Loading...
Utilities PlanN 62°46'15" W94.47'N 28°42'39" E 121.48' N 62°46' 1 5 " W 5.53' 132.15' S 30°44'42 " W 13'± 2.0'± Dock 324 323322321325326327 328 325320Mean Hi g h W at er = 3 2 0. 2 0 Seelye Road North (Pav e d D r i v e ) Grav e l D r i v eRockhurst Road100 ' SHOREL INE SETBACK PROPOSED RESIDENCE326 3263253253243233263243 2 3325 3253243243253 2 1 32 2 326325327 326 325 324 4"Ø SOLVENT WELDED SCH. 40 PVC SEWER PIPE. SLOPE @ 1/4"/FT. MIN AT ALL LOCATIONS. 4'-0" I.D. PRECAST CONC. PUMP STA. 1,250 GAL. PRECAST CONC. SEPTIC TANK 1 1/2" SDR 21 PVC SEWER FORCE MAIN EDGE OF MOUND TAPER 10'W X 55'L ABSORPTION BED WITH: (2) 1 1/2"Ø X 50'L LATERALS SPACED 5' O.C. W/ (12) 1/4"Ø ORIFICES SPACED 4' O.C. 12.92' (10' MIN.) 11.50' (10' MIN.) TOPOGRAPHIC INFORMATION BEYOND SURVEY BOUNDARIES WAS OBTAINED FROM NYS OFFICE OF INFORMATION TECHNOLOGY SERVICES GIS PROGRAM OFFICE 100% FUTURE EXPANSION AREA 22.14' (10' MIN.)37.86'(20' MIN)100' WETLAND SETBACK WETLAND BOUNDARY DELINEATED BY THE ENVIRONMENTAL DESIGN PARTNERSHIP IN JULY 2022. 10.00' (10'MIN.) APPROXIMATE LOCATION OF EXISTING SEPTIC TANK. SEE WASTEWATER TREATMENT SYSTEM NOTE NO. 21. APPROXIMATE LOCATION OF EXISTING WASTEWATER TREATMENT SYSTEM. SEE WASTEWATER TREATMENT SYSTEM NOTE NO. 21. PROPERTY LINE LEGEND EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS FORCEMAIN MEAN HIGH WATER LINE 860 862 860 EXISTING MAJOR CONTOURS FROM LIDAR EXISTING MINOR CONTOURS FROM LIDAR 860 SAVE DATE: 3/15/2023 1:22 PMFILE NAME: Z:\Projects\2021 Projects\21113 - Seeyle Road Feasibility\DWG\03 SHEETS\21113.01_L-3.10-UTILITIES.dwgPLOTTED BY:CLOUGHMANDESIGN BY:DRAWN BY:CHECKED BY:############UTILITIES PLANL-3.10 6 on 24" x 36" sheet 10 20 40020 1 inch = 20 feet GRAPHIC SCALE northDRAWING NO. PROJECT NO.PROJECTDRAWING TITLEDATE:REVISIONSDATEDESCRIPTIONSTUDIO A LANDSCAPE ARCHITECTURE + ENGINEERING, DPC MAILING: PO BOX 272 SARATOGA SPRINGS, NY 12866 OFFICE LOCATION: 38 HIGH ROCK AVE, SUITE 3 SARATOGA SPRINGS, NY 12866 (518) 450-4030 IT IS A VIOLATION OF NEW YORK STATE EDUCATION LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR, TO ALTER ANY ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING LICENSED PROFESSIONAL SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERNATION, AND SPECIFIC DESCRIPTION OF THE ALTERATION. 