CC-0369-2021 r.
Office Use Only
c PRINCIPLE STRUCTURE
i PERMIT APPLICATI ON Permit#: CC, I
Permit Fee: $
Town of Queeizsbury
742 Bay Road,Queensbury, NY 12804 *Rec Fee: $
P: 518-761-8256 www.queensburynet Invoice#:
QQ Flood Zone? Y N Reviewed By:
�V
Project Location: {
Tax Map #: 296.8-1-3 Subdivision Name: Hiland PUD 17 n/7
lul
*RECREATION FEE$1000.00 for new dwelling units: single family, dupl / onilymultipl f it ,
apartments,condominiums, townhouses,cr NYS Building Standards 8, s o of red home.
This is in addition to the permit fee(s).
TOWN OF QUEENSBURY
PROJECT- INFORMATION:
BUILDING& CODES
❑ Residential ® Commercial, Proposed Use: Memory Care Facility
❑ Single-Family: ❑Two-Family ❑ Multi-Family (#of units: )
1. ❑ Custom
2. ❑Modular(REQUIRED:NYS stamped engineered drawings of foundation plans)
❑Townhouse ❑ Garage (#of cars ) ❑ Business Office
❑ Retail ❑ Hotel/Motel ❑ Industrial
❑ Heated Warehouse/Storage Building ❑ Unheated Warehouse/Storage Building
❑ Amusement Ride ❑ Other(describe: )
MAIN STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE:
1ST floor: 24,875
1'floor:
2n1 floor: 1,186
2"d floor:
3rd floor: na Total square feet:
Basement(habitable space): na
Total square feet: 26,061
Principle Structure Packet Revised March 2021
ADDITIONAL PROJECT INFORMATION:
1. Estimated Cost of Construction: $ 9,307,000
2. Proposed use of the building: New Memory Care Facility
3. If Commercial or Industrial, indicate the name of the business:The Glen at Hiland Meadows
4. Source of Heat:. ® Gas ❑ Oil ❑ Propane ❑ Solar ❑ Other:
(Fireplaces need a separate Fuel Burning Appliances &Chimney Application, one per appliance)
5. Are there any structures not shown on the plot plan? ❑ YES ® NO Explain, if yes:
6. Are there any easements on the property? ® YES ❑ NO
7. SITE INFORMATION:
a. What is the dimensions or acreage of the parcel?
b. Is this a corner lot? ❑YES ® NO
c. Will the grade be changed as a result of the construction? Vj YES ❑ NO
d. What is the water source? ® PUBLIC ❑ PRIVATE ❑ WELL
e. What type of wastewater system is on the parcel? ® SEWER ❑ PRIVATE SEPTIC
DECLARATION:
1. 1 acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be
completed within a 12 month period.Any changes to the approved plans prior to/during construction will require
the submittal of amended plans, additional reviews and re-approval.
2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of
Queensbury.After 1 year from the initial application date, 100%of the fee is retained.
3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or
description of the work proposed, that all work will be performed in accordance with the NYS Building
Codes,local building laws and ordinances, and in conformance with localzoning regulations.
4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of
occupancy.
5. 1 also understand that I/we are required to provide an as-built survey by a NYSlicensed land surveyor of all newly
constructed facilities prior to issuance of a certificate of occupancy.
have read and agree to the above:
PRINT NAME: Sara K. Wengert AIA ASID
SIGNAURE: � DATE: 05/06/2021
Principle Structure Packet Revised March 2021
y
CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL
• Applicant:
Name(s):architecture+
Mailing Address, C/S/Z: 297 River Street, Troy, NY 12180
Cell Phone: Land Line:518-272-4481
Email: kervins@aplususa.com
Primary Owner(s):
Name(s): The Glen at Hiland Meadows Inc. (Andrea Hebert, Executive Director)
Mailing Address, C/S/Z: 39 Longview Drive, Queensbury, NY 12804
Cell Phone: Land Line:518-832-7856
Email: andrea.hebert@sphp.com
❑ Check if all work will be performed by property owner only
• Contractor(s): (List all additional contractors on the back of this form)
Contractor Name(s): Sano Rubin Construction Services (Scott Hawkins, Senior Project Manager)
Contractor Trade: Construction -All Trades
Mailing Address, C/S/Z: PO Box 9078, 624 Delawae Avenue, Albany, NY 12209
Cell Phone:518-857-7860 Land Line: 518-462-6471 ext. 227
Email: shawkins@sanorubin.com
"Workers' Comp documentation must be submitted with this application"
• Arch itect(s)/Engineer(s):
Business Name: architecture+
Contact Name(s):Sara K. Wengert, AIA, ASID
Mailing Address, C/S/Z: 297 River St. Troy, NY 12180
Cell Phone: Land Line: 518-272-4481
Email: wengerts@aplususa.com
Contact Person for Compliance in regards to this project: Stephen Kervin, AIA
Cell Phone:518-307-3212 Land Line: 518-272-4481
Email: kervins@aplususa.com
Principle Structure Packet Revised March 2021
CHECKLIST--SINGLE FAMILY Project Location:
REQUIRED-2 SETS
1. Building Permit application, completed YES NO N/A
2. Energy Code inspector's report from ResCheck, completed &signed ❑ ❑
3. Septic alteration application, if applicable ❑ ❑
4. Solid fuel burning or gas insert appliance form(s), if applicable ❑ ❑ ❑
5. Driveway permit, if applicable ❑ ❑ ❑
6. Structural drawings, including:
a. Floor plans ❑ ❑ ❑
b. Foundation plans ❑ ❑ ❑
c. Cross sections ❑ ❑ ❑
d. Elevations ❑ ❑ ❑
e. Window&door schedule ❑ ❑ ❑
f. Natural light, ventilation & emergency egress ❑ ❑ ❑
7. Plot plan: showing proposed structure(s)with setback dimensions from all ❑ ❑ ❑
surveyed property lines
8. Electrical inspection agency selected ❑ ❑ ❑
CHECKLIST-- MULTI-DWELLING/COMMERCIAL Project Location:
REQUIRED-2SETS
1. Building Permit application, completed YES NO N/A
2. Energy Code inspector's report from ComCheck, completed &signed ❑ ❑
3. Septic alteration application, if applicable ❑ ❑
4. Solid fuel burning or gas insert appliance form(s), if applicable ❑ ❑ (
5. Driveway permit, if applicable ❑ ❑
6. Structural drawings, including:
a. Floor plans ❑ ❑
b. Foundation plans ❑ ❑
c. Cross sections ❑ ❑
d. Elevations ❑ ❑
e. Design loads including floor, snow &wind load ❑ ❑
f. Seismic design ❑ ❑
g. Plans signed and sealed by registered architect or engineer ❑ ❑
h. Window& door schedule ❑ ❑
7. Plot plan: showing proposed structure(s) with setback dimensions from all [ ❑ ❑
surveyed property lines
8. Electrical inspection agency selected �' ❑ ❑
9. FINAL AS-BUILT PLANS SUBMITTED ELECTRONICALLY
Principle Structure Packet Revised March 2021
NATURAL LIGHT,VENTILATION&EMERGENCY EGRESS CALCULATION SHEET
(please complete if details are not provided on plans)
Project Location: 39 Longview Drive, Queensbury, NY
Primary Owner (s):The Glen at Hiland Meadows
Habitable Sq. Ft. Required Actual Required Actual Sq. ft.
Rooms of Light Light Ventilation Ventilation opening
Room 8% of rm. (sq. ft. 4% of room (sq. ft. for Egress
Multipurpose 716sf 57sf 76sf 28.5sf 43.76sf N/A per 1030.1
104
Day Rest 214sf 17sf 38sf 8.6sf 21.88 N/A per 1030.1
106
Suite 108 216sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 109 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 110 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 111 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Den 113 163sf 13sf 38sf 6.5sf 21.88sf N/A per 1030.1
Suite 114 218sf 17.5sf 19sf 8.7sf 10.94sf N/A per 1030.1
Suite 115 218sf 17.5sf 19sf 8.7sf 10.94sf N/A per 1030.1
Suite 116 218sf 17.5sf 19sf 8.7sf 10.94sf N/A per 1030.1
Suite 117 218sf 17.5sf 38sf 8.7sf 21.88sf N/A per 1030.1
Sunroom 119 84sf 6.7sf 34sf 3.4sf 10.94sf N/A per 1030.1
Suite 120 218sf 17.5sf 38sf 8.7sf 21.88sf N/A per 1030.1
Suite 121 218sf 17.5sf 19sf 8.7sf 10.94sf N/A per 1030.1
Principle Structure Packet Revised March 2021
NATURAL LIGHT,VENTILATION &EMERGENCY EGRESS CALCULATION SHEET
(please complete if details are not provided on plans)
Project Location: 39 Longview Drive, Queensbury, NY
Primary Owner (s):The Glen at Hiland Meadows
Habitable Sq. Ft. Required Actual Required Actual Sq. ft.
Rooms of Light Light Ventilation Ventilation opening
Room 8% of rm. sq. ft. 4% of room sq. ft. for Egress
Suite 122 218sf 17.5sf 19sf 8.7sf 10.94sf N/A per 1030.1
Suite 123 218sf 17.5sf 19sf 8.7sf 10.94sf N/A per 1030.1
Suite 127 216sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 128 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 129 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Activity 131 274sf 21.9sf 28.5sf 11 sf 16.41 sf N/A per 1030.1
Porch/Dining/ 1,590sf 127sf 145sf 63.6sf 65.64sf N/A per 1030.1
Servery
Suite 155 210sf 16.8sf 19sf 8.4sf 10.94sf N/A per 1030.1
Suite 156 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 157 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 158 216sf 17sf 38sf 8.6sf 21.88sf N/A per 1030.1
Den 160 163sf 13sf 38sf 6.5sf 21.88sf N/A per 1030.1
Suite 161 218sf 17.5sf 38sf 8.7sf 21.88sf N/A per 1030.1
Suite 162 218sf 17.5sf 19sf 8.7sf 10.94sf N/A per 1030.1
Principle Structure Packet Revised March 2021
NATURAL LIGHT,VENTILATION&EMERGENCY EGRESS CALCULATION SHEET
(please complete if details are not provided on plans)
Project Location: 39 Longview Drive, Queensbury, IVY
Primary Owner (s):The Glen at Hiland Meadows
Habitable Sq. Ft. Required Actual Required Actual Sq. ft.
Rooms of Light Light Ventilation Ventilation opening
Room 8% of rm. sq. ft. 4% of room sq. ft. for Egress
Suite 163 218sf 17.5sf 19sf 8.7sf 10.94sf N/A per 1030.1
Suite 164 218sf 17.5sf 38sf 8.7sf 21.88sf N/A per 1030.1
Sunroom 166 84sf 6.7sf 34sf 3.4sf 10.94sf N/A per 1030.1
Suite 167 218sf 17sf 38sf 8.6sf 21.88sf N/A per 1030.1
Suite 168 - 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 169 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 170 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 174 216sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 175 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Suite 176 217sf 17sf 19sf 8.6sf 10.94sf N/A per 1030.1
Activity 178 274sf 21.9sf 28.5sf 11 sf 16.41 sf N/A per 1030.1
Principle Structure Packet Revised March 2021
WINDOW SCHEDULE CALCULATION SHEET
(please complete if details are not provided on plans)
Project Location: 39 Longview Drive, Queensbury, NY
Primary Owner (s): The Glen at Hiland Meadows
Habitable Porch/Dining/ Activity Sunroom Den (typical)
Rooms Suite (typical) Servery (typical) (typical)
Window#/letter
On Plan A A A A A
Manufacturer
Name Anderson Anderson Anderson Anderson Anderson
Model/Type
400 Series 400 Series 400 Series 400 Series 400 Series
Unit/Block#
Cell Size Double Hung Double Hung Double Hu gDouble Hun Double Hung
TW28410 TW28410 TW28410 TW28410 TW28410
Rough Opening
Width 2-101/8 2-101/8 2-101/8 2-101/8 2-101/8
Sq. Ft. Vent 5.47sf 5.47sf 5.47sf 5.47sf 5.47sf
Sq. Ft. Egress/
Clear Opening N/A per 1030.1 N/A per 1030.1 N/A per 1030. /A per 1030.1 N/A per 1030.1
Clear Opening-
Width in inches - - - - -
Clear Opening-
Height in inches. - - - - -
Special Hardware
or instructions - - - - -
U-Value 32 .32 .32 .32 .32
Principle Structure Packet Revised March 2021
FIRE MARSHAL'S OFFICE
Town of Queensbury
742 Bay Road, Queensbury, NY 12804
"Home of Natural Beauty ... A Good Place to Live "
FILE COPY
PLAN REVIEW
GHM Memory Care
Longview Drive,
CC-
4/5/2021
24875 sf building, I story
OCC Class I-I Type V
The following comments are based on review of drawings:
• Verify fire extinguisher location
• CO detection required
- • Verify operation of exit/Emergency lighting.
• Lock/ latches shall comply with Chapter 10 of 2020 IFC.
• Delayed egress locks shall comply with Section 1010.1.9.7 of 2020 IF.0
• Verify paths of egress
• Verify storage
i Install Knox Box and main entrance for FD use
Truss ID required at all ingress and egress points
• Complete fire alarm system submittals required including:
- Contractors license
- Complete system layout
- Spec. sheets for all equipment and appliances
- Central station monitoring
- FM witness inspection before CO
- NFPA 72 completion report
- NFPA-72 Inspection and Testing report
Fire Marshal 's Office • Phon_e: 518-761-8206 Fax: 518-745-4437
{cremarshal fteensbun/net www.queensbunf.net
- Exterior HIS required over FDC, to operate on all alarms
- Note b sits'cal address assi ned t
she ro ert,
• Verify all dryer venting is to the outside of the building
• Truss ID signage required
• Complete sprinkler system plans required, including hydraulic calculations
and system layout. FDC connection shall be 5",storz and an NFPA 13
compliant certification,will be required, prior to issuance of CO
• Provide specifications on the generator. A certificate of completion and
operation will be required prior to issuance of CO
• Provide complete kitchen layout, including:
- Hood and duct clearances details
- Suppression specifications
- Grease light test per 506.3.2.5 of 2020 IMC
- Fan interlock provided per 507.1.1 of 2020 IMC
- Provide specs. for any planned duct wrap material
- FM witness function test required with suppression vendor
- NFPA 96 inspection report required
- Posting of EVAC routes is required
Michael J Palmer
Fire Marshal
742 Bay Road
Queensbury NY 12804
firemarshal@queensbury.net
Fi r e M a r s h a I 's Off i c e • P h o n e: 518-761-8206 F a x: 518-7454437
firenmrshal@queensbuvj net • M-MV.queensbuMmet
COMcheck Software Version COMcheckWeb ( z C40 3 N
Y Envelope Compliance Certificate o e �
REVIEWED FOR 3
3 QonW
ENERGY CODE COMPLIANCE Project Information
of
Energy Code: 2020 New York Energy Conservation Construction Code C a
Project Title: New Memory Care Residence at the Glen at Hiland Meadows 3
Location: Glens Falls, New York
d
Climate Zone: 6a CL
O
Project Type: New Construction
Vertical Glazing/Wall Area: 18%
F � E n
o '
rn Construction Site: Owner/ t: igner/Contractor: CD
39 Longview Drive MAY 18 2021 �-'
QUEENSBURY, New York 12804 N
Additional Efficiency Package(s) TOWN OF QUEENSBURY �-
Credits: 1.5 Required 1.0 Proposed BUILDING&CODES
Reduced Lighting Power, 1.0 credit
Building Area Floor Area
1-Health Care-Clinic: Residential 24875 FILE COPY
Envelope Assemblies
Assembly Gross Area Cavity Cont. Proposed Budget U-
or R-Value R-Value U-Factor Factor(.)
Perimeter
Roof: Insulation Entirely Above Deck, [Bldg. Use 1-Health 1220 -- 30.0 0.032 0.048
Care-Clinic]
Roof:Attic Roof,Wood joists, [Bldg. Use 1-Health Care-Clinic] 1889 39.0 0.0 0.026 0.027
Roof:Attic Roof,Wood joists, [Bldg. Use 1-Health Care-Clinic] 21699 19.0 30.0 0.020 0.027
Floor: Unheated Slab-On-Grade,Vertical 4 ft., [Bldg. Use 1- 1117 -- 0.0 0.730 0.520
Health Care-Clinic] (d)
NORTH
Ext. Wall:Wood-Framed, 16in.o.c., [Bldg. Use 1-Health Care- 3797 20.0 6.0 0.044 0.051
Clinic]
Window:Wood Frame: Operable, Perf. Specs.: Product ID AND- 650 — --- 0.320 0.550
N-24-02240-00003,SHGC 0.25, [Bldg. Use 1-Health Care-
Clinic] (c)
Window: Wood Frame: Fixed, Perf.Specs.: Product ID AND-N-1- 105 -- — 0.280 0.450
01145-00002, SHGC 0.29, [Bldg. Use 1-Health Care-Clinic] (c)
Door: , Perf. Specs.: Product ID EC 97911-201, SHGC 0.21, 48 --- --- 0.740 0.800
[Bldg. Use 1-Health Care-Clinic] (c)
EAST
Ext.Wall:Wood-Framed, 16in. o.c., [Bldg. Use 1-Health Care- 3205 20.0 6.0 0.044 0.051
Clinic]
Window:Wood Frame: Operable, Perf. Specs.: Product ID AND- 428 --- --- 0.320 0.550
N-24-02240-00003,SHGC 0.25, [Bldg. Use 1-Health Care-
Clinic] (c)
Window: Wood Frame: Fixed, Perf.Specs.: Product ID AND-N-1- 53 — --- 0.280 0.450
01145-00002,SHGC 0.29, [Bldg. Use 1-Health Care-Clinic] (c)
Door: , Perf. Specs.: Product ID EC 97911-201,SHGC 0.21, 27 _ --- 0.740i 0.800
[Bldg. Use 1-Health Care-Clinic] (c)
Door: , Pert. Specs.: Product ID EC 97911-201, SHGC 0.21, 48 -- --- 0.740 0.800
[Bldg. Use 1-Health Care-Clinic] (c)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 1 of 33
Assembly Gross Area Cavity Cont. Proposed Budget U-
or R-Value R-Value U-Factor Factor(.)
Perimeter
Door: , Perf.Specs.: Product ID EC 97911-201,SHGC 0.21, 27 __ ___ 0.740 0.800
[Bldg. Use 1-Health Care-Clinic] (c)
Door: Other(U-Factor option),Swinging, [Bldg. Use 1-Health 49 — — 0.550 0.500
Care-Clinic]
SOUTH
Ext.Wall:Wood-Framed, 16in.o.c., [Bldg. Use 1-Health Care- 3645 20.0 6.0 0.044 0.051
Clinic]
Window:Wood Frame: Operable, Perf. Specs.: Product ID AND- 387 — --- 0.320 0.550
N-24-02240-00003, SHGC 0.25, [Bldg. Use 1-Health Care-
Clinic] (c)
Window:Wood Frame: Fixed, Perf. Specs.: Product ID AND-N-1- 79 --- --- 0.280 0.450
01145-00002,SHGC 0.29, [Bldg. Use 1-Health Care-Clinic] (c)
Door: , Perf. Specs.: Product ID EC 97911-201, SHGC 0.21, 27 -- --- 0.790 0.800
[Bldg. Use 1-Health Care-Clinic] (c)
Door: , Perf. Specs.: Product ID EC 97911-201, SHGC 0.21, 27 -_ --- 0.790 0.800
[Bldg. Use 1-Health Care-Clinic] (c)
WEST
Ext.Wall:Wood-Framed, 16in. o.c., [Bldg. Use 1-Health Care- 3441 20.0 6.0 0.044 0.051
Clinic]
Door: Other(U-Factor option), Swinging, [Bldg. Use 1-Health 24 -- --- 0.550 0.500
Care-Clinic]
Door: Other(U-Factor option),Swinging, [Bldg. Use 1 -Health 24 -- --- 0.550 0.500
Care-Clinic]
Window:Wood Frame: Operable, Perf. Specs.: Product ID AND- 387 — --- 0.320 0.550
N-24-02240-00003,SHGC 0.25, [Bldg. Use 1-Health Care-
Clinic] (c)
Window: Wood Frame: Fixed, Perf.Specs.: Product ID AND-N-1- 79 — --- .0.280 0.450
01145-00002, SHGC 0.29, [Bldg. Use 1-Health Care-Clinic] (c)
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)'Other'components require supporting documentation for proposed U-factors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(d)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
ae -
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed envelope systems have been
designed to meet the 2020 New York Energy Conservation Construction Code requirements in COMcheck Version COMcheckWeb
and to comply with any applicable mandatory requirements listed in Winsecon Checklist.
Sara K.Wengert,AIA ASID 05/07/2021
Name-Title Sign a Date
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 2 of 33
COMcheck Software Version COMcheckWeb
Interior Lighting Compliance Certificate
Project Information
Energy Code: 2020 New York Energy Conservation Construction Code
Project Title: New Memory Care Residence at the Glen at Hiland Meadows
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
39 Longview Drive
QUEENSBURY, New York 12804
Additional Efficiency Package(s)
Credits: 1.5 Required 1.0 Proposed
Reduced Lighting Power, 1.0 credit
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Wafts
(ft2) Wafts/ft2
1-Health Care-Clinic 24875 0.74 18358
Total Allowed Watts= 18358
Proposed Interior Lighting Power
A B C D E
Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixture Waft.
