Loading...
CC-0529-2022 Office Use Only ADDITION/ALTERATION PERMIT Permit#:CC -D5Zn • 20 22— Town ofQ APPLICATION 2 Permit Fee: $ 64 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www.queensbury.net Invoice#: �!;A Flood Zone? Y ( N/ Reviewed By: AA S Project Location: (4 (J S 9 5V I VE 1 (INV E Cs109(ZAZ Tax IVlap ID#: Subdivision Nam AUG 2 4 �0?2 PROJECT INFORMATION: TOWN OF BUILD UILD & CODES TYPE: ❑ Residential N Commercial, Proposed-Use: (` ERCIWALZ I ❑ Single-Family ❑ Two-Family ❑ Multi-Family (#of units_) ❑ Townhouse ❑ Business Office ,Retail ❑ Industrial/Warehouse ❑ Garage (#of cars ) ❑ Other(describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor:I S1 2nd floor: 2nd floor: 3rd floor: 3rd floor: Basement (habitable space): Basement (habitable space): Total sq ft: Total sq ft:-1S7 _ Scope of work to be done: P9 OJEC l (S A (LF_(naO6(_ C F Tve' Ex(5n tJ G-5gt4c !;5 ITV r"smfzE, �lrl(�1►z a o Ir(C(.VD Ir(TjC�RIdN Mr _srdl(tGxrw— OEM I wtw! F49n ncrYS t 0%,L5, (-ywWl ( T'kr(iSt_SES CE(OcrYGS I-5s-Q(Lff_VTYR•E5 tJ"&4 F'UrW,4C:E,c0rA1)CNS1rC- VH1'r, Canl Zz0c,s, I"h(�K6NV_ �-OIF�"�lSeYt.s aEu -TAS Pc�'I�G. rtEw ELecrn,l.cnj. {'/5c4e1.� TrmE C(CjCK LIGurlrf- CGC(Mau a v i Lets s VA Irgl- 5 Lx twl r ry'\6C. W N VdcX/X Addition/Alteration Application Revised June 2022 ADDITIONAL PROJECT INFORMATION: w 1. Estimated Cost of Construction: $ 17� 2. Source of Heat (circle one): %Gas ❑ Oil ❑ Propane ❑ Solar ❑ Other: Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application 3. Are there any structures not shown on the plot plan? ❑ YES ff NO Explain: 4. Are there any easements on the property? ❑ YES C'NO SITE INFORMATION: • Is this a corner lot? ❑ YES ONO, • Will the grade be changed as a result of the construction? ❑ YES C�NO • What is the water source? @PUBLIC ❑ PRIVATE WELL • What type of wastewater system is on the parcel? ®'SEWER ❑ PRIVATE SEPTIC DECLARATION: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans, additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: SIGNATURE: DATE: VIZ-42-L Addition/Alteration Application Revised June 2022 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): T(NM 5C(SGHkC Mailing Address, C/S/Z: 1124 £•$0& 5r 5yar yl .6Lo(3cnmC '®M M. 01r,( ::Y-:r Cell Phone: (952 ) Z56 .q$6�- Land Line: 952- 3145. 604 Email: �'�P►15C°�e(a�@�`.�one5•���- • Primary Owner(s): Name(s): L-�M ASSac.IAXES I rREr(c(.� (n8VdfNr( CdnnmM 5 Mailing Address, C/S/Z: _(A3q 51""E GEoQZGE� W 12%' Cell Phone: ( Land Line: ( 5t a ) 683-pr)ZO Email: 7_M0o)rP_@ Gak.Q3r-_ ❑ Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contact Name(s):-T ISO Contractor Trade: Mailing Address, C/S/Z: Cell Phone: Land Line: Email: **Workers' Comp documentation must be submitted with this application** • Arch itect(s)/Engineer(s): Business Name: Coy(4cQ- ,W M" (LGnc-( f icl�cT�c.GrS. Contact Name(s): CORSCAND (nv(LG/_t.l Mailing Address, C/S/Z: -1,k 1q. r I ELDER %y . A(Wr(C4 NtTiS 1601Z Cell Phone: Land Line: 0311 ) 635- 5GRG , Email: +Y'1 Cio► CrYia�Cn. G��� Contact Person for Compliance in regards to this project: 33M 5c"Fjy(�. Cell Phone: ( qS2 ) 256 • Land Line: 952 6049 Email: + i r►Ms @, el Aec,3 anw cao__ Addition/Alteration Application Revised June 2022 COMcheck Software Version COMcheckWeb Interior Lighting Compliance Certificate Project Information Energy Code: 2020 New York State Energy Conservation Construction Co �R� FRgN�s Project Title: Sunglass Hut Lake George NY Project Type: Alteration * cc r w ovk W Construction Site: Owner/Agent: 0 tractor: ?'