Final As Built Plan Stamped Survey Plan-Hardware WQL.
Office Use Only
ADDITION/ALTERATION.PERMIT Permit#:.: CAPPLICATIONPTo
. Permit Fee $. .
742:Bay Road,Queensbu_M NY 12804 Invoice#: G
P:518-761-8256. www:aueensburv.net
y�
1
Flood Zone? Y Reviewed By..
Project'Location: 43 Everts.Avenue Q V
D _
.Tax Map ID#: 302.12A645 Subdivision Na MAY. Z:O .ZO22
TOWN OF.QUEENSBURY
•
BUILDING& CODES
PROJECT INFORMATION:
TYPE: Residential X Commercial, Proposed Use:
Single-Family :: _Two-Family.-.. Multi. (#of-units . . ) . - Townhouse.
Business.Office Retail . X -Industrial/Warehouse. Garage of cars_)
Other.(describe .
ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE:
.1st floor: 3.000 1st floor:. : . . ..
2
"d floor::: 2nd floor:,
.
3rd floor: V floor:. . ,:
Basement(habitable space): ': Basement (habitable space):
Totals ft 3000: Total s q.. q ft:. .
A.
.Scope of-work to be'-done- Pre=engineered building storage addition.50'x60'.
-Addition/Alteration Application' Revised January 2021
ADDITIONAL,PROJECT INFORMATION:
1. Estimated Cost of.Construction:$ 220;000
I Source of:Heat (circle one): X .Gas : . .. Oil Propane Solar . Other
Fireplaces/inserts need a separate:Fuel Burning Appliances, &.Chimney.Application
3. Are there any structures not shown onthe.plot plan?. ._YES X NO Explain:::
4. Are.there:any.easements:on the property? _YES X- :NO.
SITE INFORMATION:
• Is:this a corner lot? : YES X-NO:
Will the'grade'be changed as a.result of the construction? YES.. X .NO.
0 What.is the:water sourceT X-PUBLIC: . :. : PRIVATE WELL
.� : What type,of wastewater.system.is on the.pa.rcel? X . SEWER __ PRIVATE SEPTIC
DECLARATION:
i. 1 acknowledge that rio.construction shall be-commenced prior to the issuance of a valid permit.and will be
completed within a-12 month:period..Any changes to the approved plans prior to/during construction will require
.
....the submittal.of amended.plans,additional reviews.and re=approval..
2. If,for any reason,the building permit application is withdrawn,30%of the:fee is retained-by the Town of
Queensbury-After 1 yearfrom the initial application date, 100%ofthe.fee is.retained:
3. :if the work is:not:completed by the:1 year: expiration -date:the permit rnay. be renewed, subject.to fees
and department approval. ..'
4.::I certify that the application,'plans,and supporting.materials area true and a complete statement and/or.descfl' ion
ofthe Work:proposed.-that all work will be performed in accordance with the NYS.Building Codes,.local building.laws
and ordinances; and in conformance.With local "zoning regulations:
5. I' acknowledge that prior to. occupying the.facilities.proposed I; or,my agents, will obtain a .certificate of
.occupancy., . . .
6. :I also understand that I/we are required to provide an as-built survey:by a licensed land surveyor.ofall.newly
constructed:facilities prior to issuance of acertificate.ofoccupancy:
have.read and agree to the.above: .
PRINT NAME::: . :Tim Barber.
SIGNATURE:: 2DATE:. 5/20/22 . .. ..
Addition/Alteration Application Revised January 2021.
CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN. EMAIL
"Applicant::. . .
JAG I LLC
Mailing Ad.dress;:C/s/Z:_ 8-Blue Lupine Lane,Wilton:NY"12831
Cell Phone:
) Land:Line: 518 - ) 812-0808
Email:_ .timWa99roupllc:com
Primary:Owner(s): .
Name(s): Fenssgen.Hardware
Mailin Address "C S Z 43 everts.Ave Queensbury.NY 12804
Cell_Phone.: :(. ) Land-Line::
Email: mattna henssgenhaidware.com
0. Check if:all work will be performed:by.property owner.or�ly.
�. Contractor(s): (List all additional.contractors onthe back of."this,form)
Contact.Names) JAG I LLG
Contractor.Trade: : General coritractor "
Mailing Address;"C/S/Z:. 8 Blue Lupine Lane, Wilton NY 12831
Cell:Phone:
._) Land. Line: 518 :.) 812=0808"
: Email:."
** .
Workers' Comp documdritation must be.subm-fitted with this application**:
• "-Architect(s)/En�ineer(s):
BusinessName :_MRH.en4ineerin4 P:C:" -
Contact:Name s : Michael Hutsenpiller.P.E.
Mai ing Address,C/S/Z:' ._Bay"berry drive Que'ensbury'NY"12804
Cell Phone:
( ) hand.Line.: 518.: ) 7924042
Email:. mrhengiaaiol.com.
Contact"Person.foe Compliance,in regard's to_this project Tim barber. .
Cell Phone: ( 5.10 ) :361=1254 Land Line:".' . 518: ) 812=0808 x-8
Email:_. aim iaaoiouallc.com
Addition/Alteration Application' .
Revised January.2021 .
FIRE MARSHAL'S OFFICE
Town of Queensburyj
742 Bay Road, Queensburyy, NY 12804
"Horne of Natural Beauty ... A Good Place to Live "
PLAN REVIEW
Henssgen Hardware
43 Everts Avenue
CC-0309- 2022 FILE CO PY
6/2/2022
New Warehouse
The following comments are based on review of drawings:
• Verify fire extinguisher location, Fire extinguishers will be install as required and verified on walkthrough.
• Verify storage at time of CO walk through No storage racking to be installed.
• Exit and Emergency lighting will be verified, including exterior emergency
lighting. All breakers clearly marked for function test of the fixtures. will comply.
• Carbon Monoxide detection required Detectors will be installed. No resubmittal required per Mike P.
• Locks /latches on egress doors to be compliant with Chapter 10 of the IFC.
Key locks and thumb turns are not accepted. Lever locks will be used to comply with this.
• Knox Box needs to be provided, with an entry key for FD access Knox box will be ordered
and installed.
Michael J Palmer
Fire Marshal
742 Bay Road
Queensbury NY 12804
firemarshal@queensbury.net
Fi r e M a r s It a I 's Off i c e • P It o it e: 518-761-8206 • F a s: 518-745-4437
flrerttarshal@gueensbitni.net - 7MMqueensbunlmet
I
Project Job Ref.
ANY Teklao I T eddy Henssgen Hardware-17'76"Eave Metal Building 22-07
Section Sheet no./rev..