1-Health Care-Clinic
LED:Al: LED Contemporary Troffer 2x2: Other: 1 24 29 696
LED:A2: LED Contemporary Troffer 2x2: Other: 1 11 23 253
LED:A3: LED Wet Location Troffer 2x2: Other: 1 6 37 222
LED:A4: LED Contemporary Troffer 2x4: Other: 1 4 39 156
LED: 131: LED Multi-purpose Linear Strip: Other: 1 16 30 480
LED: Cl: LED Perimeter Slot: Other: 1 207 6 1242
LED: C1N: LED Perimeter Slot: Other: 1 36 6 216
LED: C2: LED Cove Light: Other: 1 396 7 2772
LED: Dl: LED Downlight: Other: 1 88 16 1408
LED: D2: LED Downlight: Other: 1 13 14 182
LED: D3: LED Downlight: Other: 1 4 20 80
LED: D4: LED Downlight: Other: 1 6 16 96
LED: D5: LED Wet Location Downlight: Other: 1 4 26 104
LED: El: LED Emergency Lighting Unit: Other: 1 2 2 4
LED: Fl: LED Linear Wrap: Other: 1 6 25 150
LED: G1: LED Decorative 4.75" Round: Other: 1 30 15 450
LED: G2: LED Decorative 20" Drum: Other: 1 30 35 1050
LED: GI LED Retrofit Shade Wall Lamp: Other: 1 30 10 300
LED: G4: LED Decorative 5-7/8" Round: Other: 1 30 10 300
LED: G5: LED Shower Light: Other: 1 30 12 360
LED: G6: LED Trim Lit Mirror: Other: 1 30 15 450
LED: G7: LED Downlight: Other: 1 16 14 224
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 3 of 33
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixture Watt.
LED:G8: LED Night Light: Other: 1 66 2 132
LED: Kl: LED Linear Slot: Other: 1 36 11 396
LED: K2: LED Hi-Angle Linear Wall Washer: Other: 1 6 9 52
LED: Ml: LED Over Mirror Light:Other: 1 7 15 105
LED: Pl: LED Decorative 30" Round Pendan: Other: 1 4 45 180
LED: P2: LED Decorative Pendant: Other; 1 6 47 282
LED: PI LED Decorative Pendant: Other: 1 5 15 75
LED: P4: LED Decorative Pendant: Other: 1 6 80 480
LED: P5: LED Decorative Pendant: Other: 1 4 20 80
LED: P6: LED Decorative Pendant Cluster: Other: 6 1 20 20
LED:Ql: LED Linear Asymmetric: Other: 1 162 7 1102
LED: Rl: LED Decorative 24" Drum: Other: 1 2 35 70
LED; R2: LED Decorative 24" Round: Other; 1 2 33 66
LED; III LED Decorative 24" Round Suspen: Other: 1 3 30 90
LED: R4: LED Decorative 24" Drum: Other: 1 4 35 140
LED: R5: LED Decorative 24" Drum: Other: 1 2 35 70
LED: R6: LED Decorative 16" Drum: Other: 1 2 35 70
LED:S1: LED Decorative Wall Sconce:Other: 1 20 14 280
LED:X1: LED Edge-Lit Exit Sign Single F: Other: 1 26 1 36
LED:X2; LED Edge-Lit Exit Sign Double F: Other: 1 6 1 8
Total Proposed Watts= 14930
Interior Lighting Compliance
Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been
designed to meet the 2020 New York Energy Conservation Construction Code requirements in COMcheck Version COMcheckWeb
and to comply with any applicable mandatory requirements listed in the I spec Checklist.
Name-Title Signature Date
i
I
i
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 4 of 33
COMcheck Software Version COMcheckWeb
Exterior Lighting Compliance Certificate
Project Information
Energy Code: 2020 New York Energy Conservation Construction Code
Project Title: New Memory Care Residence at the Glen at Hiland Meadows
Project Type: New Construction
Exterior Lighting Zone 3 (Other(LZ3))
Construction Site: Owner/Agent: Designer/Contractor:
39 Longview Drive
QUEENSBURY, New York 12804
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Tradable Allowed Watts
Watts/ Wattage (B X C)
Building Facade(Free standing/attached sales canopy) 120 ft2 0.6 Yes 72
Entrance/Exit Doors(Pedestrian and vehicular entrances and exits) 36 ft of 21 Yes 756
Canopy&Courtyard (Entry canopy) 1500 ft2 0.4 Yes 600
Parking area 24900 ft2 0.06 Yes 1494
Landscaping 13700 ft2 0.04 Yes 548
Total Tradable Watts(a)= 3470
Total Allowed Watts= 3470
Total Allowed Supplemental Watts(b)= 500
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 500 watts may be applied toward compliance of both non-tradable and tradable
areas/surfaces.
Proposed Exterior Lighting Power
A B C D E
Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixture Watt.
Building Facade (Free standing/attached sales canopy. 120 ft2): Tradable Wattage
LED: D5: LED Wet Location Downlight: Other: 1 1 26 26
Entrance/Exit Doors (Pedestrian and vehicular entrances and exits. 36 ft of door width): Tradable Wattage
LED: Wl: LED Exterior Wall Sconce: Other: 1 6 17 102
Canopy& Courtyard (Entry canopy. 1500 ft2): Tradable Wattage
LED: D5: LED Wet Location Downlight: Other: 1 19 26 494
Parking area (24900 ft2): Tradable Wattage
LED: SLl: LED Post Light: Other: 1 10 76 760
Landscaping (13700 ft2): Tradable Wattage
LED: SL2: LED Bollard: Other: 1 8 22 176
Total Tradable Proposed Watts= 1558
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 5 of 33
o - ,. -
Exterior Lighting Compliance
Statement
Compliance Statement. The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed exterior lighting systems have been
designed to meet the 2020 New York Energy Conservation Construction Code requirements in COMcheck Version COMcheckWeb
and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name-Title Signature Date
I
d
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 6 of 33
COMcheck Software Version COMcheckWeb
Mechanical Compliance Certificate
Project Information
Energy Code: 2020 New York Energy Conservation Construction Code
Project Title: New Memory Care Residence at the Glen at Hiland Meadows
Location: Glens Falls, New York
Climate Zone: 6a
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
39 Longview Drive
QUEENSBURY, New York 12804
Additional Efficiency Package(s)
Credits: 1.5 Required 1.0 Proposed
Reduced Lighting Power, 1.0 credit
Mechanical Systems List
Quantity System Type&Description
2 ACCU-1 &2 (Single Zone):
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode: Capacity= 133 kBtu/h,
No minimum efficiency requirement applies
Cooling Mode: Capacity= 144 kBtu/h,
No minimum efficiency requirement applies
Fan System: None
1 ACCU-3 (Single Zone):
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode: Capacity= 116 kBtu/h,
No minimum efficiency requirement applies
Cooling Mode: Capacity= 122 kBtu/h,
No minimum efficiency requirement applies
Fan System: None
1 ACCU-4 (Single Zone):
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode: Capacity= 150 kBtu/h,
No minimum efficiency requirement applies
Cooling Mode: Capacity= 177 kBtu/h,
No minimum efficiency requirement applies
Fan System: None
30 Resident Room VRF(Single Zone):
Cooling: 1 each-VRF Zone Fan Unit, Capacity= 7 kBtu/h, No Economizer, Economizer exception: Low Capacity
Residential
No minimum efficiency requirement applies
Fan System: Small VRF Fan Coil--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 6 Supply, Constant Volume, 270 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <=5HP
6 073M1 Ducted VRF(Single Zone):
Cooling: 1 each-VRF Zone Fan Unit,Capacity= 7 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Small VRF Fan Coil--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 6 Supply,Constant Volume, 270 CFM, 0.3 motor nameplate hp; 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <=5HP
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 7 of 33
Quantity System Type&Description
2 093M1 Ducted VRF (Single Zone):
Cooling: 1 each-VRF Zone Fan Unit,Capacity= 9 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Small VRF Fan Coil--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 6 Supply,Constant Volume, 270 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= SHP
2 123M1 Ducted VRF(Single Zone):
Cooling: 1 each-VRF Zone Fan Unit,Capacity= 12 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Med VRF Fan Coil--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 11 Supply, Constant Volume, 400 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception: Single fan <=5HP
4 153M1 Ducted VRF(Single Zone):
Cooling: 1 each-VRF Zone Fan Unit, Capacity= 15 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Med VRF Fan Coil--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 11 Supply,Constant Volume,400 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= SHP
3 183M1 Ducted VRF (Single Zone):
Cooling: 1 each-VRF Zone Fan Unit, Capacity= 19 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Med VRF Fan Coil--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
FAN 11 Supply,Constant Volume, 400 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= SHP
2 243M1 Ducted VRF(Single Zone):
Cooling: 1 each-VRF Zone Fan Unit, Capacity= 24 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: Large VRF Fan Coil I Various--Compliance (Motor nameplate HP and fan efficiency method) : Passes
Fans:
VRF-large Supply, Constant Volume, 750 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency,0.0 design fan efficiency,fan exception: Single fan <= 5HP
2 283M2 Ducted VRF(Single Zone):
Cooling: 1 each-VRF Zone Fan Unit, Capacity = 28 kBtu/h, No Economizer, Economizer exception: Low Capacity
Residential
No minimum efficiency requirement applies
Fan System: Large VRF Fan Coil I Various--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
VRF-large Supply, Constant Volume,750 CFM, 0.3 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <=5HP
4 363M2 Ducted VRF(Single Zone):
Cooling: 1 each-VRF Zone Fan Unit, Capacity = 36 kBtu/h, No Economizer, Economizer exception: Low Capacity
Residential
No minimum efficiency requirement applies
Fan System: Large VRF Fan Coil I Various--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Fans:
VRF-large Supply,Constant Volume, 750 CFM,0.3 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <=5HP
1 Kitchen MAU (Single Zone):
Heating: 1 each-Hydronic or Steam Coil, Hot Water, Capacity= 213 kBtu/h
No minimum efficiency requirement applies
Fan System: MAU-1 I Kitchen--Compliance(Motor nameplate HP and fan efficiency method) : Passes
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 8 of 33
Quantity System'Type&Description
Fans:
FAN 13 Supply,Single-Zone VAV, 2900 CFM,2.0 motor nameplate hp, 0.0 fan efficiency grade, 0.0 total fan
efficiency, 0.0 design fan efficiency,fan exception: Single fan <= 5HP
4 Boilers:
Heating: Hot Water Boiler,Capacity 264 kBtu/h, Gas
Proposed Efficiency: 95.00%AFUE, Required Efficiency: 82.00%AFUE
2 Indirect Water Heater:
Gas Storage Water Heater,Capacity: 119 gallons, Input Rating: 75 kBtu/h w/Circulation Pump
No minimum efficiency requirement applies
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 2020 New York Energy Conservation Construction Code requirements in COMcheck Version COMcheckWeb
and to comply with any applicable mandatory requirements listed in the Ins ection Checklist.
.16/Q®2
Name-Title Sign re Date
i
i
I
i
i
j
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 9 of 33
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 2020 New York Energy Conservation Construction Code
Requirements: 88.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 'Plans and/or specifications provide all '❑Complies
[PR1]1 information with which compliance ;❑Does Not
;can be determined for the building
;envelope and document where ;❑Not Observable
exceptions to the standard are ;❑Not Applicable I
;claimed.
C103.2 ;Plans,specifications,and/or °❑Complies ;Requirement will be met.
[PR2]1 :calculations provide all information ❑Does Not
;with which compliance can be
determined for the mechanical :❑Not Observable
:systems and equipment and ❑Not Applicable
;document where exceptions to the
standard are claimed. Load
.calculations per acceptable
'engineering standards and
'handbooks. ;
C103.2 'Plans,specifications, and/or ;❑Complies ;Requirement will be met.
[PR3]1 .calculations provide all information ;❑Does Not
with which compliance can be
;determined for the service water L❑Not Observable
'heating systems and equipment and ;❑Not Applicable
;document where exceptions to the
standard are claimed. Hot water
;system sized per manufacturer's
;sizing guide.
C103.2 ;Plans,specifications,and/or ❑Complies ;Requirement will be met.
[PR4]1 ;calculations provide all information '❑Does Not
;with which compliance can be ❑Not Observable!Location on plans/spec: 260501, 260921, 265001, E101,
;determined for the interior lighting ,E401, E402
:and electrical systems and equipment ;❑Not Applicable ;
and document where exceptions to
ithe standard are claimed. Information
:provided should include interior '
lighting power calculations,wattage of
;bulbs and ballasts,transformers and
control devices.
C103.2 'Plans,specifications, and/or ;❑Complies
[PR8]1 calculations provide all information I❑Does Not
;with which compliance can be
,determined for the exterior lighting ❑Not Observable
;and electrical systems and equipment :❑Not Applicable
•and document where exceptions to
';the standard are claimed. Information
'provided should include exterior I
lighting power calculations, wattage of:
,bulbs and ballasts,transformers and
control devices.
C402.4.1 ;The vertical fenestration area <=30 ;❑Complies
[PR10]1 :percent of the gross above-grade wall I❑Does Not
;area.
'❑Not Observable
❑Not Applicable
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 10 of 33
Section
# Plan Review Complies? Comments/Assumptions
&Req.ID
C402.4.1 :The skylight area <= 3 percent of the ;❑Complies
[PR1111 !gross roof area. 1❑Does Not
❑Not Observable:
`:❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 11 of 33
Section
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
C303.2 ;Slab edge insulation installed per ;❑Complies
[FO4]2 manufacturer's instructions. ❑Does Not
❑Not Observable
❑Not Applicable
C303.2.1 Exterior insulation protected against ;❑Complies ;
[FO611 damage,sunlight, moisture,wind, ❑Does Not
.landscaping and equipment
;maintenance activities. ;❑Not Observable
❑Not Applicable
C105 !Installed slab-on-grade insulation type ;❑Complies ;See the Envelope Assemblies table for values.
[FO3)2 and R-value consistent with insulation ❑Does Not
(specifications reported in plans and
f COMcheck reports. :❑Not Observable
❑Not Applicable
C402.2.4 {Slab edge insulation depth/length. ;❑Complies ;See the Envelope Assemblies table for values.
[FO7]2 ;Slab insulation extending away from '❑Does Not
building is covered by pavement or
>= 10 inches of soil. I❑Not Observable:
❑Not Applicable
C403.12.2,Snow/ice melting system and freeze ;❑Complies ;,Exception: Requirement does not apply.
;protection systems have sensors and ;❑Does Not
C403.12.3 i controls configured to limit service for ❑Not Observable
[FO9]3 !pavement temperature and outdoor
temperature.future connection to ❑Not Applicable
controls.
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 12 of 33
Section
# Framing/Rough-in Inspection Complies? Comments/Assumptions
& Req.ID
C303.1.3 'Fenestration products rated in ❑Complies
[FR12]2 laccordance with NFRC. �❑Does Not
i
❑Not Observable
❑Not Applicable
C303.1.3 ;Fenestration products are certified as ;❑Complies
[FR13]1 `to performance labels or certificates �01)oes Not
provided.
'❑Not Observable
❑Not Applicable
C402.4.3 ;Vertical fenestration SHGC value. ❑Complies ;See the Envelope Assemblies table for values.
[FR10]' ;❑Does Not
❑Not Observable
❑Not Applicable
C402.4.3, :Vertical fenestration U-Factor. ❑Complies ;See the Envelope Assemblies table for values.
C402.4.3. ❑Does Not
4 1 ;❑Not Observable;
[FR8] 1❑Not Applicable
;
C402.4.4 j U-factor of opaque doors associated ElComplies ;See the Envelope Assemblies table for values.
[FR14]2 with the building thermal envelope '❑Does Not
i meets requirements.
❑Not Observable
i ❑Not Applicable
C402.5.7 ;Vestibules are installed on all building ;❑Complies
[FR17]3 )entrances. Doors have self-closing '❑Does Not
;devices.
'❑Not Observable;
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 13 of 33
Section
# Rough-In Inspection Complies? Comments/Assumptions
& Req.IDE
lumbing
C404.5, ;Heated water supply piping conforms ;❑Complies ;Exception: Requirement does not apply.
C404.5.1, !to pipe length and volume ❑Does Not
C404.5.2 ;requirements. Refer to section details. ❑Not Observable
[PL6]3 ❑Not Applicable
h
C404.5, Heated water supply piping conforms ❑Complies ;Exception: Requirement does not apply.
C404.5.1, ;to pipe length and volume UDoes Not
C404.5.2 I requirements. Refer to section details.
[PL6]3 ❑Not Observable
} ❑Not Applicable
s
C404.5, ;Heated water supply piping conforms ;❑Complies :Exception: Requirement does not apply.
C404.5.1, :to pipe length and volume ❑Does Not
C404.5.2 :requirements. Refer to section details.
[PL6
f
]3 ; ❑Not Observable
❑Not Applicable
C404.5, ;,Heated water supply piping conforms ❑Complies ;Exception: Requirement does not apply.
C404.5.1, ;to pipe length and volume ❑Does Not
C404.5.2 ;requirements. Refer to section details.
[PL6]3 ; �❑Not Observable;
❑Not Applicable
C404.5, ;Heated water supply piping conforms ❑Complies ;Exception: Requirement does not apply.
C404.5.1, ;to pipe length and volume :❑Does Not
C404.5.2 ;requirements. Refer to section details.
[PL6]3 ' ,❑Not Observable;
❑Not Applicable
C404.5, ;Heated water supply piping conforms '❑Complies ;Exception: Requirement does not apply.
C404.5.1, Ito pipe length and volume ;❑Does Not
C4045.2 !requirements. Refer to section details.
:❑Not Observable
[PL6]3i ❑Not Applicable
I
C404.5, ;Heated water supply piping conforms EComplies 'Exception: Requirement does not apply.
C404.5.1, :to pipe length and volume ;❑Does Not
C404.5.2 requirements. Refer to section details. ;
[PL6]3 :❑Not Observable
❑Not Applicable
C404.5, !Heated water supply piping conforms ;❑Complies" Exception: Requirement does not apply.
C404.5.1, !to pipe length and volume :❑Does Not
C404.5.2 ;requirements. Refer to section details.
[PL6]3 i ;❑Not Observable:
❑Not Applicable
C404.5, ;Heated water supply piping conforms I❑Complies ;Exception: Requirement does not apply.
C404.5.1, Ito pipe length and volume :❑Does Not
C404.5.2 ;requirements. Refer to section details.
[PL6]3 ,❑Not Observable,
❑Not Applicable
C404.5, ;Heated water supply piping conforms ;❑Complies ;Exception: Requirement does not apply.
C404.5.1, 'to pipe length and volume ;❑Does Not
C404.5.2 ;requirements. Refer to section details.
[PL6]3 ;❑Not Observable;
❑Not Applicable
C404.5, ;Heated water supply piping conforms '❑Complies :Exception: Requirement does not apply.
C404.5.1, Ito pipe length and volume ;❑Does Not
C404.5.2 ;requirements. Refer to section details.
[PL6]3 UNot Observable
❑Not Applicable
1 JHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 14 of 33
Section
# Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Re .ID
C404.5, ?Heated water supply piping conforms ;❑Complies !Requirement will be met.
C404.5.1, !to pipe length and volume 1❑Does Not
C404.5.2 requirements. Refer to section details. ; i
[PL6]3 i "❑Not Observable
❑Not Applicable
C404.5, ;Heated water supply piping conforms ❑Complies ;Requirement will be met.
C404.5.1, )to pipe length and volume ,❑Does Not
C404.5.2 ;requirements. Refer to section details.3 ❑[ Not Observable!
PL6] �❑Not Applicable
C404.5, :Heated water supply piping conforms ;❑Complies Exception: Requirement does not apply.
C404.5.1, ;to pipe length and volume ;❑Does Not
C404.5.2 :requirements. Refer to section details. ;
[PL6]3 ; '❑Not Observable
}
:❑Not Applicable
C404.5, ,Heated water supply piping conforms ;❑Complies ;Requirement will be met.
C404.5.1, ;to pipe length and volume ;❑Does Not
C404.5.2 ;requirements. Refer to section details.
[PL6]3 ;❑Not Observable;
❑Not Applicable
;
C404.6.1, ;Automatic time switches installed to ;❑Complies I Requirement will be met.
C404.6.2 :automatically switch off the 1❑Does Not
[PL3]1 recirculating hot-water system or heat
:_trace. ,❑Not Observable;
❑Not Applicable
C404.6.3 'Pumps that circulate water between a ❑Complies ;Exception: Requirement does not apply.
[PL7]3 I heater and storage tank have controls ❑Does Not
,that limit operation from startup to
<=5 minutes after end of heating ❑Not Observable
cycle. ;❑Not Applicable
C404.6.3 ;,Pumps that circulate water between a ;❑Complies ;Exception: Requirement does not apply.
[PL7]3 :heater and storage tank have controls ❑Does Not
;that limit operation from startup to
<=5 minutes after end of heating ❑Not Observable
;cycle. ❑Not Applicable
C404.6.3 ;Pumps that circulate water between a ❑Complies !Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls ❑Does Not
;that limit operation from startup to ❑Not Observable
<= 5 minutes after end of heating ;
;cycle. ;❑Not Applicable
C404.6.3 -,Pumps that circulate water between a ;❑Complies Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls :❑Does Not
;that limit operation from startup to
I<=5 minutes after end of heating ' ;❑Not Observable
]cycle. : Not Applicable
C404.6.3 ,Pumps that circulate water between a I❑Complies !Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls T❑Does Not
'that limit operation from startup to
<=5 minutes after end of heating ❑Not Observable
t❑
;cycle. Not Applicable
C404.6.3 ;Pumps that circulate water between a ;❑Complies ;Exception: Requirement does not apply.
