Loading...
RC-0264-2022 Office Use Only PRINCIPLE STRUCTURE Permit#:— k- 62k4 a 2. PERMIT APPLICATI ON Permit Fee:$ D 742 Bay Road, Queensbury, NY 1280 . *Rec Fee:$ 11300 MAY P: 518-761-8256 www.queensbury.�ELt i Invoice#: IVI Flood Zone? Y Reviewed By Project Location: VJS'sFr wlmn !11 �+oA-D Tax Map #: Subdivision Name: *TOWN BDAESOLUTION 385-2020:$1000 recreationfee for new dwelling units: single family,duplexes/two-family, multiple family, apartments, condominiums,townhouses, and/or manufactured & modular homes, but not mobile homes.This is in addition to the permit fee(s)-. PROJECT INFORMATION: Residential Commercial, Proposed Use: Single-Family: Two-Family Multi-Family (#of units:_) 1. _�e,Custom 2. Modular(REQUIRED:NYS stamped engineered drawings of foundation plans) Townhouse —Garage (#of cars Business Office Retail Hotel/Motel Industrial Heated Warehouse/Storage Building Unheated.Warehouse/Storage Building Amusement Ride Other(describe: MAIN STRUCTURE SQUARE FOOTAGE:, GARAGE SQUARE FOOTAGE: 11T floor: 1ST floor: 2 nd floor: 2nd floor: 3rd floor: Total square feet: Basement(habitable space): Total square feet: Principle Structure Packet Revised March 2022 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 2. Proposed use of the building: 511U611 1 W 1- 3. If Commercial or Industrial, indicate the name of the business: 4. Source of Heat: Gas Oil Propane Solar Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application, one perappliance) 5. Are there any structures not shown on the plot plan? YES_�LNO Explain, if yes: 6. Are there any easements on the property? YES--,VNO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? 3 - B 140E S b. Is this a corner lot? YES X,,_NO c. Will the grade be changed as a result of the construction? YES_KNO d. What is the water source? YPUBLIC PRIVATE WELL e. What type of wastewater system is on the parcel? SEWER__�/, PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury. After 1 year from the initial application date, 100%of the fee is retained. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and inconformance with local zoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed I,or my agents,will obtain a certificate of occupancy. 5. 1 also understand that I/we are required to provide an as-built survey by a NYS licensed la nd surveyor of all newly constructed facilities prior to issuance of certificate of occupancy. I have read and agree to the above: PRINT NAME: , SIGNATURE: DATE: i Principle Structure Packet Revised March 2022 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): C�O=PF�AJr__ 0 _ Mailing Address, C/S/Z:. S t-W-- KA-!LD 1 Cell Phone: b ) 5(-1�- .(073c:3 Land Line: Email:._ 13c11��CrLs CEj MA-i L cam • Primary Owners Name(s): c:� Mailing Address, C/S/Z: - 0 Cell Phone: (Si �6 ) 7_7 Z ^ �i.'7R U Land Line: �) Email: ❑ Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contractor Name(s): CE'PIZ -N�1 t Cc —, aA cm zyj Contractor Trade: C C_ _ -Mailing Address, C/S/Z: 159al PoU Te' 01 12 Z� Cell Phone: ( ($ ) �J�s (00 Land Line: �) Email: L GoYV� **Workers' Comp documentation must be submitted with this application** • Architect(s1/Engineer(sl: Business Name: � 1 LlL t�- I��Ifl'N �� �• Contact Name(s): Mailing Address, C/S/Z: CS Cell Phone: Z- Land Line:�) Email: ftyj Contact Person for Compliance in regards to this project: Avui�N� ("tj E_ Cell Phone: (15,8 ) CJ�1 5a� Land Line: Email: Principle Structure Packet Revised March 2022 i Town of Queensbury � - David Duell Highway Superintendent Highway 618-761-8212 Department .'y Mark De Mers 74 Bay Road—Queensbury, NY 2 12801 : �_Y Deputy Highway Superintendent _ Phone: (518) 761-8211 618-761-8210 Fax: (518) 74574466 DRIVEWAY PERMIT" DATE: 5 (o 'Z 2— APPLICANT NAME: 0 r_:� N TELEPHONE NO.: f 5q o a ADDRESS TO INSPECT: 3 ) Lo° AJ f RETURN ADDRESS & EMAIL: -?+- �' WAaD, N3 111 I Z'M Applicant'must show exact location and width of driveway(s) to connect to the highway by placing stakes at the specified location. The Superintendent of Highways of the Town of Queensbury has reviewed this application. The following action taken: STEP 1: ( ) Preliminary Approval J NEED: ( ) Slight Swale ( ) Deep swale ( ) Level with the road ( ) Level with the top of the paved wing Size culvert pipe to use (if necessary) () 12" ( ) 15" ( ) 18" ( ) 24" ( ) 36" Preliminary inspection completed by: Date: Approval by Highway Supt: (or) Deputy Supt: Upon completion, please resubmit this approved permit for a final approval. STEP 2: ( ) Final Approval ( ) Rejected Date: David Duell, Highway Superintendent Mark De Mers, Deputy Highway Superintendent 1/21/2022 Revised NATURAL LIGHT, VENTILATION & EMERGENCY EGRESS CALCULATION SHEET (please complete if details are not provided on plans) Project Location: �J� "�/� KkCU L) Primary Owner (s): G d Habitable Sq. Ft. Required Actual Required Actual Sq. ft. Rooms of Light Light Ventilation Ventilation opening Room (8% of rm.) '(sq. ft. 4% of room (sq. ft. for Egress !►J iV 12 IS• 3 23 . 1e T-7 II • �} �, + S. o fiLL`" 6�1 �4 3. b 3,$ -Dee%J Io ,-1 23 . c� 5• �l 1� Principle Structure Packet Revised March 2022 r . Office Use Only Permit#: Permit Fee:$ 742 Bay Road,Queensbury,NY 12804 P:518-761-8256www.aueensbury.net Invoice#: Flood Zone? Y Reviewed By. SEPTIC DISPOSAL PERMIT APPLICATION Project Location: 9 3,5 w CST AA/ ofkStrI' NJ Tax Map#• 295 . 13 - I - 2- RESIDENCE INFORMATION: Year Built Gallons #of bedrooms: X gallons per =total daily flow per day bedroom Garbage Grinder Yes o 1980 or older 150 Installed? (circle one) 1981-1991 130 Spa or Hot Tub Yesi 3 33 C) o _ Installed? (circle one) 1992-Present 110 J PARCEL INFORMATION: Topography Flat Rolling Steep Slope %Slope Soil Nature XC Sand XLoam Clay Other, explain: Groundwater At what depth? A Bedrock/Impervious At what depth? material A Domestic Water Supply ,Municipal _Well _Lake (if well or lake,water supply from any septic system absorption is ft.) Percolation Test Rate: • 13 M per minute per inch (test to be completed by a licensed engineer/architect) PROPOSED SYSTEM INFORMATION: Tank size 260 gallons (min. size 1,000 gallons, add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field w/#2 stone Total length ft.; Each Trench S_K_ ft. Seepage Pit w/#3 stone How many:________; Size: Alternative System Bed or other type: Holding Tank System Total required.capacity? : tank size #of tanks NOTES: 1. Alarm system and associated electrical work must be inspected by a Town approved electrical inspection agency; 2. We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file—no exceptions. 3. As- built drawings must be submitted prior to the'inspection, if there has been a change to the submitted plans. Principle Structure Packet Revised March 2022 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL ❑ Check if all work will be performed by property owner only • Contractor: Contact Name(s): C E74ZCYV 4;:-;� Co AJ S fW CR0VJ Contractor Trade: Mailing Address, C/S/Z: I ftmk i�J1fi�1�17 Z Cell Phone: _(-2) ) — (.0 �—ov Land Line: _( ) �0-77 S:?