MRH Engineering, P.C. .
Design Calculations
20 Bayberry Drive 1:
Queensbury,New York Calc.by Date Chk'd:by' . Date App'd by Date..
12804 MRH 1/1722. . MRH 1/1722 MRH 1/1722 . :
Fourdation Design
•
Code Load Combineations (ASD) _ Ic
L5
1. Dead+Coll-+ Live
2. . Dead.+Coll+.Show
MAY 2 0 2022
I Dead+Coll'+.75Snow+.45Wind
4. Dead+Coll+.75Snow-..45Wind W{�I OF QUEEN BURY.
5. Dead+Coll_+.75Snow+.53EQ TOBUILDING&CODF8
6. Dead+Coll+'.75Snow-.53EQ
7: :6Dead+.Coll+.:6Wind
8. :6Dead_+Coll--.6Wnd
9: . ..6Dead+Coll+.7EQ
FILE
10 :6Dead+Coll-.7EQ
Foundation A/Al Design (See.Nucor foundation.load,printout at Col Line A/1,A/3 and foundation plan drawing)
1. Dead:+Coll+Live=; 1+ 1 +2=4.000;kips
2. Dead:+Coll+Snow=;.1-+.1 +3=5.000; kips
3. Dead+Coll+.75Snow+::45Wind 1 +_1 +.75,*,3+.45*-3 2.900; kips.
4: ,Dead+:Coll:+..75Snow--.45Wind=; 1 + 1 +:.751*3-.45*-3 5:600- kips Governs
5. :Dead:+Coll+.75Snow+.53EQ=; 1 + 1:+:75'*3+.53*'0.:=4;250;.kips
6. bead+Coll+'.75Snow-.53EQ 1 +1 +.75*3-.53*0. =4.250; kips
7. .6(Dead+Coll)+'.6Wnd=; .6«(1+ 1)'+.6*.-3 . 0:600;'.kips
.8.- ;.6(Dead+Coll)-.6Wind:=;:6`(1.+ 1)-.6*.-3. =3.000;kips;:
9.. .6(Dead+Coll)+:7EQ=; .6*(1 + 1):+:7*0 =.:1.200;kips . .
10. '.6(Dead+Coll):-.7EQ=; .6".(1 +.l)-:.7*-0 =.1.200;kips -
Load has.a net uplift:The weight of:the.footer, pier and soil over the footer,will be dsed.to resist the uplift.The total footer and
soil weight is=.footer.weight+pier Weight+soil weight
3:33*3.0:*1.0*A5.+1:33* 1.17*3.5*.15+(3.33*3:00.-1.33*1.17)*3.5*.110=5.563; kips>.-.600kips
OK
Foundation'B/B1 Design .(See Nucor foundation load printout:at Col Line A/2 arid D/.2.and foundation plan drawing).
1. 'Dead:+Coll 4-'Live=; 5+5+ 12=22.000;:kips .
2. . :Dead.+Coll+Snow=;5+5+30=40.000; kips
3. Dead+Coll+.75Snow+ .45Wind=; 5+5+.75*30+.45*_=19 23.950;kips
4. Dead+Coll+.:75Snow=.45Wind=;.5+5+.75*,30-..4.5*=.19 =:41.050;kips.Governs
5. -Dead:+.Coll+..75Snow+.53EQ=; '5'+5+.75-*.30+:53*1 =33.030;kips- . . .
.6.; . Dead:+Coll+.75Snow:-.53EQ=;.5.+54.75*30+:53*-1 =31.970; kips
7.. .6(Dead+Coll)+:.6Wind=; .6*.(5+5)+..6*-19.'_-5.400; kips.
8. ..6(Dead+Coll)-..6Wind=; .6" (5+5).-.6*-19 =17.400;kips
9.„ .6(Dead+.Coll)+.7EQ .6*.(5-+5)+.7* 1 =6.700;kips
10 .6(Dead+.Coll)-.7EQ=; .6*(5+5),-.7*1 =5.300; kips
302.12-1-45 CC-0309-2022
Henssgen Hardware
43 Everts Ave.
Commercial Addition - Storage Bldg.
Project Job Ref.
.�
TeklamTedds Henssgen Hardware- -6"Eave Metal Building 22-07
MRH Engineering; P.C. Section Sheet no./rev.
zo Bayberry Drive Design:Calculations 2:
Queensbury,New York- .: Calc.by. Date Cfik'd.by Date App'd by Date..
12ao4 MRH 1/1722. MRH 1/1722 MRH 1/1722
Load 7 has:a net uplift.The weight of the footer;:pier.and soil over the.footer will:be used to resist the uplift.The total footer and
soil weight is=footer weight+pier weight•+:soil weight
4:00*.4.00* 1.0*.15+1.17.*_1.33*3.5*-_15+.(4.0*4.0-.1.17* 1.33)*3.5*.:110=9.778-kips>5.46 kips . .
OK
Foundation C/C1 Design-.(See Nuoor.foundation load printout at Col 13/.1;C/1, B/3 and/3 and foundation plan drawing)
1. Roof Dead+.Coll+Live=;2+2+6=10.000;kips
2. . Roof Dead+Coll+Snow=;2+2+.1.0=:14.000;kips
3: Dead+•Coll+.75Snow+.45Wind=;:2+2+.75.*10+.45*-1.0:=7.000; kips
4: Dead+Coll+.75Snow =.45Wnd=;2+2+:75 10 -:45*.-io =,.16.600; kips Governs
5: Dead+Coll+.75Snow+.53EQ=;.2+2+ .75*10,+:53* 1..=12.030;kips
6. Dead+.Coll+.75Snow- ':53EQ 24 2+.75* 10.+:53*.-1 =:10.970; kips.
7. 6(Dead+Coll)+.6W nd._; .6.*. (2+,2):+.6*-10 -3.600; kips
8. : ..6(Dead+Coll)_.6Wrid:=; .6*(2+.2)-.6*-10. 8:400;kips
9: :6(D'ead+Coll)+:7EQ=;:6,*•(2+2):+.7*:T =3..100; kips.
.10. :6(Dead+Coll)-.7EQ .6*(2:+2)-:7.* 1.=1.700;:kips
Foundation D 7 D1 Design (Use.the same loads as Foundation A/A1)
Hairpin Deslari at Column Linen/D
Horizontal load=_Dead+Coll.+:Snow=;3+3+.17=23.600; kips .