[PL7]3 heater and storage tank have controls 'ODoes Not
;that limit operation from startup to
;<= 5 minutes after end of heating ❑Not Observable
;cycle. ;❑Not Applicable
C404.6.3 ;Pumps that circulate water between a '❑Complies Exception: Requirement does not apply.
[PL7]3 I heater and storage tank have controls ;❑Does Not
;that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
I cycle. ;QNot Applicable
1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 15 of 33
Section
# Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C404.6.3 ;,Pumps that circulate water between a ;❑Complies ;Exception: Requirement does not apply.
[PL7]3 ;heater and storage tank have controls 1❑Does Not
;that limit operation from startup to
<=5 minutes after end of heating UNot Observable
;cycle. ;❑Not Applicable ;
C404.6.3 j Pumps that circulate water between a ;❑Complies !Exception: Requirement does not apply.
[PL7]3 "heater and storage tank have controls I❑Does Not
;that limit operation from startup to
<=5 minutes after end of heating ❑Not Observable
cycle. ;❑Not Applicable
C404.6.3 ;Pumps that circulate water between a ;❑Complies :Exception: Requirement does not apply.
[PL7]3 ;heater and storage tank have controls '❑Does Not
;that limit operation from startup to
<= 5 minutes after end of heating ;❑Not Observable
;cycle. ❑Not Applicable
C404.6.3 ;Pumps that circulate water between a ;❑Complies ;Exception: Requirement does not apply.
[PL7]3 ;heater and storage tank have controls ❑Does Not
that limit operation from startup to
<=5 minutes after end of heating ❑Not Observable
cycle. ;❑Not Applicable
C404.6.3 Pumps that circulate water between a ;❑Complies ;Requirement will be met.
[PL7]3 heater and storage tank have controls I❑Does Not
;that limit operation from startup to I❑Not Observable
<= 5 minutes after end of heating
;cycle. ;❑Not Applicable
C404.6.3 ;Pumps that circulate water between a ;❑Complies ;Exception: Requirement does not apply.
[PL7]31 i heater and storage tank have controls 1❑Does Not
;that limit operation from startup to ; 1 Location on plans/spec: N/A for this system
<=5 minutes after end of heating '❑Not Observable
cycle. ❑Not Applicable
C404.6.3 ;,Pumps that circulate water between a ';❑Complies Requirement will be met.
[PL7]3 )heater and storage tank have controls :❑Does Not
;that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable,
icycle. ❑Not Applicable ;
C404.6.3 ;Pumps that circulate water between a ;❑Complies Requirement will be met.
[PL7]3 ;heater and storage tank have controls ;❑Does Not
?that limit operation from startup to ;❑Not Observable
<=5 minutes after end of heating
.cycle. ;❑Not Applicable
C404.7 ;Demand recirculation water systems ;❑Complies ;Exception: Requirement does not apply.
[PL0]3 !have controls that start the pump ;❑Does Not
upon receiving a signal from the
;action of a user of a fixture or ;❑Not Observable
;appliance and limits the temperature ;❑Not Applicable
of the water entering the cold-water
piping to 104°F. ;
C404.7 {Demand recirculation water systems ❑Complies ;Exception: Requirement does not apply.
[PL8]3 have controls that start the pump j❑Does Not
;upon receiving a signal from the
action of a user of a fixture or ❑Not Observable
:appliance and limits the temperature !❑Not Applicable
of the water entering the cold-water
piping to 104°F.
C404.7 ;Demand recirculation water systems ❑Complies ,Exception: Requirement does not apply.
[PL8]3 have controls that start the pump :❑Does Not
upon receiving a signal from the
action of a user of a fixture or ;❑Not Observable;
appliance and limits the temperature ;❑Not Applicable
of the water entering the cold-water
piping to 104°F. ;
111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 16 of 33
Section
# Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C404.7 Demand recirculation water systems ❑Complies ;Exception: Requirement does not apply.
[PL8]3 !have controls that start the pump I❑Does Not
),upon receiving a signal from the
❑Not Observable
;action of a user of a fixture or
appliance and limits the temperature UNot Applicable
!of the water entering the cold-water
piping to 104°F.
C404.7 :Demand recirculation water systems ;❑Complies Exception: Requirement does not apply.
[PL8]3 ;have controls that start the pump :❑Does Not
upon receiving a signal from the
i action of a user of a fixture or ❑Not Observable
lappliance and limits the temperature ❑Not Applicable
;of the water entering the cold-water
piping to 104°F.
C404.7 -,Demand recirculation water systems ❑Complies :Exception: Requirement does not apply.
[PL8]3 have controls that start the pump ❑Does Not
upon receiving a signal from the
.action of a user of a fixture or T❑Not Observable
appliance and limits the temperature ❑Not Applicable
!of the water entering the cold-water
piping to 104°F.
C404.7 Demand recirculation water systems ;❑Complies ;Exception: Requirement does not apply.
[PL8]3 1 have controls that start the pump !❑Does Not
upon receiving a signal from the
action of a user of a fixture or UNot Observable
;appliance and limits the temperature ;❑Not Applicable
of the water entering the cold-water j
piping to 104°F. ;
C404.7 j Demand recirculation water systems ;❑Complies ;Exception: Requirement does not apply.
[PL8]3 i have controls that start the pump ;❑Does Not
jupon receiving a signal from the
;action of a user of a fixture or 1❑Not Observable
`appliance and limits the temperature ❑Not Applicable
of the water entering the cold-water
piping to 104°F.
C404.7 ;Demand recirculation water systems I❑Complies ;Exception: Requirement does not apply.
[PL8]3 have controls that start the pump ❑Does Not
upon receiving a signal from the
action of a user of a fixture or ❑Not Observable
;appliance and limits the temperature ;❑Not Applicable
of the water entering the cold-water
piping to 104°F. ;
C404.7 ',Demand recirculation water systems ;❑Complies ;Exception: Requirement does not apply.
[PL8]3 I have controls that start the pump '❑Does Not
;upon receiving a signal from the
action of•a user of a fixture or ,❑Not Observable,
:appliance and limits the temperature ;❑Not Applicable
of the water entering the cold-water
!piping to 104°F.
C404.7 Demand recirculation water systems ;❑Complies ;Exception: Requirement does not apply.
[PL8]3 have controls that start the pump ❑Does Not
upon receiving a signal from the
laction of a user of a fixture or UNot Observable
!appliance and limits the temperature :❑Not Applicable
of the water entering the cold-water
piping to 104°F:
C404.7 ;Demand recirculation water systems ❑Complies !Requirement will be met.
[PL8]3 ;have controls that start the pump T]Does Not
upon receiving a signal from the
;action of a user of a fixture or UNot Observable
kappliance and limits the temperature ❑Not Applicable ;
;of the water entering the cold-water
;piping to 104°F. ;
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 17 of 33
Section
# Plumbing Rough-In Inspection ]7 Complies? Comments/Assumptions
& keq.ID
C404.7 !,Demand recirculation water systems ;❑Complies :Exception: Requirement does not apply.
[PL8I3 1have controls that start the pump '❑Does Not
I upon receiving a signal from the !Location on plans/spec: Does not apply to this system type
;action of a user of a fixture or :❑Not Observable:
'appliance and limits the temperature ❑Not Applicable
;of the water entering the cold-water
;piping to 104°F.
C404.7 ;Demand recirculation water systems ` ;❑Complies Requirement will be met.
[PL8]3 have controls that start the pump ;❑Does Not
;upon receiving a signal from the
action of a user of a fixture or ❑Not Observable!
_
lappliance and limits the temperature ❑Not Applicable ;
of the water entering the cold-water
piping to 104°F.
C404.7 ;Demand recirculation water systems ;❑Complies ;Requirement will be met.
[PL8]3 r have controls that start the pump ;DDoes Not
upon receiving a signal from the
action of a user of a fixture or InNot Observable
!appliance and limits the temperature .❑Not Applicable
of the water entering the cold-water
piping to 104°F.
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 18 of 33
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.iD
C402.2.6 ;Thermally ineffective panel surfaces of;❑Complies '.Exception: Requirement does not apply.
[ME41]3 !sensible heating panels have '❑Does Not
!insulation >= R-3.5.
I❑Not Observable I
❑Not Applicable
C402.5.5, ;Stair and elevator shaft vents have ;❑Complies
C403.2.4. ;motorized dampers that automatically ;❑Does Not
3 ;close. Refernece section C403.7.7 for
[ME3]3 ;operational details. ;❑Not Observable'
:❑Not Applicable
C403.11.3 HVAC piping insulation insulated in ;❑Complies ;Requirement will be met.
[ME61]2 !accordance with Table C403.11.3. i❑Does Not
Insulation exposed to weather is
protected from damage and is ;❑Not Observable;
!provided with shielding from solar ;❑Not Applicable
radiation.
C403.11.3 HVAC piping insulation insulated in ;❑Complies :;Requirement will be met.
[ME61]2 !accordance with Table C403.11.3. �01)oes Not
'Insulation exposed to weather is
;protected from damage and is :❑Not Observable
provided with shielding from solar ;❑Not Applicable
y radiation.
C403.11.3 i HVAC piping insulation insulated in !❑Complies ;Requirement will be met.
[ME61]2 !accordance with Table C403.11.3. ❑Does Not
!Insulation exposed to weather is ;
protected from damage and is .❑Not Observable,
i provided with shielding from solar ❑Not Applicable
eradiation.
C403.11.3'HVAC piping insulation insulated in ;❑Complies ;Requirement will be met.
[ME61)2 #accordance with Table C403.11.3. �❑Does Not
Insulation exposed to weather is
',protected from damage and is ❑Not Observable
!provided with shielding from solar ❑Not Applicable
radiation.
C403.11.3 j HVAC piping insulation insulated in ;❑Complies :Requirement will be met.
[ME61]2 {accordance with Table C403.11.3. ;DDoes Not
!Insulation exposed to weather is
;protected from damage and is ;❑Not Observable
provided with shielding from solar ;❑Not Applicable
radiation.
C403.11.3 i HVAC piping insulation insulated in ;❑Complies ;Requirement will be met.
[ME61]2 accordance with Table C403.11.3. j❑Does Not
!Insulation exposed to weather is ;
protected from damage and is ❑Not Observable:
provided with shielding from solar ;❑Not Applicable ;
]radiation.
C403.11.3;HVAC piping insulation insulated in ❑Complies :Requirement will be met.
[ME61]2 accordance with Table C403.11.3. ;DDoes Not
Insulation exposed to weather is
protected from damage and is ;❑Not Observable
!provided with shielding from solar !❑Not Applicable
radiation.
C403.11.[ME61]2 3!a accordance with Table C403a11 S HVAC piping insulation insulted in I❑Complies ;Requirement will be met.
❑Does Not
Insulation exposed to weather is
protected from damage and is ❑Not Observable
provided with shielding from solar ;❑Not Applicable
radiation.
11 High Impact(Tier l) 2 Medium Impact(Tier 2) =3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 19 of 33
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C403.11.3;HVAC piping insulation insulated in ❑Complies ;Requirement will be met.
[ME61]2 accordance with Table C403.11.3. 1❑Does Not
Insulation exposed to weather is
protected from damage and is ❑Not Observable
provided with shielding from solar ❑Not Applicable
radiation.
C403.11.3;HVAC piping insulation insulated in :❑Complies ;Requirement will be met.
[ME61]2 accordance with Table C403.11.3. ❑Does Not
Insulation exposed to weather is
protected from damage and is ❑Not Observable
provided with shielding from solar ;❑Not Applicable
radiation.
C403.11.3!HVAC piping insulation insulated in ;❑Complies ;Requirement will be met.
[ME61]2 }accordance with Table C403.11.3. !❑Does Not
;Insulation exposed to weather is
protected from damage and is �❑Not Observable
{provided with shielding from solar ❑Not Applicable
radiation.
C403.11.3 j HVAC piping insulation insulated in ❑Complies Requirement will be met.
[ME61]2 accordance with Table C403.11.3. ❑Does Not
Insulation exposed to weather is
;protected from damage and is ❑Not Observable
i provided with shielding from solar ;❑Not Applicable
radiation.
C403.11.3IHVAC piping insulation insulated in ;❑Complies Requirement will be met.
[ME61]2 ;accordance with Table C403.11.3. ❑Does Not
i Insulation exposed to weather is
;protected from damage and is ❑Not Observable
!provided with shielding from solar ❑Not Applicable
radiation.
C403.8.4 ;Motors for fans that are not less than ;❑Complies ;Requirement will be met.
[ME142]2 `1/12 hp and less than 1 hp are ❑Does Not
electronically commutated motors or ; j
have a minimum motor efficiency of ,❑Not Observable
170 percent.These motors have the I❑Not Applicable
means to adjust motor speed.
C403.8.4 ;Motors for fans that are not less than ;❑Complies Requirement will be met.
[ME142]2 1/12 hp and less than 1 hp are UDoes Not
electronically commutated motors or
have a minimum motor efficiency of ❑Not Observable
r70 percent.These motors have the ;❑Not Applicable
means to adjust motor speed. j
C403.8.4 ;Motors for fans that are not less than '❑Complies Requirement will be met.
[ME142]2 y 1/12 hp and less than 1 hp are ❑Does Not
;electronically commutated motors or
have a minimum motor efficiency of ;❑Not Observable
70 percent.These motors have the ;❑Not Applicable
means to adjust motor speed.
C403.8.4 ;Motors for fans that are not less than ;❑Complies ;Requirement will be met.
[ME142]2 i 1/12 hp and less than 1 hp are ❑Does Not
,electronically commutated motors or
I have a minimum motor efficiency of 1❑Not Observable
170 percent.These motors have the ❑Not Applicable
;,means to adjust motor speed.
C403.8.4 !Motors for fans that are not less than ;❑Complies :Requirement will be met.
[ME142]2 1/12 hp and less than 1 hp are ❑Does Not
;electronically commutated motors or
1{have a minimum motor efficiency of ❑Not Observable'
70 percent.These motors have the ;❑Not Applicable
means to adjust motor speed.
1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 20 of 33
Section
#. Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Re .ID
C403.8.4 Motors for fans that are not less than ❑Complies ;Requirement will be met.
[ME142]2 1/12 hp and less than 1 hp are ❑Does Not
electronically commutated motors or
have a minimum motor efficiency of ;❑Not Observable
70 percent.These motors have the ❑Not Applicable
;means to adjust motor speed.
C403.8.4 ;Motors for fans that are not less than iElComplies 'Requirement will be met.
[ME142]2 1/12 hp and less than 1 hp are �❑Does Not
electronically commutated motors or
$have a minimum motor efficiency of ❑Not Observable
70 percent.These motors have the ❑Not Applicable
means to adjust motor speed.
C403.8.4 Motors for fans that are not less than ;❑Complies ;Requirement will be met.
[ME142]2 ti 1/12 hp and less than 1 hp are ❑Does Not
lelectronically commutated motors or
have a minimum motor efficiency of ❑Not Observable
70 percent.These motors have the ❑Not Applicable ;
means to adjust motor speed.
C403.8.4 ;Motors for fans that are not less than ;❑Complies Requirement will be met.
[ME142]2 :1/12 hp and less than 1 hp are '❑Does Not
;electronically commutated motors or
have a minimum motor efficiency of ❑Not Observable!
70 percent.These motors have the '❑Not Applicable
means to adjust motor speed. i
C403.8.4 ,Motors for fans that are not less than ❑Complies ;Requirement will be met.
[ME142]2 :1/12 hp and less than 1 hp are ❑Does Not
;electronically commutated motors or
have a minimum motor efficiency of ❑Not Observable
{70 percent.These motors have the ❑Not Applicable
means to adjust motor speed.
C403.8A Motors for fans that are not less than ;❑Complies ;Requirement will be met.
[ME142]2 ;1/12 hp and less than 1 hp are [:]Does Not
electronically commutated motors or
have a minimum motor efficiency of ;❑Not Observable
')70 percent.These motors have the ;❑Not Applicable
means to adjust motor speed.
C403.8A ;Motors for fans that are not less than '❑Complies ;Requirement will be met.
[ME142]2 I1/12 hp and less than 1 hp are ❑Does Not
electronically commutated motors or 1
{have a minimum motor efficiency of 1❑Not Observable
(70 percent.These motors have the ❑Not Applicable
means to adjust motor speed.
C403.8.4 ,Motors for fans that are not less than '❑Complies ;Exception: Requirement does not apply.
[ME142]2 :1/12 hp and less than 1 hp are ❑Does Not
;electronically commutated motors or ; Location on plans/spec: 2HP Motor
have a minimum motor efficiency of ❑Not Observable
'70 percent.These motors have the :❑Not Applicable
means to adjust motor speed.
C403.8.5 ;Each DX cooling system > 65 kBtu ;❑Complies ;Exception: Requirement does not apply.
[ME143]2 ;and chiller water/evaporative cooling :❑Does Not
;system with fans > 1/4 hp are
designed to vary the indoor fan airflow;❑Not Observable
Ias a function of load and comply with '❑Not Applicable
;detailed requirements of this section.
C403.8.5 ;Each DX cooling system > 65 kBtu ❑Complies ;Exception: Requirement does not apply.
[ME143]z and chiller water/evaporative cooling I❑Does Not
,system with fans> 1/4 hp are
�designed to vary the indoor fan airflow,❑Not Observable
;as a function of load and comply with ;❑Not Applicable
detailed requirements of this section.
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 21 of 33
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Re .ID
C403.8.5 !,Each DX cooling system > 65 kBtu ;❑Complies :Exception: Requirement does not apply.
[ME143]2 ;and chiller water/evaporative cooling I❑Does Not
;system with fans> 1/4 hp are ❑Not Observable'
;designed to vary the indoor fan airflow:
!as a function of load and comply with ;❑Not Applicable
;detailed requirements of this section.
C403.8.5 ;Each DX cooling system > 65 kBtu '❑Complies Exception: Requirement does not apply.
[ME143]2 rand chiller water/evaporative cooling ❑Does Not
;system with fans > 1/4 hp are
;designed to vary the indoor fan airflow ❑Not Observable
as a function of load and comply with .❑Not Applicable
;detailed requirements of this section.
C403.8.5 !,Each DX cooling system > 65 kBtu :❑Complies ;Exception: Requirement does not apply.
[ME143]2 and chiller water/evaporative cooling '❑Does Not
system with fans > 1/4 hp are
;designed to vary the indoor fan airflow;❑Not Observable
!as a function of load and comply with :❑Not Applicable ;
;detailed requirements of this section.
C403.8.5 Each DX cooling system > 65 kBtu ❑Complies - :Exception: Requirement does not apply.
[ME143]2 )and chiller water/evaporative cooling ❑Does Not
;system with fans > 1/4 hp are
;designed to vary the indoor fan airflow;❑Not Observable:
ias a function of load and comply with ;❑Not Applicable
;detailed requirements of this section.
C403.8.5 ;Each DX cooling system > 65 kBtu ❑Complies Exception: Requirement does not apply.
[ME143]2 and chiller water/evaporative cooling !❑Does Not
;system with fans > 1/4 hp are ;
;designed to vary the indoor fan airflow;❑Not Observable
;as a function of load and comply with ;❑Not Applicable
,detailed requirements of this section.
C403.8.5 ;Each DX cooling system > 65 kBtu ;❑Complies Exception: Requirement does not apply.
[ME143]2 :and chiller water/evaporative cooling ❑Does Not
;system with fans > 1/4 hp are
;designed to vary the indoor fan airflow;❑Not Observable
ras a function of load and comply with ❑Not Applicable ;
;detailed requirements of this section.
C403.8.5 !Each DX cooling system > 65 kBtu '❑Complies 'Requirement will be met.
[ME143]2 !and chiller water/evaporative cooling ;❑Does Not
;system with fans > 1/4 hp are
designed to vary the indoor fan airflow ❑Not Observable
has a function of load and comply with ❑Not Applicable
;detailed requirements of this section.
C403.8.5 1 Each DX cooling system > 65 kBtu 1❑Complies Exception: Requirement does not apply.
[ME143]2 and chiller water/evaporative cooling 1❑Does Not
(system with fans > 1/4 hp are I
?designed to vary the indoor fan airflow;❑Not Observable
has a function of load and comply with !❑Not Applicable
;detailed requirements of this section.
C403.8.5 ;Each DX cooling system > 65 kBtu ;❑Complies ;Exception: Requirement does not apply.
[ME14,3]2 ;and chiller water/evaporative cooling :❑Does Not
system with fans > 1/4 hp are ❑Not Observable;
r designed to vary the indoor fan airflow I❑Not Applicable
,as a function of load and comply with PP
;detailed requirements of this section.
C403.8.5 !Each DX cooling system > 65 kBtu ❑Complies :Exception: Requirement does not apply.
[ME143]2 ;and chiller water/evaporative cooling �DDoes Not
;system with fans > 1/4 hp are
designed to vary the indoor fan airflow;❑Not Observable
as a function of load and comply with ❑Not Applicable
jdetailed requirements of this section.
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 22 of 33
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Re .ID
C403.8.5 Each DX cooling system > 65 kBtu ;❑Complies !Exception: Requirement does not apply.