� Email: c)n mot L "Workers' Comp documentation must be submitted with this application" • En ineer s : Name(s): -"L W erN . C Mailing Address, C/S/Z: O.ac 10 C� LDS Cell Phone( ) Land Line: _( S'T!b ) 7 `f Z -- 9 57o Email: 1✓q PIri) �W RV C--am. _- Contact Person for Compliance in regards to this project: Cell Phone: _���) 25= (PS-0-6 Land Line: 1_) Email: c�`fti�-tfinlL $✓i �d�21�S �. a i�11a.i Ca" Declaration: Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: C. SIGNATURE: DATE:_ J du 17-Z- Principle Structure Packet Revised March 2022 rb Office Use Only Permit#: Permit Fee:$ 742 Bay Road,Queensbury, NY 12804 P:518-761-8256 www.gueensbury.net J Invoice#: FUEL BURNING APPLIANCE & CHIMNEY APPLICATION **ONE APPLICATION PER APPLIANCE** Project Location: �3 V�C! lr M6L'Lr4x"M--ap ID #: 2 3 — — Z Room of Install: Lt\1 ik)e. 12M __,_Planned Install Date: ' I FUEL BURNING APPLIANCE INFORMATION: TYPE OF DEVICE: Stove x Fireplace Insert Fireplace Fuel Fired Equipment(Garage Only, 18" clearance per IMC 304.3) Fireplace, factory built** (**Manufacturer's name: 'f-oa f"A Model #: DV 3`7 SOURCE OF HEAT: Wood Coal Pellet Gas CHIMNEY INFORMATION: Masonry (require plans to be submitted): block brick stone Flue: the steel size, in inches _Material*: double-wall triple-wall insulated (*Manufacturer's name: Model #: ) Principle Structure Packet Revised March 2022 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL ❑ Check if all work will be performed by property owner only • Installer/Builder: Workers' Comp documentation must be submitted with this application Contact Name(s): ��T Contractor Trade:. Mailing Address, C/S/Z: 10-216 Cell Phone:_( ���Z�e Land Line: Email: W15Aty 1 -PES-rf= 12-e • Guth Contact Person for any questions regardingthis project: &L-nkAK,�, Cell Phone: )��,�— (0�7) 0 Land Line: ) y UU 7 1�—o Email: c-13 L)l L- G ADDITIONAL INFORMATION: 1. Two(2) inspections are required. A rough-in inspection, prior to installation and a final inspection, after installation. 2. Manufacturer's installation manual must be available at the time of inspection. 3. Masonry fireplaces &chimneys require plans to be submitted. 4. Twenty-four(24) hour notification is required for inspections. S. Workers' Comp insurance information is required with this application. Declaration: Construction/installation must conform to NYS Fire Prevention & Building Code and/or manufacturer requirements.The applicant or owner agrees to comply with all applicable laws, ordinances, regulations and all conditions that are part of these requirements and also will allow the inspector to enter the premises to perform the required inspections. I have read and agree to the above: PRINT NAME: SIGNATURE: DATE: ( 2 Principle Structure Packet Revised March 2022 -�Z(,:,4,2,--,-Q2 Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (1 of 2) Two (2) full sets of plans Over 1,500 sq. ft. requires engineering stamp Design loads on plans: 115 Wind Floor Loads 40 psf 1j (North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas &Attics 30 psf Calculations Decks 40 psf Wind design for lake front properties e%/1 Window schedule with glass size & main doors/Air leakage< .5 cfm for doors, < .3 cfm for 6 7 windows/Tempered glass in bathrooms Door schedule/Main entrance 36" door / � Emergency Escape or Bedrooms & Habitable Space l Above-grade: 5.7 sq. ft. It Grade: 5.0 sq. ft. 24" (h) x 20" (w) minimum YA 44" maximum height above door ��/ Window control devices 24" or less 2nd story or 72" above grade J� Egress window from basement 5.0 sq. ft. L Floor system sizing per table 502.3.1 Residential check ERI or Prescriptive method Driveway length: 300' or more-12' width required/500' or more,turnaround required Foundation drainage on plans, if required 6" drop in 10' exterior grade Framing cross section for each roof line, vertical fire stopping every 10' where required/joist spans pg. 127 ti Ice &snow shield—24" from exterior wall Z, r— Platforms at exterior doors Stairway headroom 6'8"; all stairs 36" width Stair run and rise Winder run and rise Spiral stairs meet requirements Smoke detectors—battery backup & proper location, interconnected Bathroom fixtures—proper clearance Hall width-36" width Handrails more than four risers on open sides Railing &guards >30"/basement stairs included/closed risers more than 4" in height Safety glazing notes for required areas Garage fire separation:%" gable end/5/8" under living space &%" on walls/20 min. door L and closer Garage floor sloped tC- Attic access: gasket seal & R-value equal to roof insulation Roof over 30"—22"x 30"/Crawl spaces 18" x 24" access Continued on back 4 4 Residential Plan Review a Revised October 2021 Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (2 of 2) �ll Carbon Monoxide detector outside lowest sleeping area, on every level & interconnected within 15' of sleeping area Soil test results, if required Septic to well or water line separation L All paperwork signed Note on plans energy saving light bulbs 90% Blower door test agency paperwork Floodplain Permit required—check map: 2 feet above flood elevation Hurricane clips required Floors less than 2 x 10 covered by%" gypsum or 5/8" wood panel f Manuals S &J required for heating system. Cold air return hard piped jJ� Separate room for draft HVAC or hot water heater with fresh air HRV shown and calculations t Baffles at eaves for insulations and knee walls Makeup air for range hood >400 cfm 4-k( Continuous header for garage doors to end wall Chimney rain cap shown for fireplaces Deck hold down shown not less than 4 lags and bolts per table 507.2 Residential Plan Review Revised October 2021 TOWN OF QUEENSBURY 74-2 Bay Road, Queensbui i, DIY. 12804-5902 Septic System Checklist Plan to scale Received Deep hol perc test suits from engineer/Architect if applicable(Town Approved Engineers and Architects;June 30 to Apra 15 Town Engineer for unapproved Engineers and Architects) MAII wells on property and adjacent properties shown �ater line shown Municipal or well 10'separation to any part of system �etback to property lines show 10'or more for any part of system Aeptic tank and pump stations 10'from foundation 50'from any well/lake/wetland 10'from any waterline /"Iv„eptic tank to foundation crawl space/slab on grade,grade in crawl space must be above top of septic tank for 0',Separation required (field verification required) Septic tank sized for number of bedrooms and add 250 gals for Jacuzzi tubs/garbage grinder each VVLeech Field 20'from foundation 100'from any well 10'from water line ALA Seepage pit 150'from well 50'from septic tank PI/{Seepage Pits 3-times diameter apart Septic tank and pump stations over 30 gallons 50'from watercourse or wetland distance from bottom of trench or system 24"to bedrock or mottling 36"within 1000'of Lake George `Leech field 100'from watercourse or wetland A-Toe of mound or bottom of retaining wall 10'from property line 100'from well 20'from Foundation Provide'Engineer/Architect stamp for bed or design systems Department of Health Approval for all mobile home park new systems Flood Plain requirements 2'above established flood elevation to bottom of system All tanks anchored or 2' above flood elevation 1?v�rieoA A/1 V')W)1 , l•s iss mAx PERFORMANCE(kVI,CERTIFIED) `LIFE'®RER7°fl`: a e • • i �Pr,(Us) tF�i(Lis)' CFM(LIS) CFM(LIS) CNA-WS) CVM(LA) GVM(US) -I' VAC @ 60Ni Net Supply Airflow 184(87) 163(1l)` 14ti(69)'" '182(62)', 115(54),r ' 92,(43j 60'(28)' Watts 7;l'ow,Speed ;;Cross SupplyA(rflow ,. •188(87) 168•(78)�' • 149(70)'" ;';134;(63)' 11T(55)•''.',";`94'(44), 61'(29) Watts%High Speed 118 ' Gross Exhaust-Airflow •239 013)' 228+(101) 212(100):, . :193(91)'`' 172(61) •:; ;d50(7,1).:f °,126(60)' Sensible Effecliveness(ASE) 1so ....,. ................................. WEIGHT: 32°E(0°C) 8416 @ 59.CFM(28 Us)' T1 LB5(32 KG) 32°F(0°C) ,75°/ Sensible Efficiency+(SRE),:i:': 16 .... .... ...... .. .:............... T. ° B _ LB ( 3 . 140 ......:'. .. ......:..... . ...... ........ 'HIPPING WEIGHT: . E .,,I�.o.��_ 3 5 3 FtG Sensible Efficiency(SRE) 32°f(0'C)' 75%.'. i @ 64 CFM(30 Us) 3 120 .. ... @84 CFM'(30 Sens161eEffciency.(SRE);:. ao NOTE: Us), 131(-25C), 72° 100 Front clearance of 25 in.(635 mm)is 80 ......• ...... •••••• ............•••. recommended for servicing unit All ducts use 6 in.(152 mm)round collars,Balancing lgftlll. 1S0 <,%4kw, 60 ........................................................................ dampers are located in all air streams. x,T CUs MTVI 9001 0.1 0.2 0.3 0.4 ❑.S 0.6 0.7 0.8 Static Pressure(in w.q.) TI W Ul A . .........................................................................................................................................:................ 