Use 1 did. hairpins. Hairpin tension load;'23/.(2-*.707)_16.266;kips
Allowable#8 hairpin tension load .79*24 18.960;kips>:16.266 kips•OK
' Page 1/2
Concrete Footing Design
Job: Jag-Henssgen Hardware Designed By: MRH JR
Description: Fdn AM Checked By:
Time: 9:07 PM 1/17/2022 Program: Spread Footing Design 0.2 Code:ACI 2008
SOIL DATA CONCRETE DATA COLUMN DATA
Max. Vert Press. = 3.000 K /Ft ^2 Flo = 3.000 K /In ^2 Fla = 3.000 K /In ^2
Max. Flexural Press. = 3.000 K /Ft ^2 Density = 150.000 Lb/Ft ^3 X Dim. = 16.000 In
Density = 110.000 Lb/Ft ^3 Fy = 60.000 K /In ^2 Z Dim. = 14.000 In
Phi Angle = 30.000 Deg X Offset = 0.000 Ft
Coeff. of Friction = 0.330 Z Offset = 0.000 Ft
Cohesion = 0.000 Lb/Ft ^2 SURCHARGE DATA
Ftg. Depth = 4.500 Ft +X,+Z Quadrant = 0.000 K /Ft ^2
FS Uplift = 1.500 +X,-Z Quadrant = 0.000 K /Ft ^2 BASE PLATE DATA
FS Overturning = 1.500 -X,-Z Quadrant = 0.000 K /Ft ^2 X Dim. = 0.000 In
FS Sliding = 1.500 -X,+Z Quadrant = 0.000 K /Ft ^2 Z Dim. = 0.000 In
C 0 L U M N L 0 A D D E S C R I P T I O N S
COLUMN LOAD DESCRIPTION
1 Al/A3
L 0 A D C 0 M B I N A T I 0 N S
LOAD COMBINATION DESCRIPTION
1 1.4D
2 1.2D + 1.61, + 0.5R
3 1.2D + L + 1.6R
4 1.2D + 0.6W + 1.6R
5 1.2D + L + 1.6W + 0.5R
6 1.2D + L + 1.4E + 0.2R
7 0.9D + 1.6W
8 0.9D + 1.4E
9 1.2D - 0.8W + 1.6R
10 1.2D + L - 1.6W + 0.5R
11 1.2D + L - 1.4E + 0.2R
12 0.9D - 1.6W
13 0.9D - 1.4E
U N F A C T O R E D L O A D S I N P U T
COLUMN LOAD No. 1 DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOF LOAD
Vertical = -2.000 K' 0.000 K 0.000 K 0.000 K -4.000 K
Moment X = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K
Moment Z = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K
Horizontal X = 0.000 K
Z = 0.000 K
F O O T I N G 0 U T P U T
FOOTING CHECK SHEAR STRESSES (ONE WAY) SHEAR STRESSES (TWO WAY)
X Dimension = 3.330 Ft +X Area = 0.002 K /In ^2 +X Area = 0.006 K /In ^2
Z Dimension = 3.000 Ft -X Area = 0.002 K /In ^2 -X Area = 0.006 K /In ^2
Thickness = 12.000 In +Z Area = 0.001 K /In ^2 +Z Area = 0.006 K /In ^2
Max. Press. = 0.641 K /Ft ^2 -Z Area = 0.001 K /In ^2 -Z Area = 0.006 K /In ^2
Allow. = 0.082 K /In ^2 Allow. = 0.164 K /In ^2
Max. Pressure Governing Column = 1, Combination = 2
Footing is Adequate
BOTTOM STEEL DESIGN (Parallel to X Axis) BOTTOM STEEL DESIGN (Parallel to Z Axis)
Governing Column = Temp/Shrink Minimum Governing Column = Temp/Shrink Minimum
Moment (+X Area) = 1.317 Ft-K Moment (+Z Area) = 1.232 Ft-K
(-X Area) = 1.317 Ft-K (-Z Area) = 1.232 Ft-K
Steel Required = 0.778 In^2 (Min) Steel Required = 0.863 In^2 (Min)
C:22HardwareA 1/17/2022
s Page 2/2
Dist. to Centroid = 3.000 In Dist. to Centroid = 3.000 In
Typical Spacings Typical Spacings
8 #3 Bars at 4.286 In. Centers (Anchor) 8 #3 Bars at 4.851 In. Centers (Anchor)
4 #4 Bars at 10.000 In. Centers (Anchor) 5 #4 Bars at 8.490 In. Centers (Anchor)
3 #5 Bars at 15.000 In. Centers (Anchor) 3 #5 Bars at 16.980 In. Centers (Anchor)
Steel Distribution in the Short Dim. is Governed by ACI 15.4.4.2 and Spacings Should be Modified Accordingly.
QUANTITIES 14.831 Lbs of Steel'and 9.990 Ft^3 of Concrete.