[ME143]2 land chiller water/evaporative cooling 1❑Does Not
;system with fans > 1/4 hp are ; ;Location on plans/spec: Heating Only
designed to vary the indoor fan airflow;❑Not Observable;
as a function of load and comply with :❑Not Applicable
;detailed requirements of this section. ;
C403.12.1 i Systems that heat outside the building;❑Complies :Exception: Requirement does not apply.
[ME71]2 ;envelope are radiant heat systems ;DDoes Not
controlled by an occupancy sensing
device or timer switch. :FNot Observable
j❑Not Applicable
C403.2.3 HVAC equipment efficiency verified. ❑Complies ;see the Mechanical systems list for values.
[ME55]2 ❑Does Not
❑Not Observable
❑Not Applicable
C403.2.2 ;Natural or mechanical ventilation is ;❑Complies ;Requirement will be met.
[ME59]1 :provided in accordance with ❑Does Not
;International Mechanical Code
;Chapter 4. Mechanical ventilation has ❑Not Observable
,capability to reduce outdoor air supply jElNot Applicable
;to minimum per IMC Chapter 4.
C403.7.1 ;Demand control ventilation provided ❑Complies Exception: Systems with energy recovery.
[ME59]1 :for spaces >500 ft2 and >25 UDoes Not
;people/1000 ft2 occupant density and
;served by systems with air side :DNot Observable;
:economizer,auto modulating outside :❑Not Applicable
;air damper control,or design airflow
>3,000 cfm. ;
C403.7.2 Enclosed parking garage ventilation ;❑Complies !Exception: Requirement does not apply.
[ME115]3 !has automatic contaminant detection :❑Does Not
Viand capacity to stage or modulate
;fans to 50%or less of design capacity. : Not Observable:
❑Not Applicable
C403.7.6 ;HVAC systems serving guestrooms in '❑Complies 'Exception: Requirement does not apply.
[ME141]3 'Group R-1 buildings with > 50 ;❑Does Not
;guestrooms: Each guestroom is ;
;provided with controls that ❑Not Observable;
automatically manage temperature ;❑Not Applicable
setpoint and ventilation (see sections
C403.7.6.1 and C403.7.6.2).
C403.7.4 !Exhaust air energy recovery on ;❑Complies ;Requirement will be met.
[ME57]1 ;systems meeting Table C403.7.4(1) ;❑Does Not
;and C403.7.4(2). ❑Not Observable
❑Not Applicable
C403.7.5 ;Kitchen exhaust systems comply with :❑Complies :Requirement will be met.
[ME116]3 ;replacement air and conditioned ❑Does Not
;supply air limitations, and satisfy hood
!rating requirements and maximum ;❑Not Observable
exhaust rate criteria. ;❑Not Applicable
C403.11.1!HVAC ducts and plenums insulated in ;❑Complies .;Requirement will be met.
!accordance with C403.11.1 and ;❑Does Not
C403.11.2;constructed in accordance with
[ME60]2 lC403.11.2,verification may need to t❑Not Observable
;occur during Foundation Inspection. 1❑Not Applicable
i
C403.4.3. ;Three-pipe hydronic systems using a ❑Complies Requirement will be met.
1 !common return for hot and chilled 1❑Does Not
[ME50]2 water are not used. ❑Not Observable
R ;❑Not Applicable
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 23 of 33
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Re .ID
C403.4.3. ;Closed-circuit cooling tower within '❑Complies ;Exception: Requirement does not apply.
3.2 (heat pump loop have either automatic;❑Does Not
[ME121]3 +bypass valve or lower leakage positive
closure dampers. Open-circuit tower ;❑Not Observable:
'within heat pump loop have automatic UNot Applicable
;valve to bypass all heat pump water
;flow around the tower. Open-or
;closed-circuit cooling towers used in
;conjunction with a separate heat
;exchanger have heat loss by shutting
idown the circulation pump on the
cooling tower loop. Open-or closed
;circuit cooling towers have a separate;
heat exchanger to isolate the cooling.
;tower from the heat pump loop,and
heat loss is controlled by shutting
Idown the circulation pump on the
;cooling tower loop.
C403.4.3. ;Closed-circuit cooling tower within '❑Complies ;Exception: Requirement does not apply.
3.2 heat pump loop have either automatic .❑Does Not
[ME121]3 ;bypass valve or lower leakage positive
;closure dampers. Open-circuit tower ❑Not Observable
`within heat pump loop have automatic;❑Not Applicable
(valve to bypass all heat pump water
;flow around the tower. Open-or ;
closed-circuit cooling towers used in
;conjunction with a separate heat
;exchanger have heat loss by shutting
;down the circulation pump on the
cooling tower loop. Open-or closed
;circuit cooling towers have a separate
I heat exchanger to isolate the cooling
!tower from the heat pump loop,and
heat loss is controlled by shutting
,down the circulation pump on the
cooling tower loop.
C403.4.3. ;Closed-circuit cooling tower within ❑Complies ;Exception: Requirement does not apply.
3.2 !heat pump loop have either automatic ;❑Does Not
[ME121]3 !bypass valve or lower leakage positive
;closure dampers. Open-circuit tower ❑Not Observable
within heat pump loop have automatic;❑Not Applicable
;valve to bypass all heat pump water
;flow around the tower.Open-or
closed-circuit cooling towers used in
;conjunction with a separate heat
;exchanger have heat loss by shutting
!down the circulation pump on the
cooling tower loop. Open-or closed
;circuit cooling towers have a separate
I heat exchanger to isolate the cooling '
;tower from the heat pump loop,and
heat loss is controlled by shutting
:down the circulation pump on the
;cooling tower loop.
C403.4.5 ;Chilled water plants with multiple '❑Complies `Requirement will be met.
[ME2613 !chillers have capability to reduce flow ❑Does Not
automatically through the chiller plant
;when a chiller is shut down. Boiler ;❑Not Observable;
i plants with multiple boilers have the 1❑Not Applicable
;capability to reduce flow automatically;
3through the boiler plant when a boiler
is shut down.
1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 24 of 33
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C403.4.1. )Heating for vestibules and air curtains ❑Complies !Requirement will be met.
4 !with integral heating include '❑Does Not
[ME63]2 ,automatic controls that shutoff the
heating system when outdoor air :❑Not Observable
itemperatures > 45F.Vestibule '.❑Not Applicable 11
heating and cooling systems
;controlled by a thermostat in the
;vestibule with heating setpoint<_
60F and cooling setpoint>= 80F.
C403.9.5 ;Condenser heat recovery system that ;❑Complies ;Exception: Design SWH load = 1 MMBtu/h.
[ME31]3 can heat water to 85°F or provide ;❑Does Not
60%of peak heat rejection is installed ; :Location on plans/spec: No condenser water on site
;for preheating of service hot water. ❑Not Observable
'.❑Not Applicable
C404.2.1 ;Gas-fired water-heating equipment ❑Complies Requirement will be met.
[ME111)2 I installed in new buildings: where a ;❑Does Not
;singular piece of water-heating ❑Not Observable
i equipment>= 1,000 kBtu/h serves ;❑Not Applicable
e
!the entire building,thermal efficiency PP
>= 90 Et.Where multiple pieces of
;water-heating equipment serve the
building with combined rating >_
1,000 kBtu/h,the combined input-
;capacity-weighted-average thermal ;
;efficiency>=90 Et. Exclude input
jrating of equipment in individual i
;dwelling units and equipment<= 100 '
1 kBtu/h.
C408.2.2. ;Air outlets and zone terminal devices ;❑Complies !Requirement will be met.
1 )have means for air balancing. i❑Does Not
[ME53]3 ;
❑Not Observable
❑Not Applicable
C408.2.2. i HVAC hydronic heating and cooling ;❑Complies ',Requirement will be met.
2 coils have means to balance and have :❑Does Not
[ME54]3 !pressure test connections.
❑Not Observable
❑Not Applicable
C403.5, ;Refrigerated display cases,walk-in ;❑Complies !Exception: Requirement does not apply.
C403.5.1, 'coolers or walk-in freezers served by ❑Does Not
C403.5.2 ;remote compressors and remote
[ME123]3 ;condensers not located in a ;❑Not Observable
I condensing unit, have fan-powered '❑Not Applicable
;condensers that comply with Sections
C403.5.1 and refrigeration compressor;
.systems that comply with C403.5.2..
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 25 of 33
Section
# Rough-in Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.2. ;Spaces required to have light- ;❑Complies ;Exception: Daylight spaces that comply with this code.
2 'reduction controls have a manual :❑Does Not
[EL22]1 :control that allows the occupant to Location on plans/spec: 260921, 265001, E002, E101, E401,
!reduce the connected lighting load in ❑Not Observable E402
;a reasonably uniform illumination ;❑Not Applicable
pattern >= 50 percent.
C405.2.1, ;Occupancy sensors installed in ;❑Complies ;Exception:Automatic-on controls are allowed in corridors,
C405.2.1. classrooms/lecture/training rooms, ;❑Does Not stairways, restrooms, primary building entrance areas and
1 ;conference/meeting/multipurpose I :lobbies, and areas where manual-on controls could impact
[EL18]1 ;rooms, copy/print rooms, :❑Not Observable'safety or security.
ilounges/breakrooms,enclosed offices, i❑Not Applicable I
;open plan office areas, restrooms, Location on plans/spec: 260921, E002, E101, E401, E402
'storage rooms, locker rooms,
'warehouse storage areas,and other
;spaces <= 300 sgft that are enclosed
;by floor-to-ceiling height partitions.
Reference section language
C405.2.1.2 for control function in
;warehouses and section C405.2.1.3
;for open plan office spaces.
C405.2.1. ;Occupancy sensors control function in ;❑Complies ;Exception: Requirement does not apply.
2 'warehouses: In warehouses,the ❑Does Not
[EL19]1 ;lighting in aisleways and open areas is
;controlled with occupant sensors that ;❑Not Observable;
automatically reduce lighting power ,❑Not Applicable
by 50%or more when the areas are
;unoccupied.The occupant sensors ;
;control lighting in each aisleway
;independently and do not control j
;lighting beyond the aisleway being
controlled by the sensor.
C405.2.1. !Occupant sensor control function in ;❑Complies ;Requirement will be met.
3 :open plan office areas: Occupant 1❑Does Not
[EL20]1 ;sensor controls in open office spaces ;❑Not Observable;Location on plans/spec: 260921, 265001, E101
>= 300 sq.ft. have controls 1)
;configured so that general lighting can:❑Not Applicable
be controlled separately in control
;zones with floor areas <= 600 sq.ft.
within the space, 2) automatically turn
;off general lighting in all control zones i
;within 20 minutes after all occupants
have left the space, 3) are configured
so that general lighting power in each
;control zone is reduced by>= 80%of ;
!the full zone general lighting power
:within 20 minutes of all occupants
leaving that control zone,and 4) are
configured such that any daylight
responsive control will activate space
;general lighting or control zone ;
:general lighting only when occupancy '
:for the same area is detected.
C405.2.2, ;,Each area not served by occupancy ;❑Complies ;Exception: Lighting that is related to means of egress in
C405.2.2. !sensors (per C405.2.1) have time- !:❑Does Not stairways, ramps,corridors,or emergency routes.
1, 'switch controls and functions detailed ,
C405.2.2. ;in sections C405.2.2.1 and C405.2.2.2..❑Not Observable;Location on plans/spec: 260921, 265001, E002, E101, E401,
2 ;❑Not Applicable E402
[EL21]? j
I '
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 26 of 33
Section
# T Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.3, ;Daylight zones provided with ❑Complies ;Requirement will be met.
C405.2.3. ;individual controls that control the '❑Does Not
1, !lights independent of general area !Location on plans/spec: 260921, 265001, E101
C405.2.3. ;lighting.See code section C405.2.3 ❑Not Observable
2 i Daylight-responsive controls for ;[:]Not Applicable
[EL23]2 ;applicable spaces, C405.2.3.1 Daylight,
;responsive control function and ;
;section C405.2.3.2 Sidelit zone.
C405.2.4 ;Separate lighting control devices for ❑Complies ;Requirement will be met.
[EL26]1 'specific uses installed per approved '❑Does Not
,lighting plans. Location on plans/spec: 260921, 265001, E002, E101, E401,
❑Not Observable;E402
❑Not Applicable
C405.2.4 :Additional interior lighting power ;❑Complies ;Requirement will be met.
[EL27]1 :allowed for special functions per the ❑Does Not
approved lighting plans and is :Location on plans/spec: 260921, 265001, E002, E101, E401,
:automatically controlled and ;❑Not Observable:E402
separated from general lighting. ;❑Not Applicable
C405.2.5 'Automatic lighting controls for exterior;❑Complies
[EL28]no0 ;lighting installed. Controls will be ;❑Does Not
;daylight controlled,set based on i
'business operation time-of-day, or !❑Not Observable
reduce connected lighting > 30%. ;❑Not Applicable
C405.3 !Exit signs do not exceed 5 watts per UComplies ;Requirement will be met.
[EL6]1 face. ;❑Does Not
'❑Not Observable:Location on plans/spec: 265001
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 27 of 33
Section
# Insulation Inspection Eo
plies? Comments/Assumptions
& Req.ID
C303.1 'Roof insulation installed per ;❑Complies
[IN3]1 :manufacturer's instructions. Blown or i❑Does Not
poured loose-fill insulation is installed 1
;only where the roof slope is <=3 in '[]Not Observable I
12, ❑Not Applicable
C402.2.1 ':Insulation installed on a suspended '.❑Complies
[IN20]1 :ceiling having ceiling tiles is not being ❑Does Not
;specified for roor/ceiling assemblies.
;Continuous insulation board installed ;❑Not Observable,
in 2 or more layers with edge joints ;❑Not Applicable
offset between layers.
C303.1 ;Building envelope insulation is labeled I❑Complies
[IN10]2 with R-value or insulation certificate !❑Does Not
;providing R-value and other relevant
;data. :❑Not Observable;
❑Not Applicable
C303.2 ;Above-grade wall insulation installed '❑Complies
[IN7]1 ;per manufacturer's instructions. '❑Does Not
❑Not Observable
❑Not Applicable
C303.2.1 I Exterior insulation is protected from ❑Complies
[IN14]2 damage with a protective material. []Does Not
,verification for exposed foundation'
insulation may need to occur during �❑Not Observable
I Foundation Inspection. ;[]Not Applicable
C105 ;Installed above-grade wall insulation I❑Complies ;See the Envelope Assemblies table for values.
[IN6]1 type and R-value consistent with :❑Does Not
insulation specifications reported in
;plans and COMcheck reports. ;❑Not Observable
❑Not Applicable
C402.2.3 Installed floor insulation type and R- ;❑Complies See the Envelope Assemblies table for values.
[IN8]2 #value consistent with insulation j❑Does Not
,specifications reported in plans and
;COMcheck reports. ❑Not Observable;
I❑Not Applicable
C402.2.6 ;Radiant panels and associated ;❑Complies
[IN18]3 components,designed for heat ❑Does Not
jtransfer from the panel surfaces to the;
;occupants or indoor space are ❑Not Observable
insulated with a minimum of R-3.5. ;❑Not Applicable
C105 :,Installed roof insulation type and R- ;❑Complies ;See the Envelope Assemblies table for values.
[IN2]1 :value consistent with insulation ElDoes Not
;specifications reported in plans and
COMcheck reports. For some ceiling ;❑Not Observable
:systems,verification may need to ;❑Not Applicable
;occur during Framing Inspection.
C402.5.1. ;All sources of air leakage in the ;❑Complies
1 building thermal envelope are sealed,. UlDoes Not
[IN1]1 !caulked,gasketed, weather stripped ❑Not Observable'
;or wrapped with moisture vapor-
permeable wrapping material to !❑Not Applicable
minimize air leakage.
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 28 of 33
Section
# Final Inspection Complies?. Comments/Assumptions
& Req.ID
C303.3, ;Furnished 0&M instructions for ;❑Complies ;Requirement will be met.
C408.2.5. !systems and equipment to the !❑Does Not
2 !building owner or designated i
[FI17]3 ;representative. I❑Not Observable I
1❑Not Applicable
I
C303.3, ;,Furnished O&M manuals for HVAC ;❑Complies ;Requirement will be met.
C408.2.5. .';systems within 90 days of system !'❑Does Not
3 . ;acceptance.
[FI8]3 ❑Not Observable
; !❑Not Applicable
C402.5 ;Building envelope contains a ;❑Complies
[FI55]1 'continuous air barrier that has been ❑Does Not
;tested and deemed to limit air leakage; Observable
<= 0.40 cfm/ft2.
❑Not Applicable
C402.5.6 _Weatherseals installed on all loading '❑Complies
[FI37]1 dock cargo door openings and provide '❑Does Not
;direct contact along the top and sides ;
of vehicles parked in the doorway. E❑Not Observable,
❑Not Applicable
C402.5.6 ;Weatherseals installed on all loading I❑Complies
[FI37]1 dock cargo door openings and provide ;❑Does Not
,direct contact along the top and sides
of vehicles parked in the doorway. ❑Not Observable
❑Not Applicable
C402.5.6 ;Weatherseals installed on all loading E❑Complies ;
[FI37]1 !dock cargo door openings and provide :❑Does Not
direct contact along the top and sides
;of vehicles parked in the doorway. !❑Not Observable
;❑Not Applicable ;
C402.5.6 ;Weatherseals installed on all loading ❑Complies
[FI37]1 'dock cargo door openings and provide ❑Does Not
direct contact along the top and sides
of vehicles parked in the doorway. ❑Not Observable
❑Not Applicable
C403.2.2 ;HVAC systems and equipment ❑Complies ;Requirement will be met.
[FI27]3 capacity does not exceed calculated ❑Does Not
loads.
❑Not Observable:
❑Not Applicable
C403.2.4. ;Heating and cooling to each zone is ❑Complies ;Requirement will be met.
1 scontrolled by a thermostat control. j❑Does Not j
[F[47]3 ;Minimum one humidity control device
per installed ,❑Not Observable;;
humidification/dehumidification ;❑Not Applicable
!system.
C403.2.4. ;Heating and cooling to each zone is ;❑Complies !Requirement will be met.
1 !controlled by a thermostat control. :❑Does Not
[FI47]3 'Minimum one humidity control device
per installed :❑Not Observable
I humidification/dehumidification :❑Not Applicable
;system.
C403.2.4. ;Heating and cooling to each zone is ;❑Complies :Requirement will be met.
1 ;controlled by a thermostat control. !❑Does Not I
[FI47]3 Minimum one humidity control device ; I
per installed :❑Not Observable;
y humidification/dehumidification ;❑Not Applicable
i system.
r
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 29 of 33
Section '
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C403.2.4. Heating and cooling to each zone is ;❑Complies ;Requirement will be met.
1 ;controlled by a thermostat control. ❑Does Not
[F[47]3 ;Minimum one humidity control device
per installed i❑Not Observable:
!humidification/dehumidification ;❑Not Applicable
system.
C403.2.4. ;Heating and cooling to each zone is ;❑Complies Requirement will be met.
1 ;controlled by a thermostat control. ❑Does Not
[FI47]3 ;Minimum one humidity control device
per installed :❑Not Observable
Ihumidification/dehumidification ❑Not Applicable
!system.
C403.2.4. ;Heating and cooling to each zone is ;❑Complies Requirement will be met.
1 !controlled by a thermostat control. ❑Does Not
[F147]3 :'Minimum one humidity control device
;per installed ❑Not Observable
humidification/dehumidification ❑Not Applicable
!system.
C403.2.4. 'Heating and cooling to each zone is ;❑Complies ;Requirement will be met.
1 'controlled by a thermostat control. - ❑Does Not
[F147]3 ;Minimum one humidity control device ;
per installed ❑Not Observable
=humidification/dehumidification ❑Not Applicable
system.
C403.2.4. ;Heating and cooling to each zone is I❑Complies ;Requirement will be met.
1 I controlled by a thermostat control. ❑Does Not
[F[47]3 Minimum one humidity control device
'per installed ,❑Not Observable
;humidification/dehumidification ;❑Not Applicable
system.
C403.2.4. ;Heating and cooling to each zone is ;❑Complies ;Requirement will be met.
1 !controlled by a thermostat control. 1DDoes Not
[FI47]3 !Minimum one humidity control device
per installed ,❑Not Observable
I humidification/dehumidification '❑Not Applicable
:system.
C403.2.4. ;Heating and cooling to each zone is '❑Complies ;Requirement will be met.
1 controlled by a thermostat control. 1EIDoes Not
[F147]3 �Minimum one humidity control device :
;per installed ;❑Not Observable
humidification/dehumidification 1❑Not Applicable
system.
C403.2.4. i Heating and cooling to each zone is I❑Complies ;Requirement will be met.
1 controlled by a thermostat control. E❑Does Not
[F147]3 !Minimum one humidity control device ;
;per installed :❑Not Observable;
!humidification/dehumidification ❑Not Applicable j
system.
C403.2.4. ;Heating and cooling to each zone is ❑Complies Requirement will be met.
1 !controlled by a thermostat control. ❑Does Not
[F147]3 Minimum one humidity control device
per installed ;❑Not Observable:
humidification/dehumidification ;❑Not Applicable
system.
C403.2.4. ;Heating and cooling to each zone is ❑Complies Requirement will be met.
1 controlled by a thermostat control. UDoes Not
(F147]3 ;Minimum one humidity control device
;per installed ❑Not Observable
I humidification/dehumidification ❑Not Applicable
i system.