0 Ir W DIMENSIONS to * Lj 0 1=+ FRONTVIEW TOPMEW Filter 143141�(37�I I- 4h Recirculating ` V r—h Must iz�Damper, Blower rT1 Removable �+ Q, Heat Motor Stake air to outside . ' X Recovery A Cute [� Fresh air from outside G) \. O _._-== Stale air from inside n Fresh air to inside Un (� ,$ fD 9 �► a' 61n,(152 nmr) '33 5/8In.(854 mm) V0 Round Collars I I to N ......................................................................................................................................................................... Date, WARRANTY Contractor. Taq: on tile IqRV Coreand. Project• Qty-. Supplier: Quote#: All units conform to CSA and uL standards Engineer: ®e Control: Submitted By: L��� ® Indoor Air Systems Timer. Timer Qty: 1SSMAX(O1-Di-18) www,lifebreath.com ISS MAX :li°y4r. ff it'?t Xt l RECOVERY , ■ ENGINEERING DATA .t, 'ClFEBRERTH' :1 . r, 1 THERMALLY CONDUCTIVE,PATENTED :DEFROST ALUMINUM'CORE Recirculating damper defrost system. The counter-flow heat recovery core transfers heat between the two airstreams.It is easily removed for cleaning or service. CASE Twenty gauge prepainted galvanized steel for superior corrosion resistance.Insulated to MOTORS AND.BLOWERS prevent exterior condensation.Drain connections 2-1/2'in.(12 mm)-,00.Balancing ports Each airstream has one centrifugal btower driven by a common PSG motor',,with multiple - are located on door. fan speed,op'erations. ELECTRONICS FILTERS The DXPL02 contraI included with the unit can be wall mounted in a central location of Washable air filters in exhaust and supply air streams. the home,3 wire 20 gauge(min.)100 ft,length(max.). MOUNTING Four threaded inserts at corners of the cabinet designed to accept the"s"hooks and WARRANTY hanging straps supplied with,the'unit replacement oarts warranty. ....... ...... ............... ............... ....................................................... ............: .......................... OPTIONAL ACCESSORIES; ;,.. •,t��:Wireless20 40 60 r / Weathe Nfin Tithe�9 9-E A6 :99+D 02 ET f 99-189 99=EA 1 , 'i 'y" ....................................:.................................................................................................................................................. LIFEBREATH CONTROL OPTIONS TIMER OPTIONS FEATURES - r a e Q 99-DET01-•Lifebreath 20/40/60 Minute Timer Initiates high speed Ventilation for 20,40 or 60 minutes.3 wire connection. 5ispeed,fanepefation:'llwoacfl{nlcde' f , 99-DET02 2 speed fan operation(Low/High) Wireless Lifebreath 20/40/60 Minute Timer ;✓ Initiates high speed Ventilation for 20,40 or 60 Continuo s`o'ks+°ee .fen,o eiation' 'i 4 u,I w p,-tl p, minutes.Wirelessly connects to main control:for Humidity control through adjustable Dehumidistat ✓^;, ' ''''°; 4✓ 4" %'' :y-"`y''•`` ease of installation.4b'approximate range. Excusive to Lifebreath. Lar' `dII ;LCDscFeen%', 99-RX02-Wireless Lifebreath Repeater LED status Indicator lights ✓' 'r' i ✓''' '✓'.;`'° Extends range of 99-DET02'Wireless Timers.Plugs into 120V power outlet.Wirelessly connects to ✓' "✓' n -DETD2.Install at halfway .r`.. Cont'inuous.V(3ntilation'' main control a d 99 1 t ll y point between timer grid main wall control if timer Continuous Recirculation ✓ .+f 6 ✓, is out of range. �0 0'0�%4 IIFF'2 N - 'y'.. 10 ON/50 OFF „• ' tl 40 ec'rculatio .•,:'.. 20/40/60 min.High speed override button ✓ ( "' i` '+' " g. p XP.L02 99-DET02 Compatible:with99DET02?W ire less;Tiiner ®®® 3.wireconnectioo ✓o, ✓:,:'`' rrt,✓.:'':.. , ✓,. LIFEB/�iErR H' a indoor Air Systems 155MAX(Ol-01-18) www.lif6bre*6th.com Generated by RESchecfc Web Software F1 COPt Compliance Certificate Project Cerrone Builders Inc Energy Code: 2018 IECC Location: Glens Falls, New York Construction Type: Single-family 295.13-1-24 RC-0264-2022 Project Type: New Construction Scrivo, Joseph & Elena/Cerrone Conditioned Floor Area: 1,714 ft2 935 West Mountain Rd Glazing Area 15% Climate zone: 6 (7635 HDD) SFD w/gas fp 1714 s.f., Garage 539 s.f. Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 935 West Mtn Road Daniel W. Ryan P.E. Queensbury, NY 12804 PO Box 596 Glens Falls, NY 12801 518-742-9569 dryan@dwrpe.com . . - . Compliance: 1.4%Better Than Code Maximum UA: 283 Your UA: 279 The%Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. _ Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelope Assemblies Gross Area . . . . Ceiling: Raised or Energy Truss 1,714 38.0 0.0 0.025 0.026 43 45 Wall: Wood Frame, 16" o.c. 1,809 21.0 0.0 0.057 0.045 87 69 Door: Solid Door(under 50%glazing) 18 0.140 0.300 3 5 Door 1: Solid Door(under 50%glazing) 20 0.240 0.300 5 6 Door 2: Glass Door(over 50% glazing) 40 0.290 0.300 12 12 Window:Vinyl Frame 196 0,290 0.300 57 59 Floor:All-Wood joistrrruss 12 30.0 0.0 0.033 0.033 0 0 Basement Wall: Solid Concrete or Masonry Wall height: 7.8' 1,568 0.0 19.0 0.041 0.050 63 77 Depth below grade: 6.0' Insulation depth: 7.8' Window 1:Vinyl Frame 32 0.290 0.300 9 10 Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 1 of10 I i : Compliance Statement; The proposed building design described here is consistent with the building plans, specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatoequir nts listed in the REScheck Inspection Checklist. Daniel W. Ryan P.E. I �U 4/18122 Name-Title Signature Date ENGINEERS STAMP: -�Or N�iy ,* ym (P A 0A o + Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 2 of10 REScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field.Verified # Pre-Inspection/Plan Review Value Value & Re .ID Complies? Comments/Assumptions 103.1, ;Construction drawings and i❑Complies 103.2 (documentation demonstrate } ❑Does Not [PR111 !energy code compliance for the {building envelope.Thermal 5❑Not Observable :envelope represented on € ❑Not Applicable ; construction documents. 103.1, ;Construction drawings and ClComplies 103.2, documentation demonstrate []Does Not 403.7 ;energy code compliance for I [PR3]1 (lighting and mechanical systems. ; i❑Not Observable U Systems serving multiple ;❑Not Applicable (dwelling units must demonstrate !compliance with the IECC ; ;Commercial Provisions. I I 302.1, ;Heating and cooling equipment is; Heating: Heating: ;❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ;❑Does Not [PR2]2 !on loads calculated per ACCAi Cooling: Cooling: ❑Not Observable Btulhr ; J I Manual J or other methods ; Btu/hr I ❑Not Applicable approved by the code official. f i Additional Comments/Assumptions: 1 High Impact(Tier 1) 12 J Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 3 of10 f Section [ Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Re .ID 402.1.1 IConditioned basement wall R- ; R- ;❑Complies :See the Envelope Assemblies [FO4]1 insulation R-value.Where interior 1 R_ R- insulation Not table for values. e� ;insulation is used, verification :[--]Not Observable may need to occur during I Insulation Inspection. Not ;❑Not Applicable ; required in warm-humid locations; in Climate Zone 3, i ' 303,2 Conditioned basement wall ElComplies [FO5]1 :Insulation installed per i❑Does Not f ;manufacturer's instructions. ,❑Not Observable , ❑Not Applicable 402.2.9 ;Conditioned basement wall ft ft ❑Complies :See the Envelope Assemblies [FO6]1 ;insulation depth of burial or i ;❑Does Not table for values. l` i!distance from top of wall. I ;❑Not Observable ❑Not Applicable 303.2.1 ;A protective covering is installed , ;❑Complies [F011]2 :to protect exposed exterior i❑Does,Not ;Insulation and extends a U f minimum of 6 in. below grade. i❑Not Observable I ❑Not Applicable 403.9 ;Snow-and Ice-melting system E Complies [F012]2 'controls installed. ;❑Does Not J { ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 4 of10 Section Plans Verified Field Verified• # Framing /Rough-in Inspection Value Valu® Complies? Commonts/Assumptions & Re: q.ID 402.1.1, Door U-factor. U. ; U- ;❑Complies ;See the Envelope Assemblies 402.3.4 ! []Does Not ;table for values. [FR1]1 ! ! ; J ; ;❑Not Observable ; 1 ❑Not Applicable 402.1.1, jGlazing U-factor(area-weighted ; U- U- E Complies ;See the Envelope Assemblies 402.3.1, l average). !