C:22HardwareA 1/17/2022
Page 1/2
Concrete Footing Design
Job: Jag Hennsgen Hardware Designed By: NIM JR
Description: Fdn B/B1 Checked By:
Time: 8:54 PM 1/17/2022 Program: Spread Footing Design 0.2 Code:ACI 2008
SOIL DATA CONCRETE DATA COLUMN DATA
Max. Vert Press. = 3.000 K /Ft ^2 PIC = 3.000 K /In ^2 F'c = 3.000 K /In ^2
Max. Flexural Press. = 3.000 K /Ft ^2 Density = 150.000 Lb/Ft ^3 X Dim. = 12.000 In
Density = 110.000 Lb/Ft ^3 Fy = 60.000 K /In ^2 Z Dim. = 24.000 In
Phi Angle = 30.000 Deg X Offset = 0.000 Ft
Coeff. of Friction = 0.330 Z Offset = 0.000 Ft
Cohesion = 0.000 Lb/Ft ^2 SURCHARGE DATA
Ftg. Depth = 4.500 Ft +X,+Z Quadrant = 0.000 K /Ft ^2
FS Uplift = 1.500 +X,-Z Quadrant = 0.000 K /Ft ^2 BASE PLATE DATA
FS Overturning = 1.500 -X,-Z Quadrant = 0.000 K /Ft ^2 X Dim. = 0.000 In
FS Sliding = 1.500 -X,+Z Quadrant = 0.000 K /Ft ^2 Z Dim. = 0.000 In
C O L U M N L O A D D E S C R I P T I O N S
COLUMN LOAD DESCRIPTION
1 Dead + Collateral + Snow
LOAD COMBINATIONS
LOAD COMBINATION DESCRIPTION
1 1.4D
2 1.2D + 1.6L + 0.5R
3 1.2D + L + 1.6R
4 1.2D + 0.8W + 1.6R
5 1.2D + L + 1.6W + 0.5R
6 1.2D + L + 1.4E + 0.2R
7 0.9D + 1.6W
8 0.9D + 1.4E
9 1.2D - O.8W + 1.6R
10 1.2D + L - 1.6W + 0.5R
it 1.2D + L - 1.4E + 0.2R
12 0.9D - 1.6W
13 0.9D - 1.4E
U N F A C T O R E D L O A D S I N P U T
COLUMN LOAD No. 1 DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOF LOAD
Vertical = -10.000 K 0.000 K 0.000 K 0.000 K -30.000 K
Moment X = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K
Moment Z = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K
Horizontal X = 0.000 K
Z = 0.000 K
F O O T I N G O U T P U T
FOOTING CHECK SHEAR STRESSES (ONE WAY) SHEAR STRESSES (TWO WAY)
X Dimension = 4.000 Ft +X Area = 0.026 K /In ^2 +X Area = 0.043 K /In ^2
Z Dimension = 4.000 Ft -X Area = 0.026 K /In ^2 -X Area = 0.043 K /In ^2
Thickness = 12.000 In +Z Area = 0.009 K /In ^2 +Z Area = 0.043 K /In ^2
Max. Press. = 2.540 K /Ft ^2 -Z Area = 0.009 K /In ^2 -Z Area = 0.043 K /In ^2
Allow. = 0.082 K /In ^2 Allow. = 0.164 K /In ^2
Max. Pressure Governing Column = 1, Combination = 2
Footing is Adequate
BOTTOM STEEL DESIGN (Parallel to X Axis) BOTTOM STEEL DESIGN (Parallel to Z Axis)
Governing Column = Temp/Shrink Minimum Governing Column = Temp/Shrink Minimum
Moment (+X Area) = 16.875 Ft-K Moment (+Z Area) = 7.500 Ft-K
(-X Area) = 16.875 Ft-K (-Z Area) = 7.500 Ft-K
Steel Required = 1.037 In^2 (Min) Steel Required = 1.037 In^2 (Min)
C:22HardwareB 1/17/2022
' Page 2/2
Dist. to Centroid = 3.000 In Dist. to Centroid = 3.000 In
Typical Spacings Typical Spacings
10 #3 Bars at 4.667 In. Centers 10 #3 Bars at 4.667 In. Centers
6 #4 Bars at 8.400 In. Centers 6 #4 Bars at 8.400 In. Centers (Anchor)
4 #5 Bars at 14.000 In. Centers 4 #5 Bars at 14.000 In. Centers (Anchor)
QUANTITIES 24.696 Lbs of Steel and 16.000 Ft^3 of Concrete.
C:22HardwareB 1/17/2022
Page 1/2
Concrete Footing Design
Job: Jag-Henssgen Hardware Designed By: MRH JR
Description: Footing Design C/Cl Checked By:
Time: 9:24 PM 1/17/2022 Program: Spread Footing Design v3.2 Code:ACI 2008
SOIL DATA CONCRETE DATA COLUMN DATA
Max. Vert Press. = 3.000 K /Ft ^2 Flo = 3.000 K /In ^2 Flo = 3.000 K /In ^2
Max. Flexural Press. = 3.000 K /Ft ^2 Density = 150.000 Lb/Ft ^3 X Dim. = 17.000 In
Density = 110.000 Lb/Ft ^3 Fy = 60.000 K /In ^2 Z Dim. = 14.000 In
Phi Angle = 30.000 Deg X Offset = 0.000 Ft
Coeff. of Friction = 0.330 Z Offset = 0.000 Ft
Cohesion = 0.000 Lb/Ft ^2 SURCHARGE DATA
Ftg. Depth = 4.500 Ft +X,+Z Quadrant = 0.000 K /Ft ^2
FS Uplift = 1.500 +X,-Z Quadrant = 0.000 K /Ft ^2 BASE PLATE DATA
FS Overturning = 1.500 -X,-Z Quadrant = 0.000 K /Ft ^2 X Dim. = 0.000 In
FS Sliding = 1.500 -X,+Z Quadrant = 0.000 K /Ft ^2 Z Dim. = 0.000 In
C O L U M N L O A D D E S C R I P T I O N S
COLUMN LOAD DESCRIPTION
1 Dead + Snow
LOAD COMBINATIONS
LOAD COMBINATION DESCRIPTION
1 1.4D
2 1.2D + 1.61, + 0.5R
3 1.2D + L + 1.6R
4 1.2D + 0.8W + 1.6R
5 1.2D + L + 1.6W + 0.5R
6 1.2D + L + 1.4E + 0.2R
7 0.9D + 1.6W
8 0.9D + 1.4E
9 1.2D - O.SW + 1.6R
10 1.2D + L - 1.6W + 0.5R
11 1.2D + L - 1.4E + 0.2R
12 0.9D - 1.6W
13 0.9D - 1.4E
U N F A C T O R E D L O A D S I N P U T
COLUMN LOAD No. 1 DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOF LOAD
Vertical = -4.000 K 0.000 K 0.000 K 0.000 K -10.000 K
Moment X = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K
Moment Z = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K
Horizontal X = 0.000 K
Z = 0.000 K
F O O T I N G O U T P U T
FOOTING CHECK SHEAR STRESSES (ONE WAY) SHEAR STRESSES (TWO WAY)
X Dimension = 3.330 Ft +X Area = 0.004 K /In ^2 +X Area = 0.014 K /In ^2
Z Dimension = 3.000 Ft -X Area = 0.004 K /In ^2 -X Area = 0.014 K /In ^2
Thickness = 12.000 In +Z Area = 0.003 K /In ^2 +Z Area = 0.014 K /In ^2
Max. Press. = 1.441 K /Ft ^2 -Z Area = 0.003 K /In ^2 -Z Area = 0.014 K /In ^2
Allow. = 0.082 K /In ^2 Allow. = 0.164 K /In ^2
Max. Pressure Governing Column = 1, Combination = 2
Footing is Adequate
BOTTOM STEEL DESIGN (Parallel to X Axis) BOTTOM STEEL DESIGN (Parallel to Z Axis)
Governing Column = Temp/Shrink Minimum Governing Column = Temp/Shrink Minimum
Moment (+X Area) = 2.858 Ft-K Moment (+Z Area) = 2.913 Ft-K
(-X Area) = 2.858 Ft-K (-Z Area) = 2.913 Ft-K
Steel Required = 0.778 In^2 (Min) Steel Required = 0.863 In^2 (Min)
C:22HardwareC-Cl 1/17/2022
Page 2/2
Dist. to Centroid = 3.000 In Dist. to Centroid = 3.000 In
Typical Spacings Typical Spacings
8 #3 Bars at 4.286 In. Centers (Anchor) 8 #3 Bars at 4.851 In. Centers (Anchor)
4 #4 Bars at 10.000 In. Centers (Anchor) 5 #4 Bars at 8.490 In. Centers (Anchor)
3 #5 Bars at 15.000 In. Centers (Anchor) 3 #5 Bars at 16.980 In. Centers (Anchor)
Steel Distribution in the Short Dim. is Governed by ACI 15.4.4.2 and Spacings Should be Modified Accordingly.
