05 25 2023 Added May 24
Queensbury Planning Board Agenda
Third Regular Meeting: Thursday, May 25, 2023 / Time 7 – 11 pm
Queensbury Activities Center @ 742 Bay Road
Administrative Items
Subdivision Final 14-2022 Jeffrey & Joanne Mann (5 lot) - Request for 90 day extension
Subdivision Final 15-2022 Jeffrey & Joanne Mann (3 lot) - Request for a 90 day extension
Applicant(s) JEFFREY & JOANNE MANN (3 LOT) Application Type Subdivision Preliminary 4-2022
Subdivision Final Stage 15-2022
Freshwater Wetlands 6-2022
Owner (s) Same as applicant SEQR Type Unlisted (APA)
Agent(s) Hutchins Engineering Lot size 17.49 acres
Location 76 Pickle Hill Road Ward: 1 Zoning Classification: RR-3A
Tax ID No. 265.-1-23.2 Ordinance Reference 183, Chapter 94
Cross Reference AV 19-2022 Warren Co. Referral n/a for subdivision
Public Hearing December 15, 2022 Site Information APA
Project Description: Applicant proposes a 3 lot residential subdivision of a 17.1 acre parcel for preliminary and final stage. The lot sizes are: Lot 6 to be
3.84 acres, lot 7 to be 4.1 acres, and lot 8 to be 9.2 acres. Lot 8 contains access to Pickle Hill Road including easements for shared access to Pickle Hill
Road for lots 6 and 7. The project site contains APA wetlands, stream, and slopes greater than 20%. Pursuant to chapter 183 and chapter 94, subdivision
for 3 lots, wetland permit and work within 100 ft of wetlands shall be subject to Planning Board review and approval.
Applicant(s) JEFFREY & JOANNE MANN (5 LOT) Application Type Subdivision Preliminary 5-2022
Subdivision Final Stage 14-2022
Freshwater Wetlands 7-2022
Owner (s) Same as applicant SEQR Type Unlisted (APA)
Agent(s) Hutchins Engineering Lot size 34.5 acres
Location Bay Road & Pickle Hill Road Ward: 1 Zoning Classification: RR-3A
Tax ID No. 265.-1-23.1 Ordinance Reference 183, Chapter 94
Cross Reference SUB (S) 14-2020, AV 18-2022 Warren Co. Referral n/a for subdivision
Public Hearing December 15, 2022 Site Information APA
Project Description: Applicant proposes a 5 lot residential subdivision of a 34.74 acre parcel for preliminary and final stage. The lots would be divided
as follows: Lot 1 to be 6.37 acres, lot 2 at 5.96 acres, lot 3 to be 7.21 acres, lot 4 to be 3.63 acres with access through lot 3, and lot 5 at 11.57 acres. Lot
4 contains an existing barn and shed that will remain. Project site work contains APA wetland areas. Pursuant to Chapter 183 and Chapter 94,
subdivision of 5 lots, and wetlands permit for site work within 100 ft of wetlands shall be subject to Planning Board review and approval.