❑Does Not ;table for values. 402.3.3, , 402.5 !❑Not Observable [FR2]1 ; ;❑Not Applicable ; I I I 1 303.1.3 j U-factors of fenestration products; ;❑Complies [FR4]1 !are determined in accordance :❑Does Not !with the NFRC test procedure or `taken from the default table. ;❑IVot Observable l ❑Not Applicable ; 402.4.1.1 ;Air barrier,and thermal barrier F' ;❑Complies [FR23]1 installed per manufacturer's UDoes Not ;instructions, ;❑Not Observable I ❑Not Applicable 402.4.3 Fenestration that is not site built ; ❑Complies [FR2011 is listed and labeled as meeting !❑Does Not J AAMA/WDMA/CSA 101/1.5.2/A440 F ❑Not Observable !or has infiltration rates per NFRC 400 that do not exceed code 1EINot Applicable ; limits. i 402.4.5 i IC-rated recessed lighting fixtures;' i❑Complies [FR16]2 sealed at housing/interior finish s❑Does Not !and labeled to indicate s2,0 cfm ;❑Not Observable leakage at 75 Pa. ! ; ❑Not Applicable ; 403.3.1 ;Supply and return ducts in attics ;❑Complies [FR12]1 !insulated >= R-8 where duct is ;❑Does Not >= 3 inches in diameter and >= R-6 where <3 inches. Supply and, []Not Observable return ducts in other portions of ! ;❑Not Applicable ; !the building insulated >= R-6 for diameter>= 3 inches and R-4.2 !for< 3 inches in diameter. 403.3.2 I Ducts, air handlers and filter , j❑Complies [FR13]1 !boxes are sealed with ❑Does Not !joints/seams compliant with !. E❑Not Observable International Mechanical Code or l International Residential Code, as: ![:]Not Applicable lappiicable. ! 403,3.5 4 Building cavities are not used as 1❑Complies [FR15]3 !ducts or plenums. ;❑Does Not ;❑Not Observable ❑Not Applicable l 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 5 of10 Section Plans Verified. ;, Field Verified #• Framing],R'ough-In Inspection , Value Value" Complies? Comments/Assumptions : & Re .ID 4013;7 'I Ducts declared to be within the t: ❑Complies [FR28]3 conditioned space are either 1) I' .4❑Does Not completely within the continuous , air barrier and within the building 1,. ❑Not Observable I (thermal envelope, 2) buried E ;.. ;❑Not Applicable ; #within.ceiling insulation in , accordance with Section ; R403.3.6 and the air handler is I located completely within the I continuous air barrier and within the building thermal envelope and the duct leakage is <= 1.5 ,. cfm/100 square feet of , conditioned floor area served by t the duct system,or 3)the ceiling i; i insulation R-value installed ; against and above the insulated duct >=to the proposed ceiling insulation R-value, less the value of the insulation on the I' I 403,4 ;HVAC piping conveying fluids R- R- ;❑Complles [FR17]2 above 105°F or chilled fluids ;❑Does Not I below 55°F are insulated to zR- ; 13 ,❑Not Observable ,. ❑Not Applicable 403,4.1 ;Protection of insulation on HVAC j❑Complies [FR24]1 I piping. ❑Does Not ,❑Not Observable ❑Not Applicable 403.5.3 ;Hot water pipes are insulated to R. ; R- f❑Complies [FR18]2 !aR-3. ;❑Does Not J I ;❑Not Observable ❑Not Applicable 403.6 ;Automatic or gravity dampers are; ;❑Complies [FR19]2 i installed on all outdoor airI I ',❑Does Not Intakes and exhausts.. 1 ❑Not Observable I + ' ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 6 of10 Section �• Plans,Verified; Field Verified' # . Insulation,lnspection, complies? • Comments/Assumptions & Re .ID Value Value 303.1 ;AII installed insulation is labeled ;❑Complies [IN13]2 !or the installed R-values ;❑Does Not provided. ;❑Not Observable , ❑Not Applicable 402.1.1, !FloorinsulationR-value. R- R. ;❑Complies ;See the Envelope Assemblies 402.2.E ) Wood Wood ;❑Does Not 1 table for values. [IN1]1 1 Steel ❑ Steel tlNot Observable ❑Not Applicable 1 ( I 303.2, !Floor insulation installed per ;❑Complies 402.2.8 !manufacturer's instructions and I, I❑Does Not [IN2]1 in substantial contact with the ;r.' .1•:. SOl underside of the subfloor, or floor: !❑Not Observable l !framing cavity insulation is in i ;',, i❑Not Applicable !contact with the top side of ' ;sheathing, or continuous insulation is installed on the 1' underside of floor framing and extends from the bottom to the top of all perimeter floor framing I members. ! 402.1.1, Mall insulation R-value. If this Is a 1 R- R- ;,[]Complies ;See the Envelope Assemblies 402.2.5, 1 mass wall with at least 1/2 of the Wood Wood ;❑Does Not �table for values. 402.2.6 ;wall insulation on the wall ; ! [IN3]1 I exterior,the exterior insulation Mass I Mass UNot Observable C19' I requirement applies(FR10). ;❑ Steel I Steel ;❑Not Applicable I t 1 I 1 I I 1 1 6 1 i I I 1 I l 1 1 1 303.2 I Wall insulation is installed per I❑Complies ; [IN4]1 i manufacturer's instructions. != 1❑Does Not ❑Not Observable ; ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions "Value Value Complies? Comments/Assumptions & Re .ID 402.1.1, (Ceiling Insulation R-value. 1 R. R. 1❑Complies ;See the Envelope Assemblies 402.2.1, i Wood ;❑ Wood ❑Does Not 1 table for values. 402,2.21 Steel ❑ Steel t❑Not Observable,; 402.2.6 [FI1]1 i 1 1❑Not Applicable ; 1 I 1 I I f 1 1 1 303.1,1A,;Ceiling insulation installed per ; ;[]Complies 303.2 i manufacturer's instructions, Ij,,` ,. ,❑Does Not , [17I2]1 !Blown insulation marked every ❑ ; 300 ft'. ! Not Observable } ;❑Not Applicable ; 402.2.3 ;Vented attics with air permeable I❑Complies [FI22]2 !insulation include baffle adjacent !❑Does Not to soffit and eave vents that ![]Not Observable }extends over insulation. } 1❑Not Applicable ; 402.2.4 ;Attic access hatch and door R- R- ,❑Complies [17I3]1 :insulation aR-value of the Z]Does Not adjacent assembly, I ❑Not Observable 1 ❑Not Applicable 402.4.1.2 !Blower door test @ 50 Pa, <=5 ACH 50 = , ACH 50 = ❑Complies [FI17]1 i ach in Climate Zones 1-2, and 1 ❑Does Not <=3 ach in Climate Zones 3-8. ;❑Not Observable ❑Not Applicable 403.3.3 ;Ducts are pressure tested to cfm/100 cfm/100 ;❑Complies [FI27]1 {determine air leakage with ft2 9 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a ; t❑Not Observable {pressure differential of 0.1 inch i , ,❑Not Applicable ; w,g, across the system including lthe manufacturer's air handler enclosure if installed at time of P i I I test. Postconstruction test:Total I 1 1 1 I leakage measured with a pressure differential of 0.1 inch w.g, across the entire system P including the manufacturer's air handler enclosure. 403.3.4 ;Duct tightness test result of<=4 ; cfm/100 cfm/100 ;[ Complies [FI4]1 !cfm/100 ft2 across the system or ft2 ft2 r❑Does Not <=3 cfm/100 ft2 without air 1 ![_-]Not Observable handler @ 25 Pa. For rough-in , , (tests, verification may need to 1 , ;❑Not Applicable ; ;occur during Framing Inspection. 403.3.2.1 ;Air handler leakage designated `❑Complies [FI24]1 :by manufacturer at <=2%of ;❑Does Not }design air flow. ,[]Not Observable ❑Not Applicable 403.1.1 !Programmable thermostats ;❑Complies [Flg]2 }installed for control of primary / ;❑Does Not heating and cooling systems andi {initially set by manufacturer to ❑Not Observable i code specifications. 1 ,❑Not Applicable ; 403.1.2 Heat pump thermostat installed '❑Complies [FI10]2 ;on heat pumps. ❑Does Not I ;❑Not Observable ❑Not Applicable 403.5.1 iaccessible Circulating service hot water I ;❑Complies [FI11]2 systems have automatic or ;❑Does Not manual controls, ,❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 8 of10 section]__ Plans Verified Field Verified & Re ID Final Inspection Provisions Value Value Complies? Comments/Assumptions 403.6.1 ;All mechanical ventilation system;' ;DComplies [FI25]2 fans not part of tested and listed ;❑Does Not HVAC equipment meet efficacy ;and airflow limits per Table !❑Not Observable ; !R403.6.1. ;❑Not Applicable 403.2 !Hot water boilers supplying heat ❑Complies [FI26]2 !through one-or two-pipe heating ;❑Does Not systems have outdoor setback !control to lower boiler water !