RC-0037-2022 I Office Use Only
1 ADDITION/ALTERATION PERMIT Permit#:
APPLICATION permit Fee:
Town of Queensbury
742 Bay Road,Queensbury, NY 12804
Invoice#: _"
P:518-761-8256 www.gueensburV.net
Flood Zone? Y " Reviewed By:
Project Location: `Jt \ 2
Tax Map ID #: O l � —4 — \ ` Subdivision Name: t1 '
DE �
PROJECT INFORMATION:
TOWN OF QUEENSBURY
BUILDING&CODES
TYPE: Residential Commercial,"Proposed Use:
Single-Family _Two-Family _ Multi-Family (#of units ) _Townhouse
Business Office _ Retail Industrial/Warehouse _Garage (#of cars_ )
Other (describe )
ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE:
1st floor: KIM& 1st floor: q 5o C-'�'
2nd floor: 211 floor:
3rd floor: 3rd floor:
Basement (habitable space): Basement (habitable space):
Total sq ft: Total sq ft: 'Z50 s}�F
Scope of work to be done:
Addition/Alteration Application Revised January 2021
N
e
ADDITIONAL PROJECT INFORMATION:
1. Estimated Cost of Construction: $ jtox 5e
2. Source of Heat (circle one): _Gas _Oil XPropane _Solar_Other
Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application
3. Are there any structures not shown on the plot plan? _YES _XNO Explain:
4., Are there any easements on the property? _YES —XNO
SITE INFORMATION:
• Is this a corner lot? YES XNO
• Will the grade,b.e:changQcl as a result of the construction? YES \A/NO
• What is the water source? PUBLIC PRIVATE WELL
• What type of wastewater system is on the parcel? _SEWER YPRIVATE SEPTIC
DECLARATION:
1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be
completed within a 12 month period.Any changes to the approved plans prior to/during construction will require
the submittal of amended plans, additional reviews and re-approval.
2. If, for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of
Queensbury. After 1 year from the initial application date, 100% of the fee is retained.
3. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees
and department approval.
4. 1 certify that the application, plans and supporting materials are a true and a complete statement and/or description
of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws
and ordinances, and in conformance with local zoning regulations.
5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of
occupancy.
6. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly
constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree to the above:
PRINT NAME: �ZLR. v 3
SIGNATURE: DATE:
Addition/Alteration Application Revised January 2021
CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL
• Applicant:
Name(s): �1 •J�c-�2
Mailing Address, C/S/Z: „ q K)acti `(
Cell Phone: ( 511 ) aa9`aads Land Line: � )
Email:
Primary Owner(s):
Name(s): "Rv-r t, Q- o
Mailing Address, C/S/Z: )Uac � �,�� e or �- N
Cell Phone: ( 5("i ) a a 9-�d� S Land Line: � )
Email: 1Titc t 3 (Al 0 Y g� sn .0 Ar't
Check if all work will be performed by property owner only
q
Contractor(s): (List all additional contractors on the back of this form)
}-Contact Name(s): tww-4 CO-V")r5 Nor C
Contractor Trade: Vac
Mailing Address, C/S/Z: 1 OA rk a w-
Cell Phone: 5( R Land Line: � )
Email:
"Workers' Comp documentation must be submitted with this application"
• Arch itect(s)/Engi nee r(s):
Business Name:
Contact Name(s):
Mailing Address, C/S/Z:
Cell Phone: �_) Land Line: � )
Email:
Contact Person for Compliance in regards to this project: e�= �����
Cell Phone: ( SJJ s Land Line: )_
Email: II'ace,3 6,6q 0 y o,l 00 -cam
Addition/Alteration Application Revised January 2021
Residential Plan Review: 1- and 2- Family Dwellings
Y/N/NA (1 of 2)
Two (2) full sets of plans
Over 1,500 sq. ft. requires engineering stamp
Design loads on plans: 115 Wind Floor Loads 40 psf
(North of Rte. 149 60) 50 Ground Snow Load f Sleeping Areas &Attics 30 psf
Calculations Decks 40 psf
Wind design for lake�ront properties
Window schedule with glass size & main doors/Air leakage < .5 cfm for doors, < .3 cfm for
'I windows/Tempered glass in bathrooms
Door schedule/Main entrance 36" door
Emergency Escape or Bedrooms & Habitable Space
Above-grade: 5.7 sq. ft.