3/15/2023 21113SEEYLE ROAD NORTH RESIDENCEGERALDINE EBERLEIN12 SEEYLE ROAD NORTHQUEENSBURY, NYDRAWINGS NOT FOR CONSTRUCTION DWG OF 9PREPARED FORDIG SAFE NOTE: THIS PLAN SET WAS DRAFTED WITHOUT THE BENEFIT OF "DIG SAFE" MARKINGS. UTILITIES SHOWN ARE NOT WARRANTED TO BE EXACT OR COMPLETE. THE CONTRACTOR SHALL CONTACT "DIG SAFE" AT 811 BEFORE COMMENCING ANY WORK AND SHALL PRESERVE EXISTING UTILITIES WHICH ARE NOT SPECIFIED TO BE REMOVED IN THIS PLAN SET. MAP REFERENCE: BASE SURVEY INFORMATION OBTAINED FROM "MAP OF A SURVEY MADE FOR GERALDINE EBERLEIN TOWN OF QUEENSBURY, WARREN COUNTY, NEW YORK. CREATED BY VAN DUSEN & STEVES LAND SURVEYORS DATED JANUARY 5, 2020.10/26/2022PERMITS & APPROVALS12/21/2022PERMITS & APPROVALS2/10/2023REV. TO UTILITY PLAN3/15/2023REV. TO UTILITY PLANWASTEWATER TREATMENT SYSTEM NOTES: 1.THE ON-SITE SUBSURFACE WASTEWATER TREATMENT SYSTEM SHALL BE A MOUNDED SOIL ABSORPTION SYSTEM.THE BASIS OF DESIGN FOR THE SYSTEM IS AS FOLLOWS: DESIGN STANDARDS NYSDOH APPENDIX 75A NUMBER OF BEDROOMS 4 DESIGN WASTEWATER FLOW RATE 440 GPD SEPTIC TANK MIN CAPACITY 1250 GAL. SEPTIC TANK CAPACITY PROVIDED 1250 GAL. IN-SITU SOIL DESIGN PERC. RATE 6-7 MIN./IN. IN-SITU SOIL APP. RATE 1.0 GDP/SQFT BASAL AREA MIN.440 GPD/1.0 GPD/SQFT = 440 SQFT BASAL AREA PROVIDED 107'-0"L X 54'-0"W = 5778 SQFT MOUND FILL DESIGN PERC. RATE 6-7 MIN./IN. MOUND FILL APP. RATE 0.8 GPD/SQFT ABSORPTION BED AREA MIN.440 GPD/0.8 GPD/SQFT = 550 SQFT ABSORPTION BED AREA PROVIDED 55'-0"L X 10'-0"W = 550 SQFT PLUMBING FIXTURES MAX. 1.6 GAL./FLUSH WATER CLOSET PUMP DESIGN BASIS: DOSE VOL.110 GAL. FLOW RATE 33 GPM TDH 37' PUMP RUN TIME ±3 MIN./DOSE 2.ALL WASTEWATER TREATMENT SYSTEM COMPONENTS SHALL BE IN STRICT CONFORMANCE WITH THE SYSTEM DESIGN INFORMATION INDICATED ON THESE DRAWINGS, ALL N.Y.S. DEPT. OF HEALTH AND TOWN OF QUEENSBURY REQUIREMENTS. 3.THE DISCHARGE OF WASTE FROM GARBAGE GRINDERS, SUMP PUMPS, ROOF DRAINS, WATER TREATMENT SYSTEM BACKWASH, AND NON-CONSERVING WATER FIXTURES IS PROHIBITED. ADDITIONALLY, LAWN IRRIGATION SYSTEMS SHALL NOT BE INSTALLED ABOVE THE ABSORPTION FIELD AREA. 4.THE SEPTIC TANK SHALL BE A PRECAST CONCRETE TRAFFIC TYPE UNIT WITH SANITARY TEES OR BAFFLES AT INLETS AND OUTLETS. MINIMUM TANK CAPACITY SHALL BE AS SHOWN. FOR TWO-PIECE TANKS, PROVIDE SEALANT PER MANUFACTURERS INSTRUCTIONS BETWEEN THE TANK SECTIONS. THOROUGHLY CLEAN JOINT IMMEDIATELY PRIOR TO INSTALLING SEALANT. IF AIR TEMPERATURE IS BELOW 65F, WARM SEALANT TO A PLIABLE CONDITION. SET TANKS LEVEL ON NO. 2 CRUSHED STONE AS INDICATED. THE EXTERIOR SURFACES OF THE SEPTIC TANK SHALL BE THOROUGHLY COATED WITH THE MANUFACTURERS STANDARD WATERPROOFING COATING. 