❑Not Observable , !temperature based on outdoor I ❑Not Applicable !temperature. I 403.5.1.1 !Heated water circulation systems ;❑Complies (FI28]2 !have a circulation pump.The ;❑Does Not !system return pipe is a dedicated return pipe or a cold water supply. '[]Not Observable I pipe. Gravity and thermos- 1 ❑Not Applicable syphon circulation systems are 'not present.Controls for ! ; circulating hot water system pumps start the pump with signal; ; ;for hot water demand within the ; occupancy.Controls I 1 1 automatically turn off the pump when water is in circulation loop 1 is at set-point temperature and no demand.for hot water exists. I 403.5.1.2 ;Electric heat trace systems ❑Complies [FI29]2 comply with IEEE 515.1 or UL r '❑Does Not l515. Controls automatically 1❑Not Observable , adjust the energy input to the , !heat tracing to maintain the ; ;❑Not Applicable ; !desired water temperature in the 1 1 piping. 1 403.5.2 :Demand recirculation water ;[]Complies [F130]2 systems have controls that ❑Does Not manage operation of the pump ;and limit the temperature of the ❑Not Observable jwater entering the cold water i❑Not Applicable ; j piping to <= 1049F. 1 403.5.4 ;Drain water heat recovery,units ;❑Complies [F131]2 :tested in accordance with CSA ;❑Does Not 655.1. Potable water-side 'pressure loss of drain water heat ❑Not Observable recovery units < 3 psi for '❑Not Applicable !individual units connected to one or two showers. Potable water- ; !side pressure loss of drain water I 1 I 'heat recovery units < 2 psi for ; ! `individual units connected to !three or more showers. 404.1 ;90%or more of permanent ;❑Complies [FI6]1 fixtures have high efficacy lamps. PDoes Not I ;❑Not Observable j !❑Not Applicable 404.1.1 ;Fuel gas lighting systems have ❑Complies (FI23]3 no continuous pilot light. 1 T❑Does Not ;❑Not Observable ❑Not Applicable 401.3 )Compliance certificate posted. ;❑Complies [F]7l2 ; :❑Does Not ! i f ❑Not Observable R ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename, Page 9 of10 Sect!on Plans'Verified Field.Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 3033 Manufacturer manuals for UComplies (F[18]3. {mechanical and water heating ;❑Does Not systems have been provided. ; ,❑Not Observable , ❑Not Applicable Additional Comments/Assumptions: i 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Cerrone Builders Inc Report date: 04/18/22 Data filename: Page 10 of10 2018 I ECC Energy Efficiency certificate i Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork(unconditioned spaces): Dooe RatIF U Window 0.29 Door 0.29 , . . Heating System: Cooling System: Water Heater: Name: Date: Comments \ J ` Manual S Compliance Report Job: 935westmntrd te: Ma 11,2022 Entire House By: Plan: 1758 Project • • For: cerrone.builders Cooling Equipment Design Conditions Outdoor design DB: 85.0°F Sensible gain: 17969 Btuh Entering coil DB: 75.2°F Outdoor design WB: 71.0°F Latent gain: 4167 Btuh Entering coil WB: 62.6°F Indoor design DB: 75.0°F Total gain: 22136 Btuh Indoor RK 50% Estimated airflow: 860 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: York Model: YCJD36S41S1+C(A,C,D,E)36D24++MV12D+TDR Actual airflow: 1080 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 . Btu.h 0% of load SHR: 0% Heating Equipment Design Conditions- Outdoor design DB: -4.0°F Heat loss: 83869 Btuh Entering coil DB: 65.7°F Indoor design DB: 68.00.F. Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: York. Model: TM9T100C16MP11 Actual airflow: 1080 cfm Output capacity: 96000 Btuh 114% of load Temp. rise: 50 OF RDECa �IE JUN 2.3 2022 02 2 TOWN OF QUEENSBURY Meets are all requirements ofACCA Manual S. BUILDING& CODES - wrightsoft® Right-Suite® 2022-May-11 10:14:27 Universal 2017 17.0.16 RSU25116 Page 1 ACCA ....langeworthy\Documents\York\935 WEST MNT RD.rup Calc=MJ7 Front Door faces: N �. Form Residential Plans - - - • for A D- •n (Loads, Equipment, D 15 Mar 09 - - PYCad'6viigCaRarbsd/4reta . queensbury nY Header Information Contractor: REQUIRED ATTACHMENTS ATTACHED . Manual J1 Form(and supporting worksheets): Yes. 0 No ❑ Mechanical license: - or MJ1AE Form*(and supporting worksheets): Yes ❑. No ❑ OEM performance data(heating,cooling,blower): Yes :I] No Building plan#: 1758 " Manual D Friction Rate Worksheet: Yes No Duct distribution sketch:- Yes E] No 0 . Home address(Street or Lot#,Block,Subdivision): , Entire House HVAC LOAD CALCULATION 41 Design Conditions Building Construction Information Winter Design Conditions. Building Outdoor temperature: -4 °F- Orientation: Front Door faces North Indoor temperature: 68 of - North,East,West,South,Northeast;Northwest,Southeast,Southwest Total heat loss: 83869 Btuh= Number of bedrooms: 1 Conditioned floor area: 4257 ft' Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 'F Indoor temperature: . 75 °F Windows Roof Grains difference: 27 gr/Ib a�0% RH = Eave overhang depth: ". p ft: Sensible heat gain-9 19965. Btuh Internal shade: none Eave Latent heat gain: Blinds,drapes,etc. 9 4630 Btuh Depth Window' Total heat gain: 24595 Btuh Number of skylights: 0- HVAC EQUIPMENT • (IRC ,1 Heating. Equipment Data Cooling Equipment"Data Blower Data . Equipment type:. Gas furnace E%igment type: SpIitAC Heating cfm: 1080 umace,Hea pump,Boiler,etc. it onditioner,Heat pump,etc. Cooling cfm: 1080" Model: York - Model: York" Static pressure: 0 in H2O TM9T100C16MP11. YCJD36S41S1 . Fan's rated external static pressure for design airtlow Heating output capacity: 96poo Btuh Total cooling capacity: 0 Btuh Heatpumps-capacityatwmterdesignoudoorconditions SenSIblecooling capacity: 0 Btuh Aux.heating_output capacity: 0 Btuh' Latent cooling capacity:, 0 -Btuh DISTRIBUTIONHVAC DUCT .1 Design airflow: 1080. .cfm, Longest supply"duct:_ 0 ft Duct Materials Used Equipment design ESP:=_ 0 .in H2O Longest return duct: 0 ft.. Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 :ft Available static pressure(ASP):' 0 in H2O Friction rate: in/100ft Branch duct: Sheet metal Friction Rate=ASP+(TELx 1015) I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name: " Contractor's signature:. Date: Reserved for County,Town Municipality orAuthority having jurisdiction use. *Home qualifies for MJ1AE Form based on Abridged Edition Checklist . wrightsoft' Right-Suite®Universal 2017 17.0.16 RSU25116 . Pro eCt SU117tl1a Job: 935 west mnt rd Date: May 11,2622 Entire House. By: Plan: 1756- Proaect Information For: cerrone builders. Notes: Desicin Information Weather: Glens Falls AP, NY US. Winter Design .Conditions Summer-Design Conditions Outside db -4 OF Outside db 85 OF Inside db 68 OF Inside db . 75--6F Design TD. 72 OF Design TD 10- OF Daily range M Relative humidity 50 % Moisture difference .27 -gr/lb Heating Summary Sensible Cooling Equipment Load'Sizing Structure 79121 Btuh. Structure 17113 Btuh Ducts .4747 .Btuh Ducts 856 Btuh Central vent (0 cfm) - 0 Btu.h Central vent (0 cfm) 0 Btuh none (none) Humidification 0 Btuh Blower 0 Btuh Piping: 0 Btuh Equipment load 83869 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 . Infiltration Equipment sensible load 16172 Btuh Method Simplified Latent Cooling Equipment.Load Sizing Construction quality. Average Fireplaces 1 (Average) . Structure. 4167 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Heatingg -Coolingg (none) •Area(ftz .425 .4257 Equipment latent load 4167 Btuh Volume(ft3) 34056 '34056 Air changes/hour 0.90 0.40 Equipment total load 20339 Btuh. Equiv.AVF_(cfm) 511 227 Req.-total capacity at 0.70.SHR 1.9 -ton Heating Equipment Summary- Cooling Equipment Summary Make York. Make York Trade YORK. Trade ASPEN Model -TM9T100C16MP11 Cbnd YCJD36S41S1 AHRI ref. 2008690 Coil. C(A C,D,E)36D24++MV12D+TDR AHRI.ref 3241405 Efficiency 96AFUE Efficiency - 11.5 EER, 14 SEER Heating input 1b0000 Btuh Sensible cooling 22680- Btuh Heating output 96000 Btuh Latent cooling 9720 Btuh . Temperature rise. . 