Loading...
Signed Inspection Report (Thu Dec 29, 2022 at 845 AM)INSPECTION WORKSHEET (BINS-022923-2022) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0237-2022 Case Module:Permit Inspection Date:Wed Dec 28, 2022 Inspection Status:Partial Pass Inspector:Dyer, Charles Inspection Type:Building Insulation Job Address:Parcel Number:27 SILVER CIR Queensbury, NY, 12804 309.17-1-17.2 Contact Type Company Name Name Granted Permission 27 Silver Circle LLC Architect Rucinski-Hall Architecture Primary Owner 27 Silver Circle LLC Contractor JAG I, LLC Applicant 27 Silver Circle LLC Checklist Item Status Permit Card Visible From Road Failed 15 min thermal barrier/intumescent paint applied - to open spray foam Failed Dec 28, 2022 Page (1) INSPECTION WORKSHEET (BINS-022923-2022) Checklist Item Status Building Inspector Notes Failed 10/5/22 partial approval for insulation -roof insulation at the east end of the east building, the first 10' verified, R 25 with a second layer of R 11 installed in the opposite direction. 10/5/22 partial approval for insulation - insulation completed to first I beam, R 25 with R 11 Provide an updated com check for the change in R value at the roof. 10/6/22 partial approval for insulation -insulation completed half way to second roof beam, R 25 with R 11 10/6/22 partial approval for insulation - insulation completed approximately 8' past second I beam from east end of building. R 25 with R 11. Contractor to provide updated COM check for change in R value of roof insulation. 10/7/22 partial approval for insulation -insulation completed to third I beam from east end of building R 25 with R 11 10/11/22 partial approval for insulation - roof insulation completed to sixth I beam from east end of building, R 25 with R 11 10/12/22 partial approval for insulation - roof insulation at building east of loading dock completed, R 25 with R 11 10/24/22 partial approval for insulation -insulation at loading dock, the first 12' verified, working east to west. 10/25/22 partial approval for insulation - roof above loading dock 2/3 completed, R 25 with R 11 10/27/22 partial approval for insulation - insulation at loading dock roof completed, insulation at west warehouse completed approximately 8' out from loading dock 11/1/22 partial approval for insulation - roof insulation at west warehouse completed to fifth I beam from east end. R 25 with R 11 11/2/22 partial approval for insulation - roof insulation completed partially at last bay R 25 with R 11 11/3/22 partial approval for insulation -roof insulation completed, R25 with R 11. Contractor to provide updated Com check 12/19/22 partial approval for insulation Dec 28, 2022 Page (2) INSPECTION WORKSHEET (BINS-022923-2022) Checklist Item Status Insulation at west warehouse, north wall only approved R 30 verified at north wall. 12/19/22 partial approval for insulation R 30 insulation at west warehouse, south wall verified. Insulation under bow & bay window(s)Failed Window Sealing Failed U Factors = .3 cfm for windows, .5 cfm for doors Failed Tyvek or Similar Exterior Sealant Failed Proper Vent, Attic Vent Failed Insulation Residential Check Commercial Check Passed 12/28/22 verified insulation at west end and north overhead's R 30 / verified east building overhead walls of R 30. Duct work sealed properly / No duct tape Failed Blower Door Test Failed Combustion Air Supply for Furnace Failed Fresh air supply 3' from grade Failed Duct Insulation - if required in unheated spaces Failed Dec 28, 2022 Page (3) INSPECTION WORKSHEET (BINS-022923-2022) Checklist Item Status Door / Window Sealed (No Insulation)Failed Air Sealing all Joints Before Insulation Failed Air Seal all Plates and Sills Failed Duct Testing Outside Conditioned Space Failed Air Seal All Registers at Floor Failed Exterior wall outlets sealed Failed Air Seal Outside Penetrations Failed Tub Shower R-20 with Vapor Barrier Failed Air Barrier behind Knee Walls Failed All Ductwork Sealed Return and Supply Failed Duct Blaster Test for duct work, R-8, unhtd spaces Failed Dec 28, 2022 Page (4) INSPECTION WORKSHEET (BINS-022923-2022) Checklist Item Status All Return Air Hard Duct Work Failed House Wrap Taped at all Seams Failed Dec 28, 2022 Page (5) Dyer, Charles