&N � COMP A os o5'+ P`� �r0 0 Allowed Int r�or �g r g Power ERG`( CoC 0 FEss� 17/2022 A �� B C D 8:07:37 PM Area Category Floor Area Allowed Allowed (ft2) Watts /ft2 Watts 1-Sales Area (Retail:Dressing/Fitting Room) 542 0.50 271 Allowance: Furniture,clothing, cosmetics highlighting/Fix. ID:T/E1/E2/ 542(a) 1.05 569(b) E3 Allowance: Furniture,clothing, cosmetics highlighting/Fix. ID: MS 542(a) 1.05 134(b) Supplemental Allowed Watts(null) = 67 Total Allowed Watts = 1041 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s) are specified. (b)Allowance is (B x C)or the actual wattage of the fixtures given in Proposed Power section, whichever is less. (c)Supplemental watts must be associated with retail merchandise highlighting fixtures. Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp/Wattage Per Lamp% Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Sales Area (Retail: Dressing/Fitting Room. 542 sq.ft.) General Light: MS: 2-head adjustable: Other: 2 5 34 168 Track Lighting Display Window:T/E2/E3:Track Lighting: Wattage based on total 0 0 103 Exempt luminaires Exemption:Retail display window Track Lighting Sales Display:T/E1/E2/E3:Track Lighting: Wattage based on total 0 0 636 636 luminaires Sales Display: MS: 2-head adjustable: Other: 2 4 34 134 Total Proposed Watts = 938 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2020 New York State Energy Conservation Construction Code requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Sware Derua - Designer — 7/26/22 Name-Title Signature Date C E V E 288.-1-55 CC-0529-2022 AUG 2 4 2022 Sunglass Hut 01 1 1439 State Rte 9 Pr ject� N OU NsuRveo ge N' Commercial Alterations 757 S.f, Report date: 07/26/22 D DING NUT Page 1 of 5 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 2020 New York State Energy Conservation Construction Code Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans,specifications, and/or ;❑Complies Requirement will be met. [PR4]1 .!calculations provide all information !❑Does Not with which compliance can be determined for the interior lighting i❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to ;the standard are claimed. Information ; provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/26/22 Data.filename: Page 2 of 5 Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.2. ;Spaces required to have light- ;❑Complies ;Requirement will be met. 2 .reduction controls have a manual :❑Does Not [EL22]1 control that allows the occupant to reduce the connected lighting load in ;❑Not Observable a reasonably uniform illumination I❑Not Applicable ; pattern >= 50 percent. C405.2.1, ;Occupancy sensors installed in ;❑Complies :Exception: Requirement does not apply. C405.2.1. :classrooms/lecture/training rooms, !❑Does Not 1 conference/meeting/multipurpose [EL18]1 ;rooms,copy/print rooms, ,❑Not Observable I lounges/breakrooms,enclosed offices, ❑Not Applicable open plan office areas, restrooms, storage rooms, locker rooms, warehouse storage areas,and other spaces <= 300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language I C405.2.1.2 for control function in ; ;warehouses and section C405.2.1.3 .for open plan office spaces. 1 : C405.2.1. ;Occupancy sensors control function in ;❑Complies Exception: Requirement does not apply. 2 'warehouses: In warehouses,the E❑Does Not [EL19]1 lighting in aisleways and open areas is;❑Not Observable controlled with occupant sensors that ❑Not Applicableery ery automatically reduce lighting power by 50%or more when the areas are unoccupied.The occupant sensors ; :control lighting in each aisleway independently and do not control ; :lighting beyond the aisleway being ; controlled by the sensor. C405.2.1. ;Occupant sensor.control function in I❑Complies ;Exception: Requirement does not apply. 