5.THE PUMP STATION SHALL BE A 4'-0" I.D. PRECAST CONC. MANHOLE WIITH A MINIMUM INTERIOR HEIGHT OF 8'-1" AS MANUFACTURED BY FORT MILLER CO. SET STRUCTURE ON LEVEL STONE AS INDICATED. ALL SURFACES SHALL BE SEALED WITH THE MANUFACTURERS STANDARD SEALANT. 6.THE EFFLUENT PUMP SHALL BE A ZOELLER PUMP COMPANY MODEL 140 SUBMERSIBLE EFFLUENT PUMP, 1.5 HP, SINGLE PHASE, 115 VOLT OR APPROVED EQUIVALENT. 7.FLOAT CONTROL SWITCHES SHALL BE ZOELLER PUMP COMPANY PIGGYBACK VARIABLE LEVEL FLOAT SWITCH, FIRMLY MOUNTED TO THE PUMP PIT STRUCTURE. 8.PUMP CONTROL PANEL SHALL BE A ZOELLER SIMPLEX ELECTRICAL CONTROL PANEL UNIT, OR EQUIVALENT, INCLUDING NEMA 4X WATERTIGHT ENCLOSURE, AUDIBLE AND VISUAL ALARMS FOR HIGH WATER, RUN INDICATOR LIGHTS, AND MANUAL OPERATION SWITCHES, PUMP CONTROL PANEL SHALL BE INSTALLED IN A CONSPICUOUS LOCATION WITHIN BUILDING OR ON A PPT POST PROXIMAL TO PUMP STATION. 9.ALL ELECTRICAL WIRING SHALL BE IN STRICT ACCORDANCE WITH THE NATIONAL ELECTRIC CODE AND STATE AND LOCAL REQUIREMENTS. ALL CONDUIT BELOW GRADE SHALL BE SCHEDULE 40 PVC CONDUIT WITH APPROPRIATE FITTINGS. 10.FORCE MAIN PIPING SHALL BE A 1 1/2"Ø SDR 21 PVC PIPE (PRESSURE RATING OF 160 PSI) WITH GASKETED JOINTS AND FITTINGS. FORCE MAIN PIPING SHALL BE INSTALLED TO DRAIN BACK FROM THE MOUNDED SOIL SYSTEM TO THE PUMP STATION WITHOUT SAGS OR HUMPS. 11.BUILDING AND GRAVITY SEWER PIPING SHALL BE SOLVENT WELDED SCH. 40 PVC PIPE. INSTALL SEWER PIPING AT A UNIFORM SLOPE BETWEEN DESIGNATED LOCATIONS WITH NO SAGS OR HUMPS. THE MINIMUM SLOPE FOR ALL SEWER PIPING SHALL BE 1/4"/FT. (2%) UNLESS OTHERWISE INDICATED. 12.DISTRUBUTION LATERALS SHALL BE 1 1/2"Ø SDR 21 PVC PIPE WITH (12) 1/4" ORFICES SPACED 4'-0" O.C. DISTRIBUTION LATERALS SHALL BE INSTALLED LEVEL. 13.REMOVE ALL TOPSOIL, STUMPS, AND ORGANIC MATERIAL FROM THE DISPOSAL SYSTEM AREA. AFTER EXCAVATING THE BASAL AREA TO THE LIMITS AND DEPTHS INDICATED, THE WALLS AND FLOORS OF THE BASAL AREA SHALL BE CLEANED AND RAKED TO ACHIEVE AN EVEN SECTION AND TO LOOSEN SMEARED AREAS. 14.NO HEAVY EQUIPMENT OR VEHICULAR TRAFFIC SHALL BE ALLOWED WITHIN THE LIMITS OF THE DISPOSAL FIELD AFTER FILL MATERIAL HAS BEEN PLACED BOTH DURING OR AFTER CONSTRUCTION. 15.PLACEMENT OF THE SAND FILL SHALL BE AS SHOWN AND CARE SHALL BE TAKEN TO AVOID INCLUSION OF FINE GRAINED SOIL AND WASTE MATERIAL IN THE SAND. THE FILL MATERIAL SLOPE SHALL NOT EXCEED ONE VERTICAL TO THREE HORIZONTAL. 16.FILL MATERIAL FOR THE MOUND SYSTEM SHALL MEET THE FOLLOWING REQUIREMENTS: - 10% MAX. PASSING A #200 SIEVE - 15% MAX. BEING RETAINED BY A 1/2 INCH MESH SIEVE - 25% MIN. RETAINED BY A #35 SIEVE TO #10 SIEVE - EFFECTIVE GRAIN SIZE OF 0.15MM - 0.30MM - COEFFICIENT OF UNIFORMITY OF 4-6 17.FILL SHALL BE MECHANICALLY COMPACTED IN APPROX. 