QUANTITIES 14.831 Lbs of Steel and 9.990 Ft^3 of Concrete.
C:22HardwareC-Cl 1/17/2022
Page 1/2
Concrete Footing Design
Job: Jag-Henssgen Hardware Designed By: MRH JR
Description: Fdn D Checked By:
Time: 9:36 PM 1/17/2022 Program: Spread Footing Design v3.2 Code:ACI 2008
SOIL DATA CONCRETE DATA COLUMN DATA
Max. Vert Press. = 3.000 K /Ft ^2 F'C = 3.000 K /In ^2 F'c = 3.000 K /In ^2
Max. Flexural Press. = 3.000 K /Ft ^2 Density = 150.000 Lb/Ft ^3 X Dim. = 16.000 In
Density = 110.000 Lb/Ft ^3 Fy = 60.000 K /In ^2 Z Dim. = 15.000 In
Phi Angle = 30.000 Deg X Offset = 0.000 Ft
Coeff. of Friction = 0.330 Z Offset = 0.000 Ft
Cohesion = 0.000 Lb/Ft "2 SURCHARGE DATA
Ftg. Depth = 4.500 Ft +X,+Z Quadrant = 0.000 K /Ft ^2
FS Uplift = 1.500 +X,-Z Quadrant = 0.000 K /Ft ^2 BASE PLATE DATA
FS Overturning = 1.500 -X,-Z Quadrant = 0.000 K /Ft ^2 X Dim. = 0.000 In
FS Sliding = 1.500 -X,+Z Quadrant = 0.000 K /Ft ^2 Z Dim. = 0.000 In
C O L U M N L O A D D E S C R I P T I O N S
COLUMN LOAD DESCRIPTION
1 Dead + Snow
LOAD COMBINATIONS
LOAD COMBINATION DESCRIPTION
1 1.4D
2 1.2D + 1.61, + 0.5R
3 1.2D + L + 1.6R
4 1.2D + O.8W + 1.6R
5 1.2D + L + 1.6W + O.5R
6 1.2D + L + 1.4E + 0.2R
7 0.9D + 1.6W
8 0.9D + 1.4E
9 1.2D - O.8W + 1.6R
10 1.2D + L - 1.6W + 0.5R
11 1.2D + L - 1.4E + 0.2R
12 0.9D - 1.6W
13 0.9D - 1.4E
UNFACTORED LOADS INPUT
COLUMN LOAD No. 1 DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOF LOAD
Vertical = -2.000 K 0.000 K 0.000 K 0.000 K -3.000 K
Moment X = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K
Moment Z = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K
Horizontal X = 0.000 K
Z = 0.000 K
F O O T I N G O U T P U T
FOOTING CHECK SHEAR STRESSES (ONE WAY) SHEAR STRESSES (TWO WAY)
X Dimension = 3.330 Ft +X Area = 0.001 K /In ^2 +X Area = 0.005 K /In ^2
Z Dimension = 3.330 Ft -X Area = 0.001 K /In ^2 -X Area = 0.005 K /In ^2
Thickness = 12.000 In +Z Area = 0.002 K /In ^2 +Z Area = 0.005 K /In ^2
Max. Press. = 0.491 K /Ft ^2 -Z Area = 0.002 K /In ^2 -Z Area = 0.005 K /In ^2
Allow. = 0.082 K /In ^2 Allow. = 0.164 K /In ^2
Max. Pressure Governing Column = 1, Combination = 2
Footing is Adequate
BOTTOM STEEL DESIGN (Parallel to X Axis) BOTTOM STEEL DESIGN (Parallel to Z Axis)
Governing Column = Temp/Shrink Minimum Governing Column = Temp/Shrink Minimum
Moment (+X Area) = 1.077 Ft-K Moment (+Z Area) = 1.169 Ft-K
(-X Area) = 1.077 Ft-K (-Z Area) = 1.169 Ft-K
Steel Required = 0.863 In^2 (Min) Steel Required = 0.863 In^2 (Min)
C:22HardwareD 1/17/2022
' Page 2/2
Dist. to Centroid = 3.000 In Dist. to Centroid = 3.000 In
Typical Spacings Typical Spacings
8 #3 Bars at 4.851 In. Centers (Anchor) 8 #3 Bars at 4.851 In. Centers
5 #4 Bars at 8.490 In. Centers (Anchor) 5 #4 Bars at 8.490 In. Centers (Anchor)
3 #5 Bars at 16.980 in. Centers (Anchor) 3 #5 Bars at 16.980 In. Centers (Anchor)
QUANTITIES 16.624 Ibs of Steel and 11.089 Ft^3 of Concrete.
C:22HardwareD 1/17/2022
COMcheck Software Version" 4.1.5.3 '
Envelope. -Cormp ian. Certificate
Project Information D .E C E 0 V -E
Energy:Code: 2018 IECC
Project.Title: Henssgen Hardware " MAY 2.0 2022
Location: Glens Falls;:New York' . : •
Climate Zone:. : 6a
TOWN OF QUEENSBURY
Project.TYpe; Addition BUILDING &CODES
Vertical Glazing/Wall-Area: 8%,
REVIEWED FOR
construction Site:. : --ENERGY � QMPLIANCE Des�gnericontraotor:.:
43.Everts:Avenue
g6eensbury, NY 12804
Building Area . : Floor Area
1-Wareh6use:'Nonresidential. 3000
Envelope Assembliesopy
LbFyt
Asse Gross Area: Cavity Cont. Proposed : Budget U-
' or R-Value' .R-Value - actor , . Factor�a>
Perimeter
Roof 1:Other Metal:Building Roof,[Bldg.Use.1 -Warehouse].(b) 3000 =- 6.035 0.0 f
Floor 1:Slab-OrnGrade:Unheated,.Vertical 4 ft:,[Bldg.Use.1-. 170 - 10.0 0.480 0.540
Warehouse],(c)
EAST.