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 30 of 33
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C403.2.4. ;Heat pump controls prevent ;❑Complies ;Exception: Requirement does not apply.
1.1 'supplemental electric resistance heat '❑Does Not
[FI42]3 ?from coming on when not needed.
❑Not Observable i
;❑Not Applicable
C403.2.4. Heat pump controls prevent ❑Complies Exception: Requirement does not apply.
1.1 ;supplemental electric resistance heat ;❑Does Not
[F[42]3 ;from coming on when not needed.
❑Not Observable;
❑Not Applicable
C403.2.4. !Heat pump controls prevent ;❑Complies :Exception: Requirement does not apply.
1.1 :supplemental electric resistance heat UDoes Not
[FI42]3 ;from coming on when not needed.
❑Not Observable
❑Not Applicable
C403.4.1. iThermostatic controls have a 5 °F ;❑Complies ;Requirement will be met.
2 ideadband. 1ODoes Not
[F[38]3 '
;❑Not Observable
❑Not Applicable
C403.2.4. ;Temperature controls have setpoint ', Complies ;Requirement will be met.
1.3 ;overlap restrictions. ;❑Does Not i
[F120]3
❑Not Observable;
❑Not Applicable
C403.2.4. ;Each zone equipped with setback ;❑Complies !Requirement will be met.
2 controls using automatic time clock or T❑Does Not
[F139]3 ,programmable control system. ❑Not Observable
❑Not Applicable
C403.2.4. ;Automatic Controls: Setback to 55°F ;❑Complies Exception: Requirement does not apply.
2.1, !(heat) and 85°F(cool); 7-day clock, 2- ❑Does Not
C403.2.4. ;hour occupant override, 10-hour
❑Not Observable;
2.2 -,backup
[F140]3. ❑Not Applicable
,
C403.2.4. ,Systems include optimum start ;❑Complies Exception: Requirement does not apply.
2.3 controls. ;❑Does Not
[FI41]3 t
❑Not Observable
❑Not Applicable 11
C403.2.4. ;Systems include optimum start ❑Complies ;Exception: Requirement does not apply.
2.3 controls. ❑Does Not
[F141]3
❑Not Observable
❑Not Applicable
C403.2.4. ;Systems include optimum start ;❑Complies ;Exception: Requirement does not apply.
2.3 controls. ;❑Does Not
[FI41]3 '
;❑Not Observable:
❑Not Applicable
C403.2.4. Systems include optimum start ❑Complies ;Exception: Requirement does not apply.
2.3 I controls. j❑Does Not
[FI41]3
❑Not Observable'
❑Not Applicable
C403.2.4. ;Systems include optimum start ;❑Complies ;Exception: Requirement does not apply.
2.3 3controls. ;❑Does Not
[FI41]3
❑Not Observable
❑Not Applicable
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 31 of 33
Section
# Final Inspection Complies?, Comments/Assumptions
& Re .ID
C403.2.4. ;Systems include optimum start ;❑Complies ;Exception: Requirement does not apply.
2.3 !controls. ;❑Does Not
[F141]3
❑Not Observable'
[E]Not Applicable
C403.2.4. ;Systems include optimum start ;❑Complies Exception: Requirement does not apply.
2.3- controls. ;❑Does Not
[FI41]3 ;❑Not Observable
j ❑Not Applicable
C403.2.4. ;Systems include optimum start iflComplies ;Exception: Requirement does not apply.
2.3 �
scontrols. ❑Does Not
[FI41]3 I
❑Not Observable;
❑Not Applicable
C403.2.4. ;Systems include optimum start ;❑Complies ;Exception: Requirement does not apply.
2.3 controls. f*❑Does Not
[F141]3
❑Not Observable j
❑Not Applicable
C403.2.4. ;Systems include optimum start '❑Complies ;Exception: Requirement does not apply.
2.3 1controls. '❑Does Not
[FI41]3 ;❑Not Observable;
❑Not Applicable
C403.2.4. ;Systems include optimum start ;❑Complies ;Exception: Requirement does not apply.
2.3 controls. ❑Does Not
[F141]3
'❑Not Observable;
❑Not Applicable
C403.2.4. ;Systems include optimum start ;❑Complies Exception: Requirement does not apply.
2J controls. PDoes Not
[F141]3
❑Not Observable;
❑Not Applicable
C403.2.4. ;Systems include optimum start ;❑Complies ;Exception: Requirement does not apply.
2.3 controls. ;❑Does Not
(FI41]3 I �Location on plans/spec: Make-up Air System
;❑Not Observable
❑Not Applicable
C404.3 ;Heat traps installed on supply and ;❑Complies !Exception: Requirement does not apply.
[F[11]3 !discharge piping of non-circulating UDoes Not
systems.
❑Not Observable
❑Not Applicable
C404.4 ;All piping insulated in accordance with ;❑Complies ;Requirement will be met.
[FI25]2 !section details and Table C403.11.3. ❑Does Not
;❑Not Observable:
j :❑Not Applicable
C404.6.1 'Controls are installed that limit the �T]Complies Requirement will be met.
[FI12]3 operation of a recirculation pump ;❑Does Not
installed to maintain temperature of a
{storage tank. System return pipe is a ❑Not Observable
dedicated return pipe or a cold water ;❑Not Applicable
;supply pipe.
C405.4.1 ;Interior installed lamp and fixture ;❑Complies ;See the Interior Lighting fixture schedule for values.
[FI18]1 :lighting power is consistent with what :❑Does Not
is shown on the approved lighting
;plans, demonstrating proposed watts ❑Not Observable
are less than or equal to allowed ;❑Not Applicable
watts.
1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 32 of 33
Section
# Final Inspection Complies? Comments/Assumptions
i & 6tee1.I D
C405.5.1 :Exterior lighting power is consistent ❑Complies !See the Exterior Lighting fixture schedule for values.
[FI19]1 with what is shown on the approved ;❑Does Not
lighting plans, demonstrating
-proposed watts are less than or equal ;❑Not Observable I
'to allowed watts. ;❑Not Applicable
C408.2.1 ;Commissioning plan developed by ;❑Complies ;Requirement will be met.
[FI2811 registered design professional or ;❑Does Not
,approved agency.
❑Not Observable
❑Not Applicable
C408.2.3. HVAC equipment has been tested to '❑Complies ;Requirement will be met.
1 'ensure proper operation. ❑Does Not
(FI31]1
❑Not Observable
❑Not Applicable
C408.2.3. HVAC control systems have been ;❑Complies ;Requirement will be met.
2 ;tested to ensure proper operation, �❑Does Not
[FI10]1 ;calibration and adjustment of controls.
❑Not Observable,
❑Not Applicable
C408.2.4 ;Preliminary commissioning report ❑Complies !Requirement will be met.
[F129]1 completed and certified by registered ❑Does Not
;design professional or approved
;agency. ,❑Not Observable'
❑Not Applicable
C408.2.5.,;Furnished HVAC as-built drawings ❑Complies ;Requirement will be met.
1 ;submitted within 90 days of system :❑Does Not
[F17]3 ;acceptance.
I❑Not Observable
❑Not Applicable
C408.2.5. I Furnished as-built drawings for ;❑Complies Requirement will be met.
1 :electric power systems within 90 days ;❑Does Not
(FI16]3 ;of system acceptance.
❑Not Observable
❑Not Applicable
C408.2.5. ;An air and/or hydronic system ❑Complies Requirement will be met.
3 'balancing report is provided for HVAC I❑Does Not
[F]43]1 systems. ❑Not Observable
❑Not Applicable
C408.2.5. ;Final commissioning report due to ;❑Complies Requirement will be met.
4 'building owner within 90 days of !❑Does Not
[F130]1 receipt of certificate of occupancy.
;❑Not Observable
❑Not Applicable
C408.3 Lighting systems have been tested to ;❑Complies ;Requirement will be met.
[FI3311 ;ensure proper calibration,adjustment, ;❑Does Not
;programming, and operation. :Location on plans/spec: 260501, 260921
❑Not Observable;
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3- Low Impact(Tier 3)
Project Title: New Memory Care Residence at the Glen at Hiland Meadows Report date: 05/05/21
Data filename: Page 33 of 33
C� SUSTAINABLE
COMFORT
April 2, 2021
p a
Randall Berkebile C E E copy
Sano-Rubin Construction Services MAY 1
62LI Delaware Avenue 202�
Albany, NY 12209 TOWN OF QUEENSBURY
BUILDING&CODES
Dear Mr. Berkebile,
To assist Sano-Rubin Construction Services with your green building and energy efficiency goals on the New
Memory Care Residence project, Sustainable Comfort is pleased to present this proposal (referred to as
Exhibit"A"].We are committed to helping you deliver a high quality, energy efficient and healthy building.As a
RESNET certified HERS Rater, Energy Star Partner, NYSERDA partner, Enterprise Green Communities partner,
and USGBC LEED for Homes Provider, Sustainable Comfort will work with your team to achieve compliance
with the following programs:
Proposed Scope
The New Memory Care Residence project consists of one (1] new construction building with thirty [30] units
within a senior living facility in Queensbury, NY.As the green building and energy efficiency partner for this
project, Sustainable Comfort will complete these tasks:
Phase I - Initial Assessment
L Building Assessment- Initial assessment and determination of testing procedure and building
classifications to meet the New York Energy Conservation Construction Code Air Leakage
Requirements.
- Depending on requirements from the code officials testing options are to test dwelling units
for compartmentalization or complete a whole building infiltration test. If unit testing is
selected,we can visit the site to perform preliminary testing to see how air-tight the dwelling
units are and provide feedback to ensure air leakage targets are met. If the whole building
testing option is selected we would coordinate a conference call to review testing procedure in
advance of the test to review setup and requirements of the whole building testing.
Phase 11 -Testing
Option 1: Individual Unit Blower Door Testing
1. Blower Door Testing: Blower door testing will be conducted following the procedures of the New York
Energy Conservation Construction Code Section Ry02.y.1.3.The target testing value for the dwelling
units is 0.3 CFM/sf of enclosure. Sampling following the sampling protocols of RL102AI.1.3.1 will be
followed, assuming the code official approves sampling.A maximum of four[LI] inspections will be
conducted for blower door testing, any additional testing due to failures or lack of approval of
sampling will be charged per day.
2. Compliance Reporting -A written report of the results of the tests will be prepared for the code official
with all information required by the Energy Code.
Page 1 of 10
Client Initials
y SUSTAINABLE
COMFORT
Option 2:Whole Building Blower Door Testing
1. Blower Door Testing: Blower door testing will be conducted following the procedures of the New York
Energy Conservation Construction Code Section R402.y.1.2.The target testing value for the whole
building 3 ACH50 on the entire building.The entire building will need to be accessible for 1 entire day
to allow testing of the building to occur.Any retesting due to failures will incur additional charges.
2. Compliance Reporting-A written report of the results of the tests will be prepared for the code official
with all information required by the Energy Code.
If project designated as a commercial building:
1. Commercial Whole Building Blower Door Testing: Blower door testing will be conducted following the
procedures of the New York Energy Conservation Construction Code Section C902.5.The target testing
value for the whole building O.LI CFM/ft2 @ 75 Pa on the entire building.The entire building will need to
be accessible for 1 entire day to allow testing of the building to occur.Any retesting due to failures will
incur additional charges.
Proposed Schedule
We will begin our work upon receipt of a signed Professional Service Agreement[Exhibit B attached]. Our
analysis will follow the schedule of the project. Our compliance reports will be delivered no later than two(2]
weeks after construction completion unless other arrangements are made prior to that date.
Fee for Service
Our total fee for these services is Six Thousand Seven Hundred Fifty [56,750.00]. We will have billed for the
following fee according to these milestones:
Phase I: Initial Assessment -Total Fee: $1,500
• Milestone 1: Initial Assessment- $1,5000.00 billed after our initial site visit and preparation meeting
with site personnel are complete.
Phase II: Option 1: Unit to Unit Blower Door Testing:Total Fee: $5,250
• Milestone 2: Blower Door Testing - $3,250 billed after air leakage testing has begun for the project.
• Milestone 3: Compliance Report- $2,000 billed after the compliance report has been provided to the
owner.
If compliance testing cannot be successfully completed within the y inspections, either due to failures or if
sampling is not approved, a fee of One Thousand Five Hundred Dollars [$1,500] per day will be charged for any
inspections beyond the y included.
Initial if this option is selected:-_--
Page 2 of 10
Client Initials
SUSTAINABLE
COMFORT
Phase II: ILU Option 2:Whole Building Blower Door Testing -Total Fee: $5,250
• Milestone 2: Compliance Report- $5,250 billed after compliance report has been provided to the
owner.
If the whole building air tightness tests fail and another test is needed, an additional Four Thousand Five
Hundred Dollars ($LI,500) per whole building test will be charged for retesting the building.
Initial if this option is selected:-----
We are looking forward to working with you and your team on this project. Please let me know if you have any
questions.
Sincerely,
Albert LaValley, President
Sustainable Comfort, Inc.
860-595-9907
albert@greenrater.com
Enclosure: Professional Service Agreement
By signing below, signing party agrees to proceed with the proposal dated April 2, 2021 to Sano-Rubin
Construction Services and agrees to the terms and conditions in Exhibit B "Agreement for Engineering
Services."
Sano-Rubin Construction Services Sustainable Comfort, Inc.
Authorized Signer Albert G. LaValley, President
Date Date
Page 3 of 10
Client Initials
Agreement
April 2, 21
EXHIBIT B: AGREEMENT
FOR ENGINEERING SERVICES
THIS AGREEMENT made April 2, 2021, by and between:
Sano-Rubin Construction Services
624 Delaware Avenue
Albany, NY 12209
(hereinafter referred to as"Client")
and
Sustainable Comfort, Inc.
146 Main Street, Suite 301
Worcester, MA 01608
(hereinafter referred to as"SCI")
WITNESSETH,that it is the intention of the Client to retain SCI for energy engineering consulting services
in support of green building and energy efficiency efforts at a proposed site(s):
New Memory Care Residence, Queensbury, New York
NOW,THEREFORE, in consideration of the mutual covenants and conditions contained herein, the
Client and SCI agree as follows:
ARTICLE 1: PROFESSIONAL SERVICES
SCI shall provide Basic Services and Additional Services as identified in this Article 1. Basic Services
and Additional Services shall hereinafter be collectively identified as the Services.
1.1 BASIC SERVICES
SCI's Basic Services shall consist of engineering services as detailed in our proposal letter dated April 2,
2021 to Sano-Rubin Construction Services.
1.2 ADDITIONAL SERVICES
SCI shall provide Additional Services for the Project when authorized in writing by the Client in addition to
the Basic Services. Such Additional Services shall include any services not specifically included in
Paragraph 1.1 of this Agreement, and the scope, deliverables, and schedule for such Additional Services
shall be defined in writing through a mutually agreed modification to this Agreement.
ARTICLE 2: SCI'S RESPONSIBILITIES
2.1.1 SCI acknowledges the importance to the Client of the Client's project schedule and agrees to put
forth its best professional efforts to perform its services under this Agreement in a professional and
workmanlike manner consistent with that schedule. . The Client understands, however, that SCI's
Page a of 10
Client Initials
performance must be governed by sound analysis and engineering practices and the availability of
information provided by others.
2.1.2 SCI shall not be responsible for delay caused by circumstances beyond its reasonable control,
nor for delay which may be occasioned by actions which are required in the exercise of usual and customary
professional care. SCI shall not be liable for damages arising out of any such delay, nor deemed to be in
default of this Agreement as a result thereof.
2.1.3 Client and SCI understand and agree that the SCI is providing the Services according to its best
skill and judgment as a professional and that SCI has no control over decisions of third-parties who make
final determinations as to whether the Project may qualify for any,energy efficiency standard, tax credit, or
certification requirement. SCI shall act in the capacity as an advisor to the Client, but no action or activity
of the SCI when performing the Services shall be construed as a guarantee or warranty that(1)the Project
will achieve an identified Target Green Measure or any related tax incentive or other funding; or (2) that
any Target Green Measure shall exist or be available when the Project is completed.
2.1.4 Client acknowledges that any cost estimates provided by SCI shall represent SCI's judgment as
a professional familiar with the construction industry. It is recognized that neither Client nor SCI has control
over the cost of labor, materials or equipment, or over any third-party firms' methods of determining bid
prices,or over competitive bidding, market or negotiating conditions.Accordingly, SCI cannot and does not
warrant or represent that any bids or negotiated prices prepared by any third-party firm will not exceed the
estimate.
2.1.5 In the event that the Project is subsequently designed and/or constructed by others, SCI shall
have no responsibility for the design services or construction work performed by others and any failure of
such others to produce a project that achieves the Target Green Measures.
2.1.6 SCI has the expertise, experience and skill to render the desired Services and shall perform the
Services in a competent and efficient manner using best efforts to accomplish the objectives of the Service.
2.1.7 SCI shall abide by and perform the Services in accordance with all applicable laws, rules,
regulations and standards prevailing in the industry.
2.1.8 SCI shall maintain all necessary licenses, permits,certifications or other authorizations necessary
to provide the Services under this Agreement during the term of this Agreement.
2.1.9 SCI has become familiar with and examined the project site and the local conditions under which
the project is to be designed, constructed and operated.
ARTICLE 3: CLIENT'S RESPONSIBILITIES
3.1.1 The Client shall provide full information regarding the building systems and the utility costs and
bills,for the Project as identified in our proposal dated April 2, 2021 to Sano-Rubin Construction
Services.
3.1.2 SCI shall be entitled to rely upon the accuracy and completeness of information furnished by the
Client. Client agrees to indemnify and hold SCI harmless for any claim for damages solely arising from
any inaccurate information provided by Client and all services and work based on inaccurate information
supplied by Client.
Page 5 of 10
Client Initials
I
t
3.1.3 The Client shall furnish all information reasonably requested by SCI that is necessary to perform
the Services in a timely manner, so as not to delay the Services.
3.1.4 The Client shall provide SCI access to the Project and all areas of the Project necessary for
Consultant to perform the Services.
3.1.5 The Client shall designate a representative authorized to act in its behalf with respect to the
Project. All direction and authorization shall be by or through such representative.
ARTICLE 4: COMPENSATION
4.1 RATE OF COMPENSATION.
4.1.1 SCI will be compensated for its professional services as outlined in Exhibit A above. The site
visits for this project are included in our price.
4.1.2 SCI shall submit a monthly invoice for all Services and the Client shall pay any such invoice within
30 days of receipt.
4.1.3 By signing below, the Customer agrees to pay SCI Six Thousand Seven Hundred Fifty
Dollars ($6.750.00), as outlined in our proposal dated April 2. 2021 to Sano-Rubin Construction
Services.
4.1.4 SCI acknowledges and agrees that, except as provided herein, it shall not be entitled to and the
Client shall not be obligated to pay, any monies or other cmpensations for the.Services provided in this
Agreement.
4.2 ADDITIONAL SERVICE RATES.
4.2.1 The cost of any Additional Services requested in accordance with Paragraph 1.2 of this
Agreement may be negotiated as a fixed fee for a discrete scope of services or may be billed at SCI's hourly
rates. For all Services to be billed at hourly rates, including the Basic Services,the following rate schedule
shall apply:
Sustainable Comfort, Inc.
Professional Services Hourly Rates
Officer/Executive $200 per hour
Senior Engineer/Program Manager $165 per hour
Senior Project Manager $150 per hour
Project Manager $135 per hour
Engineer $115 per hour
*Applicable taxes not included in rates.
Page 6 of 10
Client Initials
1
4.2.2 SCI shall submit a monthly invoice for all Additional Services and the Client shall pay any such
invoice within 30 days of receipt. No additional work will be paid without prior written authorization from
Sano-Rubin Construction Services.
ARTICLE 5: GENERAL TERMS
5.1 TERM OF AGREEMENT
5.1.1 The term of this agreement shall commence once executed and shall continue until SCI
satisfactorily completes the performance of Services or until either party decides to terminate this
agreement as provided for herein (the"Term").
5.2 TERMINATION OF AGREEMENT
5.2.1 This Agreement may be terminated by either party upon ten (10) days written notice should the
other party fail substantially to perform in accordance with its terms through no fault of the party initiating
the termination.
5.2.2 In the event of termination as set forth in Subparagraph 5.1.1, SCI shall be paid for Services
performed to termination date, if such obligation to pay is not in dispute.Any and all Materials prepared for
and/or delivered to the Client prior to termination shall remain the property of the Client.
5.3 INSURANCE
5.3.1 SCI shall secure and maintain in force during the life of the Agreement, insurance policies and
coverage as described below:
General Liability:
General Aggregate: $ 2,000,000
Personal Injury: $ 1,000,000
Each Occurrence: $ 1,000,000
Medical Expenses (any one person): $ 10,000
Automobile Liability:
Combined Single Limit: $ 1,000,000
Owner's Protective Liability:
Each Occurrence: $ 1,000,000
Aggregate: $ 1,000,000
Umbrella Liability:
Each Occurrence: $5,000,000
Aggregate: $5,000,000
Worker's Compensation:
Employer Limit Each Accident: $ 1,000,000
Employer Limit Disease—Policy Limit: $ 1,000,000
Employee Limit Disease—Each Employee: $ 1,000,000
All such insurance policies shall be in a form satisfactory to Client, with companies having a minimum
rating of"A" by the A.M. Best Co., and shall be obtained and become effective within two weeks of
execution of this Agreement. SCI shall submit certificates of insurance to Client. The certificate shall
require that the insurance Client give at least thirty(30)days prior written notice of cancellation or
material change in any such policy to Client.
