Loading...
RC-0122-2023 Office Use Only _ 1 ADDITION/ALTERATION PERMIT permit#: K C, ,-Z) 2 Z A 230zZ Town of Clybw APPLICATION permit Fee:$ 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www.aueensburv.net Invoice#: � �, Flood Zone? Y DNReviewed By.6 Project Location: Tax Map ID Subdivision Name: E- � � PROJECT INFORMATION: �,�AR 3 2u2.j, TYPE: Residential ❑ Commercial, Proposed Use: Eq Single-Family ❑ Two-Family ❑ Multi-Family(#of units_) ❑ Townhouse - ❑ Business Office ❑ Retail ❑ Industrial/Warehouse ❑ Garage(#of cars ) ❑ Other(describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 2nd floor: 2nd floor: 3rd floor: V floor: Basement(habitable space): Basement(habitable space): Total sq ft: Total sq It: Scope of work to be done: Q Addition/Alteration Application Revised June 2022 • J ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction:$ 2. Source of Neat(circle one): ❑ Gas ❑ Oil ❑ Propane ❑ Solar ❑ Other: Fireplaces/inserts need a separate Fuel Burning Appliances&Chimney Application 3. Are there any structures not shown on the plot plan? ❑.YES M NO Explain: 4. Are there any easements on the property? ❑ YES NO SITE INFORMATION: • is this a corner lot? ❑ YES (`ENO • Will the grade be changed as a result of the construction? ❑ YES CVO • What is the water source? ❑ PUBLIC ❑ PRIVATE WELL • What type of wastewater system is on the parcel? ❑ SEWER ❑ PRIVATE SEPTIC DECLARATION: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After,I year from the initial application date,100%of the fee is retained. 3. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application, plans and supporting materials area true and a complete statement and/or description . of the work proposed,that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. [also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME' SIGNATURE: ` DATE: 3491 bs Addition/Alteration Application Revised June 2022 CONTACT INFORMATION: PLEASEPRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): S i Mailing Address,C/S/Z: Cell Phone: Land,Li e: Email: , U610 Cr " • Primary Owner(s): Name(s):' �SC��� �" Mailing Address, C/S/Z: Cell Phone: I Land Line: �) Email: ❑ Check if all work will be performed by property owner only • Contractors : (List all additional contractors on the back of this form) Contact Name(s): TVJAnQ Contractor Trade: Mailing Address, C/S/Z: ) Cell Phone: At - ) Land Line: Email• M "Wor.. s' CompdoedmentWon must be submitted with this application" a Architect(s)/Engineer(s): Business Name: Contact Name(s): Mailing Address,C/S/Z: Cell Phone:�_) Land Line: Email: Contact Person for Compliance in regards to this project:&--sbrvrl Cell.Phone: �_) Land Line: qm Addition/Alteration Application Revised June 2022 TOWN OF QUEEIVSBURY Q �� E BUILDING & CODES PT" Reviewed.B , MAR 232023 Date: FOWN DATE: 02/20/2023 r-� BL!Idid�' ctiCf�fv �,iA AVERAGE ROOFING CO • [ ���'� 1RR9 Route 9 Halfmoon NY 12065 yj TOWN OF QUEENSBURY �^ BUILDING DEPARTMENT Based on our lirnited examination,compliance with our comments s ball not be construed as indicating_tha.plact"'' s ecifications._are in PROPOSAL SUBMITTED TO: i ADDRESS: full compliance with the wilding CodQs of . Christine and James Cassidy i 28 Owen AvenAew York Sty , _ . ..._ - .. i PHONE: (518)222-6691 CITY STATE ZIP i EMAIL: Spectaculargifts@aal.com Queensbury New York 12804 NEW ROOF NO MESS PROMISE Upon arrival crew members will set up a fully netted and breathable tarp system(The Catch-All)that will go around ':the entire perimeter of the home.This protects the home for the entire process of removal of the old shingles and ; installation of your new roof.We will then nail a L bent piece of aluminum to the roofs edge.This stops all the roofing debris from ever going to the ground. We then have our crew members throw the roofing debris into our Equipter. i The Equipter is a self propelled dump trailer that raises to the roofs edge to collect the.roofing debris.We then drive i the Equipter to a roll off dumpster(we manage ourselves)and dump the roofing debris in there_Leaving you with NO MESS! ESTIMATElCONTRACT' -Once protection systems are in place we will remove all old shingles and underlayment so only the roof deck is left. r -Inspection of the entire roof deck will commence with looking for any rotted wood and finish with inspecting to see if the roof deck nails have loosened. If any of the roof deck needs to be re-nailed we will do this free of charge.If any i plywood needs to be replaced the cost is 1/2"-$105.00,5/8%$120.00,and 3/4"$135.00. ! •We will inspect all the flashing horizontal and vertical