Loading...
1.1 1.1 WASTEWATER-SEWER�APPROVE\Young and Modale-Replacement System With Components and ETU to Lanes&Extension Time to Install In APA—4-3-2023 RESOLUTION APPROVING RICHARD & MARYBETH YOUNG AND AMANDA MODALE'S APPLICATION FOR SANITARY SEWAGE DISPOSAL VARIANCES AND EXTENSION OF TIME TO COMPLETE WASTEWATER SYSTEM IMPROVEMENTS RESOLUTION NO.: 12023 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS, Richard and Marybeth Young and Amanda Modale (Applicants) filed an application for variances from provisions of the Town of Queensbury On-Site Sewage Disposal Ordinance Chapter 136 to install a replacement wastewater system with the: 1. Absorption field fill to be located 1' from the east property line in lieu of the required 10' setback; 2. Absorption field fill to be located 1' from the west property line in lieu of the required 10' setback; and 3. Fuji Clean Enhanced Treatment Unit (ETU) and Pump Station to be located 5' from the east property line in lieu of the required 10' setback; on property located at 9 Fielding Lane in the Town of Queensbury, and WHEREAS, the Town Clerk's Office published the Notice of Public Hearing in the Town's official newspaper and the Local Board of Health duly conducted a public hearing concerning the variance request on Monday, April 3rd, 2023, and WHEREAS, the Town Clerk's Office has advised that it duly notified all property owners within 500 feet of the subject property, and WHEREAS, Town Code Chapter 137 requires inspection of Onsite Wastewater Treatment Systems (OWTS) prior to the sale of certain real property and provides that a $2,000 escrow deposit will be forfeited to the Town in the event that completion of a wastewater treatment system meeting all standards is not completed within the time provided as established by Chapter 137, and WHEREAS, a change of deed for the Applicants' property occurred on or about March 15th, 2022 and when the required property transfer septic inspection took place, it was found that the existing wastewater system was deficient; however, the proposed new system was not able to be completed within the required six (6) month time period due to inclement weather, the challenges of scheduling contractors and the need for septic variances, and WHEREAS, the Applicant has therefore applied for a timeline extension or until October 13t", 2023 to complete installation of the replacement wastewater system and extend the date on which the $2,000 escrow deposit they previously deposited with the Town shall be automatically forfeited to the Town and the Director of Building and Codes Enforcement has recommended Town Board approval of this requested extension, NOW, THEREFORE, BE IT RESOLVED,that 1. due to the nature of the variances, the Local Board of Health determines that the variances would not be materially detrimental to the purposes and objectives of this Ordinance or other adjoining properties nor otherwise conflict with the purpose and objectives of any Town plan or policy; and 2. the Local Board of Health finds that the granting of the variances is necessary for the reasonable use of the land and are the minimum variances which would alleviate the specific unnecessary hardship found by the Local Board of Health to affect the Applicants; and BE IT FURTHER, RESOLVED, that the Local Board of Health hereby approves the application of Richard and Marybeth Young and Amanda Modale for variances from the Sewage Disposal Ordinance to install a replacement wastewater system with the: 1. Absorption field fill to be located 1' from the east property line in lieu of the required 10' setback; 2. Absorption field fill to be located 1' from the west property line in lieu of the required 10' setback; and 3. Fuji Clean Enhanced Treatment Unit (ETU) and Pump Station to be located 5' from the east property line in lieu of the required 10' setback; on property located at 9 Fielding Lane in the Town of Queensbury and bearing Tax Map No: 227.13- 2-14, and BE IT FURTHER, RESOLVED, that the Enhanced Treatment Unit (ETU) shall be maintained by the property owners in accordance with the manufacturer's recommendations for the life of the system, and BE IT FURTHER, RESOLVED, that the Local Board of Health further authorizes and grants the Applicants additional time to obtain a certificate of compliance from the Town's Building and Codes Enforcement Office as set forth in Chapter 137 to complete installation of the replacement wastewater system and extends the date on which the $2,000 escrow deposit the Applicants previously deposited with the Town be automatically forfeited to the Town until October 13`h, 2023 and authorizes and directs the Director of Building and Codes Enforcement to take any and all actions necessary to effectuate the terms of this Resolution, and BE IT FURTHER, RESOLVED, that the Town Board authorizes and directs the Town Clerk to forward by certified mail a certified copy of this Resolution to the Adirondack Park Agency for its review, and BE IT FURTHER, RESOLVED, that this approval Resolution shall not be effective until 30 days after such notice to the Adirondack Park Agency and shall be subject to any lawful action by the Adirondack Park Agency during such period. Duly adopted this 3rd day of April, 2023,by the following vote: AYES NOES ABSENT: John O'Brien From: Richard Young { ryoungnj@aol.com > Sent: Sunday, March 19, 2023 10:26 PM To. John O'Brien; Kate Deck Cc. thutchins@hutchinsengineering.com; tcenter360yahoo.com; kpeirceO hutch insengineering.com; mbyoungnj@aol_com Subject- John, Kate, and Members of the Queensbury Town Board, We Respectfully Request That You Grant Us A 6 Month Extension. - Property Transfer Inspections - 9 FIELDING LN, Queensbury, NY, 12804 - Signed Inspection Report (Mon Mar 13, 2023 at 10:06 A... Attachments- Septic System Map-20210719_131805Jpg; Exemption Letter - T of Q - Notarized-221011 .tiff; Signed Inspection Report (Mon Mar 131 2023 at 1006 AM).pdf Dear John , Kate, and Members of the Queensbury Town Board , Please confirm receipt of this e-mail by hitting "Reply." Per Mr. John O'Brien's kind phone conversation ( . . . and e-mail, right below) with us on 3/13/23, we recognize that our Septic System Exemption For Repair/Replacement At 9 Fielding Lane, Cleverdale, ID# 227. 