Loading...
IM Inspection Worksheet_28-10-2022_13-56-50INSPECTION WORKSHEET (021797-2022) RC-0577-2021Case Number:Case Module:Permit Management 10/28/2022 PassedInspection Status:Inspection Date: Zoning-PermitInspection Type:Inspector:Bruce Frank Job Address:Parcel Number:3 Polk Dr Lake George, NY 12845 239.12-2-35.2 Company Name NameContact Type Applicant ROCKHURST, LLC Architect Balzer & Tuck Architecture Concrete Contractor R. C. Springer Concrete Contractor Abele Builders Excavation Contractor Crandall Excavating Framing Contractor Top Notch Builders Granted Permission ROCKHURST, LLC Primary Owner ROCKHURST, LLC Checklist Item CommentsPassed Code Compliance Notes True October 28, 2022: final inspection revealed all per approval, and certified by EDP's Gavin Vuillaume, RLA (see letter dated October 28, 2022 and as-built site plan), except permeable paver sidewalk on south side of dwelling changed to lawn, and small landscaping bed by garage to be planted in the Spring of 2023 (availability problem and promissory letter provided by Chris Abele). Good for sign-off of SP 57-2020. As-built survey for dwelling to be provided next week for ZA review for AV 49-2020. October 28, 2022 Page 1 of 1