for any flaws. If flashing is found to be bad it is$7.50 a foot to, replace the bad flashing.The vertical flashing will be replaced with new 4"x4"x8"anti corrosion metal.The horizontal flashing will get replaced with 4"x4"x10'anti corrosion metal and is also$7.50 a foot to be replaced. -After all inspections are complete we will then install a 2"anti corrosion drip edge around the entire perimeter of the roofs edge.We will install a 1"anti corrosion drip edge on all eaves with existing gutters. -Once finished with drip edge installation we will put on a Owens Coming(granulated g)reinfbrced self adhering membrane(Ice and Water).This will be installed two rows from the roofs edge,in all valleys,where the roof meets the wall horizontal and vertical,chimneys,plumbing stacks,and any other roof penetrations. -The rest of the exposed roof deck will get Owens Coming synthetic underlayment (RHINO). This undedayment allows the roof deck to breathe. It is highly durable and can withstand up to 120 days exposed_tothe-alemP k 295.15-1-31 RC-0122-2023 Cassidy, 3ames &Christine 28 Owen Ave Complete Re-roof without shingles on it. -Next is the starter strip gets installed.This helps bond the first layer of shingles to the roofs edge.Ensuring no uplift': at the roofs edge. -We will then install Owens Coming Tru-Definition Duration Series shingles. A LIFETIME shingle. Please see {warranty packet. -After the lifetime shingle is installed.We will put on an Owens Coming ridge vent(FOUR FOOT VENT SURE).This product allows great ventilation for your attic and will not allow critters in. If the ridge vent is not open at least 1-112". on each side of the ridge we will cut the ridge so it meets this requirement.Free of charge. i -An Owens Corning cap(PRO-EDGE) will go over the ridge vent this will be installed with a 2 3/4"grip right nail. These nails have a spiral rings around them and are installed by hand. This ensures the upmost integrity at your roofs weakest point. -All plumbing vents will get a new.flashing around them and a PERMA-BOOT.The PERMA-BOOT is a hard plastic that goes over the plumbing stack and the flange.This is a lifetime solution because it covers the rubber gasket that i i always goes bad at year 15.. i-Any bathroom vents will be replaced by a LIFETIME TOOL VENT. This vent has four times the coverage on its flange than normal vents and is made out of 26 gauge anti corrosion metal. -If any masonry chimney is on the home.We will remove all the old flashing and curb our Ice and Water up 6"onto:, the chimney from the roof deck.Then install new base flashing(.030 anti corrosion metal).After the base flashing,a one piece counter flashing(.030 anti corrosion metal)will be installed over the base flashing.A triple polymer sealant i will seal up the top portion of your counter flashing. i -Skylights not replaced by Next Generation Roofing are unwarranted i -Each additional layer is$601SQ Estimate/Contract valid for 30 days JOB NOTES: :Complete reroof iRemove 3 attic vents 'Cut ridge open 2 Inches on each side of the house I .Re plywood entire main roof due to black mold(45)price is in quote.If mold reoccurs next Generation Roofing is not i ,reliable We wfll be replacing back flat roof with roll roofing .Cut 2 holes for bathroom vents and hook them up t f SHINGLE COLOR: SKYLIGHT REPLACEMENT COST: We propose hereby to finish material and labor complete in accordance with above specification for the sum of: Dollars $ We accept cash,check and credit card.(Please note there Is a 2.5%fee for credit cards) PAYMENT DUE UPON COMPLETION OF WORK Please be advised if not paid upon completion we will charge-3%interest at 1 week,5%interest at 2 weeks,8% interest at 3 weeks,at 30 days legal proceedings will follow. ;Acceptance of Proposal —The above prices, specifications,)Signature: and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified.Both parties agree j OUWy to a three day(3)right to cancel on all signed/dated contracts.; i Payment will be made as outlined above. —-- --- - - -- -- ---- •Obstacles not removed from home before roof replacements Note:This proposal may be withdrawn if not accepted are not our responsibility' All materials are guaranteed to be as specified.All workis tw Authorized Signature: be completed In a workmanlike manner according to standards l practices.A lifetime workmanship warranty is provided. Any unsound decking will be replaced at an additional charge.Any: I 7 alterations or deviations from the above specifications will; i---••--_.___.�_._. become an additional charge over and above the estimate: PM - j Date: 02/20/2023