3 :open plan office areas: Occupant :❑Does Not [EL20]1 :sensor controls in open office spaces ❑Not Observable; >= 300 sq.ft. have controls 1) configured so that general lighting can I❑Not Applicable be controlled separately in control zones with floor areas <= 600 sq.ft. ; within the space, 2)automatically turn ;off general lighting in all control zones ;within 20 minutes after all occupants ; have left the space,3)are configured so that general lighting power in each ;control zone is reduced by>= 80%of ,the full zone general lighting power I within 20 minutes of all occupants leaving that control zone, and 4)are configured such that any daylight responsive control will activate space ; ;general lighting or control zone )general lighting only when occupancy :for the same area is detected. C405.2.2, Each area not served by occupancy ;❑Complies :Requirement will be met: C405.2.2. sensors(per C405.2.1) have time- :❑Does Not 1, switch controls and functions detailed ❑Not Observable: C405.2.2. in sections C405.2.2.1 and C405.2.2.2. Not Applicable : 2 PPi e [EL21]2 I ; 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/26/22 Data filename: Page 3 of 5 Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.3, Daylight zones provided with :❑Complies :Exception: Sidelit zones on first floor in Group A-2 and M C405.2.3. individual controls that control the :0Does Not :occupancies. 1, lights independent of general area C405.2.3. lighting. See code section C405.2.3 ;❑Not Observable 2 Daylight-responsive controls for :❑Not Applicable [EL23]2 applicable spaces,C405.2.3.1 Daylight; !!1 responsive control function and section C405.2.3.2 Sidelit zone. C405.2.4 ;Separate lighting control devices for :❑Complies :Requirement will be met. [EL26]1 !specific uses installed per approved :❑Does Not lighting plans. ❑Not Observable ❑Not Applicable C405.2.4 ;Additional interior lighting power ;❑Complies ;Requirement will be met. [EL27]1 allowed for special functions per the E❑Does Not approved lighting plans and is :automatically controlled and :❑Not Observable (separated from general lighting. ;❑Not Applicable C405.3 ;Exit signs do not exceed 5 watts per ;❑Complies :Requirement will be met. [EL6]1 :face. UDoes Not i ;❑Not Observable: ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1), 2 Medium Impact(Tier 2) 13 JLow Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/26/22 Data filename: Page 4 of 5 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, Furnished O&M instructions for ;❑Complies ;Requirement will be met. C408.2.5. systems and equipment to the ;❑Does Not 2 ' building owner or designated [FI17]3 representative. I❑Not Observable ❑Not Applicable C405.4.1 ,Interior installed lamp and fixture ;❑Complies ;See the Interior Lighting fixture schedule for values. [FI18]1 :lighting power is consistent with what E❑Does Not is shown on the approved lighting ;plans, demonstrating proposed watts ;❑Not Observable .are less than or equal to allowed ;❑Not Applicable watts. C408:2.5. Furnished as-built drawings for ;❑Complies !Requirement will be met. 1 electric power systems within 90 days :❑Does Not [FI16]3 of system acceptance. ❑Not Observable ❑Not Applicable C408.3 ;Lighting systems have been tested to ;❑Complies ;Requirement will be met. (FI33]1 :ensure proper calibration,adjustment, T❑Does Not programming, and operation. ,❑Not Observable: ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/26/22 Data filename: Page 5 of 5 COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate 86 oa- Project Informatio�����GOM� OF NEWVY Energy Code: ��G o� 020 New York State Energy Conservation Construction Code 5�pS A. y R Project Title: CiO Sunglass Hut Lake George NY Location: Lake George, New York Climate Zon `�' 6a cc Project Type: Alteration W Construction ite;. C' Owner/Agent: Designer/Contractor: A O 901 o5N �' 9 FESSIO P Mechanical stems List •ZL Quantity5ystem Type & Description 1 F-1 (Single Zone): Heating: 1 each-Central Furnace, Gas,Capacity 80 kBtu/h Proposed Efficiency= 96.00% Et, Required Efficiency: 80.00% Et or 80%AFUE Cooling: 1 each-Split System,Capacity= 47 kBtu/h,Air-Cooled Condenser, Unknown Economizer Proposed Efficiency= 16.00 SEER, Required