Grade: 5.0 sq. ft.
24" (h) x 20" (w) minimum
f-?
44" maximum height above door
Window control devices 24" or less 2"d story or 72" above grade
Egress window from basement 5.0 sq. ft.
Floor system sizing per table 502.3.1,
Residential check ERI or Prescriptive method
Driveway length: 300' or more-12' width required/500' or more, turnaround required
Foundation drainage on plans, if required
6" drop in 10' exterior grade
vr Framing cross section for each roof line, vertical fire stopping every 10' where
required/joist spans pg. 127
Ice &snow shield—24" from exterior wall
Platforms at exterior doors
Stairway headroom 6'8"; all stairs 36" width
Stair run and rise
Winder run and rise
Spiral stairs meet requirements
Smoke detectors—battery backup & proper location, interconnected
LI Bathroom fixtures—proper clearance
Hall width-36" width
Handrails more than four risers on open sides
Railing &guards > 30"/basement stairs included/closed risers more than 4" in height
Safety glazing notes for required areas
j Garage fire separation: %" gable end/5/8" under living space &%" on walls/20 min. door
r and closer
Garage floor sloped
Attic access: gasket seal & R-value equal to roof insulation
Roof over 30"—22" x 30"/Crawl spaces 18" x 24" access
Continued on back 4 4
Residential Plan Review Revised October 2021
Residential Plan Review: 1- and 2- Family Dwellings
Y/N/NA (2 of 2)
Carbon Monoxide detector outside lowest sleeping area, on every level & interconnected
within 15' of sleeping area
Soil test results, if required
Septic to well or water line separation
All paperwork signed
Note on plans energy saving light bulbs 90%
Blower door test agency paperwork
Floodplain Permit required—check map: 2 feet above flood elevation
Hurricane clips required
Floors less than 2 x 10 covered by%" gypsum or 5/8" wood panel
Manuals S &J required for heating system. Cold air return hard piped
Separate room for draft HVAC or hot water heater with fresh air
HRV shown and calculations
Baffles at eaves for insulations and knee walls a.4r
Makeup air for range hood >400 cfm
Continuous header for garage doors to end wall
J(`� Chimney rain cap shown for fireplaces
Deck hold down shown not less than 4 lags and bolts per table 507.2
Residential Plan Review Revised October 2021
Manual S Compliance Report Job: 31 nacy rd
Date: Feb 03,2022
Entire House By:
Plan: 31 nacy rd
Project • •
For:
Cooling Equipment
Design Conditions
Outdoor design DB: 85.0*F Sensible gain: 14661 Btuh Entering coil DB: 75.3°F
Outdoor design WB: 71.0'F Latent gain: 2120 Btuh Entering coil WB: 62.6°F
Indoor design DB: 75.0°F Total gain: 16781 Btuh
Indoor RH: 50% Estimated airflow: 784 cfm
Manufacturer's Performance Data at Actual Design Conditions U [E C E 0 V I
Equipment type: Split AC
Manufacturer: York Model: YCJD24S41S1+F,PE*E20(6,9)24 FEB 0 7 2022 U
Actual airflow: 720 cfm
Sensible capacity: 0 Btuh 0% of load
Latent capacity: 0 Btuh 0% of load TOWN OF QUEENSBUR`;' ,
Total capacity: 0 Btuh 0% of load SHR: 0% BUILDING&CODES
• Equipment
Design Conditions
Outdoor design DB: -4.0°F Heat loss: 48657 Btuh Entering coil DB: 66.0°F
Indoor design DB: 68.0°F
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Gas furnace
Manufacturer: York Model: TM9X060B12MP11
Actual airflow: 720 cfm
Output capacity: 57000 Btuh 117% of load Temp. rise: 50 OF
289.6-1-19 RC-0037-2022
Rudolph, Reece
31 Nacy Rd
Meets are all requirements of ACCA Manual S. Res Interior Alterations 850 S.f.