13-2-14, will expire --4/13/23. Despite our best efforts since well before 10/11 /22, and given the many demands on Mr. Tom Hutchins, PE , engineering plans were just completed and submitted to Mr. O'Brien and to the Town Board on 3/1 /23. This, coupled with the inclement weather, the upcoming mud season , the challenges of scheduling contractors, and the need for a septic variance (which will be heard at 413123 Town Board Meeting) cause us to respectfully request that the Members of the Queensbury Town Board grant us a 6 month extension. We will continue to endeavor to commence and complete the brand new, complete ETU Septic System work before the summer months. 1f that is not possible, we will schedule the work for late Summer/early Fall , with completion in October. In the meantime, you would want to know that our small family camp is only designed for summer seasonal use, ^ 4 months/year. The current septic system and its distribution fines are over 145 feet from the shores of Lake George. The current septic system continues to operate flawlessly, as it always has. We have attached the 10/11 /22 Notarized letter Requesting Septic System Exemption For Repair/Replacement At 9 Fielding Lane, Cleverdale, ID# 227. 13-2-14 Please let us know what else you may need from us . . . and how else we may help. Our Thanks for Your Consideration, Dick & Mary Beth Young 9 Fielding Lane PO Box 242 Cleverdale, NY 12820 Mary Beth: cell 973-296-3449 MBYoungNJOaol.com i Dick: cell 203-627-8085 RYoungNJ aol.corn =»> Please send ALL US Mail items to us at: 179 Inter ale Road Parsippany, NJ 07054 ---Original Message----- From: John O'Brien <JohnO'�,,7a queensbury.net> To: ryoungnj(§)aol.com <ryoungnj@aoI_com>: tcenter360yahoo.com <tcenter360yahoo.com> Go: Kate Deck <KateD@queensbury. net> Sent: Mon, Mar 13, 2023 10:06 am Subject: Property Transfer Inspections - 9 FIELDING LNQueensbury, IVY, 12804 - Signed Inspection Report (Mon Mar 131 2023 at 10:06 AM). pdf 3/13/23 As per my phone conversation with Richard Young I explained to him that his waiver will be expiring on 4113/23 and that he should file for an extension due to the inclement weather, scheduling of contractor and the need for a septic variance which will be heard at 413123 Town Board Meeting, He will request a 6 month extension with the hope of his contractor getting it done before the summer months and if not having it installed no later than October 2023. Sent from my Wad This is an external ernail - D • not click links or openj attachrnents unlessr - * r - the sender and kno ontent - fe ..__. ___ . . . .. .. Z 9 Fielding Lane PO Box 242 Cleverdale, NY 12820 October 11 , 2022 Mr. John O' Brien , Director Building and Code Enforcement Town of Queensbury 742 Bay Roam Queensbury , NY 12804 Re: Notarized Letter Requesting septic System Exemption For Repair/Replacement At 9 Fielding Lane , Cleverdale, ID# 227 . 13-2- 14 Dear Mr. O'Brien , Per your helpful instructions and the Town of Queensbury Property Transfer Sewage Disposal Information Form, this is our Notarized Letter Requesting Septic System Exemption For Repair/Replacement At 9 Fielding Lane , Cleverdale, ID# 227. 13-2- 14 . Professional Engineer Tom Hutchins is working with us on preparing plans for Septic System Repair/Replacement, weather-permitting and contractor schedules-permitting , by 4/22/23 ("within 6 months after the 10/22/22 date"). As you know, our camps are NOT winterized , so there cannot be any use of the current septic system, as we currently Dare doing winter shutdown . Regards, l ("�;'2� . 71�� ..' Mary Beth Young 9 Fielding Lane PO Box 242 Cleverdale, NY 12820 Mary Beth : cell 973-296-3449 MBYoune- NJ, aol. com Dick: cell 203-627-8085 RYoungNJo,d).aal _ com 179 lntervale Road Parsippany , NJ 07054 Before me this i l�day of October, 2022, did appear Mary Beth Young , known to me. Notary rated KATHRYN REGAN-DOANE NOTARY PUBLIC-STATE OF NEW YORK No. 01 RE6365347 Qualified in warren County My Commission Expires 10-02-2025 r Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761 -8256 Building 11 761 -8206 Fire Marshal Case Number: PT-0629-2022 Case Module: Permit Inspection Date: Mon Mar 13, 2023 Inspection Status: Failed Inspector: O'Brien, John Inspection Type: Property Transfer Inspections Job Address: 9 FIELDING LN Parcel Number: 227. 