Exterior Wall.1:Other Metal Building Wall,[Bldg:Use.1 904 - -- 0.052- - 0.052
',Warehouse],(b : . ..
Door 1:Insulated Metal;Garage door 14%glazing,[Bldg:Use:1-. 100 - —. 0.210 0.310
Warehouse]
Door 2:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1. 100 — == 0..210 0:310
Warehouse]. . . _
Door4:Insulated,Metal,Swinging,[Bldg..Use 1-Warehouse] 21 =° .:, — 0.140. . 0.370
SOUTH:
Exterior Wall 3:Other Metal BuildingWall; Bld Use.1:-.
[ 9 0.052 .
Warehouse](b)
D I e Me aI Swin in Bld :Use:1 -Warehouse z I :+ —_Door 3: nsulat d t g .g;[ g ] `•2 :" 0.140 0.370
r-
"Exterior Wall 2:Other Metal Building.Wall,[Bldg.Use'1_- :1125 -- 0.052 0.052
Warehouse](b)
(a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements.
(b)-'Other:coinponents require supporting documentation for -factors.
(c)-Slab-On-Grade proposed and budget U-factors shown in table are.
F-factors.
302.12-1-45 CC-0309-2022
Henssgen Hardware
43 Everts Ave.
Commercial Addition - Storage Bldg.
Project Title: Henssgen Hardware Report date: 03/28%22
Data filename: C:\Users\Larry\Documents\COMcheck\henssgen.cck Page_ 1 of 10
op ' ' better than code
Envelope.Compliance Statement
Compliance Statement: The proposed envelope design represented.in this document is consistent with the building.plans,.
.,specifications, and other.talcUlations.submitted.with:this permit application.The proposed envelope systems have been
designed to meet,the 2018 IECC requirements in COMcheck Version 4.1.5.3 and to comply with any applicable mandatory
.requirements listed in the Inspection Checklist:: .
Name-Title Signature Date.
Project Title: Henssgen Hardware . Report date: 03/28/22
Data filename:. C:\Users\Larry\Documents\COMcheck\henssgen.cck Page. .2 of 10
CO.Mcheck Software Version 4 J.5.3
-
Inspection ec ist - .
Energy Code: 2018:IECC.
Requirements:.0.0%o were addressed directly in the-COMch-eck software
Text in the ''Corrlments/Assumptions":column i•s provided by the user in.the COMcheck Requirements screen..For each
requirement;the:user.certifies that a.code requiremerit will be met and how that isAdcumented, or that:an exception
is being claimed._Where compliance is itemized,in a 'separate table, a reference to that table is provided. .
Section
# Plan Review- Complies? Comments/Assumptions
& Req.ID
C103:2 ;Plans and/or specifications provide all .;❑Complies•
[PR1]l. . iinformation with-which compliance:. ❑Does Not'.:-
can be determined for the building: _ IDN,ot Observable;
envelope and document where.
exceptions to the standard are ❑Not Applicable.
;claimed.
C402.4.1 .;The vertical fenestration area<= 30 ❑Complies, .
[PR10]l i percent of the gross above-grade wall �❑Does Not
urea.. .
❑Not Obseniable
I❑Not Applicable:.;
C402A.1 The skylight area <_3.percent of the .I❑Complies-
[PR1111 gross roof area: UDoes NoY...
I
E]Not Observable;.
: .;❑Not Applicable
C406:: {Plans;specifications;and/or ;❑Complies
[PR9]1 . calculations provide all information ❑Does Not .
with which compliance can be.; INNof Observa ble'
determined for the additional energy, ..
efficiency package options: I❑Not Applicable
Additional Comments/Assumptions:'
1 High Impact(Ties•1) 2 Medium Impact(Tier 2) 3 Low Impact
Peojectjitle: Henssgen Hardware Report date:- 03/28/22 .
Data filenarm, C:\Users\Larry\Documents\COMcheck\henssgen.cck Page. 3 of 10
Section
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
C303.2 'Slab edge insulation installed per.w El Complies
[F04] manufacturer.'s mstcuctions._I. : :❑Does Not.
❑Not Observable_;
I❑Not Applicable-.;.
C303:2.1 Exterior insulation protected against ;❑Complies
[1706]1 ':damage,sunlight, moisture,wind; ❑hoes Not,'
;landscaping.and equipment
'❑Not Observable
;maintenance activities.
:❑Not.Applicable, ;.
C105 I Installed slab-on-grade insulation.type,;❑Corplies. J,See the Envelope Assemblies table for values.
[F03]2 `and,R-value.consistent.with insulation ❑Does Not
;specificat'ionsreported in:planssand : . : -
COMcheck.reports. 1❑.Not Observable,
I ;ONot Applicable
C402.2.4 ;Slab edge insulation depth/length. ❑Complies See the Envelope Assemblies table for values.
[F07]2 iSlab insulation extending awa from I❑ I.
Y Does Not
!building is covered by pavement or
pNot Observable
>=.10 inches of soil.. .
:❑Not Applicable .I.
121�42 ,Radiant heating systems panels ;❑Complies ;See,the EnvelopeAssernblies table for.values.9insulated.'to>=R-3:5 on face o ❑ o� PRosite l Des Notspace being.heated. :❑Not Observable
; ❑Not Applicable..;
Additional Comments/Assumptions:
:1. Hi h.lm act Ti&1 p g p ( ) 2 Medium Im act(Tier 2) 3 Low Impact
Project Title: Henssgen Hardware Report date: 03/28/22
Data filename: C:\Users\Larry\Documents\COMcheck\henssgen.cck. Page 4 of 10
Section
# Framing/Rough-In Inspection Complies? Comments/Assumptions
& RegAD
C303.1.3 Fenestration products rated in ❑Complies
[FR12]2 accordance:with NFRC.; ,0Does Not
[]Not Observable Observable ..
1❑Not Applicable.
C303.1:3 Fenestration products are certified as ❑Complies
[FR13j1 (to performance labels.or certificates 10Does Not
provided. I
,❑Not Observable,
❑Not Applicable..:
C402.4.3.. Vertical fenestration.SH.GC.value. ❑Complies. ;See the Envelope Assemblies table for values.
[FR1011 ❑Does Not.
U e,. .
Not Observabl
�. . 1E1Not Applicable
C402.4.31 Vertical fenestration U-Factor: ElComplies ;See the Envelope Assemblies table forvalues.
C402.4.3. 1❑Does Not
I-. .
4:
[FR8]1 . i❑Not Observable: .
1❑Not Applicable 1
�
C402.4.4 U-factor of opaque doors associated : ;❑Complies (Seethe Envelope Assemblies table for values. .
