2000-128 (2) Clinton Traver
Addition
SE view NOTICE
House FOAM INSULATION MUST BE COVERED
(existing) BY A 15 MINUTE THERMAL BARRIER
ar '0
TOWN OF QUEENSBURY BUILDING DEP�RTF� IN ION MUST BE
Based on our limited examination,
\ OV $ $ STILE
cwmpliancevith our comments BARRIER
not be construed as indicating the i
plans and specit'ications are in fug
compliance with the code.
F
N1lV view FILE COPY
rJ TOWN OF QUEENSBURY
RE W BY
LATE
X
Y
PAR 2000
OF
IP
ir
I it
I it
ado door
Y-O'Fire rated door
awdu I 1�y�j��
Fa118t BtQVa
giz —I
mm oil CEt1.��� At0
3'-0"intariordoor 23'
211-01
Ltin flue
FOUNDATION
AAbove
Foundation for cl»mney
24:ti„
4 1/2"x 4 1/2"x 9 1/4"
pocket for center beam
Detail of foundation wall
and monolithic slab
Qli p(tslttyltl8`1 EY�OS�
]48'z 10'mrlwrba8
R- insulation
b9m 4'bd—
is
Front elevation
21`
—71
T „
8'
FLOOR SYSTEM
Front
R 19 insulation
2"x 6"S P.F.bottom prate
2°x10"joists
2 0" ^16"O.C.
3Id'T&G subfloor
19'-9" 2"x6"P.T.sill plate
$-8 114" 3-2 a10'bailt up beam
"Idly cob, Detail of center beam,folly columns,and footings.
Built-up center beam
3-2"x Ws
T-0"
4"Lolly column
sear
Above
t }A✓d'
1 1'�
2"'
12'-0"
9'-10 3/4"
WALLS
Front Wall 51l4"x117i8„
Right Wall
—211.0! ,4toiaiam Lvt. 24��„
12'•411--
3'•3"
f1011
11'•10"' U
i
2"X6"shtdwd
° 161,O.C.
T•8 s(8" 5'-11(4"
61.1011
1'•6 4" 1� J� �j �j 1[ 1 IL 111 1 1
7-u
10.for frarsted
door to garage
Left Back Wall Right Detail of common wall with pa
211.011
.41/2" 3.21x l0"
6'•0" uiltupheader
1l2°aheetock 511 Ere rated sheetrock
an common wall with garage
T•8�(8" 6.611211
10,
t
R•14insulalion
tt
ROOF
FRONT ELEVATION
3T-3l4"
—fit
e
I
i
A
1 1
R4(JF
LEFT ELEVATION
2 0"
1 l'-10 1/4"
2 x 10 ridgepole----,. TQ,t,s.f Z�QQ
at'/["
-C l
A9
12
2"x 8"rafter
2"x 8"ceiling joist 16" O.C.
16"O.C.
1/2"x 16"Micro-Lam L.V.L.
Detail of ridge
4-
Ridge cap
Detail of roof and eave
R-3 0 insulation- -- 25 year shin es
double 2 x 6 late
drip edge
1S lb.roofing felt
2 x 6 sub facia-
1/2"sheathing
1 x 8 faci room in attic truss
continuous vent 2 x 2 nailcr
Tyvek wm 1/4"plywood soffit
2 x 6 wall stud
16"O.C.
1/2"sheathing
double 4 vinyl siding
Deck
4 3/4" 1'-4" 9'-4 1/4"
1 11 it III
12'-0"
Rear elevation
211-0"
all l
3'-4 1/2"
x4 pasts to be
fastened
concrete iers
• X,
1'-0" 9'41/4"
Left elevation
2"x 6"P.T.rail attached to
house at this point
5/4"x 6"bullnosed
P.T.deck boards
2"x 8"P.T.ledger
bolted to addition
2-2"x 10"P.T. 2"x 8"P.T.Joists
built up beam
9'-7 3/4" .
1'-0"