133-2-14 Queensbury, NY, 12804 Contact Type Company Name Name Agent YOUNG, RICHARD Applicant YOUNG, MARY BETH Checklist Item Status Building Inspector Notes Failed 3/13/23 As per my phone conversation with Richard Young I explained to him that his waiver will be expiring on 4I13/23 and that he should file for an extension due to the inclement weather, scheduling of contractor and the need for a septic variance which will be heard at 413123 Town Board Meeting- He will request a 6 month extension with the hope of his contractor getting it done before the summer months and if not having it installed no later than October 2023. Weather Failed Temperature (Fahrenheit) Failed Test each fixture flow to septic tank Failed Whirlpool tub add 250 gal Failed Garbage grinder add 250 gal Failed Mar 13, 2023 Page (1) 169 l-lavi{and Road Queensbury, NY 12804 745-0307 Hutchins Engineering PLLC Phone: 18) 45-0308 g 9 Fax: [51 $) 745-0308 March 1 , 2023 Town of Queensbury Town Board Board of Health 742 Bay Road Queensbury NY 12804 Re: Richard & Marybeth Young tu1AR y 3 IM Amanda Modale C3Ll�Et358�ftY 9 Fielding Lane GR's� pFF1GE Tax Map ID: 227. 13-2-14 liY► Dear Supervisor Strough & Town Board Councilmen: This office represents Richard and Marybeth Young and Amanda Modale with respect to the pursuit of wastewater variances for a replacement wastewater system installation at their property located at 9 Fielding Lane. Presently the 3-bedroom main camp and the 2-bedroom cottage are served by a unknown sized wastewater system which is not adequate and they desire to bring the parcel up to the town's current on-site wastewater system standards. Given the terrain and site constraints, it is not possible to install a compliant wastewater system. The existing structures are served by a concrete septic tank of unknown size and a drain field of unknow size. We are proposing to install a new Fuji clean enhanced treatment unit, new pump station and a 470-SF absorption bed. Relief is requested for the installation absorption field fill within 1 ft of the east property line and within 1 ft of the west property line. We are also requesting relief to install the ETU and pump station within 5 ft of the east property line so that the owners can access the main camp with a vehicle on occasion as the main camp is a significant distance from the parking area. Enclosed please find ten submission packages for this project. We respectfully request, if possible, that this item be placed upon the agenda of the next town board meeting. Please contact me if you have any questions or if you require additional information . Best Regards, ~f Thomas R. Center Jr, , P. E. Associate - Design Engineer 4M WCVM ry Office Use Only SEPTIC 'VARIANCE Permit #: APPLICATION Permit Fee: $ 742 Bay Road, queensbury, NY 12804 Approvals: P: S18-761-8256 www.gueensbury.net Submittal : 1 (one) original & 8 copies of the completed application package PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL Section I: Contact Information: Property Owner's): AMANDA MODALS Owner's Agent: HUTCHINS ENGINEERING, PLLC Address: 179 INTERVALS RD Address: 169 HAVILAND RD PARSIPPANY, NJ 07054 QUEENBSURY, NY Phone #: 203-627-8085 Phone #: 518-796-2515 Email: RYOUN+GNJ(P AOL. COM Email: TCENTER360YAHOO.COM Section 2: Site Information: site Address: 9 FIELDING LANE Tax tD#: 227. 13-2-14 Directions to Site: CLEVERDALE RD TO RT ONTO FIELDING LANE Section 3: Distance from well on property to septic system (if applicable) NA feet Section 4: Is it possible to install a conforming septic system on this property? Yes M No If YES, please explain and attach a diagram : Section 5: Does the proposed system meet setback requirements for distance from wells & septic systems on neighboring properties? QYes 0 No If No, please explain: Section 6• Is the proposed system to be installed under a parking area? [] Yes [M Na Section 7: Section of the Sanitary Sewage Ordinance from which you are seeking the variance (Le. leaching system will be 89 ft. STEM FILL 1 FT FROM EAST & WEST PROPERTY LINES IN LIEU OF 10 FT REQUIRED. from well in lieu of required SQO ft.): PLACE SY RTY LINE IN LIE U FT Revised aecember 2021 Septic Variance Application section 8: List the names, parcel addresses, and tax map numbers of all adjoining property owners. You may obtain this information from the Town of Queensbury's Assessor's Office: North Name NA Address Tax Map fD South Name STATE OF NEW YQRK Address Tax Map ID 227. 13-2-20 East Name VAN SCHAICK HOUSE LLC Address 11 FIELDING LANE Tax Map ID 227, 13-2-15 West Name J©HN LAROCCA Address 4 FIELDING PLACE Tax Map ID 227, 13-2-11 Section 9. OWNER STATEMENT I/We do hereby relieve the Town of Queensbury from any liabilities on the plumbing and septic system located at: 9 FIELDINt^ LN . l/We realize that putting the well, septic tank a leaching system less than the required feet from the PRO MRTY LINE may increase the risk of pollution. Owner—Print Name: Arr^^MANDA MODALE Owner—Signature: L Date: 311123 Section 10: NEIGHB013 OR TENANT RELEASE STATEMENT (if applicable) I/We do hereby relieve the Town of Queensbury from any liabilities on the plumbing and septic system located at: . lAAJe realize that putting the well, septic tank or leaching system less than the required feet from the may increase the risk of pollution , P!eighbor/Tenant —Print Name: Neighbor/Tenant-Signature: Date: Sentir %oariance Application Revised December 2021 C Section 11: AUTHORIZATION AND SIGNATURE PAGE This page includes the Authorization to Act as Agent form, engineering fee disclosure, authorization for site visits, other permit responsibilities and agreement to provide documentation required . Complete the following if the OWNER is using an Agent: Owner's Name: AMANDA MODALE Designates: HUTCHINS E N G R as agent regarding the Septic Variance for Site Address: 9 FIELDING LANE Tax Map #: 227 . 