[FR14]1 (with the building thermal envelope I
,Does Not I.
I meets requiremerits.
;❑Not Observable; :
I . 1�.Not Applicable 1: .
Vestibules are installed oh•all building ❑Complies. ;
[FR17]3 entrances. Doors have self-closing ❑Does.Not 1
devices.
zi. . i❑Not Observable 1.
- r 1❑Not Applicable 1.
•Additional Comments/Assumptions,
,1 High.lmpact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Henssgen Hardware Report date: 03/28/22
Data filename: C:\Users\Larry\Documents\COMcheck\henssgen.cck Page _ 5 of 10
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
tC402.5.5 r�Stair and elevator shaft vents have ;Elcomplies
C�40 lmototized dampers that automatically iODoes Not.
close; Refernece section C4033.7 for .
IpNot Observable.:
[ME3+]3'.��'•;;ioperaEional details. •
m. :E N able..;
of Applic
Additional Comments/Assumptions:.
1 High.lmpact(Tier l) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project.Title: Henssgen Hardware Report date: 03/28/22
Data filename: C:\Users\Larry\Documents\COMcheck\henssgen.cck Page_ - 6 of •10
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
&Req.ID
C405.6 Low-voltage dry-type distribution jElcornplies.
[EL26]2 I electric transformers meet the ❑Does Not.
Iminimum efficiency requirements of ;
,Table C405.6.
,❑Not Observable,
❑Not,APPlicable..
C405.7 Electric rhotors.meet the rhini,mum ❑Complies
[EL27]2 efficiency.requirements:of Tables _ ❑Does Not. .
C405,7(1)through C405:7(4).. :
IEfficiency'verified through certification;ONot Observable;under an approved certification jE1Nqt Applicable
program or the equipment.efficiency ;.
ratings shall be provided by motor
Imanufacturer(where certification. I
;programs do not exist);. +
C405.8.2, Escalators.and moving walks comply. ❑complies
C405.8.2. .with ASME A17.1/CSA B44 and have.; ❑Does Not
1 automatic.controls configured to..
[EL28]2 reduce speed to the minimum I❑Not Observable
ipermitted.speed in accordance with ONot Applicable -
IASME A17.,1/CSA B44 or applicable"
local code when not conveying
passengers.
C405.9 :Total voltage drop across the ;❑Complies ;
[EL29]2 !'combination of feeders and branch. E
,Does Not.'.
circuits < . 5%: 'I❑Not Observable.;:
❑Not Applicable
Additional.Comments/Assumptions:
I.'I HighArnpact(Tier 1) 2 Medium Impact(Tier?) 3 Low Impact(Tier -
Project.Title: Henssgen Hardware Report date:. 03/28/22 .
Data filename: C:\Users\Larry\Documents\COMcheck\henssgen.cck Page: .7 of 10
Section
# Insulation Inspection Complies? Comments/Assumptions
& Reg.lD
C303.1 'Roof insulation installed per I❑Complies:
[I1\13,]? riianufacturer's,instructions.,Blown or ❑Does Not.
;poured loose-fill insulation'is installed ;
,only where.the roof slope is.<=3 in
,❑Not Observable,
.12..
❑Not Applicable
C402.2'.1 Ilnsulation installed on a.suspended _ . p'❑Com lies ,
[IN20]1 ceiling having ceiling tiles is not being Does Not.
Ispecifietl for roor/ceiling assemblies Obs
. ; ;
;Continuous insulation board installed
❑Not ervable,
in 2 or more layers with edge joints. . IDNot Applicable
offset between layers:
C303.1 l Buildi,ng envelope insulation is labeled I❑Complies I
[IN10]2 with R-value or insulation certificate ❑Does-Not
providing R-value and other relevant:
data. :❑Not Observable-, . .
�. . ❑Not Applicable
C303.2 lAbove-grade wall insulation installed I❑Complies
[IN7]1 per manufacturer's instructions. 1ODoes Not
1. .
❑Not Observable
lONotApplicable.•;
C303.2.1 i Exterior insulation is protected from .-;❑Com p'lies
-
[IN14]z damage with a.protective material. ❑Does Not
Verification for exposed foundation
,insulation may need to occur during : ;❑Not Observable;,
Foundation Inspection. I❑Not Applicable
C105 Installed above-grade wall insulation .I❑Complies, ;See the Envelope Assemblies table forvalues.
[I1\161?. l tYp e and R-Value.cohsistent with :. Iboes NoY.
. ,O ; . .
Imsulationspecifications reported.in
plans and COMcheck reports._ ;❑Not.Observable l
I' .'El Applicable;'.
C402.2.3 Installed floor insulation type and•R- i❑Complies. lSee-the Envelope Assemblies table for values..
[IN8]2 Ivalue-consistent_with insulation 1❑Does Not ..
;specifications .reported in plans;and .
COMcheck reports: . 'IE]NotObservable
I ;❑Not Applicable l.. .
,C402.26 Radiant panels-and associated I❑Complies
[IN1817 components,designed for heat. UDoes Not.
transfer from the panel surfaces to the; ;
s ❑Not Observable,
}occupants or indoor space are
❑NotA licable
insulated with a minimum of R-3.5. . , I PP . I.
C105: : EInstalled roof.insulation type and R- ❑Complies I See the,Envelope Ass emblie stable forvalues.
[IN2]1 Ivalue consistent with insulation :❑Does Not
;specifications'reported in:plans and. .
ICOMcheck reports.For some ceiling I❑Not Observable,
.
systems,verification may need to . lE]Not Applicable
ooccur during Framing Inspection. I
I
C402.5:1. IAll sources of:air leakage in the I Complies ;
1 building thermal-envelope are sealed, 'E]Do6s No
l ppe[IN1]? caulked,gsKeted, eathestrdw Not Observable;:orwrapped with moisture vapor-
1 permeable wrapping material to
❑Not Applicable.
minimize air leakage. I
-Additional Comments/Assumptions:,.
1:11 High Impact(Tier 1) 1 2 IMedium Impact(Tier 2) 1 3 Low Impact(Tier 3) .
Henss en Hardware 03/28/22 .Project Title: g Report date:
Data filename:. C:\Users\Larry\Documents\COMcheck\henssgen.cck Page 8 of. 10_.
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C402.5 Building envelope contains.a IOCoffiplies "
[F155]1 �continuous:air barrier that has been !❑Does Not.
;tested and deemed:to limit air leakage: Observable;
<=0.40 cfm/ft2.