Page 7 of 10
Client Initials
5.3.2 Waivers of Claims: Subrogation. Notwithstanding anything to the contrary set forth in this
Agreement,the Client and the SCI waive all claims against one another for damage to or destruction of real
or personal property to the extent such damage or destruction can be covered by commercially available
"all risks" property insurance. The risk to be borne by each party shall also include the satisfaction of any
deductible amounts required to be paid under any applicable property insurance carried by the party whose
property is damaged, and each party agrees that the other party shall not be responsible for satisfaction of
such deductible. The intent of this provision is that each party shall look solely to its insurance with respect
to property damage or destruction that can be covered by"all risks" insurance of the type described in this
Paragraph. Each such policy shall include a waiver of all rights of subrogation by the insurance carrier
against the other party, its agents, and employees with respect to property damage covered by the
applicable property insurance policy.
5.4 INDEMNITY
5.4.1 Subject to Sections 5.4 and 5.5 herein, each party(individually, an "Indemnitor")shall indemnify
and hold the other party, its parent, subsidiary, affiliated companies, agencies, or entities and their
respective officers, directors and employees harmless from, and against, all claims, costs, damages,
expenses, settlements, fines, awards, demands, and liability of any other whatsoever nature or kind,
including reasonable attorneys'fees, court costs, costs of appeal and expert witness fees (the"Losses"),
to the extent caused by(a) Indemnitor's breach of this Agreement or(b) Indemnitor's acts, omissions or
negligence.
5.5 MUTUAL WAIVER OF CONSEQUENTIAL DAMAGES
5.5.1 The SCI's sole liability(whether in contract, tort, statute, for indemnity under Section 5.3 herein,
or otherwise)for the Losses in any manner related to this Agreement as between these parties, shall,
subject to the limitations set forth herein, be the payment of direct damages. Notwithstanding any other
provision of this Agreement to the contrary, and to the fullest extent permitted by law,the SCI's and its
affiliates, shareholders, officers, directors, employees, agents, contractors, consultants, subcontractors,
and subconsultants' liability under this Agreement or in connection with the Project shall not include
consequential, indirect, special, incidental, or similar damages (including damages for loss of business,
loss of profits or the like)arising in any manner from this Agreement or the Services hereunder regardless
of how characterized, even if the SCI or such other party has been advised of the possibility of such
damages or if such damages were reasonably foreseeable, and even if a remedy set forth herein is found
to have failed of its essential purpose.
5.5.2 The Client's sole liability(whether in contract, tort, statute, for indemnity under Section 5.3
herein, or otherwise)for the Losses in any manner related to this Agreement as between these parties,
shall, subject to the limitations set forth herein, be the payment of direct damages. Notwithstanding any
other provision of this Agreement to the contrary, and to the fullest extent permitted by law, the Client's
and its affiliates, shareholders, officers, directors, employees, agents, contractors, consultants,
subcontractors, and subconsultants' liability under this Agreement or in connection with the Project shall
not include consequential, indirect, special, incidental, or similar damages (including damages for loss of
business, loss of profits or the like)arising.in any manner from this Agreement or the Services hereunder
regardless of how characterized, even if the Client or such other party has been advised of the possibility
of such damages or if such damages were reasonably foreseeable, and even if a remedy set forth herein
is found to have failed of its essential purpose.
5.6 LIMITATION OF LIABILITY
5.6.1 Subject to the limitation in Section 5.4 herein, the aggregate liability of the SCI, including for
indemnity under Section 5.3 HEREOF, shall not exceed the greater of: (i)the fee paid to consultant for
Page 8of10
Client Initials
t
the services or(ii)AVAILABLE PROCEEDS OF INSURANCE PROVIDED HEREUNDER. The
allocations of liability in this section represent the agreed and bargained-for understanding of the parties
and the SCI's Fee for the Services expressly reflects the provisions of this SECTION 5.5.
5.7 HAZARDOUS MATERIALS
5.7.1 Neither the Client nor the SCI desires to or is licensed to undertake direct obligations relating to
the identification, abatement, cleanup, control, removal or disposal of hazardous materials. As used in
this Agreement, the term "hazardous materials"shall mean any substances, including but not limited to
asbestos, toxic or hazardous waste, PCBs, combustible gases and materials, petroleum or radioactive
materials (as each of these is defined in applicable federal statutes), bacteria, fungus, mold, or any other
substances under any conditions and in such quantities as would pose a substantial danger to persons or
property exposed to such substances at or near the Facility (hereinafter collectively referred to as
"hazardous materials"). Consistent with applicable laws, Client shall supply SCI with any information in its
possession relating to the presence of hazardous materials in areas where SCI shall perform Services
that may result in the disturbance of hazardous materials. If either Client or SCI become aware of or
suspects the presence of hazardous materials that may be disturbed by the Services, it shall immediately
stop the Services in the affected area and notify the other's contacts. As between Client and SCI, Client
shall be responsible at its sole expense for addressing the potential for or the presence of hazardous
materials in conformance with all applicable laws and addressing the impact of its disturbance before
Client continues with the Services.
5.8 SUCCESSORS AND ASSIGNS
5.8.1 The Client and SCI each binds themselves, successors, assigns, and legal representatives to
the other party to this Agreement and to the successors, assigns, and legal representatives of the other
party with respect to all covenants of this Agreement. Neither the Client nor SCI shall assign, sublet, or
transfer its interest in this Agreement without the written consent of the other. SCI may elect to contract
with subconsultants and/or subcontractors as it so deems necessary or desirable. If SCI contracts with
sub-consultants or subcontractors then SCI shall be fully responsible for the performance of such sub-
consultants or subcontractors and such sub-consultants and subcontractors shall be subject to the same
terms and conditions as SCI.
5.9 FORCE MAJEURE
5.9.1 Neither Party shall be liable under this Agreement for delays, failures to perform, damages,
losses or destruction or malfunction of any equipment or any consequence thereof, caused by, or due to
fire, earthquake, flood, water, the elements, third party labor disputes, power failures, explosions, civil
disturbances, acts of terrorism, governmental actions, shortages of equipment or supplies, unavailability
of transportation, acts or omissions of third parties or cause beyond its reasonable control.
5.10 EXTENT OF AGREEMENT
5.10.1 This Agreement represents the entire and integrated agreement between the Client and SCI and
supersedes all prior negotiations, representations, or agreements, either written or oral. This Agreement
may be amended only by Amendments numbered 1, 2, 3, etc., which are signed by both the Client and
SCI.
5.10.2 It is agreed that if the Client issues a Purchase Order or other document for the Services provided
under this Agreement, such instrument shall be deemed for the Client's internal use only, and any
provisions contained therein which may be in conflict with any terms of this Agreement shall be null and
Page 9 of 10
Client Initials
a
r
5.10.3 void and shall have no effect whatsoever upon this Agreement.
GOVERNING LAW
This Agreement shall be governed by the laws of the Commonwealth of Massachusetts.
THIS AGREEMENT, once executed, shall be effective as of the first date signed below.
Sano-Rubin Construction Services Sustainable Comfort, Inc.
Authorized Signer Albert G. LaValley, President
Date Date
Page 10 of 10
Client Initials
CONSTRUCTION TECHNOLOGY
INSPECTION & TESTING DIVISION, P.D.&T.S., INC.
4 William Street,Ballston Lake,New York 12019
Phone: (518)399-1848 Email: constructiontech@live.com
April 7, 2021 V
ST. PETER'S HEALTH PARTNERS MAY 18 2021
2212 Burdett Avenue, 2°d Floor FILE COPY
Troy,New York 12180 TOWN OF QUEENSBURY
BUILDING&CORS
Att'n: Building Code Enforcement Officials
Re: THE GLEN AT HLLAND MEADOWS MEMORY CARE,QUEENSBURY,NY
Construction Materials Inspection and Testing Services
Greetings,
Per the request, Mr. David Wendth, ST. PETER'S HEALTH PARTNERS,we are pleased to
inform you CONSTRUCTION TECHNOLOGY has been retained to provide the construction
materials inspection and testing services required of the referenced project including but not limited
to:
Soil compaction, structural steel, and portland cement concrete inspection and testing.
As such, we would like a moment to introduce our organization.
CONSTRUCTION TECHNOLOGY is the construction materials inspection division of
Product Development&Technical Services, Inc. Since our 1984 incorporation in New York
State, we have been devoted to providing the highest standards of on time field inspection,
testing and laboratory support to the construction industry. Our desire is a QC/QA involvement
with projects committed to timely completion while satisfying the quality controls and
assurances necessary to support today's strict design criteria.
All too often materials inspections are viewed as a necessary evil or a requirement to be
overlooked. Many times the laboratory brings this attitude on itself because of less than fully z -4 3rQ CO -� N
qualified personnel, tardy response time or uncompromising attitudes of technicians. : 0 3 A a%
n p 0 co
Given the opportunity, we are confident we can provide the services that reflect our strong 3
desire to be an asset to the construction process. @ w
Our facility and field technical force is supported by state of the art test equipment, including o
nuclear soil/asphalt density test equipment, automatic soil moisture/density (Proctor) apparatus, m
CL
temperature/humidity controlled curing environments for concrete specimens, and all other n 3
necessary equipment to satisfy the requirements of the American Society for Testing and
Materials (ASTM) standards C-1077 and E-329 as they relate to a commercial inspection o
agency. N n
CONSTRUCTION TECHNOLOGY has submitted to outside auditingb having n
y g our o
personnel, equipment, facility and quality assurance plan evaluated by the Cement and rn
Concrete Reference Laboratory (CCRL)of the National Standards Institute. A copy of the rn
CCRL/NSI audit and finding is available upon request. L N
April 7,2021
ST.PETER'S HEALTH PARTNERS
Re: THE GLEN AT HILAND MEADOWS MEMORY CARE,QUEENSBURY,NY
Construction Materials Inspection and Testing Services
Our staff ranges from consultant Professional Engineers, hydrologists and geologists to field
technicians and materials inspectors with technical backgrounds of educational degrees and/or
substantiated experience in a construction oriented discipline. Field inspectors also possess a
combination of the following certifications:
* Certification at various levels (AET-I through SET-IV)by the National Institute for
Certification in the Engineering Technologies (NICET).
* American Concrete Institute (ACI) Grade I Concrete Inspector.
* American Concrete Institute(ACI) Certified Concrete Construction Special Inspector.
*North East Transportation Training & Certification Program (NETTCP). Certified Soil and
Aggregate Inspector
* Troxler Nuclear Gauge Training Program for Radiation Safety Officers and Field Operators.
*NYSDoT Certified Asphalt Density Inspector.
* J&L Testing, Inc. Certification Program for Sanitary Landfill Inspectors.
* J&L Testing, Inc. Certification Program for Quality Control and Inspection of Geosynthetic
Systems for Use in Solid and Hazardous Waste Disposal Facilities.
In addition to particular qualifications, field inspectors are familiar with all phases of
construction materials testing and inspection including soils, concrete,reinforcement, masonry,
structural steel, fireproofing and roof installation. This generally alleviates the need and
expense of employing more than one inspector on a particular project.
CONSTRUCTION TECHNOLOGY currently has the capabilities to provide inspection and
testing services relating to many construction concerns including but not limited to: subsurface
drilling and investigation, soils placement and compaction, foundation design
recommendations, portland cement concrete, unit masonry, mortars, grouts, bituminous
concrete, structural steel and fireproofing, as well as all associated laboratory services.
In general, all forms of materials testing and inspection services, as they relate to the
construction industry, may be'obtained through CONSTRUCTION TECHNOLOGY.
We appreciate your interest in our firm and our line of work.
We look forward to completing the construction materials inspection,testing and laboratory
requirements for: ST. PETER'S HEALTH PARTNERS.
If there are any questions, or when we may be of assistance, please contact this office
immediately.
Respectfully,
CONSTRUCTION TECHNOLOGY
Robert Behan, (NICET)
Manager Technical Services
_ FILE COPY
Seismic Design Parameters ASCE 7-16
Project Name: The Glen at Hiland Meadows
Project Number:04516061
Maximum Considered Earthquake Spectral Response Accelerations: Applicable References
0.239 S,,Mapped MCE R spectral responsce acceleration ASCE 7-16 Section 11.4.1-11.4.2
parameter at short periods(g)
0.069 S 1,Mapped MCE R spectral responsce acceleration ASCE 7-16 Section 11.4.1-11.4.2
parameter at a period of 1 s(g)
Site Classification based on Soil Profile Type:
Provided by Geotechnical Report. Without a report,Site Class D shall ASCE 7-16 Section 11.4.3
be used unless the building official or geotechnical data determines Site
Class E or F soils are present at the site.
Site Coefficients and Risk-Targeted MCER Spectral Response Accelerations
E0 Fa,Site Coefficient ASCE 7-16 Table 11.4-1
90 Fv,Site Coefficient. ASCE 7-16 Table 11.4-2
Also,See requirements for site-specific ground motions in Section 11.4.8.
S ms =F o(S S J= 0.382 S., =F„(S 1)= 0.166 ASCE 7-16 Section 11.4.4
Design Spectral Acceleration Parameters
S pS =213 S ms = 0.255 Sol =2/3 S ml = 0.110 ASCE 7-16 Section 11.4.5
Seismic Design Category
I, I I, or I I I Risk Category ASCE 7-16 Table 1.5-1
1.0 I e,Importance Factor ASCE 7-16 Table 1.5-2
Seismic Design Category Seismic Design ASCE 7-16 Table 11.6-1 and 11.6-2
based on S os Category based on S D1
B Seismic Design Category(used for design) ASCE 7-16 Section 11.6
296.8-1-3 CC-0369-2021
The Glen @ Hiland Meadows
Memory Care
48 Longview Dr
New Commercial Bldg 26,061 s.f.
04516061-Seismic Loads.xlsx
Spring Line Design Parameters Worksheet
Snow Load Calculations
Comme'r'.cialFJ�,•
Project Name:The Glen at Hiland
Project Number:04516061
2020 BCNYS Section 1608.1-General.
Design snow loads shall be determined in accordance with Chapter 7 of ASCE/SEI 7-15, but the design roof load
shall not be less than that determined by Section 1607.
2020 BCNYS Section 1608.2-Ground snow loads,P 9 Applicable References
60 psf, Ground snow load, P9 ASCE/SEI 7-16 Section 7.2 or 2020 BCNYS Figure 1608.2
236 ft, Elevation of site above sea level 2020 BCNYS Section 1608.2
60 psf, Corrected Ground snow load, P9 2020 BCNYS Section 1608.2
ASCE/SEI 7-16 Section 7.3-Flat roof snow loads, Pf
B Surface Roughness Category ASCE/SEI 7-16 Section 26.7.2
Partially Exposed Exposure of Roof' ASCE/SEI 7-16 Table 7.3-1
a.Note to Engineer:See comment in cell for definitions
1.0 Exposure Factor, Ce ASCE/SEI 7-16 Table 7.3-1
1.1 Thermal Factor b, C t ASCE/SEI 7-16 Table 7.3-2
b.Note to Engineer:See comment in cell for definitions
II Risk Category of the structure ASCE/SEI 7-16 Table 1.5-1
1.00 Importance Factor, I, ASCE/SEI 7-16 Table 1.5-2
46.20 psf, Flat Roof Snow Load, Pf = 0.7CeCtIsPg (Eq.7.3-1) ASCE/SEI 7-16 Section 7.3
ASCE/SEI 7-16 Section 7.4-Sloped roof snow loads,Ps
6 :12, Roof Slope.
26.57 ]degrees, Roof Angle
Asphalt shingles Roof Surface Material
c.Note to Engineer:See comment in cell
No Slippery roof Surface?
Yes Unobstructed Roof Surface?
d.Note to Engineer:See comment in cell
Cold Is the roof considered warm or cold?(based on Ct) ASCEISEI 7-16 Sections 7.4.1,7.4.2
1.000 Roof Slope Factor, C, 1 ASCE/SEI 7-16 Figure 7.4-1
46.20 psf,Sloped Roof Snow Load e, PS = CSPf (Eq.7.4-1) ASCE/SEI 7-16 Section 7.4
e.Note to Engineer:See comment in cell
P,(perp)= 36.96 psf
ASCE/SEI 7-16 Section 7.3.4 Minimum Snow Load for low-slope roofs,Pm
NA psf, Minimum snow loadf for monoslope, hip, and gable roofs with slopes less than 15 deg.
f.Note to Engineer:See comment in cell ASCE/SEI 7-16 Section 7.3.4
A v w
,j
v Components and Cladding(Simplified Procedure) 0,Y
Project Name:The Glen at Hiland Meadows
Project Number:04516061 1 \ 3
The following Design Procedure is in Accordance with ASCE 7-16,30.4 Part 2-Simplified Procedure i ^
Step 1:Risk Category Applicable Retererces (D
Risk Category ASCE 7.16 Table 15.1 O
\> /33
Step 2:Basic Wind Speed,V sQ <� '
mph,Basic Wind Speed V(for applicable risk category) ASCE 7-16 Figure 265-1 and 26 5.2 � '�� I
Step 3:Wind Load Parameters I o`� s
Exposure Category ASCE 7-16 Section 267 Q j '�O'
:-•a 315"' ft,Building Height(Mean roof height) ,O I 'D
1.00 K,,,Topographic factor evaluated at mean roof height(1.00 assumes flat terrain) ASCE 7-16 Sed.26.8
ft Least Horizontal Dimension j Q (I
1.09 A,Height and Exposure adjustment coefficient ASCE 7-16 Table 30.7.2
>7.to27 degrees,Roof Angle ,
Net Design Wind Pressure,Pnet30(psf) (Exposure Net Design Wind Pressure,Ps(Project specific) ps==AKztPnet30
8ath=30ft with kzt=1.0)
Basic Wind Speed V(mph) Basic Wind Speed V(mph)
Effective Effective
Zone WWA-(.0 110 Zone wmd kea(:O 110
1 10 12.5 -19.9 1 10 13.6 -21.7
1 20 11.4 -19.4 1 20 12.4 -21.1
1 50 10.0 -18.6 n 1 s0 10.9 -20.3
0 1 100 8.9 -18.1 1 100 1 10.0 -19.7
n 2 10 12.5 -34.7 n 2 10 13.6 -37.8
A A
2 20 1 11.4 -31.9 2 20 12.4 -34.8
O 2 50 10.0 -28.2 O 2 50 10.9 -30.7
O O
W 2 100 8.9 -25.5 1 2 IOD 10.0 -27.8
3 10 12.5 -51.3 3 10 13.6 -55.9
3 20 11.4 47.9 3 20 12.4 -52.2
3 150 10.0 -43.5 3 50 10.9 -47.4
3 1 100 8.9 -40.2 3 IOD 10.0 -43.8
4 10 21.8 -23.6 4 10 23.8 -25.7
4 20 20.8 -22.6 4 20 22.7 -24.6
4 50 19.4 -21.3 4 SD 21.1 -23.2
4 100 19.5 -20.4 4 100 20.2 -22.2
4 500 1 16.2 -18.1 M 4 Soo 17.7 -19.7
5 10 21.8 -29.1 5 10 23.8 -31.7
5 20 20.8 -27.2 5 20 1 22.7 -29.6
5 50 19.4 -24.6 5 50 21.1 -26.8
5 100 18.5 -22.6 5 100 20.2 -24.6
5 I SOO 16.2 -18.1 5 500 17.7 -19.7
Roof Overhang Net Design Wind Pressure,P„e (psf) Roof Overhang Net Design Wind Pressure,Ps(Project Specific)
(Exposure B at h=30 ft)
Basic Wind Speed V(mph) Basic Wind Speed V(mph)
Effective Effective
Zone wmd are.(:tl 110 Zone wmdkca(,q 110
2 10 -40.6 2 10 -44.3
N 2 20 -40.6 N 2 20 -44.3
41 2 50 -40.6 +0r 2 50 -44.3
A 2 100 -40.6 A 2 100 -44.3
O 3 10 -68.3 O 3 10 -74.4
O O
cc 3 20 -61.6 3 20 -4431.5
3 50 -52.8 3 50 -62.7
3 100 -46.1 3 100 0.0
Quick Calculation for Length of Endzone(a) Quick Calculation for any Effective Area
66 t Least Horizontal Dimension
36 t Building Height(Mean roof height) sf Effective Wind Area
6.60 fit 10%Least Horizontal Dimension
14.40 t 0.4h Net Design Wind Pressure,Ps
3.00 t 4%Least Horizontal Dimension or ft 13.63 -21.69 psf Zone 1
13.63 -37.82 psf Zone 2
6.60 t Endzone length,a 13.63 -55.92 psf Zone 3
23.76 -25.72 psf Zone 4
23.76 -31.72 psf Zones
Roof Overhang Net Design Wind Pressure,Ps
-44.25 psf Zone 2
0.00 Psf Zone 3
i
1
L Table 30A-1 Steps to Determine C&C Wind Loads for Enclosed
Low-Rise Buildings(Simplified Method)
Step 1:Determine risk category:see Table 1.5-I.
Step 2:Detemtine the basic wind speed,V,for applicable risk category;see
Figs.26.5-1 and 26.5-2.
Step 3:Deiemtine wind load parameters:
• Exposure category B,C.or D:see Section 26,7.
Topographic factor,Ky;see Section 26.8 and rig.26.8-I.
