Loading...
2023-04-18 and 19 PB and ZBA Mtg PresentationSite Improvement and Building Additions for Griffey Residence Applicant: Alisha and Michael Griffey Consultants: Environmental Design Partnership, LLP Balzer & Tuck Architecture April 18 and 19, 2023 Existing Site Existing Site Approved Driveway Access Proposed Site Plan Proposed Shoreline Setback 54’ 48’ 48’2’-0” Variance Requests •Expansion of Existing Non-Conforming Structure •Expansion of Existing Floor Area by Greater than 1/3 •Building Height •Accessory Structure Area •Accessory Structure Building Height Expansion of Existing Structure •Existing Floor Area of 1929 Camp = 3,560 sf •Max Expansion allowed (1/3 existing) = 1,187 sf •Proposed Floor Area of Expansion = 2,735 sf (1,548 sf over allowable) •The Total floor area allowed on the site (2.79 acres) is on the order of 26,737 sf (0.22) while the total floor area (existing and proposed) is on the order of 7,910 sf (0.065). •The applicants could theoretically tear down the existing home and rebuild in about the same proposed footprint without needing this variance. •Therefore, keeping the existing residence is what is causing the proposed variance request. Building Height •Required = 28 ft max •Existing = 28+/-ft •Proposed = 31.52 ft Building Height Building Height North Elevation Accessory Structure Area Accessory Structure Area Accessory Building Height •Required = 16 ft max •Existing = 20.06 ft •Proposed = 18.79 ft Accessory Building Height •Required = 16 ft max •Existing = 20.06 ft •Proposed = 18.79 ft Proposed Site Benefits •Update existing dwelling (constructed in 1929) to modernize and fit the needs of the Griffey family’s current and future generations. •Decrease in total patio area on lake side of house (1,205 sf existing patios to 720 sf proposed patio) •Improve safe access to dwelling •Stormwater Management Design to handle runoff from new impervious areas as well as enhancing stormwater management for existing areas •Proposed building and accessory structure design utilizes existing areas of development on the site to greatest extent practicable in order to reduce total development along the shoreline. Alternate Design Diagrams Initial Design Concept Initial Design Concept View From Water Proposed Design View from Water Questions/Comments? Simms Property FAR Calculations Rappaport Property FAR Calculations Dunton Property FAR Calculations Property FAR Calculations Comparison