81 OF Total cooling 32400` Btuh Actual air flow 1080 .cfm Actual air flow- 1080 cfm Air flow factor 0.013 cfm/Btuh Air flow factor 0.060 cfm/Btuh Static-pressure- 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.81 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 2022-May-11 10:14:27 A_� wrightsoft®- Right-Suite®.Universal201717.0.16RSU25116 Page 1 ....langewortliy\Documents\York\935 WEST MNT RD.rup .Calo=MJ7 Front Door faces:.N " Right-JOWorksheet Job:" 935westrantrd " Entire House Date: May 11,2022 Byy: Plan: 1758 MANUAL J:7th Ed. 1 Name of room Entire House Room1 Room2 Room3 2 Length of exposed wall 526.0 ft 194.0 ft 14.0 ft 9.0 ft 3 Room dimensions 1.0 x 1670 ft 8.0 x - 6.0 ft 8.0. x 9.0 ft 4 Ceilings. Condit.Option 8.0 ftj d 8.0 ft heat/cool 8.0 ft heat/cool. 8.0 ft heat/cool TYPE OF . CST HTM. Area. Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. I Htg I Clg" UP) Htg Clg (ftj Htg Clg (ftj Htg Clg M Htg Clg 5 Gross a 12E3 5.4 1.0 4208 *'** ' 1552 "*' **** 112 **** *"' 72 '*' - Exposed b 0 0 1!1111 •• ««•• 1111!! *••• **•• IIIII! ••*• lil�lj «••* walls and c 0 0 IIIII! '« '*" !IIIII "' **** Hiii! *«•' IIIII! "" partitions d 0 0 11111! " **' !IIIII ***' **** !!!!!! e 0 0 !!!!!! *' IIIII! ..... ..*. IIIII! f 0 0 !j M .... <... 11ilii 6 Windows and a 3AO 39.7 ' 180 - 7141 **** 80 3174 *'** 0 0 *"' 0 0 ' glass doors. b 0 0 0 **'* 0 0 '* . . 0 0 0 0 **** Heating" c 0 -0 0 0 0 '"'« 0 0 0 0 **** d 0 " 0 0 *'*' 0 0 **** 0 0 0 0 **** e 0 ** 0 0 ***' 0 " 0 '*** 0 0 "*' 0 0 ** f 0 ** 0 0 **" 0 0 **** 0 0 '*'* 0 0 7 Windows and North 19.0 80 **** 1520 55 '**' 1045 0 - 0 0 "" 0 glass doors NE/NW 0 0 **** 0 0 '*** 0 0 ***' 0 0 **** 0 Cooling E/W 68.0 75 **** 5100 25 '*** 1700 0 "** 0 0 **** 0 SE/SW 0 0 "** 0 0 ***' 0 0 0 0 "' 0 South 34.0 25 " **** 850 0 "" 0 0 **** 0 O " **** 0 Horz 0 0 **** 0 0 **** 0 0 ***' 0 0 0 8 Other doors a 11FO 12.2 2.3 84 1028 194 63 771" 146 0 0 0 0 0 0 b 0 0 0 0 0 -0 0 0 0 0 0 0 .0 0 c 0 0 O 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 _ 3944 21298 4023 1409 7609 1437 112 605 : 114 72 389 73 exposed b 0 0 IIIII! 0 0 Mil! 0 0" !!!!!1 0 0 !!I!!! O 0 walls and c 0 0 !IIIII 0 0 !!!!!! 0 0 !111!I 0 0 !!!!!! 0 0 partitions d 0 0 !!!Ill 0 0 !!!ill 0 0 1Im1 0 0 IIIII! 0 0" e 0 0 !!!M 0 0 !!i!!! 0 0 !!!1!! 0 " 0 !!!!!! 0 0 f 0 0 IIIII! 0_ - 0 !!pn 0 0 IIIII! 0 .0 !!!!n 0 0 10 Ceilings a 16GO 2.4 1.1 2610 6201 2928 "1670 3968 1874 48 114 54 72 171 81 b 0 0 IIIIII 0 0 !i!i!l 0 0 IIIIII �0 0 IIIIII 0 0 c 0 0 IIIIII 0 0 !IIIII 0 0 IIIIII 0 0 1!!!!! 0 0 d 0 0 !1!!!! 0 0 M11! 0 0 1!!!!! 0 0 !!!!!! 0 0 e 0 0 " " 11 !! 0 0 !!Ill! 0 0 MIll 0 0 IIIII! 0 .0 f 0 0 !!!i!! 0 0 1!1! 0 p !!!Ill 0 0 !i M 0 0 11 Floors. a 1910 1.7 0 . .1695 2929 0 0 0 0 0 .0 0 0 0 0 (Note:room - b 1910 1.7 0 38 _ 66 0 23 40 0 0 0 0 0 .0 0 perimeter" c 0 0 IIIII! 0 0 p!!!t 0 0 IIIII! 0 0 IIIII! " 0 0" is displ. d 0 0 1!!!11 0 0 !IIIII 0 0 1!1!1! - 0 0. !l111! 0 0 for slab e 0 0 !!!!!1 0.: 0 1(!!!! 0 0 IIIII! 0 0 1!!!!! 0 0 floors) f 0 0 !i!!!! " 0 O !!!!!1 0 0 !!!!n 0 0 !!!!n. 0 0 12 Infiltration a 153 9.5 264 40459 2497 143 21915 1353 0 0 0 0 0 0 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 79121 ***' '*** 37476 **** **** 719 ***' **** 560 *'** Less external heating 0 «*«* «««« 0 .*.* 0 0 ««.« Less transfer •••• 0 «««« «**. 0 ..*. .... 0 «*• ••• 0 ••** Heating redistribution «*•• 0 «..* .««« 0 .**. .... 0 .*.. .*.« 0 «*.. 14 Duct loss: 6% 4747 "" 6% 2249 **** 6% 43 ' 6% 34 **** 15 Total loss=-13+14 ' 83869 ** ***' 39725 *' **** 762 **'* *'** 593 '** 16 Int.gains: People.@ 300 0 * 0 0 **** 0 0 '*" 0 0 0 Appl. @ 1200 0 *"* 0 0 **** 0 0 *'** 0 0 *"* 0 17 Subtot RSH gain=7+8..+12+16- "*' *"' 17113 *"* **** 7554 **** "** 168 "'* **** 154 Less:extemal cooling «**• **** 0 *««« ...* 0 «««« 0 «.«« .... 0 Less transfer •*• 0 •*** •*<* 0 •<*: .«*« 0 **** •••* 0 Cooling redistribution *** '*** 0 *'** •"' 0" * ***• 0 -*** **•• 0 18. Duct gain 5%- "*' 856 5% 378 *f 5% "" 8 5% 8" 19 Total RSH gain=(17+18)*PLF 1.00 '*" 17969 1.00 '*** 7932 1.00 **" 177 1.00 **** 162 20 Air required(cfm) 1080 1080 512 471 10 111 8 10 Calculations approved by ACCA to.meet all requirements of Manual J 7th Ed. A=" 411- wrlghtSOTt" Right-Suite®Universal 2017 17.0.16 RSU25116 2022-May-11 10:14:27Paget ....langeworthy\Documents\York\935 WEST MNT"RD.rup Calc=MJ7 Front Door faces: N Right-JO Worksheet Job:. 935westmntrd Entire House Date: " May 11,2022 Byy Pfan:- 1758 MANUAL J:7th Ed. 1 Name of room Room4 Room5 Ro6m6 Room7 2 Length of exposed wall '28.0 fit 21.0 ft 0 ft 24.0 ft 3 Room dimensions 1.0 x 200.0 ft 11.0 x 14.0 ft. 3.0_x 9.0 ft 1.0 x 168.0 ft 4 Ceilings Condit.Option 8.0 ft heat/cool B.0 ft heat/cool 8.0 ftl heat/cool .8.0 ft heat/cool. TYPE OF CST HTM Area . Load(Btuh) Area Load(Btuh) Area .Load(Btuh): Area Load(Btuh) EXPOSURE NO. Htg I Clg (ft5 Htg Clg (ft� Htg Clg ' (ft5 Htg Clg (ft5 Htg Clg 5 Gross a 12E3 5.4 1.0 224 «««« `*'* 168 `*`* 0 '*'* "" 192 Exposed b 0 0 Jill!! ** 11111! `*'* IIIIII ""* III III «`** walls and c 0 0 IIIIII ` ` I11M * JIM! partitions" d 0 0 . . IIIIII '** •'*` lI11!! "" "*' IIIIII "** ':« IIIIII `""` •`"' e 0 0 ![Ili! .,,. llllll . ,,. ..*. IIIIII ..:: !I!!!! •. . f 0 0 IIIIII ' .*.. . .".. IIIIII ,.. .... jim! *"** .*.. IIIIII .... .«.« 6 Windows and a 3A0 39.7 0 0 *"' 0 0 **** 0 0 *"* 25 992 '*** glass doors b 0 0 0 "" 0 0 *' 0 0 0 0 `**" Heating c 0 ** 0 0 '*'* 0 0 "*` 0 0 '*" 0 0 `*** d 0 .0 0.. 0 0 0 0 0 0 e 0 `* 0 0 **** 0 -0 0 0 "" 0 0 `*' 7 Windows and North -19.0 0 "" 0 0 "'« 0 0 *"* 0 25 *"' 475 glass doors NE/NW -0 0 0 - 0 `**' 0 0 `*** 0 0 ***« 0 Cooling E/W- 68.0 0 0 0 "" 0 0 0 0 0 SE/SW 0 0 0 0 "" 0 0 ** 0 0 *«" 0 South 34.0 0 ••,• 0 0 •••, 0 0 •••• 0 0 •:'• 0 Horz 0 0 '*" 0 0 0 0 *"" 0 0 `**' 0 8 Other doors a 11F0." 12.2 2.3 0 0 0 21 257 49 0 0 0 0 0 0 b 0 - 0 0 0 0 .0 0 0 0 0 0 0 0 0 c 0 0 0 0-, 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 224 1210 228 147 794 150 0 0 0 167 902 170 exposed b 0 0 HIM 0 0 llllll 0 0 IIM! .0 0 11!M 0 0 walls and c 0 0 !Ill!! 0 0 !fill! 0 0 !!Ill! 0 0 fill!! 0 .0 partitions d 0 0 !!!!!! 0 0 . IIIIII 0 0 !llll! 0 0 HIM 0 0 e 0 0 HIII! 0 0 Illlll 0 0 !Illl! 0 0- llllll 0 0 f. 0 0 !1111! 0 0 11111! 0 0 HIM 0 0 11111! 0 0 10 Ceilings a 16GO 2.4 1.1- 200 475 224 154 366 173 27 64 30 168 399- 188 b 0 0 !!!II! 0 0 11111! 0 0 IIM! .0 0: !!!M 0 0 0 0 _ 0 !111!! 0 0 .. .1111!! 0 0 Illlll 0 0 IIIIII 0 0" d 0 - 0 11111! 0 0 11111! 0 0 IIIIII 0 .0 11!H! 0 0 e 0 0 11111! 0 0 llllll 0 0 11M! 0 0 111!!! 0 0 f 0 0 11111! . 0 0 !!ill! 0 0 I1!111 0 0 llllll 0 0 11 Floors. a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:,room b 1910 1.7 0 0 0 0 10 17 0 0 0 0 0 0 0 perimeter c 0 0 Illlll 0 0 llllll 0 0 !!Jill 0 0 11111! 0 0 is displ. d 0 0 HIM0 0 llllll 0 0 !!!H! 0 0 IMB 0 0 for slab e 0 0 llllll 0- 0 .Illlll . 0 0 !11111 0 0 11111! 0 0 floors) f 0 0 111111 0 0 !I1111 0 0 !!!11! 0 0 !!!!!! 0 0 12 Infiltration a 153 9.5 0 0 0 21 3218 199 0 0 0 25 3831, 237 Ventilation 0 0 0 0 0 0 00 13 Subtotal loss=6+8..+11+12 **'* 1685 '*' *`** 4652 `*** *«`* 64 "" *' 6124 '*** Less external heating 0 ••`• `••• 0 ••• "•« 0 "'" "• 0 Less transfer 0 *""• ** 0 «** 0 **** 0 *"*' Heating redistribution 0 "" "" 0 "•* 0 «*** ***• -0 14 Duct-loss 6% 101 6% 279 '**' 6% 4 *** 6% 367 15 Total loss=13+14 "" 1786 *"' "** 4931 *"* `*** 68 "" "" 6492 16 Int.gains: People.@ 300 0 **** 0 0 `*** 0 0 '*" 0 0 0 Appl. @ 1200 0 - "" 0 0 0 0 0 0 "" 0 17 Subtot RSH gain=7+8..+12+16 "" "`* 453 "`* "" 570 "** ***` 30 "** "`* 1070 Less external cooling •• •"« 0 `" 0 •«*« 0 :<.