IM Inspection Worksheet_28-10-2022_13-56-50INSPECTION WORKSHEET (021797-2022)
RC-0577-2021Case Number:Case Module:Permit Management
10/28/2022 PassedInspection Status:Inspection Date:
Zoning-PermitInspection Type:Inspector:Bruce Frank
Job Address:Parcel Number:3 Polk Dr
Lake George, NY 12845
239.12-2-35.2
Company Name NameContact Type
Applicant ROCKHURST, LLC
Architect Balzer & Tuck Architecture
Concrete Contractor R. C. Springer Concrete
Contractor Abele Builders
Excavation Contractor Crandall Excavating
Framing Contractor Top Notch Builders
Granted Permission ROCKHURST, LLC
Primary Owner ROCKHURST, LLC
Checklist Item CommentsPassed
Code Compliance Notes True October 28, 2022: final inspection revealed all per approval, and
certified by EDP's Gavin Vuillaume, RLA (see letter dated October
28, 2022 and as-built site plan), except permeable paver sidewalk
on south side of dwelling changed to lawn, and small
landscaping bed by garage to be planted in the Spring of 2023
(availability problem and promissory letter provided by Chris
Abele). Good for sign-off of SP 57-2020. As-built survey for
dwelling to be provided next week for ZA review for AV 49-2020.
October 28, 2022 Page 1 of 1