Step 4:Enter figure to detemtine wind pressures at h=30 4,p,,,ato:see
Fig.30.4-I.
Step 5:Enter ligur:to determine adjustment for building height and
exposure.).:see Fig.30.4-I.
Step 6:Determine adjusted wind pressures,pee,:see tsl.(30.4-I).
Wind Loading Analysis(All Heights, Directional Procedure)-MWFRS
Project Name:The Glen at Hiland Meadows
Project Number:04516061
Directional Procedure,ASCE 7-16 Chapter 27 Part 1(applicable to MWFRS of any structure)
Steps following ASCE 7-16 Table 27.2-1 Applicable References
Step 1: Table 1.4-1-Risk Category of Building or Other Structures
11 77 Risk Category ASCE 7-16 Table 1.5-1
Step 2: 26.5-Wind Hazzard Map
110 mph, Basic wind speed(for applicable risk category), V��� ASCE 7-16 Figure 26.5-1 and 26.5-2
Step 3: Wind Load Parameters
0.85 Wind directionality factor,K d ASCE 7-16 Section 26.6 and Table 26.6-1
B Exposure Category ASCE 7-16 Section 26.7
7.0 Terrain Exposure Constant,a ASCE 7-16 Table 26.11-1 1st column
1200 ,Terrain Exposure Constant z 9 ASCE 7-16 Table 26.11-12nd column
1.0 Topographic Factor,KZt ASCE 7-16 Section 25.8 and Table 26.8-1
236.0 ft, Ground Elevation above Sea Level
1.0 Ground Elevation Factor,K e ASCE 7-16 Section 26.9 and Table 26.9-1
0.85 Gust-effect factor, G ASCE 7-16 Section 26.11
Enclosed Buildings Enclosure Classification ASCE 7-16Section 26.12
0.18 Internal Pressure Coefficient, G cpi ASCE 7-16 Section 26.13 and Table 26.13-1
Steps 4,5:
36.00 ft,Mean roof height,h
0.74 Velocity Pressure Coefficent, K h ASCE 7-16 Table 26.10-1
19.27 psf, Velocity pressure, q h qZ = qh = 0.00256KZKZtKdKeV2 ASCE?-16 Eq.26.10-1
Steps 6,7:
The pressures determined are limit state design pressures for strength design.If ASD is to be used,the load factor 0.6W should be applied
Wind Direction A 4
Windward, L(width of e(Width of External Design Wind Pressure,p(psf)
Surface Leeward or building parallel building L/B pressure
Side Wall? to wind) perpendicular to coefficient gGCP ±q(GCpi) p1(-) p2(+)
wind C
1 Windward 275.25 223.00 1.23 0.800 13.102 ±3.47 9.63 16.57
2 Side Wall 275.25 223.00 1.23 -0.700 -11.464 ±3.47 -14.93 -8.00
3 Leeward 275.25 223.00 1.23 -0.453 -7.421 ±3.47 -10.89 -3.95
4 Side Wall 275.25 223.00. 1.23 -0.700 -11.464 ±3.47 -14.93 -8.00
*Note:See ASCE 7-16 Figure 27.4-8 for Design Wind Load Cases to determine net pressure
Wind Direction B
g
Windward, L(width of
e(width of External Design Wind Pressure,p(psf)
Surface Leeward or building building pressure
rf g parallel perpendicular to L/B coefficient qGC ± 2
Side Wall? to wind) a g(GC P) 1' P (-) P +( )
wind C
1 Side Wall 223.00 275.25 0.81 -0.700 -11.464 ±3.47 -14.93 -8.00
2 Windward 223.00 275.25 0.81 0.800 13.102 ±3.47 9.63 16.57
-3 Side Wall 223.00, 275.25 0.81 -0.700 11.464 ±3.47 -14.93 -8.00
4 Leeward 223.00 275.25 0.81 -0.500 -8.189 ±3.47 -11.66 -4.72
*Note:See ASCE 7-16 Figure 27.4-8 for Design Wind Load Cases to determine net pressure
Wind Direction C F
e(width of External Design Wind Pressure,p(psf)
Windward, L(width of g
building pressure
Surface Leeward or building parallel L/B
Side Wall? to wind) Perpendicular to coefficient gGCP ±q(GCP;) p1(-) p2(+)
wind C
1 Leeward, 275.25 223.00 1.23 -0.453 -7.421 ±3.47 -10.89 -3.95
2- Side Wall 275.25- 223.00 1.23 -0.700 -11.464 ±3.47 -14.93 -8.00
3 Windward 275.25 223.00 1.23 0.800 13.102 ±3.47 9.63 16.57
4 Side Wall 275.25 223.00 1.23 -0.700 -11.464 ±3.47 -14.93 -8.00
*Note:See ASCE 7-16 Figure 27.4-8 for Design Wind Load Cases to determine net pressure
Wind Direction D t
Windward, L(width of
e(width of External Design Wind Pressure,p(psf)Surface Leeward or building parallel building L/B pressure
Side Wall? to wind) Perpendicular to coefficient gGCP ±q(GCpi) p1(-) p2(+)
wind C
1 Side Wall 223.00 275.25 0.81 -0.700 -11.464 ±3.47 -14.93 -8.00
2 Leeward 223.00 275.25 0.81 -0.500 -8.189 ±3.47 -11.66 -4.72
3 Side Wall 223.00 275.25 0.81 -0.700 -11.464 ±3.47 -14.93 -8.00
4 Windward 223.00 275.25 0.81 0.800 13.102 ±3.47 9.63 16.57
'Note:See ASCE 7-16 Figure 27.4-8 for Design Wind Load Cases to determine net pressure
GPIEngineering I Design I Planning I Construction Management
April 8, 2021
New Memory Care Residence
The Glen at Hiland Meadows =�FILE ®PY
39 Longview Drive
Queensbury, NY 12804
Re: Roof Drain Calculations
The calculation outlined below applies to the two flat roofs being provided on this project that are located
over the residence wings. Both roof areas are identical in size and have the same adjacent wall areas.
Both roofs are each drained by a single 3" roof drain, with connected 3" storm piping.
Flat Roof Area: 585-ft2
Half of Vertical Wall Area: 331-ft2
Total Draining onto Flat Roof: 916-ft2
Area "A" GPM = Rainfall-Rate (inches/hour) x(conversion factor to GPM/ft2)x Roof Area (ft2)
Area "A" GPM = 3.0-inches/hr x 0.0104 x 916-ft2
Area "A" GPM = 28.58 GPM
3"Vertical/Roof Drain Outlet= 92 GPM (Table 1106.3—2020 NYS PC)
3" Horizontal Storm Drain @ 1/8"/FT= 55 GPM (Table 1106.2—2020 NYS PC)
Check: 28.58 GPM < 55 GPM < 92 GPM
Based on the above calculation and subsequent check, the roof drain and storm leader size being provided
is sufficient based on the tables in Chapter 11 of the 2020 New York State Plumbing Code.
Please don't hesitate to call if you have any further questions.
Respectively Subm' ed,
296.8-1-3 CC-0369-2021
The Glen @ Hiland Meadows
Mernory Care
urt Benedetto Jr, PE 48 Longview Dr
Greenman-Pederson, Inc. New Commercial Bldg
518-898-9509 26,061 s.f.
Greenman-Pedersen, Inc. 80 Wolf Road,Suite 300 Albany,NY 12205 p 518-453-9431
An Equal Opportunity Employer
GPIGreenman-Pedersen, Inc. FILE COPY GPI/Greenman-Pedersen,Inc.
$ Wolf olf Road,Suite 300,Albany,New York,12205
Engineering and Construction Services p-518.453.9431•f-518.453.9458
2020 NYS VENTILATION WORKSHEET
GODEIMINIMUMS CALGUlATEO VALUES DESIGN
Occupant People Rate
Density Area Rate (Rp) Calculated#of CFM
Room/Space Number Area(FT) Classification• (#/1000-fe) (R.)CFM/FTZ CFM/PERSON People Area CFM People CFM Total CFM PROVIDED NOTES
Vestibule 100 - 76 1N/A N/A N/A N/A N/A N/A N/A
..................................._.................................._..._...................................................................................__J........................................................._...._................................,........._....._...._.........._..........._..__...................._.........._......_.._......_.__............,....,,:.........,_............_...._..........._...................................-_-......._....
Entry Lobby 100A i 274 !Main Entry Lobby 10 0.06 ! 5 3 1 16 : 15 31 35
-........_ _._ ............ .....:-_._.__....__._......._...-__._.....__._......__..__...-.......- -._. _._.... ..._.__.._.._....._..t.......__......_......_.............._...._._..__...._ ...._._.;...._.....- ......-_....__..W_--__....._.._.......,. 5
Marketing Office i 100B 120 `Office 5 0.06 i 5 1 7 ' S _... ___ ..............
__.__......._........._.__...._.._..._.......,......__._._.........._..........__._....._.._.__,.._._..___._.__.---._....__.___..__....__... _..__._........>...__.-.
Multi-Purpose ) ....... ......I._._.._- ...._._'.._........._......_......_._..._..._........_............................_............._..._.__._......_.._............_.._................................................ .................................._.................1.........._ ...._..............................._.._.....................,......_........... _... WSW' _.
Storage 1 104A 1 109 :N/A N/A ' N/A 1 N/A I N/A N/A N/A 100 Continuous Exhaust
HK i 105 50 !Janitors Closets(62.1) N/A 1 ' N/A N/A 50 50 - 7,5 .. Continuous Exhaust
_................. ........._..................__.....................__........_........._.._.................._......_................_........._...__....................._...................._..........,...,_............................................................_.........................a...._..........._....................1_...._.........._.....__...._........__..........................................,..,..,.,.:,.,.,_,,.,,.,,.,,...,...................__._......__..........._.._.__._..__...:..._._.
Day Rest 106 214 ',Bedroom/Living 10 0.06 ' 5 2 13 € 10 23 35
...__-.._-_._.__._.__ .___.._.......__-..._._.__ -._._..__..___..__._._...._.__.......:.:... _,,..,._.....__...._.__ -._...-.__.._._-._
Toilet j w 106A 55 'Toilet N/A ( N/A N/A N/A 20 N/A 20 50 Continuous Exhaust
...._...........__........__._....__..._.__ ............._..._.__ _ .. ___....__..........__...._.......__...___......._ .... .....__...........__......._.............................._._.p.............__._.___._....a_..._._....__._.__.........._`.._....____..._._......._._ __.....__._._._.._.........--_......_...........
_
Laundry I 107 158 !Laundry 62.1)
-.._._._...__._;-..__..._......_.......... ry - --....-._10 - ....._._0.12.__._..._;_._.__._5...._...._._...__._..._ ........ ' --19-=-......._...._10..._.._... ._.. 29 ..... 30
Sulte 108 216 'Bedroom/Living 10 € 006 ' 5 2 i 13 10 _ _23 _ 35
__-.__.__-._.._ _.-__...... --- _....... _.---.-_.-._ ...-.---....__-.._..---_.. __...._.__�_..__.._.._._. _ ... _1 _ _ _. _._..._._..--
Bath ! :Bathroom-Private N/A ! 25 N/A N/A 1 25 N/A - - 25 50 Continuous Exhaust
_._....._.._......._........__!........108A........................
g 9,,,,,;,,,,,,,,,_..................._.......................................__._..............
23
Suite 10 . €-638- ..:Bath roomLlPnvate _ -N�A ,- __256 ._-_ -N�A -_._....- .NSA- _.._ ..25 ......_....._N�A__-. _25--- „:... ..
---_.-
Bath 109
t)
A I Continuous Exhaust
.. .. .... . ....
.............__.........._._._....__........_.._:.............._...._........._...__.........__..............._.........___....._.........__....._........._._.__._._. ___._.._.._.. _-_._. __._._.._.._.._._._._,_..____._..._._...__............_....-. __._.... .__ ........._ ..._..._ _... __.. _._. •,rc,;�m:+�'..��. .-....._...._..........__.....__....-_...._._...___._
Suite ` 110 ! 218 :Bedroom/Living _._ -
_._ _-.____-__.........---.----' __.__..._._..__....-._...._. _._g_____._.......___......_ 10 ___._._..0.06._.__._._a __..5______.___._...._... __�____._13 ..... .__._ . 23 35
._
Bathroom-Private - N/A 25 1 N/A N/A ' 25 ' N/A I 25 50 Continuous Exhaust
Bath ' 110A 63
Suite 111 215
:Bedroom Livin 10 0.06 5 2 13 10 23 35
g I_.._........._......._................_.........._...i....._......._......._........._:__.....__.........__...;......_..hi-r-o-•......_..-......_....._......_. ...._....../ 1 ? [
Bath - - -C^ry111A _� 63 1Bathrocm�Private ^- N/A 25 -N/A �N/A_- 25 ......... -N/A 25 -- 50 Continuous Exhaust
Den 113 164 Bedroom/Living 10 i 0.06 ' 5 2 : 10 € 10 : 20 25
-... ,......._._...._......_.......�..._.-_....__..._..._ -._.... ..................._.
Suite 1 114 1 218 'Bedroom/Living 10 0.06 ! 5 _ 2 _: 13 _ _30 _ 23 35
Bath 1 114A 75 ? "u"-'`--13 10 23 35 Continuous Exhaust
-�- r----:Bathroom Private- - - -N A rt> - 25- -e-MN A N/A 1 25__ N/A 25_ 50 ---- -
Suite ' 115 1 222 'Bedroom/Living 10 0.06 5 2 6
_._..._._...._.................._....._._..:_.._......
............__.._...._.-__-........._.._:.......-_.._.._........_...._.............._....._....._..........__........._....._ r __.. _ ......._:.._ ._......_..._........... ....._........ ._._......__._..._................_....._...._.................__......_..._.__........ ................_._............. .._...........................__.........................._..............
Bath ' 115A 1 75 'Bathroom-Private N/A 25 N/A N/A 25 N/A 25 50 Continuous Exhaust
-... _....._.-....__._:--_ -_-_'Bedroom/Livin -_....._.. -- lo.-_ 0.06_.-E_ 5 Z..._-1...._-.13 ._. _ ._.-- __.-._._.._-_ •,.,,,,....
Suite 116 F 222 g i 10 23 35 - --- _----
.................................................................f
............_....................................................................._...................................... `
Bath 116A 1 75 :Bathroom-Private N/A 25 _n- N/A- -N/A- _-25 i-N/A -25 50 Continuous Exhaust
Suite ! 117 218 Bedroom/Living 10 i 0.06 € 5 2 i 13 i 10 1 23 35
Bath 117A 1 75 'Bathroom-Private N/A 25 ! N/A N/A ' 25 N/A 25 50 Continuous Exhaust -
__..._._..._..__._...._........._ ....... .....__..._. ;............................._.._._................ ._....._...._.._.........._...... _... _._ ......
Corridor 103-1 ' 274 Corridor N/A € 0.06 N/A N/A....._ 16......... N/A... _.16..... _...........
<......_............................:................_.............................................................._........_........................_..............................._....................._..................;............._......................................................._...._.............._...._._.............................
.....__....._.......__._.___._:.M.:.....__......._........_......
Corridor ' 103-2 Corridor N/A' 0.06' N/A N/A 41 N/A .41
.......................... .. .
.
676 € i
Activity......... _.i............118..._......._i...._......123 .:Corridor.............._................... 30 0.06 ....... 5............... 4.... .... 7......... .20..... 27..... 150 Zone-9
Sunroom 1 119 84 'Corridor 30 0.06 5 3 - 5 15 20 '
_.............._.....:.........:...................................:....... i 1
HALL i_.._...._124...__._ N„54 'Corridor N/A 0.06 1 N/A N/A 3 N/A 3....
_....._............._ .._.._...e_....._.__..........._--....._.__.._._............._-._...._.... _._...--...__......._..._.._._..__.._.....,.__._........_.._.......... ..__..__.._.__._..__.__..;._._._...._................. ..........._...._......................_:._:...................... _,.:..:,,,....,....__............_........ __........._........._.....
Suite 1 120 1 218 :Bedroom/Living 10 0.06 5 2 13 : 10 23 35
-- - ----- _ -.._ : ....._........
Bath €120A 75 Bathroom-Private NA 25 NA NA 25 NA 25 50 Continuous Exhaust
r............................................................................................_...............................................................................;_................._............_..................._.................._............_............._............._............................................................_'................................_.......... _.
Suite 1 121 1 222 :Bedroom/Living 10 0.06 5 2 1 13 10 ! 23 35 _
-... ....- _._.-._..-._ _.___... _-._..-._....-_.-____...._........_._...__._......_...___. ....._._.
Bath121A 75 'Bathroom-Private N/A ' ................. ---..._............._........._......_....._<... __...__....._.._..._..._....._._._......... ...,,.,.,. ..., ., .,,..._._ ..._............_........_.__..._......._...............
Suite 122 222 ;Bedroom/Living 10 0.06 ' 5 2 !! 13 ' 10 23 35
_......_...._._....___....-.........._.........................---:_. --.......___._..................................._............ ...___..._...._....._...._._.._............._........_>.....__._......._.__...._......_,._......_....._.......__......__......-._._......_......._........1. _..........._......__..__...._..._........._....>_............._........._.......__.....::,. ................................................................
_
BATH 122A 75 'Bathroom-Private N/A 25 _
__....-._.... -_.___..............._.....__.....__.._�_.. __....._..-......:Bedroom Livin__._.__.........._.____.__...io...__._._......__._0.06 _!_..._.._.NSA_-..._._....-..NZA_-...._�-__..._13.__..._-....._.1�0....__.._._'_._.......__23.- _._,.,,, .• 50 Continuous Exhaust
SUITE 123 218 / g 35
_...................................................:.........._...........................;............_......................;............_.................._.............................._.............................................................................._..._._.........................................................................................................................................................................................................I............................................, ., .,.t,,,b. .................................................................._....................
BATH 123A 75 -Bathroom Private N/A ' 25 1 N/A N/A ! 25 1 N/A = 25 s0 Continuous Exhaust
:__.-___ .--_�.N-_.__..---.-_-.— -_ --._ _ _.. _ _ ..._..
STORAGE ; 125 , 42 /A N/A I N/A i N/A N/A 1 N/A N/A ' N/A 50 Continuous Exhaust_-
€ .._
_......._..._._.................................:......................._...........,_............_..._......................................_........................._................................................._............>................................................:..........__............................................_.................................._.............................._.......................................................,._._......__._.........._._.......,... ........ _ .. ..._......_._
TOILETROOM 126 ! 58 Bathroom-Private N/A 25 : .............. __...__...__.........Z .....__................._13..............;.........._.....__to...._.............,_...__._._23 _.....,,..,,.,„3„•..,..,..,.. ........__._. _._._._................._...._..._..__......_....
SUITE127...._.�....._.__215, .............-_..__.._ -._....._..._._.__._._..._.._._..._..-.........._..._._.._...._..... .........
_._........___.._......-._.........._.......-`- ...._..._.._...._..__......... ,. .,.5 .. ...__ __..... --
BATH ' 127A I 63 ;Bathroom-Private N 1 25 N A N A 25 N A 25 50 Continuous Exhaust
€......_....................... ..................................:...................._...................................... ..........�?... .......... /... .. / /
SUITE g ........... . .................._...... ....................... .................. .............1..........
i 128 ! ...218 !Bedroom/Living 10.- .._. _...-0:06--. i. s._ ... 2_...-_4....-_.._13...._...._.€_.___...._10. ..__..._._...__23 JS„
BATH .. .._......_._....€._............... ......._....._.._..............._........._..............._._........_...._.................._....._._...._..........__.........___......__-.........._......................_.._...._................ ......._........._.........'.........._............._....._.f.: .. ..x... :... ..._......_._..____........._.........._.................._.__..._V.
4/8/2021
Prepared By:Curt Benedetto Jr,PE Page 1of3
GPIGPI/Greenman-Pedersen,Inc.
Greenman-Pedersen, Inc. 80 Wolf Road,Suite 300,Albany,New York,12205
Engineering and Construction Services p-518.453.9431<f-518.453.9458
2020 NYS VENTILATION WORKSHEET
GO[IE MINIMUMS CALCULATED VALUES UESIG_N
Occupant People Rate
Density Area Rate (Rp). Calculated#of CFM �
Room/Space Number' Area(FT2) Classification'` (#/1000-ft2) (R.)CFM/FT' CFM/PERSON People Area CFM Peo le CFM Total CFM PROVIDED NOTES
SUITE 129 218 Bedroom/Living 10 € 0.06 : 5 2 13 10 23 3S
.................................. t €
_.._.........._........._......._............_....;...................._....._._......................_. _ ...... _. ....... ....... ........ ........ _........ _ .....
BATH 129A ;Bathroom-Private N/A i 25 N/A... .......... ......N/A... 25 N/A 25..... 5,.,,.,,,.,,.,.,..........._......... _..._.. ....................
__...........___.._.......____...__......:-..._..._.............____.__.._..._fi3_. : 0 Continuous Exhaust
i ..._..._ _._.._..............._.._..._....._.._........._.-.........._........._........__...____....._......._._.__.<....__..............................._
CORRIDOR 103 E 628 ;Corridor N/A 0.06 N/fi N/A 38:'. N/A .38 _.._..._.._._._.._....._._.._..__...._..._........