* **-* 0. Less transfer •• 0 •'• 0 •"• •* 0 •::• ••' 0 Cooling redistribution 0 ""** •'"* 0 •««* **** 0 ••'* •«*« 0 18 Duct gain *59/ "`« 23 5% '*`« 28 50/6 `**' 2 5% `*" 54 _ 19 Total RSH gain=(17+18)"PLF 1.00 "'* 476 1.00 *"' 598 - 1.00 '*** 32 1.00 - "` 1124 20 Air required(cfm) i 231 29 64 36 1 2 84 68 Calculations approved by ACCA to.meet all requirements of Mahual J 7th Ed. wrightsoft' 2022-May-11 10:age 2 Right-Suite®Universal 2017 17.0.16 RSW5116 Page 2 .:..langewdrthy\Documents\York\935 WEST MNT RD.rup Calc=MJ7 Front Door faces: N Right-M Worksheet Job: 935 West met ra. Entire House Date: May 11,zozz LByy: : 1758 MANUAL J:.7th Ed. 1 Name of room Room8 Room9 Room 10 2 Length of exposed wall 9.0 ft 31.0 ft 196.0 ft 3 Room dimensions 6.0 x 9.0.ft 13.0 x 13.0 ft 1.0 x 1695 ft 4 Ceilings Condit.Option 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ft heat/cool .._WIPE OF CST HTM Area.: Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area EXPOSURE. I NO. .Htg I Clg (ft2) Htg Clg (ft� Htg Clg (ftz) Htg Clg Htg Clg 5 Gross a 12E3 5.4 1.0 72 . **** 248 **** 1568 - Exposed- b 0 0 I!1!!! walls and c 0 0 11!!!! *•*• •*** !!!!!! •**• * !!!!!! ••*• **• ••*• partitions d 0 0 !!!!I! •*•• ••:• Mill •*•• •••• IIMI •*** •••* **•• ***• e 0 0 !11!!! ••** Mill •••• ••** !!!!!! * •••• ***• f 0 0 I11Ill *•*• •••* IIIIII *••* * !!III! ••* ••*• :*•• **•• 6 Windows and . a 3A0 39.7 ** 10 -_ 397 **** 25 992 * 40 1587 **** ** glass doors . b 0 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 0 0 d 0 ** .0 0 :.* 0 0 ...* 0 0 e 0 ** 0 . 0 **.* 0 0 .*.* -0 0 -... *..* f 0 ** 0 0 . .*.. 0 0 .*. 0 0 *:** 7 Windows and North 19.0 0 :**** 0 0 **** 0 0 **** 0 glass doors NE/NW 0 0 0 0 ***' 0 0 **** 0 **** Cooling ENV 68.0 10 **** 680 0 **** 0 40 **** 2720 *"* SE/SW 0 0 0 0 **** 0 0 **** 0 South 34.0 0 **** 0 25 **** 850 0 **** 0 ***' Horz 0 0 **.. 0 0 .... 0 0 .*.. 0 **.* 8 Other doors a 11F0 12.2 2.3 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 62 335 63 223 1204 227 1528 8251 1559 exposed b 0 0 1!!!!! 0 0 Mill 0 0 Mill 0 0 walls and c 0 0 !!!!!! 0 0 IIIIII 0 0 1IM! 0 0 partitions d 0 0 IIIIII 0 0 IIIIII 0 0 1!!!!! 0 0 7 e 0 0 !!!!1! 0 0 !!!!!1 0 0 !!1!!! 0 0 fj 0 0 BMI 0 0 !!ill! 0 01 0 0 10 Ceilings a 16GO 2.4 1.1 54 128 61 169 402 190 48 114 54 _ b 0 0 IIIIII 0 0 IIIIII 0 0 IIIIII .0 0 c 0 0 I MI 0 0 Mi!i 0 0 IIIIII 0 d 0 0 Mill 0 0 !!!!! 0 0 1!1! 0 .0 e 0 0 !!!!!1 0 0 Mill 0 0 1m1! 0 0 f 0 0 IIIIII 0 0 Mill 0 0 I!!!!! 01. 0 11 Floors a 1910 1.7 _ 0 0 0 0 0 0 0 1695 2929 0 (Note:,room - b 1910 1.7 0 0 0 0 5 9 0 0 0 0 perimeter c 0 0 Mill 0 0 1IM1 0 0 IIIIII 0 0 is displ. d 0 0 !!11!1 0 0 !III!! 0 0 IIIIII 0 0 for.slab e 0 0 IIIIII 0 0 IIIIII 0 0 Mill 0 0 floors) f 0 0 IIIIII 0 0 IIIIII 0 0 IIIIII 0 0 12 Infiltration a 153 9.5 10 1533 95 25 3831 237 40 .6130 378 Ventilation 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 2392 **** **** 6437 **** **** 19011 **** **** Less extemal.heating **** 0 **** **** 0 •*** **** 0 **** **** **** Less transfer * 0 •:•* •••* 0 •••• ••*• 0 •*** **•* Heating redistribution 0 **** **** 0 '*** **'* 0 14 Duct loss 6% -144 **** 6% 386 **** 6% 1141 15 Total loss=13+14 ** 2536 **** **** 6824 **** *** 20152 **** **** **** 16 Int.gains: People @ 300 -0 * 0 0 **** 0 0 **** 0 '** Appl. @ 1200 0 ••• 0 0 ••*• 0 0 •**• 0 17 Subtot RSH gain=7+8..+12+16 "* **** 898 **** **** 1504 **** **** 4711 **** **** Less external cooling •••• •••* 0 ••*• *••• 0 •••* **•* 0 ••** ::** Less transfer ..* ..... 0 .**. .*.. 0 *... **** 0 Cooling redistribution **•• *•** 0 **** ***• 0 **** **** 0 *•** **** 18 Duct gain . 5%- **** 45 5% **** 75 5% **** 236 **** 19 Total RSH gain=(17+18)*P LF 1.00 ". **** 943 1.00 **** 1579 1.00 **** 4946 **** 20 Air required(cfm) 331 57 88 95 260 297 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. -� wkghtsoft® 2022-May-11 10:14:27 Right-Suite®,Universal 2017 17.0.16 RSU25116 Page 3 .� ...:langeworthy\Documents\York\935 WEST MNT RD.rup Calc=MJ7 Front Door faces: N r7l Detrormfinhc.? Your lat on Needs Good air quality Is based In part an the capacity W tho hame's ventilation system.t wally,tho unhfs capacity is Meas ured In CFM(Cubic Feet per Minute)or Lfs(Liters pair secandp of fresh air be g distributed In the Wing speco.Use ilia A8111RAE 612 Vantilallon Standard, the Hoorn Count Calculation 61 thud,or the Air Change Pet, Hatio,(ACHJ Method to deleurmine your ventiYalion needs. A-EY'VIR&E 62.24'kinthlu�fivi v ASHRAE 62.2 CFM Sizing Chart Number of Bedrooms J CFM Floor Area Ift-) 0-1 2-3 4-6 6.7 >7 I Goo 30 46 GO 76 w. '1501 -3000 45 so 75 90 105 3001 -4500 60 75 f10 M5 120 T 14501 -6000 75 90 tas 120 13.5 6 -7600 .105 001 120 135 iso .,7500 105 120 135 1.90 165 ANS),IASHRAE 15rANDARD 62.2-201 a -Venfliahrin Air Requirements:valkies in 01 n chij-1 outlines Me mininium Yaqg4remeniss for continuous ventilation. I. q-ft C FM N o o c�' 1.55 MAX 2019* HEAT RECOVERY VENTILATOR *2019 denotes i not date. L IFEBRERTH. ENGINEERING DATA of THERMALLY CONDUCTIVE, PATENTED DEFROST ALUMINUM CORE Recirculating damper defrost system. The counter-flow heat recovery core transfers heat between the two airstreams. It is easily removed for cleaning orservice. CASE Twentygauge prepainted galvanized steel for superior corrosion resistance. MOTORS AND BLOWERS Insulated to prevent exterior condensation.Drain connections 2-U2 in.(12 mm)OD. Each airstream has one centrifugal blower driven bya common PSC motor,with Balancing ports are located on door. multiple fan speed operations. INSTALLER SELECTABLE HIGH SPEED SETTINGS FILTERS Adjustable DIP switches are located on the circuit board,Hi3 is the factory setting. Washable MERV 6 airfilters in exhaust and supply airstreams. Refer to the installation manual for the adjustment instructions. Upgrade to MERV-13 option available. ELECTRONICS MOUNTING The DXPL02 control included with the unit can be wall mounted in a central location of Fourthreaded inserts at corners of the cabinet designed to accept the the home.3 wire 20 gauge(mint 100 It length(max.). "S"hooks and hanging straps supplied with the unit. OPTIONAL ACCESSORIES: I Dual Hood Weather Hood TechGrille 99-190 Terminator 99-185 99-EAG4 Fitting 99-194 99-186 / i 99-AGS \ 99-TM4 i 99-187 AGG ` ! 99-TMS 99- k 99-TM6 LIFEBREATH CONTROL OPTIONS TIMER OPTIONS FEATURES r : : r, 99-DET01-20/40/60 Minute Timer Initiates high speed ventilation for 20,46 or60 minutes.3 wire 5 speed fan operation on each mode ✓ connection. 2 speed fan operation(low/High) ✓ ✓ 99-DET02-20/40/60 Minute Timer Continuous low speed fan operation ✓ ✓ ✓ ✓ Initiates high speed ventilation for20,40 or60 minutes.Wirelessly connects to main control for ease of installation.40 ft approximate Humidity control through adjustable Dehumid- ✓ ,, ✓ range. istat Large digital LCD screen ✓ 99-RX02-Wireless Repeater Extends range of 99-DET02 Wireless Timers.Plugs into 120V power LED status indicator lights ✓ ✓ ✓ outlet Wirelessly connects to main control and 99-DET02-.Install at halfway point between timerand main wall control if timer is out of Continuous Ventilation ✓ ✓ ✓ ✓ range. Continuous Recirculation* ✓ ✓ INCLUDED WITH ALL MAX UNITS 20 ON/40 OFF ✓ ✓ ✓ 10 ON/50 OFF ✓ j . 20 ONAO Recirculation* ✓ ✓ ✓ _ d ;�_ 20/40/60 min.High speed override button ✓ 99-DXPL02 99-DET02 99-DETOl Compatible with 99-DETO2 Wireless Timer ✓ ✓ ✓ ✓ _ �� 3 wire connection ✓ ✓ ✓ ✓ L/FERRERTH' *Recirculation features not available on fan defrost models. / Indoor Air Systems 69-1SSMAX 2019(0921) www.lifebreath.com �sr *2019 denotes Energy Star certification,not manufacture date PERFORMANCE(HVI CERTIFIED) L111EBRERTH. 0.4(100) O.S(12s) ELECTRICAL SPECIFICATIONS VAC @ 60Hz 120 Net Supply Airflow 159(75) 148 00) 140(66) 125(59) Watts/Low Speed 66 Gross Supply Airflow 167(79) 159 051 146(69) 131(621 Watts/High Speed 118 Gross Exhaust Airflow 112(8D 159 05) 133163) 83139) Amp Rating 1.4 1e0 :..... ................•............................... _ ..... .. . Sensible Effectiveness(ASD 32°f(0°C) 84% WEIGHT: @ 59 CFM(28 Us) 71 LBS(32 KG) - 160 ................... ................................................... Sensible Efficiency(SRD 32°F(0°0) 75% SHIPPING WEIGHT: @ 64 CFM(30 Us) E. 140 _:......... 73 BS(33.KG) . w Sensible Efficiency(SRO % v " @95 CFM(45Us) 32°F(0°0) 12 3 120 .....,... .... ........ .................. .... .. ..................... 0 Sensible Efficiency(SRO -13°F(-25°C) 72% a too ••.. "' NOTE: @ 68 CFM(32 Us) Front clearance of 25 in.