Efficiency = 13.00 SEER Proposed Part Load Efficiency= 0.00 , Required Part Load Efficiency= 0.00 Fan System: FAN SYSTEM 1--Compliance (Motor nameplate HP and fan efficiency method) : Passes Fans: FAN 1 Supply, Constant Volume, 1700 CFM, 1.0 motor nameplate hp,0.0 fan efficiency grade, 0.0 total fan efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP 1 UH-1 (Unknown w/Perimeter5ystem): Heating: 1 each-Unit Heater, Electric, Capacity= 13 kBtu/h No minimum efficiency requirement applies Fan System: FAN SYSTEM 2--Compliance (Motor nameplate HP and fan efficiency method) : Passes Fans: FAN 2 Supply, Constant Volume, 300 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP Mechanical Compliance Statement Compliance Statement. The proposed mechanical alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2020 New York State Energy Conservation Construction Code requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Robert Harris � 0811.2-L Name-Title Signature Date 1E AUG 2 J Y022 288.-1-55 CC-0529-2022 Sunglass Hut TOWN OF QUEENSBURy 1439 State Rte 9 BUILDING 8 CODES Commercial Alterations 757 s.f. Project Title: Sunglass Hut Lake George NY Report date: 07/27/22 Data filename: Page 1 of 8 COMcheck Software Version COMcheckWeb Inspection Checklist Energy Code: 2020 New York State Energy Conservation Construction Code Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 ;Plans,specifications,and/or ;❑Complies ;Requirement will be met. [PR2]1 ;calculations provide all information E❑Does Not ;with which compliance can be ' determined for the mechanical ![:]Not Observable systems and equipment and ;❑Not Applicable ;document where exceptions to the ;standard are claimed. Load calculations per acceptable ;engineering standards and ;handbooks. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/27/22 Data filename: Page 2 of 8 Section # Footing/Foundation Inspection Complies? Comments/Assumptions & Req.ID C403.12.2 Snow/ice melting system and freeze ;❑Complies ;Exception: Requirement does not apply. protection systems have sensors and !❑Does Not C403.12.3 controls configured to limit service for [FO9]3 pavement temperature and outdoor ;❑Not Observable temperature.future connection to ❑Not Applicable controls. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/27/22 Data filename: Page 3 of 8 Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Req.ID C404.5, Heated water supply piping conforms ;❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ;❑Does Not C404.5.2 requirements. Refer to section details. [RL6]3 ,❑Not Observable, ❑Not Applicable C404.5, - Heated water supply piping conforms 1❑Complies ;Exception: Requirement does not apply. C404.5.1, to pipe length and volume ;❑Does Not C404:5.2 requirements. Refer to section details. [PL6]3 I❑Not Observable: ❑Not Applicable (404.6.3 Pumps that circulate water between a ;❑Complies !Exception: Requirement does not apply. [PL7]3. heater and storage tank have controls :❑Does Not that limit operation from startup to <= 5 minutes after end of heating ❑Not Observable cycle. ❑Not Applicable C404.6:3 Pumps that circulate water between a I❑Complies ;Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls :❑Does Not that limit operation from startup to <= 5 minutes after end of heating ❑Not Observable cycle. ;❑Not Applicable C404.7 Demand recirculation water systems ;❑Complies ;Exception: Requirement does not apply. [PL8]3 have controls that start the pump ;❑Does Not upon receiving a signal from the action of a user of a fixture or E❑Not Observable _ appliance and limits the temperature ;❑Not Applicable ; of the water entering the cold-water piping to 104°F. C404.7 Demand recirculation water systems ;❑Complies ;Exception: Requirement does not apply. [PL8]3 have controls that start the pump 1❑Does Not upon receiving a signal from the action of a user of a fixture or ❑Not Observable appliance and limits the temperature ; Not Applicable of the water entering the cold-water piping to 104°F. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/27/22 Data filename: Page 4 of 8 Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C402.2.6 'Thermally ineffective panel surfaces of;❑Complies Exception: Requirement does not apply. [ME40 sensible heating panels have j❑Does Not insulation >= R-3.5. f❑Not Observable ❑Not Applicable C403.11.3 HVAC piping insulation insulated in ;❑Complies :Requirement will be met. [ME61]2 accordance with Table C403.11.3. E❑Does Not Insulation exposed to weather is protected from damage and is :❑Not Observable provided with shielding from solar ;❑Not Applicable i radiation. C403.11.3 HVAC piping insulation insulated in ;❑Complies ;Requirement will be met. [ME61]2 accordance with Table C403.11.3. :❑Does Not Insulation exposed to weather is i protected from damage and is I❑Not Observable j provided with shielding from solar :❑Not Applicable radiation. C403.8.4 Motors for fans that are not less than ;❑Complies ;Exception: Motors in space-conditioning equipment that [ME142]2 1/12 hp and less than 1 hp are ;❑Does Not comply with Section C403.3.2 or Sections C403.8.1.through (electronically commutated motors or ; C403.8.3. have a minimum motor efficiency of ;❑Not Observable 170 percent.These motors have the ;❑Not Applicable means to adjust motor speed. ; C403.8.4 I Motors for fans that are not less than ;❑Complies ;Exception: Requirement does not apply. [ME142]2 1/12 hp and less than 1 hp are CDoes Not I electronically commutated motors or ; 1 have a minimum motor efficiency of ;❑Not Observable 70 percent.These motors have the ;❑Not Applicable 1 means to adjust motor speed. C403.8.5 !Each DX cooling system > 65 kBtu ;❑Complies Exception: Requirement does not apply. [ME143]2 and chiller water/evaporative cooling :❑Does Not system with fans > 1/4 hp are ❑Not Observable designed to vary the indoor fan airflow; as a function of load and comply with I❑Not Applicable detailed requirements of this section. C403.8.5 Each DX cooling system > 65 kBtu 10Complies ;Exception: Requirement does not apply. [ME143]2 and chiller water/evaporative cooling :❑Does Not (system with fans > 1/4 hp are { '❑Not Observable designed to vary the indoor fan airflow; as a function of load and comply with �❑Not Applicable I detailed requirements of this section. C403.12.1{Systems that heat outside the building;❑Complies ;Exception: Requirement does not apply. [ME71]2 1envelope are radiant heat systems :❑Does Not !controlled by an occupancy sensing I❑Not Observable device or timer switch. i ;❑Not Applicable ; C403.2.2 ;Natural or mechanical ventilation is ;❑Complies ;Requirement will be met. [ME59]1 ;provided in accordance with ;❑Does Not International Mechanical Code Chapter 4. Mechanical ventilation has ;❑Not Observable capability to reduce outdoor air supply,❑Not Applicable to minimum per IMC Chapter 4. C403.7.1 I Demand control ventilation provided ;❑Complies ;Exception: Requirement does not apply. [ME59]1 for spaces >500 ft2 and >25 ;❑Does Not people/1000 ft2 occupant density and ;❑Not Observable ;served by systems with air side , leconomizer, auto modulating outside ❑Not Applicable ;air damper control, or design airflow ; >3,000 cfm. C403.7.2 ;Enclosed parking garage ventilation ;❑Complies :Exception: Requirement does not apply. [ME115]3 has automatic contaminant detection :❑Does Not and capacity to stage or modulate fans to 50%or less of design capacity. ;❑Not Observable ❑Not Applicable 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/27/22 Data filename: Page 5 of 8 Section # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C403.7.6 HVAC systems serving guestrooms in ;❑Complies Exception: Requirement