13-2- 14 Engineering Fee Disclosure : Applications may be referred to the Town consulting engineer for review of septic design, storm drainage, etc. as determined by the Town Board of Health . Fees for engineering review services will be charged directly to the applicant. Authorization for Site Visits: By signing this page and submitting the application materials attached herein, the Owner, Applicant and his/her/their agent hereby authorize the Town Board of Health, building and code Enforcement Officers and Town Engineer to enter the subject properties for the purpose of reviewing the application submitted. Please Note; Other permits may be required for construction or alteration activity subsequent to approval by the Town Board of Health. it is the applicant's responsibility to obtain any additional permits. Official Meeting Minutes Disclosure: It is the practice of the Town Board of Health to have a designated stenographer tape record the proceedings of the meetings resulting from the application, and that the minutes transcribed from those tapes constitute the official record of all proceedings. If there is a discrepancy between such record and the handwritten minutes taken by the designated stenographer, the handwritten minutes shall be deemed the official record . 10 the undersigned, have thoroughly read and understand the instructions for submission; agree to the submission requirements and completed checklist: OWNER —PRINT NAME: AMAN ❑A MORALE OWNER—SIGNATURE : 3?'C1.1'�1�,"' LLG ZLczla DATE 311f23 AGENT PRINT NAME: THOMAS CENTER, PE --- - AGENT—SIGNATURE : DATE! 3/1 /23 Septic Variance Auphcation Revised December Lake George 27. 5' ± To Shore MAP REFERENCE: 1. BASE MAP INFORMATION FROM "MAP OF A TOPOGRAPHIC SURVEY MADE FOR RICHARD & MARY BETH YOUNG," IN THE TOWN OF QUEENSBURY, WARREN COUNTY, NEW YORK. DATED NOVEMBER 3, 2022. PREPARED BY VAN DUSEN & SIEVES LAND SURVEYORS. 2. ON —SITE UTILITY LOCATIONS FROM SKETCHES PROVIDED BY CLIENT. RjgEQ; INSTALL POLYETHYLENE EXTENSION TO GRADE WITH TAMPER RESISTANT ACCESS COVER (NON —TRAFFIC AREAS) 114" PER FOOT MIN. SLOPE 4" HOUSE SEWER 59" 2' I P F0- Lands NIF of 3/4° I Van Schaick Lake House, LLC 27.5'± To Shore B:6175 P:265 FUJICLEAN USA MODEL CE-7 ENHANCED TREATMENT UNIT MAINTENANCE CONTRACT NOTE A MAINTENANCE AND SERVICE CONTRACT BETWEEN SYSTEM OWNER AND MANUFACTURER'S REPRESENTATIVE IS REQUIRED FOR SEMI—ANNUAL INSPECTION AND SERVICE OF THE FUJICLEAN CE-7 ENHANCED TREATMENT UNIT. I227.13-2-15 I LAKE WATER SUPPLY NEW FUG -CLEAN CE-7 ETU.I �U ledge Roawc _.., . � � ,� c �� _ N U Joiner PROPOSED 500 GALLON PREC. CONCRETE P P STATION _ Ci 1 I 5.0 pROPO D EFFLUENT SEWER I Pum 1 0' cedar I O Ced r+ Op m .1 _ I USB 00 OO 188chain nk Pen ^ Y U.P. NM - 1 -B _ FROM LAKE 27 W e_. IPF w/ bail B.M. = 327.00' 1 327 „µ a — 327.5 24"tMaple Paver .:?'^+ 326 aple � Patio Clean�ut r N m - C imney w s hemlock het 3" Co e (V w \ 32> sewer(3 ,;` 1 ' CO Ji . a ja• .3ri' .•�... �! w 3 6 4 _ �•�...( N 07 �' 30° Maple 0 Garage V °2 N ��" ,Pence:.. ., . n pD 2 2 •'O V r ood Fence... a ' '. ,� Crv5 ed Stone ^ \ G w 11 W , _ 5,�j I Maple Cluster Lands NIF of Ad]oiner,s shed 327 John & Nancy La Rocca `d Fence �S•,I B: 1455 P: 65 U.P. = 327.l / 1. B.M. = 327.z3' CIR 2" IPF 227.13-2-11 LAKE WATER SUPPLY PROPOSED 47 / PIPE -IN -STONE ABSORP710N BE I WASTEWATER SYSTEM PLAN „�� , ,,,, ,,,,�, / SCALE. 1 "=20' / GRAPHIC SCALE 10 0 5 10 20 40 ( IN FEET ) CONTRACTOR TO FIELD VERIFY LOCATIONS AND DISTANCES REDUIRM INSTALL POLYETHYLENE EXTENSION TO GRADE WITH TAMPER RESISTANT ACCESS COVER (NON —TRAFFIC AREAS) 1/8" PER FOOT MIN. SLOPE 4" EFFLUENT SEWER LAG/ALARM 3" ABOVE 'PUMP ON' FLOAT SWITCHES — LEAD PUMP ON INSTALL INSIDE PUMP PIT IN LOCATION ACCESSIBLE WITHOUT PIT ENTRY PUMP OFF VOLUME OF DOSE TO BE 90± GALLONS ENHANCED TREATMENT UNIT & PUMP STATION DETAIL NTS 4" MINIMUM TOPSOIL ON ENTIRE e �< 16" MIN. a� a 500 GALLON PRECAST CONCRETE PUMP STATION INSTALL FLOAT SWITCHES TO OPERATE PUMP AND MAINTAIN LEVELS AS INDICATED SITE SOILS DATA TEST PIT TP-1 - 1211812022 BY TOM HUTCHINS, P.E. 0-10" - TOP SOIL 10-16' - LOAMY MEDIUM FINE SAND W/ SILT 16-29" - FINE SAND W/SILT 29-64" - SILTY SAND '--O-U.P. NG27-2 V22 NO GROUNDWATER OBSERVED MOTTLING ® 44" PROVIDE 36" VERTICAL SEPARATION TO BOUNDARY CONDITION VARIANCE SUMMARY —ABSORPTION FIELD FILL TO EAST PROPERTY LINE I 10' REQUIRED 1' PROPOSED 9' RELIEF REQUESTED —ABSORPTION FIELD FILL TO WEST PROPERTY LINE I 10' REQUIRED 1' PROPOSED 9' RELIEF REQUESTED I —ETU & PUMP STATION FROM EAST PROPERTY LINE 10' REQUIRED 5' PROPOSED 5' RELIEF REQUESTED WASTEWATER SYSTEM SETBACK REQUIREMENTS STREAM, LAKE, PROPERTY UNE HOUSE WATERCOURSE, WELL WEILAND SEPTIC TANK 10' 10' 50' 50' ABSORPTION FIELD 10' 1 20' 1 100' 100' / 1—THOPE SDR-11 FORORCEMAIN BALL VALVE 0 a SYSTEM MATERIAL SPECIFICATIONS WASTEWATER SYSTEM DESIGN 5-BEDROOM RESIDENCE DESIGN FLOW - 110 GPD/BEDROOM SYSTEM DESIGN FLOW - 550 GPD SEPTIC TANK - NEW FUJI CLEAN CE-7 TANK DESIGN APPLICATION RATE. .8 GPD/SF, BASED ON 6-7 MIN/IN PERCOLATION RATE ABSORPTION BED AREA REQ'D = (550 GPD)/(.8 GPD/SF) = 688 SF 33% REDUCTION IN BED AREA PER NYSDOH APPENDIX 75-A REDUCED BED AREA REQUIRED = 459 SF BED AREA PROVIDED = 470 SF POTABLE WATER SUPPLY IS TO BE LAKE WATER ABSORPTION BED AGGREGATE STONE IS TO BE 3/4" TO 1-1/2" WASHED CRUSHED STONE. EFFLUENT SEWER PIPE PIPING TO BE 4' SDR-35 OR SCHEDULE 40 PVC, INSTALL WITH 1/8" PER FO MINIMUM SLOPE. FILTER FABRIC FILTER FABRIC TO BE 4.8 OZ/SY NON —WOVEN SEPARATION FABRIC, TENCATE MIR 140N OR EQUIVALENT. FORCEMAIN PIPING TO BE 1-1/2" SDR-11 HDPE, PROVIDE POSITIVE DRAINBACK TO PUMP STATION. HOUSE SEWER PIPE PIPING TO BE 4' SDR-35 OR SCHEDULE 40 PVC. INSTALL WITH 1/4" PER FO MINIMUM SLOPE. SYSTEM FILL AS DESCRIBED IN FILL MATERIAL NOTES." TOPSOIL PLACE 