pm 742 Bay Road Inspector's Initials Queensbury,NY 12804 NAME PERMIT# —Q&T LOCATION DATE !S�, TYPE OF STRUCTURE N/A YES NO CONMENTS Chimney/"$"Vent/Dired Vent 'on Plumbing Vent Roof Complete Exterior finish grajcomplFntesiar/exterior gu .platf decksIaterior/exterior bapacatfarnnlda�csStair handrail 34 i Step msears '7 s 4 Bain door 44 in. AD others 36 in. Lever handles Exits at grade or platform Canopy to cover req.exit d Gas valve shut-off expo &regulator(18 in.)above gradx Floor bathroom waterti Other floors okay Hat water relief vale Boiler/furnace encl e <250.000 BTU IlZ 250.000 BTU to 1,000.000 BTU's(1 hour) >1,000,000 BTU's(2 hour) Gas furnace shut off within 30 ft_or within line of site Oil furnace shut off at entrance to furnace area Stockroom enclosure(I hour),-1/4 hour door Staragelreceiving/shipping room(2 hour), 1 "/z doors I 1,i hour doors and closers }4 hour corridor doors and closers Firewalls/fure separation,2 hour,3 hour complete Fire dampers,2 hour fire wall/separation or greater Fire door/shutters 1 1/7. hour,3 hour Ceiling fire stopping 3,000/5,000 sq.ft. Fan shutdown,smoke vents or fan Exit door/panic bars assembly hardware Elevators Elevator sigaage Handicapped bathroom grab barslsinkshoilets Handicapped bath/parking lot signage Handicapped service counters 34 in.,checkout 36 in. Handicapped ramp/handrails continuous/12 in.beyond Active listening system and signage assembly space Final Electrical Site Plan/Variance required Final Survey,new structures As-built septic system layout required Okay to issue temp.C/O(Ccrtif of Occupancy) Okay to issue permanent C/O(Certif of Occupancy) Okay to issue C/C(Certif.of Compliance) GENERAL INSPECTION REPORT ( 518 ) 761-8256 Town of Queensbury Dept.of Community Develoliment Date inspection request received: Building& Code Enforcement 742 Bay Road Queensbury,NY 12804 Arrive 611-10am/pm Depart m/pm Inspector's Initial_ NAME: k- .fe11-S, 1 PERMIT# LOCATION: o— DATE : TYPE OF STRUCTURE: RECHECK N/A YES NO COMMENTS Footings/Piers —� Monolithic Pour For►n Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placcmcn of the concrete. Materials for this purpose on site Foundation/Wallpour Reinforcement in Place Foundation/Dam pprooG ng Backlill Approval Plumbing Under Slab Plumbing Vent/Ven s in Place Rough Plumbing Heating Rough-In Insulation Foundation Walls Interior R- Foundation Walls Extcrior R- Floors - Walls - Ceiling Duct work or piping in unheated spaces R- Proper Vent, Attic Vent Framing_ _ _ s� tx �X�✓ec,,,j 2co� "/ Jack Studs/Header __ / Bracing/Bridging Joist Hangers Jack Posts/Mai Beam cve fY1Gtiu c un- �c i� l - Air Infiltration Barrier Fire Separation 1,2, 3, hour Penetration Sealed _ �� C 6GrrT c477o� ateU,�c�aL{i�� s lle..t f Fire Wall 2.3,4 hour Firestopping � /A f L a,-,( Co�,<t c vim . GENERAL INSPECTION REPORT (518 ) 761-8256 Town of Queensbury Dept.of Community Development Date inspection request received: Building& Code Enforcement ; 742 Bay Road 1 Queensbury,NY 12804 Arrive am/pm Depart! ."Jam/pm Inspector's Initials NAME: \ PERMIT Z�—(_t LOCATION: DATE TYPE OF STRUCTURE: RECHECK N/A YES O COMMENTS _ gPier, Monolithic Pour Form Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose nlsite Foundation/Wallpour Reinforcement in Place Foundation/Dampproofin T Backfill Approval- Plumbing Under Slab Plumbing Vent/Vent' PI lcc;�� Rough Plumbing Heating Rough-In ~ _--- Insulation Foundation Walls Interbr R- Foundation Walls Exter4or R- Floors s R- Walls ^R- Ceiling R- Duct work or piping in unheated spaces R- _ Proper Vent, Attic Vent_ Framing_ -_. _ Jack Studs/Headers Bracing/Bridging_. Joist Hangers Jack Posts/Main Beam Air Infiltration Barrier Fire Separation 1,2,3,hour Penetration Sealed Fire Wall 2,3,4 hour Firestopping AMERICAN BUILDINGS COMPANY EUFAULA, AL 36027 SELF STORAGE DIVISION (334)687-2032 June 26, 1998 Jim Minnick GFI-Metal Building Sales 8 Sagamore Street Glens Falls, NY 12801 Dear Mr. Minnick: This letter is in regards to American Buildings Company project number 71-7662-01. Per my conversation with you this morning, it is my understanding that the studs for the ,above referenced project are attached to the concrete floor slab with one 3/8" diameter expansion anchor and on'e Ramset shot. This attaclunent differs from the attaclunent shown on the drawings provided by American. The connection as actually constructed in the field is of adequate strength to withstand shear and uplift loads imposed on them by code. The expansion anchor must have a minimum embeddment of 2 1/2" and the Ramset shot must have an ernbeddment length of 1/2". If you have wivinore questions, please do not hesitate to advise. Sincerely. 1�4 LWe-1)X Darby Owenby cc: File ------------------------ -- ---------------- --- --------------------------- - - ---- - • +' F'RGE 1/1 American Buildings Storage S, steam &_C'om�none ts. . P.O.130)&20 Eufaula,Alabama 36072 ,rim Micuuck . + _ = _ May 18,2000 GIFT-lvleta3 Buildings Sales 506 Queensbury Ave.' S o2b ll� ti�f�i„B�w,o� vc fc� Glens Falls,NY 12$04 ✓ice �i�iUr� (518)793-8290(f) � � Job#: 71-2122ti,sfia/� cars Northway Self-Storage Queensbury,NY Jim, I am sending you this letter to verify our conversation on'Wednesday, May 10, 2000;pertaining to the above referenced project. American Building Company drawing 4/D2 shows a masonry anchor,but calls out a Ram Set Fastener{not by,American)to the concrete floor. The reaction for each stud is a gravity load of 26010 lbs,an:uplift load of 700 lbs, and a shear load of$00 lbs.The attachment can be 3/8".„.__ .. . expansion'anchor and one Ramset shot,if the anchors can exceed the reactions. American Building Company draring D) shows:'a.masonry-anchor but-calls out a-�tarri Sec Fastener'{not by Aasierkiiii to the concrete floor.The reaction foreach stud is.a gravity load of 1300 lbs,an uplift load of 400 lbs, and a shear load of 800 lbs:The attachment can be Ramset shot, if the anchors can exceed the reactions. If you have any questions or need further clarifications on these matters,please contact me�u7 334-688-2473. 11'�3� - - `�� c� �w�zr---- ..��►.r 1?v - fir-- ;�`,t� -''C'�i�= Sincerely, Robert E. Searcy Vrem re Design Engineer .�.- �,.=Vrs row y4- ' t>c�rids u flier -- I q o tc�,