does not apply. [ME141]3 Group R-1 buildings with > 50 UDoes Not guestrooms: Each guestroom is provided with controls that :❑Not Observable automatically manage temperature ;❑Not Applicable setpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2). . C403.7.4 :Exhaust air energy recovery on ;❑Complies Exception: Requirement does not apply. [ME57]1 'Isystems meeting Table C403.7.4(1) :❑Does Not ;and C403.7.4(2). UNot Observable ❑Not Applicable C403.7.5 Kitchen exhaust systems comply with ;❑Complies :Exception: Requirement does not apply. [ME116]3 replacement air and conditioned :❑Does Not supply air limitations, and satisfy hood:❑Not Observable rating requirements and maximum , exhaust rate criteria. ;❑Not Applicable C403.11.1 HVAC ducts and plenums insulated in ;❑Complies !Requirement will be met. accordance with C403.11.1 and I❑Does Not C403.11.2 constructed in accordance with i [ME60]2 C403.11.2,verification may need to UNot Observable occur during Foundation Inspection. ;❑Not Applicable C403.4.1. Heating for vestibules and air curtains ;❑Complies ;Exception: Requirement does not apply. 4 with integral heating include ;❑Does Not [ME63]2 automatic controls that shut off the heating system when outdoor air ❑Not Observable !temperatures > 45F.Vestibule :❑Not Applicable heating and cooling systems controlled by a thermostat in the ; vestibule with heating setpoint<= 60F and cooling setpoint>= 80F. C403.3.3 ;Hot gas bypass limited to: <=240 ❑Complies :Requirement will be met. [ME35]1 I kBtu/h-50%>240 kBtu/h-25% :❑Does Not j ❑Not Observable; tlNot Applicable C408.2.2. Air outlets and zone terminal devices I❑Complies ;Requirement will be met. 1 . have means for air balancing. :❑Does Not [ME53]3 !❑Not Observable ❑Not Applicable C403.5, Refrigerated display cases,walk-in ;❑Complies Exception: Requirement does not apply. C403.5.1, coolers or walk-in freezers served by :❑Does Not C403.5.2' remote compressors and remote [ME123]3 condensers not located in a :❑Not Observable condensing unit, have fan-powered ;❑Not Applicable condensers that comply with Sections C403.5.1 and refrigeration compressor; systems that comply with C403.5.2.. Additional Comments/Assumptions, 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/27/22 Data filename: Page 6 of 8 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, Furnished 0&M manuals for HVAC ❑Complies ,Requirement will be met. C408.2.5. systems within 90 days of system :❑Does Not 3 acceptance. [FIB]3 ;❑Not Observable ❑Not Applicable C403.2.2 HVAC systems and equipment ;❑Complies ;Requirement will be met. [FI27]3 capacity does not exceed calculated ;❑Does Not loads. ❑Not Observable ❑Not Applicable j C403.2.4. Heating and cooling to each zone is ;❑Complies ;Requirement will be met. 1 controlled by a thermostat control. I❑Does Not [FI47]3 Minimum one humidity control device per installed ❑Not Observable humidification/dehumidification ;❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ;❑Complies ;Requirement will be met. 1 . controlled by a thermostat control. :❑Does Not [FI47]3 Minimum one humidity control device ❑Not Observable per installed humidification/dehumidification ;❑Not Applicable system. C403.4.1. Thermostatic controls have a 5 °F ;❑Complies !Requirement will be met. 2 deadband. ;❑Does Not [F138]3 ;❑Not Observable j❑Not Applicable C403.2.4. Temperature controls have setpoint ;❑Complies ;Requirement will be met. 1.3 . overlap restrictions. T❑Does Not [F120]3 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ;❑Complies ;Requirement will be met. 2 controls using automatic time clock or !