,. 2022-Feb-03 14:58:48 wrightsoft® Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1
ACCA ...scott.langeworthy\Documents\York\31 NACY RD.rup Calc=MR Front Door faces: N
Examiner _
~' Residential
Plans • • RPER 1
ACCK. • System Design • • • • 15 Mar 09
Plr Gsdamig Gidams dArtrrka
queensburryy
Header Information
Contractor: REQUIRED ATTACHMENTS ATTACHED
Manual J1 Form(and supporting worksheets): Yes [:] No F-1
Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes E] No F-1
OEM performance data(heating,cooling,blower): Yes No ❑
Building plan#: 31 nacy rd Manual D Friction Rate Worksheet: Yes No ❑
Home address(Street or Lot#,Block,Subdivision): , Entire House Duct distribution sketch: Yes E] No E]
HVAC LOAD CALCULATION •
Design Conditions Building Construction Information
Winter Design Conditions Building
Outdoor temperature: -4 °F Orientation: Front Door faces North
Indoor temperature: 68 °F North,East,West,South,Northeast,Northwest,Southeast,Southwest
Total heat loss: 48657 Btuh Number of bedrooms: 2
Conditioned floor area: 2166 ft2
Summer Design Conditions Number of occupants: 0
Outdoor temperature: 85 °F
Indoor temperature: 75 °F Windows Root
Grains difference: 27 dr/lb 1P0% RH Eave overhang depth: 0 ft
Sensible heat gain:9 16289 Btuh. Internal shade: none Eave
Latent heat gain: 2356 Btuh Blinds,drapes,etc. Depth Window
Total heat gain: 18645 Btuh Number of skylights: 0
EQUIPMENTHVAC • 41
Heatinq Equipment Data Cooling Equipment Data Blower Data
EVipmenttype: Gas furnace E%igmenttype: Split AC Heatingcfm: 720
umace,Hea pump,Boiler,etc. Ir onditioner,Heat pump,etc.
Model: York Model: York Static ppressure: 0 i
TM9X060B12MP11 YCJD24S41S1+F,PE*E20(6,9)24 Fan'sratad external static pressure foor
design airflow
Heating output capacity: 57P00 Btuh Total cooling capacity: 0 Btuh
Heat pumps-capacity at winterdesign ou doorconditlons Sensible cooling capacity: 0 Btuh
Aux.heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh
DISTRIBUTIONHVAC DUCT •1
Design airflow: 720 cfm Longest supply duct: 0 ft Duct Materials Used
Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct:
Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft
Available static pressure(ASP): 0 in H2O Friction rate: ((�� in/100ft Branch duct: Sheet metal
Friction Rate=ASP-(TELx 109)
I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building
plan listed above. I understand the claims made on these forms will be subject to review and verification.
Contractor's printed name:
Contractor's signature: Date:
Reserved for County, . •. orAuthority having jurisdiction -
*Home qualifies for MJ1AE Form based on Abridged Edition Checklist
- 1- wrightsoft® Right-Suite®Universal 2017 17.0.16 RSU25116
Pro ect Summary Job: 31 nacy rd
Date: Feb 03,2022
Entire House By:
Plan: 31 nacy rd
Proaect Information
For:
Notes:
Design Information
Weather: Glens Falls AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db -4 OF Outside db 85 OF
Inside db 68 OF Inside db 75 OF
Design TD 72 OF Design TD 10 OF
Daily range M
Relative humidity 50 %
Moisture difference 27 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 45903 Stuh Structure 13962 Btuh
Ducts 2754 Btuh Ducts 698 Btuh
Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh
none
(none)
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 48657 Btuh Use manufacturer's data n
Infiltration Equ Equipment sensible load 13194 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 1 (Average) Structure 2120 Btuh
Ducts 0 Btuh
Central vent (0 cfm) 0 Btuh
Heating Cooling (none)
Area(ftz 2166 2166 Equipment latent load 2120 Btuh
Volume(ft') 17328 17328
Air changes/hour 0.90 0.40 Equipment total load 15315 Btuh
Equiv.AVF (cfm) 260 116 Req. total capacity at 0.70 SHR 1.6 ton
Heating Equipment Summary Cooling Equipment Summary
Make York Make York
Trade YORK Trade ADP
Model TM9X060B12MP11 Cond YCJD24S41S1
AHRI ref 2008693 Coil F,PE-E20(6,9)24
AHRI ref 6970158
Efficiency 95.5AFUE Efficiency 10.5 EER, 14 SEER
Heating Input 60000 Btuh Sensible cooling 15120 Btuh
Heating output 57000 Btuh Latent cooling 6480 Btuh
Temperature rise 72 OF Total cooling 21600 Btuh
Actual air flow 720 cfm Actual air flow 720 cfm
Air flow factor 0.015 cfm/Btuh Air flow factor 0.049 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.87
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed.