..........._............................._......._....._................._....._...................................._............_._.............._....._......_............_......_.._...:............._.................................i.........................................._............._..:_...........................:.._.._......._...............__.......•;...._.._...__........_....._.........--_........_...._......................_
ACTIVITY : 130 t 79 :Corridor 30 i 0.06 5 2 5 10 15 Zone s !.. : 150 Zo 19
_......i..._.............................,..............._............................_......._.._.................................................................i..........................._......................._...._...............................................__.._.............._........._._....._................................_._......................................................._............................ ..._._.................._.............
room
ng
ACTIVITY 131 275 E _._..._...-_....-..._-a.__�_.._.� _s,_-_......-.---_--
CONFERENCE = 132 184 ;ConfeenceRoom 50 0.06 5 9 11 45 56 `
-.................................................._........._.........._,.........................._........................................................._............._............._..............................................................................._._.............._......___....................._................................._........_............._._....._....._._.._......._.._._.........._.....__........,.,,,,,,.,,..,._�,,,,....,_,.,,.,,......................._......._._........_._..... _ ....._...__..
TOILET ROOM ! T133 55 :Bathroom-Private N/A € 25 N/A N/A 25 N/A 25 50 Continuous Exhaust
_.._..._......_._......__......_....._.__.,. ....................._-_-_. _ ._.... . .......- _ _.._
Lobby 101 € 582 :Main Entry Lobby 10 ? 0.06 5 "6 35- 30_.. .fi5..__;._ __..-....................................._.._._ ...........
....._...................................................._......................................:......................_............._..................................................._........................................_..............................._........_....................._........................................._................................................................... .. .. .
Corridor 101A : 792 :Corridor N/A i 0.06 : N/A N/A 4s..-...,._., ........_...N/A.._...... 48...........
............................................:_................_..._..__...........................................................,........................................................................................_....................................,............................................._.,..................................................................................................,......................................„........................................_..............................:.............. Zone-45
Corridor 101B 519 :Corridor N/A 0.06 N/A N/A 31 N/A 31
_._.,.._.__._........-. _.._.:,_. a..._-_......................__...__.._-_......._..................._....__........................................... _..... _.......... _........... _._......... ............_
PORCH 134 178 :Bedroom/Living 10__ 0.06 5... 2.. 11._. _. 10- - 21 785 Zone-46
...................................................................................................................._........................_........................................................................................................................;....................................................,...........................................................................................................................................i.................._.................:.........:............................................
DINING ROOM 135 i 1068 € Estimated Seating N/A 0.06 5 50 64 250. 314
................... ... ..._. .......... ._....._. ._.._._. .._...._ ...._ _.... __ one 56 "
_._..........-._._...._ _ .....__. ............................_...._..__.._......_.E....................Esti._....._._...... -
-58
SERVERY 136A 204 : Estimated Occupancy N/A 0:06 i 5 4 12.-_ -20 32 n E
o e
.....................................E. ....._...._........................_.,............................._................_.............__............._...._._._._....___.__.............._..._.............._.........................<...........__.........................._.............__...._...._....._........._._.._.. ._.......................;........:-._.............__....._.....t.........._..--..._._.......
PORCH .................... __-.- - _._..._._........__._..............._._._.....__._....._._...___._.._......._>__......._....._......__...._._.._..<......_...__......._......_.__.................__..._--....._..._._........._..._-...._...:..._...._......----._.........._._...:__..i._:._....._..._........_._.............,.. ,.,.,,,........._...................
...._.............
..........
_...._....
.......
..
325
12
.....___....... _1 .._-�.__....._-.._..___'Kitchener_........_._._....,.._.. __._____20_..._._....._`-_.._.._.._�...... ____.__.ems__ ..._..____ � _._., _.39___........__._._._52.5_._.._..__ -_915 ........ 29 MAU-1
RECEPTION i 137 134 Office 5 0.06 : 5 1 : 8 5 € 13 00"' "" - --__._...._....._ __...__._..._....
_........................................:.,..........................................;.........................................................................,......,.......................:............................................................_.,.......,,.,..,.........................,...................,...................................................................................,..................,,..............,,......,,........,..,...................,.._.:.........................._........... Zone
HALL' - _ € 146B- j 373 'Office 5 0.06 i 5 2.. : 22 [ 10 32' 85 ne 47
OFFICE....... ......_._... 13 ..... _. ............._......_.... ..._._...... ......._... .. ........ ...... ._..-- ...._....... - .... __.._... ..............._............_.__...._ _.._...._....
' .:Office 5 0.06 "-5_ .o._ _-5...;...-_ __O._ 5.._
......................_._._..............._......................._............._......._........_._.......;.......... .
_.....................................................:_...._,............._...0................... _...
5 € 0:06 5 1- 6 5..._... ill....._...._. one 48
CASE MAN. 139 108 _Office'
BREAK ROOM : 140 I 211 :Break Room(62.1) 25 0.06 5 5 i 13 : 25 : 38 75 _
MECH.ROOM 141 451
E
NA NA NA A NA N NA NA NA 100 C/ / / Continuous Exhaust
STAGING i 142 1 265 :Corridor N/A 0.06 i N/A N/A 16 : N/A : 16 100
- --.—.—_-E _ _-.-- _ - -_-.... ... .,_- -----
DRYSTORAGE.......................1...... 142C_............_5fi._......N/A.....--.........._..._.....__.... N/A : N/A N/A N/A N/A : N/A i N/A N/A _
__...... _- - _._._._......_.....:...........__......................................_....__........._....................»......._............_.__......._:._..._.._..._.. ..._._......__.........._....__................_._.......... .
JANITOR i 143 : 61 :Janitors Closets(62.1) N/A 1 N/A N/A i 61 N/A 61 75 Continuous Exhaust STAFF TOILET 144 53 :Bathroom-Private N/A 25 _.-.-._._.__....N/A_...... ._........._._...N/A... .._...?.. -25-- i N/A._.._....--._.._....-25 _.....:.......50.,.....,,,....._...._-..._.............. __._....--
_......-_..__-____......�....___.-_.�......_.._....._.. -.-.--_, Continuous Exhaust
MEDS : 147 : 133 ;Office 5 0.06 5 1 8 5 € 13 25 ----- -- —
__......_._......... •......__...._._._..._.......:...._.............. ._.,_.._.....__..__........_............_..._......_._.......__._......._..........._.._.._........>_...._...._._.....__......_...._..,..._..........__.........................................._.........................._..__.,._.........._..._......_...._..w__......-.-.____..............,.............................................. .,,...,.._. .....................__....................................................._...............
IT 148 1 167 :N/A N/A : N/A € N/A N/A : N/A N/A N/A N/A _
_......-.... ___.-.._._.. ....._.._._.__.__-...._...__._._- ..__.....--.-.--..._.__._..______.. __ -,_.._.__. _. ._._._ ... .-_.;__......-....
SHARED OFFICE 149 100 :Office 5 i 0.06 € 5 1 : 6 t 5 11 ---- -
..............................................................:.......................................................................................__.._......................................................._..........................._..................;..............:.................................,..................................................................................................,......................................................................._......_......_:..................1.................. 51
EXAM : 151 i 123 :Office 5 0.06 5 1 7 5 12 Zone
__..._...__.._......._..._.................... _._.__.;......_.....__..........._......_....._..... _........_......__-..................__...._.. ?..._..__...__......._..._.._.._._......._.._.. --..._..- ._r...... _ ..._._._......._._._....._.......__.:_..:............_.__..............._....... .. ....... ... ._....._....
i -
ST AGE OR 152 , 45 aN/A N/A N/A E N/A N/A I N/A N/A N/A 50 Continuous Exhaust
SPA € 153 119 :Beauty Salon 25 0.012 : 20 3 . 1 : 60 61 150 -
.............................__......_...................._..,_........._.........__....:.._......._...____............_....._............................._....._..__................-.._......_.._................._.._..,......................_..._................_..._......._..............__.._...___.........__.........._........._...__......__........__.._......._,.._...._.........___........_.........:..........................._......._._ ,n,„c,�.�..,�..,.,
BATHING/SHOWER 153A 115 :Shower Rooms(62.1) N/A 20 N/A N/A : 20 N/A _ 20 100 Continuous Exhaust
TOILET ROOM : 153B : 54 ;Bathroom-Private N/A 25 N/A N/A 25 i N/A 25 -. So Continuous Exhaust
........._............................................................_._........._...............r..__......._......_.............,.............................................._........................................_................._.........................._............._........................................._..._.._..._....._.._.._.......___._...._......._t_...__.._..._...__..........;__........_............_......_......_r_........_._......._..._......_ ,,..:.;,._....___......._.._.......__.....____.__....__.._..._._.
LAUNDRY 154 ! 158 iLaundry(62.1) 10 0.12 5 2 t 19 10 29 30
.-..__.._-.__..---__...._<._.__. __._.. _.-_.._.:.____._._..........___._-......----....---•-___._......_ E
SUITE mm i 155 210 ;Bedroom/Living 10 0.06 : 5 2 I 13 10 35
. ._................._............._.._............ ..... ........... ...............
......
......!Bathroom ......_..,_.__......_..25_...__...........................N/A_. .__._.. ..._N/A... ....).. ...z5..... _N/A.. -...._ ..._25.... „,5 ..__ ...... _..__.._.........
_....._3__._..._......__.._............_..........._................_._............_._..._......_............................__.._......._.._._._.... ....._......_............_............._........_.. ._._........_..................__...__....................................................._.......__. Exhaust
SUITE 156 218 :Bedroom/Living 10 0.06 5 2 13 10 23 35
BATH 156A . ...............................................
SUITE 157 218 :Bedroom/Living 10 0.06 5 2 13 10 23 35
BATH ..._..__...................._....._...........157A,W_......_._.__63 Bathroom-Private N A 25_ N A N A E 25 : N A -'25�- S0
_. _... _...........__....__......_--...._.._.___....._....._-..............__.....__....___. Continuous Exhaust
SUITE158 216 `Bedroom/Living 10 ......_0.06 -..._.'-........_........5_..__. ............_...._..._2_.._.__.._.....f.................13............__..........._......10..................,..................23_......__....,. 35.,.,,,.,,...._.........._........._.........................__....._..._ ....._.
___.._ ........_ ....._.._.._._..............._r...._.._.__._......._..._.;._.._........_....._......._...._..._..........._.._._.........._................._.....__.... _..._..........__................................................................_......................................__..._....................__.._.............................._................................_:..._........................................,. ........_. ... ......._.._......
BATH 158A 63 :Bathroom-.Private N/A : 25 N/A N/A 25 ( N/A : 25 50
- Continuous Exhaust
-__.-_. _......._. ..... _.__.._-_ .___...___._._._.__.__...___..__._ —_.-,___-_......._.._.___.....___...__._......._._._._. _....___._. ....._..._.......-_....... _................._._._.__._......._....-._..._.....__.._.......,. .
BE i 160 163 :Bedroom/Living............................ 10 I..............._ :06.................i......................5....................................................................................10._.........._a..................._10....................................._2�....................,, ,:..Zr',,,.,.,,................................................_......................_................
.
...................... ....
SUITE 161 174 Bedroom/Living 10 € 0.06 5 2 10 ! 10 € 20 35 _ _ _
BATH 161A 75 :Bathroom-Private N/A 25 : N/A N/A 25 N/A 25 50 Continuous Exhaust
...I........_...._............. ...... ........_ .._._. .._ _......_.._........_.........................._...._._...._......_._.........._._'--'-...._.._._.....__._..—._._....__....----...__._....___.._......_.....__.........._._...._._._.=__..._.._.___.__.._..'.........................._.........._._............_.....____...... M.._..... ._.r_.__..__..................._.........._.........__........—_....
..._..
4/8/2021
Prepared By:Curt Benedetto Jr,PE Page 2of3
GPIGPI/Greenman-Pedersen,Inc.
Greenman-Pedersen, Inc. 80 Wolf Road,Suite 300,Albany,New York,12205
Engineering and Construction Services p-518.453.9431-f-518.453.9458
2020 NYS VENTILATION WORKSHEET
CODE MINIMUMS fALCULATED VALUES MDESNGN
Occupant People Rate
Density Area Rate (Rp) , Calculated#of CFM
Room/Space Number Area(FTC) Classification (#/1000-ft') (R.)CFM/Ff CFM/PERSON People Area CFM People CFM Total CFM PROVIDED NOTES
SUITE € 162 E 222 ;Bedroom/Living 10 i 0.06 5 2 j 13 1 10 23 35........_...._.................................................3......-..._..._......._...._.<......_................_.........._......_................_....................._.............................._._._.......__...__.........._.........._....__.._................................__.._................_......-"-'-..._......__......._......._........._.........."'7__............................................_.........................._.._.........;...,.,�.�,...F�...,�.�,,,,.,,.•„......_......._._........._.................._............................
BATH 162A 75 'Bathroom-Private N/A i 25 N/A N/A 25 N/A 25 50 Continuous Exhaust
-�.. -------
163 f 222 Bedroom/Living 10 I 0.06 ; 5 2 13 ; 10 3 23 95
BATH . _....-.............._
........_...._............._._........__................._...__..........._.._..........:_......_................................_;._........_..........................._....................__........_.....-_._...__......_._..._........_...._........-_............._......................._._.._............._..........•,•, .,,,, ,,.,,,. ....................._..............................._........_......................
SUITE ` 164 218 ;Bedroom/Livin_g_ 10 0.06 5 2 € 13 € 10 € 23 35
:Bathroom
,Bathroom-Private - N/A 25 N/A N/A -r...--25___.. _ N/A___-.: .....__25_ __ .............. _....__..._---- .--...._......
BATH 164A 75
Continuous Exhaust€ SQ
CORRIDOR 159 950 . :Corridor N/A € 0.06 N/A N/A... 57.. .... N/A m.............57.... ...
.__.......-..........................-....--..............._......._........................_..._.................._.......,...-....-......_........................._............___........._._.............._....................__....._...._......._._._......._..................._.................................-........._.._..__..........._...._....._..._.._,:....._....._..........................._.................._......'-'i--.............._....................... -
ACTIVITY. ............ __. ..........,..............._................_..........._.........._................__.................................................._...................................................................._..................._.._:_............_.........._..........:....._................_.............._....__......................................................................_....
SUNROOM _ 166 ; 84 :Corridor 30 0.06 5 3 . 5 15 20 Zone 28.
...............-. _. ...................... _. ._.._......._....:............................................_. ':
1so
:............._.....
HALL. 171 3' 52• Corridor N/A. 0.06 N/A_........... N/A..............._E................3.._.,.... N/A....._.. _.....,..3........
. . ....... ........
..........:......._..............-.........._......_................._.........._..................._............_............__.........__......................_...... _ ........ ......... ........ ......... _
_ .Bathroom-Private N A _ 25 N/A N/A... .....a_...............25.......... ....._.....N A.._....... ......._...25......._ 50„,.,:..,._....._.._..._...._....---._...............
__..._.._-_.
BATH 167A 75 _
/ ? _/ �_ Continuous Exhaust
............................ . Bedroom/Living -_ -10 - - 0.06- 5-_ -z---...- ...._._13 10 - 23
SUITE 168 221 1
;Bathroom-Private N/A _ 25_ N/A N/A 25 N/A 25- 5S
4.=..
BATH €..... 168A--[...-75_.-._-_—.. .rival.._..-_._ -- us Ex
e
_ _. Continuous Exhaust
SUITE ? 169 i 222 iBedroom/Living ---10 -0.06 -- - 5 2 3 13 10 € 23 35 _ __'
__...._..._.._._.....--- _-._- a-_._._._...__._.__._..._._._. ___......_......_.._--- __ _____ .__.--•--_._.-----..-.--- _._.-_-__.,..__-_----
BATH 169A 1 75 :Bathroom-Private N/A 25 N/A N/A i 25 N/A -25 50 Continuous Exhaust
_......._......}.._.........................................__........_..............:.............................._...,.............................-._...................................................:...._............................................................................._................................................._....-.......................__.............I..................................._._......_........._..............................,,,,,,,,., .,.,...,.,.,.,,,,...................................._...._..................................._.......
SUITE 170 E 175 Bathroom-Private N/A - -25 _ N/A N/A —25 -€ N/A 25 - 50
- bedroom/Ervin 10 6.06 5 _ 2 _ 1 _ _
BATH 170A 75 g ........-___. -_._ __..,.___.......... 21 35„
_.._._._. __._..._. _.........:_..........___-..___;....._._.-_. .............__...-..__.........---. _.__._.__._...........---,_... I Continuous Exhaust
STORAGE 172 43 iN/A l N/A N/A N/A N/A N/A 50 Continuous Exhaust
_.-.._.__ ._..- T-__�------
TOILET ROOM € 173 I 58 :Toilet N/A N/A I N/A N/A 1 20 N/A 20 50 Continuous Exhaust
-_._._...._.- __._.._
SUITE ! 174 216 ;Bedroom/Living 10 : 0.06 5 2 13 10 23 35
_...._.__.._._. _..._._...._.._...._...._...-.................................................._............................................................_......-.._.........................-.......................e_.................. _........_...............-....................._......................................................__........................._........................................... _......_........_...._..................................._...................
BATH i 174A -63 ;Bathroom-Private _ N/A 25 N/A N/A 25 ! N/A_ ;_ 25 50 Continuous Exhaust
SUITE ; 175 217 :Bedroom/Living 10 1 0.06 5 2 - -
13 i 10 23 35
..................... .. ._..._..._.... _........_........�.... _ ........._.__........... ..........__....._._.......__......_.._._..-_.._.-_................_._.............._................_!.............._.._....._......._........-.........___......_.....__....__...........................__............;._......._..._....._.....................,._.............._..._...._..__....;
__....__ .....-.__•:Bedroom/Living_._.___.._...__..__ ..___._.. ._----0.06_..._... .._.._.-..5_..- N/A 25___._...:.-..---.13 .__ O__.-.._........_...__.23_... Continuous Exhaust
10
BATH 176A i 638 Bathroom-Private N/A 25 . N/ACORRIDOR, .
159 626 Corridor N/A i 0.06 N/A N/A i gg N/A.,.......... 38...... _......
_...._..._.__...................._......._._..._....-.._..._._._.....- ..._,.<....._...._... _......_............_......_._._........._........._....._._..._.._........... ........ _...... _..._. ..._--.--- ........ ._.. _................. _... __._. _._.__..
ACTIVITY 177 € 79 :Corridor 30 € 0.06 5 2 5 10 15 - Zone
-- 150 Zo 38
......................................_..............................-........._...._..............._.......................................................t_..,._......................_......_._....................._.........................................................................................................................
..................................
ACTIVITY i 178 1.__.._270-;Bedroom/Living - 10 0.06 1 5 3 16 15 31 5p
_.._.. -�-- -l- ---�_.—... _.. _._._.._...........--...._.. ...._..__........) _
TOILE__._......-___.....___...-__..._._.___-• ;Toilet__......._..._...._ N A N A I N A N A i 20 N/A 20
T ROOM € ...._ _..... _..__.............._................... _.__....__.. _,._._._._... -......_..._.......__._._.._._.- ...__......---._...0 -........ -
- _ -- ! 179 � 56 50 Continuous Exhaust
EXTERIOR STORAGE [ 181 j 94 iN/A N/A ..._..._.>......--_...N/A._..................-.........N/A
..............._..........__._N/A
_....................__.N/A
_...........,__..........N/A......_...._:_..____.N/A_. _..... ... N/A.....- - _ --...._....__ ._...___
4/8/2021
Prepared By:Curt Benedetto Jr,PE Page 3of3
John O'Brien
From: Scott Hawkins<shawkins@sanorubin.com>
Sent: Wednesday,June 16,2021 11:10 AM
To: John O'Brien
Cc: Kate Deck;Wendth,David;"Stephen Kelvin"
Subject: Permit-The Glen at Hiland Meadows Memory Care
Attachments: FW:Memory Care
John,
The Balancing Contractor on The Glen at Hiland Meadows Memory Care project shall be:
Northeastern Air Quality, inc.
730 Third Street
Albany, NY 12206 ���� �®��
Contact: Robert Kelley
Phone: 518-857-3641
The Commissioning Agent for the Memory Care Project shall be:
Mark Cambria,PE,CCP,LEED AP
Fusion Systems Engineeping OPC
1475 Western Ave#38141
Albany,NY 12203
Ph:518-621-0533 x101
Fx:518-621-0513
M:518-645-6373
www.fusionsystemseng.com
It is our understanding that the Fire Marshall's comments regarding the issues with the existing Building Fire Alarm
System at the ILU buildings are being resolved by The Glen at Hiland Meadows—Nick Norton and his Fire Alarm Service
Contractor, Davis Ulmer.The system revisions will be retested by Davis Ulmer and witnessed by Michael Palmer when
the modifications are complete. I have attached a copy an email from Mike Palmer addressing this situation.
Please advise if you need any additional information.
ri Scott Hawkins, LEED AP BD+C Project Executive/Senior Project Manager
{� P 518-462-6471 x227
C 518-857-7860
F 518-462-6866
Sano-Rubi11 ® %131 5a
Construction Services '~
IMPACTING LIVES THROUGH OUR DEVOTION TO AN EXCEPTIONAL BUILDING EXPERIENCE
This electronic message,including any attachments,is intended to be for the sole use of the individual or entity named herein and may contain certain privileged and/or confidential information,If you are
not the intended recipient,be aware that any disclosure,copying,alteration,distribution or use of the contents is strictly prohibited If you have received this electronic transmission in error,please notify
the sender immediately and delete the transmission in its entirety.Thank you.
pE � E0VE
EN2021
TOWN OF QUEi NN1 _B RIY
BUIi_D'NO U'ES
1