❑Does Not [FI39]3 programmable control system. ❑Not Observable ❑Not Applicable C403.2.4. Automatic Controls: Setback to 550F ;❑Complies Requirement will be met. 2.1, (heat)and 85°F(cool); 7-day clock, 2- E❑Does Not C403.2.4. hour occupant override, 10-hour 2.2 backup ❑Not Observable; [F140]3 t❑Not Applicable I ; C403.2.4. Systems include optimum start ❑Complies Requirement will be met. 2.3 controls. ;❑Does Not [F141]3 ;❑Not Observable j❑Not Applicable C403.2.4. Systems include optimum start I❑Complies :Requirement will be met. 2.3 controls. ❑Does Not [FI41]3 ❑Not Observable; ❑Not Applicable C408.2.1 Commissioning plan developed by ;❑Complies :Requirement will be met. [FI28]1 registered design professional or E❑Does Not approved agency. ,❑Not Observable, ❑Not Applicable C408.2.3. ;HVAC equipment has been tested to ;❑Complies ;Exception: Unitary or packaged HVAC eqiupment without 1 !ensure proper operation. ;❑Does Not supply air economizers. [F131] ;❑Not Observable; ❑Not Applicable 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/27/22 Data filename: Page 7 of 8 0 Section # Final Inspection Complies? Comments/Assumptions & Req.ID C408.2.3. ;HVAC control systems have been ;❑Complies :Requirement will be met. 2 :tested to ensure proper operation, :❑Does Not [FI10]1 !calibration and adjustment of controls. ❑Not Observable; ❑Not Applicable C408.2.4 ;Preliminary commissioning report ;❑Complies :Requirement will be met. [FI29]1 !completed and certified by registered T Does Not design professional or approved ;agency. UNot Observable ❑Not Applicable C408.2.5. Furnished HVAC as-built drawings ;❑Complies :Requirement will be met. 1 _ submitted within 90 days of system ;❑Does Not [FI7]3 acceptance. UNot Observable ❑Not Applicable C408.2.5. IAn air and/or hydronic system I❑Complies Requirement will be met. 3 1 balancing report is provided for HVAC :❑Does Not [FI43]1 systems. UNot Observable' ❑Not Applicable C408.2.5. Final commissioning report due to ;❑Complies ;Requirement will be met. 4 building owner within 90 days of ;❑Does Not [F[30]1 receipt of certificate of occupancy. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Sunglass Hut Lake George NY Report date: 07/27/22 Data filename: Page 8 of 8 Mark Smith From: Timothy K. Schenk <tims@elderjones.com> Sent: Tuesday, September 27, 2022 3:39 PM To: Kate Deck; Mark Smith Subject: Info and insurance for Sunglass Hut - French Mountain Commons, Queensbury, NY Attachments: SGH - French Mountoin - Queensbury.pdf Kate/Mark, I have attached a copy of the insurance certificate per your request. Below is the general contractors information and the information for the sub-contractor that will be performing the air balance. General Contractor: Madesin General Contractors 1120 Eglinton Avenue East Mississauga,Ontario L4W 1 K5 P:905-625-3617 ext.227 1 F:905-625-1975 E:MartinArnadesin.com k4i� ante u� oo_u. . .or: a e:ai IL-t<C 6 Capitol Street Auburn, NY 13021 Leo Warren 315-224-8431 Leo.Warren@alaynaheating.com Please let me know if you need any additional information or documents to complete the permit process. Thank You Tim Schenk Elder-Jones, Inc. 1120 E. 80th. Street, Suite 211 Bloomington, MN 55420 Ph: 952-345-6040 Cell: 952-250-9864 Fax: 952-854-4909 timsCa-)-elderiones.com i FIRE MARSHAL'S OFFICE Tozvn of Queensbury 742 Bay Road, Queensbury, NY 12804 "Home of Natural Beauty ... A Good Place to Live " PLAN REVIEW Sunglass Hut 1439 Route 9 CC- 0529-2022 8/30/2022 The following comments are based on a review of submittals: • Verify fire extinguisher location and inspection • Verify paths of egress • Verify storage • Verify clearances to electrical service panel • CO detection is required • Locks /Latches to comply with Chapter 10 of IFC • NFPA 72 compliance letter required for any changes, or movement of fire alarm devices • Provide key for Knox Box Michael J Palmer Fire Marshal 742 Bay Road Queensbury NY 12804 firemarshal@queensbury.net Fi r e M a r s h a l 's Off i c e - P h o n e: 518-761-8206 - F a x: 518-745-4437 firemarshal@mac ueensbury.net - 7MMqueensbumnet