4" MINIMUM TOPSOIL OVER ENTIRE BACKFILL AREA. SEED, MULCH, A ESTABLISH TURF. EXTERIOR WEATHERPROOF JUNCTION BOX (IF NECESSARY). SEAL CONDUIT GAS TIGHT. INSTALL CONTROL PANEL IN HOUSE. ALL ELECTRICAL WORK TO BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTION AGENCY PRIOR TO START—UP OF PUMP STATION. TO BE INSTALLED ON EXTERIOR OF PUMP HOUSE. TRANSITION TO 4" OUTSIDE OF D—BOX �1-1/2" SCH-40 PVC INSIDE WET WELL THROUGH WALL UNION — LOCATE SUCH THAT UNION CAN BE DISCONNECTED AND PUMP REMOVED WITHOUT TANK ENTRY REDUCING TEE POINTED DOWNWARD WITH 1" BALL VALVE THROTTLED TO ALLOW TRICKLE DRAIN BACK INTO WETWELL BALL CHECK VALVE GOULDS WE03M EFFLUENT PUMP 12" MIN. COVER DISTRIBUTION BOX TRANSITION FORCE - MAIN TO 4" PVC OUTSIDE OF D-BOX PROPOSED DISTRIBUTION BOX SITE LOCATION SYSTEM INSTALLATION NOTES LOCATION MAP CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING AND IN ACCORDANCE WITH THE N.Y.S. DEPARTMENT OF HEALTH INDIVIDUAL HOUSEHOLD SYSTEMS AND ASTM F481 INSTALLATION OF THERMOPLASTIC PIPE AND CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS. AFTER EXCAVATION OF ABSORPTION BED TO THE DEPTH REQUIRED, THE WALLS AND FLOOR SHALL BE CLEANED AND RAKED IN ORDER TO LOOSEN SMEARED AREAS OF SOIL. PLACEMENT OF CRUSHED STONE, PERFORATED PIPE AND FILTER FABRIC SHALL BE AS SHOWN, AND CARE SHALL BE EXERCISED TO AVOID INCLUSION OF FINE GRAINED SOILS AND WASTE MATERIAL IN THE STONE AND PIPE. THE PIPE SHOULD BE LAID AT THE GRADES INDICATED, MAINTAINING STRAIGHT CONTINUOUS GRADES WITHOUT SAGS, HUMPS, SEPARATED JOINTS, OR OTHER UNSUITABLE CONDITIONS. PIPE SHALL BE LAID WITH HOLES DOWN IN ALL CASES. OT ALL DISPOSAL FIELDS' SHALL BE GRADED TO SHED RAINFALL AND DIVERT SURFACE RUNOFF AWAY FROM THE DISPOSAL FIELD. DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION AREA AFTER PIPING HAS BEEN INSTALLED. AFI THE WASTEWATER TREATMENT SYSTEM IS DESIGNED AND APPROVED BASED UPON THE INSTALLATION OF WATER CONSERVING FIXTURES AND A DESIGN FLOW OF 110 GPD PER BEDROOM. THE SYSTEM IS NOT DESIGNED TO ACCOMMODATE EXTREME WATER USE FIXTURES, SUCH AS JACUZZI—TYPE SPA TUBS OR WATER TREATMENT EQUIPMENT. THE INSTALLATION OF NON —CONSERVING WATER FIXTURES OR EXTREME WATER USE FIXTURES IS CONTRARY TO THE APPROVAL OF THIS WASTEWATER TREATMENT SYSTEM. OT ROOF, FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST BE EXCLUDED FROM THE WASTEWATER SYSTEM. CONSTRUCT DRAINAGE SWALE UPGRADE OF SYSTEM IN ORDER TO DIVERT SURFACE RUNOFF AROUND ABSORPTION FIELD. SEPTIC TANK, PUMP STATION & ABSORPTION BED MUST BE INSPECTED BY LOCAL BUILDING DEPARTMENT AND DESIGN ENGINEER PRIOR TO BACKFILL AND ND FINAL GRADING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY THE NECESSARY PARTIES AND REQUEST INSPECTIONS. 23' ir r-------•,---------- - - - - - - lr---------------- I 2. I j j 10' ,I 1 1 1 -1 BAFFLE , 2. ` 2' MIN. I USE SPEED LEVELERS TO01 ASSURE ALL OUTLETS ARE AT 1- T 4" PERFORATED PVC LATERALS INSTALLED EXACTLY THE SAME 2" MIN. DROP NEAR LEVEL IN BED CONFIGURATION ELEVATION BETWEEN INVERTS 1- 30' I ` 2.15 4" PVC SDR-35 SOLID HEADER TO PERFORATED ABSORPTION TRENCH PIPING, 1/8" PER FOOT MIN SLOPE 1'< PUMP STATION NOTES SEAL ALL TANK OPENINGS WATERTIGHT. I 1 PROVIDE AND INSTALL UL LISTED PACKAGED PUMP CONTROL PANEL I 1 WITH VISUAL AND AUDIBLE ALARM. INSTALL SIMPLEX, DEMAND DOSE CONTROL PANEL INSIDE HOUSE IN ACCESSIBLE LOCATION. I, I INSTALL POWER & CONTROL WIRING TO CONTROLLER WITH ALARM IN I HOUSE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NATIONAL ELECTRIC CODE (N.E.C.) REQUIREMENTS. >r PUMP CONTROL AND FLOAT LEVELS TO BE INSTALLED TO PROVIDE A 90 GALLON DOSE. j' \ I ABSORPTION BED PLAN l 2 5' 1 NTS EFFLUENT PUMP TO BE GOULDS PUMP WE SERIES, MODEL WE003M SUBMERSIBLE EFFLUENT PUMP .3 HP, 230 VOLT, 1PH 1. 12' _ VERIFY EXISTING ELECTRICAL SERVICE PRIOR TO PURCHASING PUMP. ALL ELECTRICAL WORK TO BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTION AGENCY PRIOR TO START—UP OF PUMP STATION. FILL MATERIAL NOTES 4" MINIMUM TOPSOIL ON AFTER REMOVING ORGANICS, PLACE SYSTEM FILL OVER THE ENTIRE AREA OF PROPOSED ENTIRE BACKFILL AREA; ABSORPTION BED AND TAPER AREA WITH TRACKED EQUIPMENT, SEED AND ESTABLISH TURF APPROXIMATE MOUND SYSTEM "SYSTEM FILL" MATERIAL SHALL BE CAREFULLY SELECTED SAND, SANDY LOAM EXISTING GRADE 23' SOUTH LEG OR SANDY LOAMY GRAVEL WITH IN —PLACE PERCOLATION RATE OF 1-5 MIN/INCH AND NO 9" MAX 30' WEST LEG INTO EX. SOIL ORGANICS OR OBJECTS OVER 3" IN SIZE. LESS THAN 10% BY WEIGHT SHALL BE FINER THAN --SLOPE BED LENGTH a0PE— 0.075mm (#200 SIEVE). AT LEAST 259 OF THE MATERIAL BY WEIGHT SHALL BE IN THE m SIEVE). LESS THAN 15% OF THE MATERIAL RANGE OF 0 50mm TO 2 0 m (#35 SIEVE TO #10 VE . BY WEIGHT SHALL BE LARGER THAN A 1/2" SIEVE. SYSTEM FILL MATERIAL SHALL BE INSTALLED TO PROVIDE MINIMUM OF 18" BETWEEN TILLED NATIVE MATERIAL AND BOTTOM OF ABSORPTION BED. ONLY SYSTEM FILL MATERIAL SHALL BE INSTALLED THROUGHOUT THE MOUND AREA AND TAPER AREAS. SYSTEM FILL MATERIAL WITH 4" SDR-35 PVC PERFORATED L FILTER FABRIC, TENCATE IN -PLACE PERCOLATION RATE OF LATERAL INSTALLED NEAR LEVEL, IN MIRAFI 140N OR SYSTEM FILL MATERIAL IS TO BE MECHANICALLY STABILIZED 1N 6" LIFTS WITH TRACKED 1-5 MIN/INCH. MECHANICALLY BED CONFIGURATION EQUIVALENT EQUIPMENT PRIOR TO INSTALLATION OF BED. STABILIZE WITH TRACKED EQUIPMENT. INSTALLER TO NOTIFY ENGINEER OF PROPOSED SOURCE OF SYSTEM FILL MATERIAL PRIOR TO ABSORPTION BED PROFILE Dig hafely, New ®York Call Before You Dig IM Wait rho Required Time Confirm Utility Response Respect The Marks Dig With Care 800.962-7962 www.digsafelynewyork.com TAX MAP # 221.13-2-14 TRANSPORTING TO SITE. / SCALE. 