(635 mm)'is E30 .:.:.............:.....:....... ............... :.. ........... ...:.. recommended for servicing limit.All ducts c.Vc� ® us �NV•I ® - use 6in(152 mm)round ollars.Balanc in g ISOo 60 ............................................... . dam ersarelocated,inallairstreams. 9001 CERTIFIED arssnnm 0.1 0.2 0.3 0.4 os 0.6 0.7 .0.e MERV13 Upgrade:65.195.6R Static Pressure(in w.g.) This product earned the ENERGYSTAR@ by meeting strict energy efficiency guidelines set by Natural Resources Canada and the US EPA.It meets ENERGY STAR@ requirements only when used in Canada: DIMENSIONS .......::...:...... ...........................:........................................... DOOR SIDE VIEW -SIDE VIEW -TOP_VIEW - o - Airflow:. E w Stale Air to Outside e Gore O o. a ♦ Fresh Air from Outside Stale Air from Inside Fresh Air to Inside 6 in.(152 mm) :Round Collars 33.63 in(854mm) I 1435In,(375 mm) " Recirculating Filters Motorized Defrost Damper Impellers ARRANTY Date: Contractor: VV Units carry a lifetime warranty on the HRV core and S year Tag. Supplier: replacement parts Project: City: Quote#: All_units conform.to 6A andUL standards Engineer. Submitted By:. •� LIFEBRERTH Control: Timer: Timer Qty. IndaorAirsystems 69-1SSMAX 2019(0921) vmw.lifebreath.com Z-64-2LZ A 5 wIL� / G � `fiN r AIR SEALING AND BLOWER DOOR f TEs-rING SERVICES RESIDENTIAL ONLY JILT Building services® LLC North Last Spray Foam Jim Telfer, Owner 7 Rocky Midge 518-925-771-5 Warrensburg, NY 12885 jltbuildingservices@gmaii.com 518-350-2491 or 518-623-7010 Thernal Associates Grajny Consulting' LLC 21 Thomson Ave. 69 Hayden Pt. Loop Glens Falls, NY 12801 Diamond Point, NY 12824 518-798-5500 518-221 -3240 Stonehenge Associates 27 Cohoes Road Watervliet, NY 12189 518-874-1604 Town of Queensbury Building&Code Enforcement Revised March 2017 01 023 12 : 17 F:r0In,: 151822.09.0.14 Cincinnati Sawyer. >P&gc-: 2i2 DIDDLE DEPARTMENT NSPECTION AGENCY-, INC. ;M Ve?.tti� that the electrical wiring to the electrical aquipment listed below has been examined and is approved as being in accord with the National Electrical Code, applica le governmental, utility and Agency rules in effect on the date 1 noted below and is issued subject to the following conditio is. Owner: Cerrone Builders Date: 01/26/2023 , Occupant: 1st FI. & Basement Location 935 West Mountain Rd. v Occupancy Ingle Family Dwg. Queensbury,Warren Co. NY v Applicant: 4 Cerrone Builders Gianni Cerrone r 1589 Rt 9 L Fort Edward, NY 12828 _1 f Ray Novak Jr. No. 145314172832EL Equipment: 200 Amp. Service Equipment Transfer Switch;42-Switche ; 58-Receptacles;48-Fixtures; 1 -30A Air Conditioner, 1 -Burner, Wiring &Controls for Gas; 1 -20A Dishwasher, -30A Dryer, 7-Smoke Detectors;2-Vent Fans; 1 - 200A Sub Panel Zo 2.2. I his certificate applies to the electrical wiring to the electrical equipment listed Immediately null and void. This certificate applies only to the use,occupancy and I above and the installation inspected as of the above noted date based on a visual ownership as indicated herein. Upon a change in the use,occupancy or ownership inspection. No warranty Is expressed or implied as to the mechanical safety,effi- of the property indicated above,this certificate shall be immediately null and void. ciency or fitness of the equipment for any particular purpose. This certificate shall In the event that this cerwrate becomes invalid based upon the above conditions, be valid for a period of one year from the above noted date. Should the electrical this certificate may be revalidated upon reinspection by Middle Department system to which this certificate applies be altered in any way,including but not limit- Inspection Agency,Inc. An application for inspection must be submitted to Middle ed to,the Introduction of additional electrical equipment and/or the replacement of Department Inspection Agency, Inc.to initiate the inspection and revalidation any of the components Installed as of the above noted date,this certificate shall be process. A fee will be charged for this service, JAN 2 7 22,23 TOWN Of QUEENS-BURY BUILDING&CODES This home has been professionally insulated with Owens Corning® PROPINK® L77 Loosefi ll Insulation (Job Site Address) Name ___________________________________________________________________________________________________ Address _________________________________________________________________________________________________ City ________________________________________________________________ State __________ Zip ________________ Owens Corning® PROPINK® L77 Loosefi ll Insulation Owens Corning will accept no responsibility when the product is not installed in accordance with the product label. Stated R-value is provided by installing the required number of bags at a thickness not less than the labeled minimum thickness. Installation of the required number of bags may yield more than the specifi ed minimum thickness. Failure by the installer to provide both the required bags and at least the minimum thickness will result in lower insulation R-value. Loosefi ll insulations vary in thermal performance due to factors such as aging, mean temperature, settlement, convection, moisture absorption and installation variation. Convection in glass loosefi ll insulation installed in open attics can reduce its thermal performance in extreme winter temperatures during the heating season. Specifi cation for Open Blow Attics New Construction Retrofi t  Number of bags used Estimated R-value of previous insulation Area of coverage (sq. ft.) Other type(s) of insulation in attic Thickness of insulation Depth of previous insulation Pub. No. 10012954-B. Printed in U.S.A. October 2016. The color PINK is a registered trademark of Owens Corning. © 2016 Owens Corning Insulating Systems, LLC. All Rights Reserved. OWENS CORNING INSULATING SYSTEMS, LLC ONE OWENS CORNING PARKWAY TOLEDO, OHIO, USA 43659 1-800-GET-PINK® www.owenscorning.com Contractor _______________________________Date ________ Builder _____________________________________ Date __________ Company ___________________________________________ Company __________________________________________________ (Signature) (Signature) Address _____________________________________________ Address ___________________________________________________ Phone ______________________________________________ Phone _____________________________________________________ Coverage charts are based on a nominal net bag weight of 32 lbs. Attics R-value Minimum Initial Installed Thickness (Inches) Minimum Settled Thickness (Inches) Maximum Coverage Per Bag (sq. ft.) Minimum Bags Per 1000 sq. ft. Minimum Weight (lbs per sq. ft.) 13 4.75 4.75 184.6 5.4 0.173 19 7.00 7.00 125.0 8.0 0.256 22 8.00 8.00 106.3 9.4 0.301 26 9.25 9.25 89.6 11.2 0.357 30 10.50 10.50 77.0 13.0 0.416 38 13.25 13.25 59.9 16.7 0.534 44 15.00 15.00 50.7 19.7 0.631 49 16.75 16.75 45.0 22.2 0.711 60 20.00 20.00 35.8 28.0 0.895 Walls R-value Framing Installed Thickness (inches) Installed Density (lbs per cu. ft.) Maximum Coverage per Bag (sq. ft.) Minimum Bags Per 1,000 sq. ft. Minimum Weight (lbs per sq. ft.) 14 2x4 3.5 1.25 87.8 11.4 0.364 15 2x4 3.5 1.45 75.7 13.2 0.423 16 2x4 3.5 2.20 49.9 20.1 0.642 22 2x6 5.5 1.25 55.9 17.9 0.573 23 2x6 5.5 1.35 51.7 19.3 0.619 24 2x6 5.5 1.75 40.0 25.0 0.802 Floors R-value Framing Minimum Thickness (inches) Installed Density (lbs per cu. ft.) Maximum Coverage Per Bag (sq. ft.) Minimum Bags Per 1,000 sq. ft. Minimum Weight (lbs per sq. ft.) 30 2x8 7.25 1.35 39.2 25.5 0.816 38 2x10 9.25 1.35 30.8 32.2 1.041 46 2x12 11.25 1.35 25.3 39.6 1.266 Cathedral Ceiling R-value Framing Minimum Thickness (inches) Installed Density (lbs per cu. ft.) Maximum Coverage Per Bag (sq. ft.) Minimum Bags Per 1,000 sq. ft. Minimum Weight (lbs per sq. ft.) 30 2x8 7.25 1.35 39.2 25.5 0.816 38 2x10 9.25 1.35 30.8 32.5 1.041 49 2x12 11.25 1.85 18.5 54.2 1.734 935 West Mountain Road Queensbury 32 N/A 1820 N/A 13.25 N/A 11/13/22 Cerrone BuildersThermally Yours 149 Plant Rd., Halfmoon NY 12065 518-312-0859