1 Wrii htsoft® 2022-Feb-0314:58:48
�& 9 Right-Suite®Universal 2017 17.0.16 RSU25116
..scott.langeworthy\Documents\York\31 NACY RD.rup Calc=MJ7 Front Door faces: N Page 1
Right-J®Worksheet Job: 31 nacy rd
Entire House Date: Feb 03,2022
By:
Plan: 31 nacy rd
MANUAL J:7th Ed.
1 Name of room Entire House Room1 Room2 Room3
2 Length of exposed wall 351.0 ft 132.0 ft 24.0 ft 27.0 ft
3 Room dimensions 1.0 x 870.0 ft 12.0 x 12.0 ft 12.0 x 11.0 ft
4 Ceilings Condit.Option 8.0 fti d 8.0 ft heat/cool 8.0 fti heat/cool 8.0 ft heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
EXPOSURE NO. Htg I Clg (W) Htg Clg M Htg I Clg (ft� Htg Clg (ft2) Htg I Clg
5 Gross a 12E3 5.4 1.0 2808 **** "*` 1056 "`* **'* 192 "*" "`* 216
Exposed b 0 0 IIIM *•*• •••• IIMI •••• •••• llllll *•*• •••• II!M •••• ••*•
walls and c 0 0 IMI! *••• •••• IlII!! •••• •••• llllll ***• **•• ii M ,••• ••••
partitions d 0 0 II!!!! '*** **** llllll "** "" llllll "*** •*** MM *`•• •**-
e 0 0 1IM! .... ..:: llllll .... .... I!!!!! "... *... II!!!! .... ....
f 0 0 llllll •••• •••• llllll •••• •••• llllll •••• ••*« III!!! •••• •••*
6 Windows and a 3A0 39.7 ** 150 5951 "" 45 1785 **** 30 1190 "" 30 1190 ****
glass doors b 0 `* 0 0 "" 0 0 ***' 0 0 "*' 0 0 ****
Heating c 0 ** 0 0 *'** 0 0 **** 0 0 "** 0 0 ***"
d 0 ** 0 0 "** 0 0 *"' 0 0 "** 0 0 `**`
e 0 ** 0 0 "** 0 0 *'*' 0 0 **** 0 0 **"
f 0 ** 0 0 '*'* 0 0 "*' 0 0 '*** 0 0 ****
il
7 Windows and North 19.0 15 "`* 285 0 "" 0 15 "*** 285 0 "" 0
glass doors NE/NW 0 0 '*** 0 0 "" 0 0 ""** 0 0 "" 0
Cooling E/W 68.0 105 "** 7140 45 **" 3060 15 **'* 1020 15 *"` 1020
SE/SW 0 0 '*'* 0 0 **" 0 0 "`* 0 0 **" 0
South 34.0 30 "`" 1020 0 *"` 0 0 '**` 0 15 *"' 510
8 Other doors a 11 FO 12.2 2.3 63 771 146 21 257 49 0 0 0 0 0 0
b 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Net a 12E3 5.4 1.0 2595 14013 2647 990 5346 1010 162 875 165 166 1004 190
exposed b 0 0 11!M 0 0 llllll 0 0 II!!!! 0 0 lilli! 0 0
walls and c 0 0 Ill!!! 0 0 1!1!1! 0 0 !!!!!! 0 0 I!!!!! 0 0
partitions d 0 0 1I!!1! 0 0 llllll 0 0 1!!!!! 0 0 IlM! 0 0
e 0 0 !!!1!! 0 0 !!!!I1 O 0 !!!III 0 0 1M1! 0 0
f 0 0 !II!!! 0 0 11111! 0 0 1!!!!1 0 0 !I!!!! 0 0
10 Ceilings a 16G0 2.4 1.1 1296 3079 1454 870 2067 976 144 342 162 132 314 148
b 0 0 llllll 0 0 Mill 0 0 !III!! 0 0 III!!! 0 0
c 0 0 !ill!! 0 0 !!1!!! 0 0 1!1!!! 0 0 1M1! 0 0
d 0 0 !!!!!1 0 0 11IM 0 0 !!!!!! 0 0 !!!!!!