❑Not_A licable '
I
PP,
C402.5:6 (Weatherseals installed on all loading ❑Complies ;
[FI37.]1 dock cargo door openings and provide ElDoes Not
:direct contact along the top and sides
,❑Not Observable,
!of vehicles parked in the doorway:,
❑Not Applicable..;
C402.5.6. ,Weatherseals installed on all loading IDCorhplies ;
[F137]1 !dock cargo door openings and provide:❑Does Not I
direct contact along.the top and sides_ ;
;of vehicles parked in,the doorway. - ❑Not Qbservable
;❑Not Applicable
C402.5;6 (Weatherseals installed on all loading 11❑Complies ;
tH3711 Idock cargo'dooropenings and provide•.❑Does Not,'
direct:contact along the top and.sides ;
of vehicles arked in the doorway. 1❑Not observable, .
P . y ;❑Not Applicable.
C402.5:6 'Weatherseals-installed on all loading.-',QComplies'
[F137]1 dock cargo door openings and provide l❑Does Not.
direct contact along the top and sides
,❑Not Observable
,of Vehicles parked in'the doorway.
I❑Not Applicable..;-
C408..1.1 1Building operations.and maintenance Complies
[F157]1 jdocuments will be provided.to the :❑Does Not
loaner:Documents will cover:
manufacturers'.information, Not Observable;. .-
-ispecifications, programming ❑Not'Applicable
Iprocedures and means,of illustrating,
•
IIto owner how build!ng,.equipment and; .
!systems are intended to be installed,.
:.;maintained,and.operated.:
Additional Comments/Assumptions:.
1 JHighAmpact(Tier 1) 2 1 Medium Impact(Tier 2)' 1 3 Low Impact(Tier 3) . 771.
Project Title: Henssgen Hardware Report date:_ 03/28/22 .
Data filename:. C:\Users\Larry\Documents\COMcheck\henss,gen.cck. Page 9 of lb -
• te: p3128122
Repot da 1p of 1Q
• Page.
e check\\?e�ssge�cck
t\e• Nepsse s\� o�Umel, ts\��M
Pao\e�tT� e C,,\U5
pata��\exam
Mark Smith
From: Larry <larry@jaggroupllc.com>
Sent: Thursday,June 9, 2022 9:58 AM
To: Mark Smith
Cc: Kate Deck;Tim Barber, Maryssa Couse -JagGroup LLC
Subject: 43 Everts Ave-additional information and responses
Attachments: W22KO161A- STAMPED CALCS - 6.8.22.pdf; Fire marshal plan review-responses.pdf
Good morning Mark. Please see the responses to your questions below in red.
1. Who will be doing the 3 d party special inspections for concrete and the steel structure. Construction
technology for concrete testing and MRH engineering for steel inspection.
2. Please provide the structural calculations for the addition.The.calculations are attached.
3. Provide a plan for the shelving/storage racks that will be installed.There is no racking intended to be
installed in this addition.
4. Review and respond to the fire marshals items, attached. Please see notes on attached fire marshals
review.
Lowily J.JP,�Il
Estimator
JAG I, LLC FIVL E C®PY
8 Blue Lupine Lane
Wilton, NY 12831
(518)812-0808 x-5
Web www.jaaaroupllc.com
ENGINEERS, LLP.
n 411 Union Strect
PART ERS n Schenectady,NY 12305
JOSEPIfJ �FfINE,P.E. /! 518-377-0315 Fox 518-377-0379 DEDICATED
RESPONSIVE
WIOIA.PALLESCHI.P.E. j�1
ROSERT D.DAVIS,JR,P.L.S. 6�'1VV1.a17C1Cng.001]1 PROFESSIONAL
RECE6 December 19,2022
DEC 2 0 202.2
TOWN OF OUEENSBURY PE: Henssgen Hardware,Inc.
PLAN1�IING OFFICE
Town of Queensbury
Proiect#5416A
Bruce Frank,Code Enforcement Officer
Planning and Zoning Department
Town of Queensbury 702 2--
742 Bay Rd.
Queensbury,NY 12831
I
Dear Bruce:
Please be advised that the site work for Henssgen Hardware, Inc. at 43 Everts
Avenue has been inspected by our firm, and we certify that the work to date has been
completed in general accordance with the plans and specifications. Please note the +
dumpster pad was relocated to better suit the tenant needs, and all meet the original
design intent. Also, attached is an as-built survey.
i
Should you have any questions or need anything further,please do not hesitate to
contact me.
Very truly yours,
AB4A. Palles..*,
EERS,LLP
Lu' P.E.
Partner
LAP:cly
cc: Tun Barber w/encl, (via email)
5416A-12192022
Jan, 9, 2023-11 : 11A MDIA No. 0720 P. 2/2
MIDDLE DEPARTMENT INSPECTION AGENCY INC.
eyl that the electrical wiring to the electrical equipment listed•below has been.examined and is approved as
being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date
noted below and is issued subject to the following conditions.
Owner: Wenssgen Hardward
Date- 12/20/2022
Occupant:
Warehouse Addition Location-
Occupan 43 Everts Ave.
cy
Non-Residential Queensbury, Warren Co. NY
Applicant F- �
Electric Concepts
PO Box 5473
Clifton Park, NY 12065
Joseph A.Holmes.
No.
141387174211 EL .••.,
Equipment:
1 -Switch; 5-Receptacles; 8- Fixtures;1 - Burner, Wiring &Controls for Gas;2-Emergency Lights;2-
Exit/Emergency Combos.; 1 -100 Amp,Sub Panel
This certificate applies to the electrical wiring to the electrical equipment listed immedlawy nu11 and void. This cartificate applies only to the use,occupancy and
above and the installaton Inspected as of the above noted date based on a visual ownership as indicated hereln, Upon a change in the use,occupancy or ownership
inspection, No warranty is expressed or Implied as to the mechanical safety,am- of the pfopery Indicated above,this cerdRcate shall be immediately null end void.
clency or fitness of the equipment for any particular purpose. This certificate shall In the event that this certificate becomes invalid based upon the above conditions,
be velid for a period of one year from the above noted date. Should the electrical this certificate may be revalidated upon relnspection by Middle Department
system to which this certificate applies be altered in any way,including but not limit- Inspection Agency,Inc. An application for inspaCGGn must be submitted to Middle
ed to,the introduction of t ddhone]electrical eCuiprnent and/or the replacement of Department Inspection Agency, Inc.to initiate the inspection and revalidation
eny of the canpogents instilled as of the above noted date,ihls certl6cate ahall be process. A fee will ba charged for this service_
D � CE0WE
JAN 09 2023 10
TOWN OF QUEENSBURY
BUILDING& CODES .