1 "=20' / GRAPHIC SCALE 10 0 5 10 20 40 ( IN FEET ) CONTRACTOR TO FIELD VERIFY LOCATIONS AND DISTANCES REDUIRM INSTALL POLYETHYLENE EXTENSION TO GRADE WITH TAMPER RESISTANT ACCESS COVER (NON —TRAFFIC AREAS) 1/8" PER FOOT MIN. SLOPE 4" EFFLUENT SEWER LAG/ALARM 3" ABOVE 'PUMP ON' FLOAT SWITCHES — LEAD PUMP ON INSTALL INSIDE PUMP PIT IN LOCATION ACCESSIBLE WITHOUT PIT ENTRY PUMP OFF VOLUME OF DOSE TO BE 90± GALLONS ENHANCED TREATMENT UNIT & PUMP STATION DETAIL NTS 4" MINIMUM TOPSOIL ON ENTIRE e �< 16" MIN. a� a 500 GALLON PRECAST CONCRETE PUMP STATION INSTALL FLOAT SWITCHES TO OPERATE PUMP AND MAINTAIN LEVELS AS INDICATED SITE SOILS DATA TEST PIT TP-1 - 1211812022 BY TOM HUTCHINS, P.E. 0-10" - TOP SOIL 10-16' - LOAMY MEDIUM FINE SAND W/ SILT 16-29" - FINE SAND W/SILT 29-64" - SILTY SAND '--O-U.P. NG27-2 V22 NO GROUNDWATER OBSERVED MOTTLING ® 44" PROVIDE 36" VERTICAL SEPARATION TO BOUNDARY CONDITION VARIANCE SUMMARY —ABSORPTION FIELD FILL TO EAST PROPERTY LINE I 10' REQUIRED 1' PROPOSED 9' RELIEF REQUESTED —ABSORPTION FIELD FILL TO WEST PROPERTY LINE I 10' REQUIRED 1' PROPOSED 9' RELIEF REQUESTED I —ETU & PUMP STATION FROM EAST PROPERTY LINE 10' REQUIRED 5' PROPOSED 5' RELIEF REQUESTED WASTEWATER SYSTEM SETBACK REQUIREMENTS STREAM, LAKE, PROPERTY UNE HOUSE WATERCOURSE, WELL WEILAND SEPTIC TANK 10' 10' 50' 50' ABSORPTION FIELD 10' 1 20' 1 100' 100' / 1—THOPE SDR-11 FORORCEMAIN BALL VALVE 0 a SYSTEM MATERIAL SPECIFICATIONS WASTEWATER SYSTEM DESIGN 5-BEDROOM RESIDENCE DESIGN FLOW - 110 GPD/BEDROOM SYSTEM DESIGN FLOW - 550 GPD SEPTIC TANK - NEW FUJI CLEAN CE-7 TANK DESIGN APPLICATION RATE. .8 GPD/SF, BASED ON 6-7 MIN/IN PERCOLATION RATE ABSORPTION BED AREA REQ'D = (550 GPD)/(.8 GPD/SF) = 688 SF 33% REDUCTION IN BED AREA PER NYSDOH APPENDIX 75-A REDUCED BED AREA REQUIRED = 459 SF BED AREA PROVIDED = 470 SF POTABLE WATER SUPPLY IS TO BE LAKE WATER ABSORPTION BED AGGREGATE STONE IS TO BE 3/4" TO 1-1/2" WASHED CRUSHED STONE. EFFLUENT SEWER PIPE PIPING TO BE 4' SDR-35 OR SCHEDULE 40 PVC, INSTALL WITH 1/8" PER FO MINIMUM SLOPE. FILTER FABRIC FILTER FABRIC TO BE 4.8 OZ/SY NON —WOVEN SEPARATION FABRIC, TENCATE MIR 140N OR EQUIVALENT. FORCEMAIN PIPING TO BE 1-1/2" SDR-11 HDPE, PROVIDE POSITIVE DRAINBACK TO PUMP STATION. HOUSE SEWER PIPE PIPING TO BE 4' SDR-35 OR SCHEDULE 40 PVC. INSTALL WITH 1/4" PER FO MINIMUM SLOPE. SYSTEM FILL AS DESCRIBED IN FILL MATERIAL NOTES." TOPSOIL PLACE 4" MINIMUM TOPSOIL OVER ENTIRE BACKFILL AREA. SEED, MULCH, A ESTABLISH TURF. EXTERIOR WEATHERPROOF JUNCTION BOX (IF NECESSARY). SEAL CONDUIT GAS TIGHT. INSTALL CONTROL PANEL IN HOUSE. ALL ELECTRICAL WORK TO BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTION AGENCY PRIOR TO START—UP OF PUMP STATION. TO BE INSTALLED ON EXTERIOR OF PUMP HOUSE. TRANSITION TO 4" OUTSIDE OF D—BOX �1-1/2" SCH-40 PVC INSIDE WET WELL THROUGH WALL UNION — LOCATE SUCH THAT UNION CAN BE DISCONNECTED AND PUMP REMOVED WITHOUT TANK ENTRY REDUCING TEE POINTED DOWNWARD WITH 1" BALL VALVE THROTTLED TO ALLOW TRICKLE DRAIN BACK INTO WETWELL BALL CHECK VALVE GOULDS WE03M EFFLUENT PUMP 12" MIN. COVER DISTRIBUTION BOX TRANSITION FORCE - MAIN TO 4" PVC OUTSIDE OF D-BOX PROPOSED DISTRIBUTION BOX SITE LOCATION SYSTEM INSTALLATION NOTES LOCATION MAP CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING AND IN ACCORDANCE WITH THE N.Y.S. DEPARTMENT OF HEALTH INDIVIDUAL HOUSEHOLD SYSTEMS AND ASTM F481 INSTALLATION OF THERMOPLASTIC PIPE AND CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS. AFTER EXCAVATION OF ABSORPTION BED TO THE DEPTH REQUIRED, THE WALLS AND FLOOR SHALL BE CLEANED AND RAKED IN ORDER TO LOOSEN SMEARED AREAS OF SOIL. PLACEMENT OF CRUSHED STONE, PERFORATED PIPE AND FILTER FABRIC SHALL BE AS SHOWN, AND CARE SHALL BE EXERCISED TO AVOID INCLUSION OF FINE GRAINED SOILS AND WASTE MATERIAL IN THE STONE AND PIPE. THE PIPE SHOULD BE LAID AT THE GRADES INDICATED, MAINTAINING STRAIGHT CONTINUOUS GRADES WITHOUT SAGS, HUMPS, SEPARATED JOINTS, OR OTHER UNSUITABLE CONDITIONS. PIPE SHALL BE LAID WITH HOLES DOWN IN ALL CASES. OT ALL DISPOSAL FIELDS' SHALL BE GRADED TO SHED RAINFALL AND DIVERT SURFACE RUNOFF AWAY FROM THE DISPOSAL FIELD. DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION AREA AFTER PIPING HAS BEEN INSTALLED. AFI THE WASTEWATER TREATMENT SYSTEM IS DESIGNED AND APPROVED BASED UPON THE INSTALLATION OF WATER CONSERVING FIXTURES AND A DESIGN FLOW OF 110 GPD PER BEDROOM. THE SYSTEM IS NOT DESIGNED TO ACCOMMODATE EXTREME WATER USE FIXTURES, SUCH AS JACUZZI—TYPE SPA TUBS OR WATER TREATMENT EQUIPMENT. THE INSTALLATION OF NON —CONSERVING WATER FIXTURES OR EXTREME WATER USE FIXTURES IS CONTRARY TO THE APPROVAL OF THIS WASTEWATER TREATMENT SYSTEM. OT ROOF, FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST BE EXCLUDED FROM THE WASTEWATER SYSTEM. CONSTRUCT DRAINAGE SWALE UPGRADE OF SYSTEM IN ORDER TO DIVERT SURFACE RUNOFF AROUND ABSORPTION FIELD. SEPTIC TANK, PUMP STATION & ABSORPTION BED MUST BE INSPECTED BY LOCAL BUILDING DEPARTMENT AND DESIGN ENGINEER PRIOR TO BACKFILL AND ND FINAL GRADING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY THE NECESSARY PARTIES AND REQUEST INSPECTIONS. 