8" LOOSE LIFTS WITH TRACK TYPE EQUIPMENT TO ACHIEVE AN IN PLACE PERCOLATION RATE OF 6-7 MIN. PER INCH. THE FINAL PERCOLATION RATE SHALL BE VERIFIED BY THE ENGINEER PRIOR TO INSTALLATION OF THE ABSORPTION FIELD. 18.THE ABSORPTION BED AGGREGATE SHALL CONSIST OF 3/4"-1 1/2" WASHED GRAVEL OF CRUSHED STONE. 19.THE BOTTOM OF THE ABSORPTION BED SHALL BE LEVEL. THE ABSORPTION BED AGGREGATE SHALL BE COVERED BY A PERMEABLE NON-WOVEN GEOTEXTILE FABRIC.THE GEOTEXTILE FABRIC SHALL BE COVERED WITH PERMEABLE SOIL BACKFILL. 15.TOPSOIL AND SEED THE MOUND AREA AND ALL OTHER DISTURBED AREAS IMMEDIATELY AFTER CONSTRUCTION. 16.THE EXISTING SEPTIC TANK, SEEPAGE PIT, AND SEWER LINE SHALL BE PUMPED AND CLEANED TO REMOVE ALL EXISTING WASTEWATER MATERIALS. THE EXISTING SEPTIC TANK, SEEPAGE PIT, AND SEPTIC LINE SHALL BE REMOVED AND DISPOSED OFF AT A NYSDEC CERTIFIED SOLID WASTE HANDLING FACILITY. 17.SUBMITTALS: THE CONTRACTOR SHALL SUBMIT THE FOLLOWING ITEMS FOR REVIEW BY THE ENGINEER. SUBMITTALS SHALL BE TRANSMITTED ELECTRONICALLY. NO FABRICATION OF THESE ITEMS SHALL BE PERMITTED UNTIL THE SUBMITTALS HAVE BEEN REVIEWED AND ACCEPTED: A.PRECAST CONCRETE PUMP STATION B.PRECAST CONCRETE SEPTIC TANK C.EFFLUENT PUMP D.PUMP CONTROL PANEL E.FLOAT SWITCHES F.MOUND FILL MATERIAL 19.NOTIFY THE ENGINEER FOR INSPECTION AT THE FOLLOWING PHASES OF CONSTRUCTION: A.TO PERFORM PERCOLATION TESTS OF THE FILL MATERIAL AT THE BORROW PIT. B.TO INSPECT MOUND SITE PREPARATION PRIOR TO PLACING FILL MATERIAL. C.TO PERFORM PERCOLATION TEST ON THE FILL MATERIAL DURING INSTALLATION. D.UPON INSTALLATION OF THE SEPTIC TANKS, PUMP STATION AND PUMP, AND DURING ABSORPTION BED INSTALLATION WHILE DISTRIBUTION LATERALS ARE EXPOSED TO TEST PUMP PERFORMANCE. 20.UPON COMPLETION OF CONSTRUCTION THE CONTRACTOR SHALL PREPARE A MAP OF AS-BUILT CONDITIONS INDICATING A MINIMUM OF TWO TIE DIMENSIONS FROM ADJACENT CORNERS OF THE RESIDENCE TO THE SEPTIC TANK INLET AND OUTLET COVERS AS WELL AS THE PUMP TANK. 21.CONTRACTOR TO FIELD VERIFY THE LOCATION OF THE EXISTING WASTEWATER TREATMENT SYSTEM FOR LOT 227.17-1-24 AND NOTIFY ENGINEER PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. NOTE: NEIGHBORING POTABLE WATER WELLS WITHIN 100' OF THE PROPERTY LINES NEAR THE PROPOSED ABSORPTION FIELD AERA WERE NOT OBSERVED DURING A SITE VISIT BY STUDIO A ON AUGUST 24, 2022. NOTE: PARCELS 227.17-1-25 AND 227.17-1-24 ARE SUPPLIED WITH LAKE WATER L-5.20 8 L-5.20 3 L-5.20 6 L-5.20 7 L-5.20 5