23' ir r-------•,---------- - - - - - - lr---------------- I 2. I j j 10' ,I 1 1 1 -1 BAFFLE , 2. ` 2' MIN. I USE SPEED LEVELERS TO01 ASSURE ALL OUTLETS ARE AT 1- T 4" PERFORATED PVC LATERALS INSTALLED EXACTLY THE SAME 2" MIN. DROP NEAR LEVEL IN BED CONFIGURATION ELEVATION BETWEEN INVERTS 1- 30' I ` 2.15 4" PVC SDR-35 SOLID HEADER TO PERFORATED ABSORPTION TRENCH PIPING, 1/8" PER FOOT MIN SLOPE 1'< PUMP STATION NOTES SEAL ALL TANK OPENINGS WATERTIGHT. I 1 PROVIDE AND INSTALL UL LISTED PACKAGED PUMP CONTROL PANEL I 1 WITH VISUAL AND AUDIBLE ALARM. INSTALL SIMPLEX, DEMAND DOSE CONTROL PANEL INSIDE HOUSE IN ACCESSIBLE LOCATION. I, I INSTALL POWER & CONTROL WIRING TO CONTROLLER WITH ALARM IN I HOUSE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NATIONAL ELECTRIC CODE (N.E.C.) REQUIREMENTS. >r PUMP CONTROL AND FLOAT LEVELS TO BE INSTALLED TO PROVIDE A 90 GALLON DOSE. j' \ I ABSORPTION BED PLAN l 2 5' 1 NTS EFFLUENT PUMP TO BE GOULDS PUMP WE SERIES, MODEL WE003M SUBMERSIBLE EFFLUENT PUMP .3 HP, 230 VOLT, 1PH 1. 12' _ VERIFY EXISTING ELECTRICAL SERVICE PRIOR TO PURCHASING PUMP. ALL ELECTRICAL WORK TO BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTION AGENCY PRIOR TO START—UP OF PUMP STATION. FILL MATERIAL NOTES 4" MINIMUM TOPSOIL ON AFTER REMOVING ORGANICS, PLACE SYSTEM FILL OVER THE ENTIRE AREA OF PROPOSED ENTIRE BACKFILL AREA; ABSORPTION BED AND TAPER AREA WITH TRACKED EQUIPMENT, SEED AND ESTABLISH TURF APPROXIMATE MOUND SYSTEM "SYSTEM FILL" MATERIAL SHALL BE CAREFULLY SELECTED SAND, SANDY LOAM EXISTING GRADE 23' SOUTH LEG OR SANDY LOAMY GRAVEL WITH IN —PLACE PERCOLATION RATE OF 1-5 MIN/INCH AND NO 9" MAX 30' WEST LEG INTO EX. SOIL ORGANICS OR OBJECTS OVER 3" IN SIZE. LESS THAN 10% BY WEIGHT SHALL BE FINER THAN --SLOPE BED LENGTH a0PE— 0.075mm (#200 SIEVE). AT LEAST 259 OF THE MATERIAL BY WEIGHT SHALL BE IN THE m SIEVE). LESS THAN 15% OF THE MATERIAL RANGE OF 0 50mm TO 2 0 m (#35 SIEVE TO #10 VE . BY WEIGHT SHALL BE LARGER THAN A 1/2" SIEVE. SYSTEM FILL MATERIAL SHALL BE INSTALLED TO PROVIDE MINIMUM OF 18" BETWEEN TILLED NATIVE MATERIAL AND BOTTOM OF ABSORPTION BED. ONLY SYSTEM FILL MATERIAL SHALL BE INSTALLED THROUGHOUT THE MOUND AREA AND TAPER AREAS. SYSTEM FILL MATERIAL WITH 4" SDR-35 PVC PERFORATED L FILTER FABRIC, TENCATE IN -PLACE PERCOLATION RATE OF LATERAL INSTALLED NEAR LEVEL, IN MIRAFI 140N OR SYSTEM FILL MATERIAL IS TO BE MECHANICALLY STABILIZED 1N 6" LIFTS WITH TRACKED 1-5 MIN/INCH. MECHANICALLY BED CONFIGURATION EQUIVALENT EQUIPMENT PRIOR TO INSTALLATION OF BED. STABILIZE WITH TRACKED EQUIPMENT. INSTALLER TO NOTIFY ENGINEER OF PROPOSED SOURCE OF SYSTEM FILL MATERIAL PRIOR TO ABSORPTION BED PROFILE Dig hafely, New ®York Call Before You Dig IM Wait rho Required Time Confirm Utility Response Respect The Marks Dig With Care 800.962-7962 www.digsafelynewyork.com TAX MAP # 221.13-2-14 TRANSPORTING TO SITE. / 1—THOPE SDR-11 FORORCEMAIN BALL VALVE 0 a SYSTEM MATERIAL SPECIFICATIONS WASTEWATER SYSTEM DESIGN 5-BEDROOM RESIDENCE DESIGN FLOW - 110 GPD/BEDROOM SYSTEM DESIGN FLOW - 550 GPD SEPTIC TANK - NEW FUJI CLEAN CE-7 TANK DESIGN APPLICATION RATE. .8 GPD/SF, BASED ON 6-7 MIN/IN PERCOLATION RATE ABSORPTION BED AREA REQ'D = (550 GPD)/(.8 GPD/SF) = 688 SF 33% REDUCTION IN BED AREA PER NYSDOH APPENDIX 75-A REDUCED BED AREA REQUIRED = 459 SF BED AREA PROVIDED = 470 SF POTABLE WATER SUPPLY IS TO BE LAKE WATER ABSORPTION BED AGGREGATE STONE IS TO BE 3/4" TO 1-1/2" WASHED CRUSHED STONE. EFFLUENT SEWER PIPE PIPING TO BE 4' SDR-35 OR SCHEDULE 40 PVC, INSTALL WITH 1/8" PER FO MINIMUM SLOPE. FILTER FABRIC FILTER FABRIC TO BE 4.8 OZ/SY NON —WOVEN SEPARATION FABRIC, TENCATE MIR 140N OR EQUIVALENT. FORCEMAIN PIPING TO BE 1-1/2" SDR-11 HDPE, PROVIDE POSITIVE DRAINBACK TO PUMP STATION. HOUSE SEWER PIPE PIPING TO BE 4' SDR-35 OR SCHEDULE 40 PVC. INSTALL WITH 1/4" PER FO MINIMUM SLOPE. SYSTEM FILL AS DESCRIBED IN FILL MATERIAL NOTES." TOPSOIL PLACE 4" MINIMUM TOPSOIL OVER ENTIRE BACKFILL AREA. SEED, MULCH, A ESTABLISH TURF. EXTERIOR WEATHERPROOF JUNCTION BOX (IF NECESSARY). SEAL CONDUIT GAS TIGHT. INSTALL CONTROL PANEL IN HOUSE. ALL ELECTRICAL WORK TO BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTION AGENCY PRIOR TO START—UP OF PUMP STATION. TO BE INSTALLED ON EXTERIOR OF PUMP HOUSE. TRANSITION TO 4" OUTSIDE OF D—BOX �1-1/2" SCH-40 PVC INSIDE WET WELL THROUGH WALL UNION — LOCATE SUCH THAT UNION CAN BE DISCONNECTED AND PUMP REMOVED WITHOUT TANK ENTRY REDUCING TEE POINTED DOWNWARD WITH 1" BALL VALVE THROTTLED TO ALLOW TRICKLE DRAIN BACK INTO WETWELL BALL CHECK VALVE GOULDS WE03M EFFLUENT PUMP 12" MIN. COVER DISTRIBUTION BOX TRANSITION FORCE - MAIN TO 4" PVC OUTSIDE OF D-BOX PROPOSED DISTRIBUTION BOX SITE LOCATION SYSTEM INSTALLATION NOTES LOCATION MAP CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING AND IN ACCORDANCE WITH THE N.Y.S. DEPARTMENT OF HEALTH INDIVIDUAL HOUSEHOLD SYSTEMS AND ASTM F481 INSTALLATION OF THERMOPLASTIC PIPE AND CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS. AFTER EXCAVATION OF ABSORPTION BED TO THE DEPTH REQUIRED, THE WALLS AND FLOOR SHALL BE CLEANED AND RAKED IN ORDER TO LOOSEN SMEARED AREAS OF SOIL. PLACEMENT OF CRUSHED STONE, PERFORATED PIPE AND FILTER FABRIC SHALL BE AS SHOWN, AND CARE SHALL BE EXERCISED TO AVOID INCLUSION OF FINE GRAINED SOILS AND WASTE MATERIAL IN THE STONE AND PIPE. THE PIPE SHOULD BE LAID AT THE GRADES INDICATED, MAINTAINING STRAIGHT CONTINUOUS GRADES WITHOUT SAGS, HUMPS, SEPARATED JOINTS, OR OTHER UNSUITABLE CONDITIONS. PIPE SHALL BE LAID WITH HOLES DOWN IN ALL CASES. OT ALL DISPOSAL FIELDS' SHALL BE GRADED TO SHED RAINFALL AND DIVERT SURFACE RUNOFF AWAY FROM THE DISPOSAL FIELD. DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION AREA AFTER PIPING HAS BEEN INSTALLED. AFI THE WASTEWATER TREATMENT SYSTEM IS DESIGNED AND APPROVED BASED UPON THE INSTALLATION OF WATER CONSERVING FIXTURES AND A DESIGN FLOW OF 110 GPD PER BEDROOM. THE SYSTEM IS NOT DESIGNED TO ACCOMMODATE EXTREME WATER USE FIXTURES, SUCH AS JACUZZI—TYPE SPA TUBS OR WATER TREATMENT EQUIPMENT. THE INSTALLATION OF NON —CONSERVING WATER FIXTURES OR EXTREME WATER USE FIXTURES IS CONTRARY TO THE APPROVAL OF THIS WASTEWATER TREATMENT SYSTEM. OT ROOF, FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST BE EXCLUDED FROM THE WASTEWATER SYSTEM. CONSTRUCT DRAINAGE SWALE UPGRADE OF SYSTEM IN ORDER TO DIVERT SURFACE RUNOFF AROUND ABSORPTION FIELD. SEPTIC TANK, PUMP STATION & ABSORPTION BED MUST BE INSPECTED BY LOCAL BUILDING DEPARTMENT AND DESIGN ENGINEER PRIOR TO BACKFILL AND ND FINAL GRADING. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY THE NECESSARY PARTIES AND REQUEST INSPECTIONS. 23' ir r-------•,---------- - - - - - - lr---------------- I 2. I j j 10' ,I 1 1 1 -1 BAFFLE , 2. ` 2' MIN. I USE SPEED LEVELERS TO01 ASSURE ALL OUTLETS ARE AT 1- T 4" PERFORATED PVC LATERALS INSTALLED EXACTLY THE SAME 2" MIN. DROP NEAR LEVEL IN BED CONFIGURATION ELEVATION BETWEEN INVERTS 1- 30' I ` 2.15 4" PVC SDR-35 SOLID HEADER TO PERFORATED ABSORPTION TRENCH PIPING, 1/8" PER FOOT MIN SLOPE 1'< PUMP STATION NOTES SEAL ALL TANK OPENINGS WATERTIGHT. I 1 PROVIDE AND INSTALL UL LISTED PACKAGED PUMP CONTROL PANEL I 1 WITH VISUAL AND AUDIBLE ALARM. INSTALL SIMPLEX, DEMAND DOSE CONTROL PANEL INSIDE HOUSE IN ACCESSIBLE LOCATION. I, I INSTALL POWER & CONTROL WIRING TO CONTROLLER WITH ALARM IN I HOUSE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NATIONAL ELECTRIC CODE (N.E.C.) REQUIREMENTS. >r PUMP CONTROL AND FLOAT LEVELS TO BE INSTALLED TO PROVIDE A 90 GALLON DOSE. j' \ I ABSORPTION BED PLAN l 2 5' 1 NTS EFFLUENT PUMP TO BE GOULDS PUMP WE SERIES, MODEL WE003M SUBMERSIBLE EFFLUENT PUMP .3 HP, 230 VOLT, 1PH 1. 12' _ VERIFY EXISTING ELECTRICAL SERVICE PRIOR TO PURCHASING PUMP. ALL ELECTRICAL WORK TO BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTION AGENCY PRIOR TO START—UP OF PUMP STATION. FILL MATERIAL NOTES 4" MINIMUM TOPSOIL ON AFTER REMOVING ORGANICS, PLACE SYSTEM FILL OVER THE ENTIRE AREA OF PROPOSED ENTIRE BACKFILL AREA; ABSORPTION BED AND TAPER AREA WITH TRACKED EQUIPMENT, SEED AND ESTABLISH TURF APPROXIMATE MOUND SYSTEM "SYSTEM FILL" MATERIAL SHALL BE CAREFULLY SELECTED SAND, SANDY LOAM EXISTING GRADE 23' SOUTH LEG OR SANDY LOAMY GRAVEL WITH IN —PLACE PERCOLATION RATE OF 1-5 MIN/INCH AND NO 9" MAX 30' WEST LEG INTO EX. SOIL ORGANICS OR OBJECTS OVER 3" IN SIZE. LESS THAN 10% BY WEIGHT SHALL BE FINER THAN --SLOPE BED LENGTH a0PE— 0.075mm (#200 SIEVE). AT LEAST 259 OF THE MATERIAL BY WEIGHT SHALL BE IN THE m SIEVE). LESS THAN 15% OF THE MATERIAL RANGE OF 0 50mm TO 2 0 m (#35 SIEVE TO #10 VE . BY WEIGHT SHALL BE LARGER THAN A 1/2" SIEVE. SYSTEM FILL MATERIAL SHALL BE INSTALLED TO PROVIDE MINIMUM OF 18" BETWEEN TILLED NATIVE MATERIAL AND BOTTOM OF ABSORPTION BED. ONLY SYSTEM FILL MATERIAL SHALL BE INSTALLED THROUGHOUT THE MOUND AREA AND TAPER AREAS. SYSTEM FILL MATERIAL WITH 4" SDR-35 PVC PERFORATED L FILTER FABRIC, TENCATE IN -PLACE PERCOLATION RATE OF LATERAL INSTALLED NEAR LEVEL, IN MIRAFI 140N OR SYSTEM FILL MATERIAL IS TO BE MECHANICALLY STABILIZED 1N 6" LIFTS WITH TRACKED 1-5 MIN/INCH. MECHANICALLY BED CONFIGURATION EQUIVALENT EQUIPMENT PRIOR TO INSTALLATION OF BED. STABILIZE WITH TRACKED EQUIPMENT. INSTALLER TO NOTIFY ENGINEER OF PROPOSED SOURCE OF SYSTEM FILL MATERIAL PRIOR TO ABSORPTION BED PROFILE Dig hafely, New ®York Call Before You Dig IM Wait rho Required Time Confirm Utility Response Respect The Marks Dig With Care 800.962-7962 www.digsafelynewyork.com TAX MAP # 221.13-2-14 TRANSPORTING TO SITE. VERIFY EXISTING ELECTRICAL SERVICE PRIOR TO PURCHASING PUMP. ALL ELECTRICAL WORK TO BE INSPECTED BY A CERTIFIED ELECTRICAL INSPECTION AGENCY PRIOR TO START—UP OF PUMP STATION. FILL MATERIAL NOTES 4" MINIMUM TOPSOIL ON AFTER REMOVING ORGANICS, PLACE SYSTEM FILL OVER THE ENTIRE AREA OF PROPOSED ENTIRE BACKFILL AREA; ABSORPTION BED AND TAPER AREA WITH TRACKED EQUIPMENT, SEED AND ESTABLISH TURF APPROXIMATE MOUND SYSTEM "SYSTEM FILL" MATERIAL SHALL BE CAREFULLY SELECTED SAND, SANDY LOAM EXISTING GRADE 23' SOUTH LEG OR SANDY LOAMY GRAVEL WITH IN —PLACE PERCOLATION RATE OF 1-5 MIN/INCH AND NO 9" MAX 30' WEST LEG INTO EX. SOIL ORGANICS OR OBJECTS OVER 3" IN SIZE. LESS THAN 10% BY WEIGHT SHALL BE FINER THAN --SLOPE BED LENGTH a0PE— 0.075mm (#200 SIEVE). AT LEAST 259 OF THE MATERIAL BY WEIGHT SHALL BE IN THE m SIEVE). LESS THAN 15% OF THE MATERIAL RANGE OF 0 50mm TO 2 0 m (#35 SIEVE TO #10 VE . BY WEIGHT SHALL BE LARGER THAN A 1/2" SIEVE. SYSTEM FILL MATERIAL SHALL BE INSTALLED TO PROVIDE MINIMUM OF 18" BETWEEN TILLED NATIVE MATERIAL AND BOTTOM OF ABSORPTION BED. ONLY SYSTEM FILL MATERIAL SHALL BE INSTALLED THROUGHOUT THE MOUND AREA AND TAPER AREAS. SYSTEM FILL MATERIAL WITH 4" SDR-35 PVC PERFORATED L FILTER FABRIC, TENCATE IN -PLACE PERCOLATION RATE OF LATERAL INSTALLED NEAR LEVEL, IN MIRAFI 140N OR SYSTEM FILL MATERIAL IS TO BE MECHANICALLY STABILIZED 1N 6" LIFTS WITH TRACKED 1-5 MIN/INCH. MECHANICALLY BED CONFIGURATION EQUIVALENT EQUIPMENT PRIOR TO INSTALLATION OF BED. STABILIZE WITH TRACKED EQUIPMENT. INSTALLER TO NOTIFY ENGINEER OF PROPOSED SOURCE OF SYSTEM FILL MATERIAL PRIOR TO ABSORPTION BED PROFILE Dig hafely, New ®York Call Before You Dig IM Wait rho Required Time Confirm Utility Response Respect The Marks Dig With Care 800.962-7962 www.digsafelynewyork.com TAX MAP # 221.13-2-14 TRANSPORTING TO SITE. ABSORPTION BED PROFILE Dig hafely, New ®York Call Before You Dig IM Wait rho Required Time Confirm Utility Response Respect The Marks Dig With Care 800.962-7962 www.digsafelynewyork.com TAX MAP # 221.13-2-14 TRANSPORTING TO SITE.