0 0
e 0 0 IIIM 0 0 11111! 0 0 llllll 0 0 1IM! 0 0
f 0 0 llllll 0 0 llllll 0 0 11M! 0 0 !!!!I1 01 0
11 Floors a 1910 1.7 0 870 1503 0 0 0 0 0 0 0 0 0 0
(Note:room b 0 0 1!!!!! 0 0 II!!!! 0 0 1!!!!! 0 0 III!!! 0 0
perimeter c 0 0 III!1! 0 0 11111! 0 0 1!!!!! 0 0 llllll 0 0
is displ. d 0 0 1!M! 0 0 11111! 0 0 IllM 0 0 1!!!!! 0 0
for slab e 0 0 !lIM 0 0 1!!M 0 0 1IM! 0 0 llllll 0 0
floors) f 0 0 !11!!! 0 0 !IlM 0 0 M!!!! 0 0 Mill 0 0
12 Infiltration a 96.6 6.0 213 20586 1271 66 6379 394 30 2899 179 30 2899 179
Ventilation 0 0 0 0 0 0 0 0
13 Subtotal loss=6+8..+11+12 **" 45903 ***' **** 15834 **** *•*` 5306 "** **** 5408 **"*
Less external heating '••• 0 *•*• ***• 0 *•** •*** 0 •••• •••• 0 **••
Less transfer *••• 0 ••:• •••• 0 •••• •••• 0 •••• •••• 0 ••••
Heating redistribution '••• 0 •*•• •••• 0 ••** •••• 0 •••• ***• 0 •••*
14 Duct loss 6% 2754 **** 6% 950 "'* 6% 318 **" 6% 324
15 Total loss=13+14 "`* 48657 •*•* "" 16784 ***• *•'* 5625 **" **** 5732 '**"
16 Int.gains: People @ 300 0 "" 0 0 ***' 0 0 "** 0 0 '*** 0
Appl. @ 1200 0 *`*" 0 0 "*' 0 0 **** 0 0 `*** 0
17 Subtot RSH gain=7+8..+12+16 "`* *"` 13962 **" ***' 5488 •*** `**" 1811 *••* ••** 2047
Less external cooling •••• '••• 0 •••• *••• 0 •••• •••• 0 •••• •••• 0
Less transfer •••• •••• 0 •••• •••• 0 •:•• •••• 0 •••• •••• 0
Cooling redistribution ""` *"* 0 **** •**' 0 0 **" **" 0
18 Duct gain 5% ***' 698 5% **** 274 5% 91 5% **" 102
19 Total RSH gain=(1 7+18)*P LF 1.00 **'* 14661 1.00 **** 5763 1.00 "`* 1901 1.00 2149
20 Air required(cfm) 720 720 248 283 83 93 85 106
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed
wrightsoft' 2022-Feb-03 14:58:48
Right-SuRe®Universal 2017 17.0.16 RSU25116
�� ...scott.langeworthy\Documents\York\31 NACY RD.rup Calc=MJ7 Front Door faces: N Page 1
Right-JO Worksheet Job: 31 nacy rd
Entire House Date: Feb 03,2022
By:
Plan: 31 nacy rd
MANUAL J:7th Ed.
1 Name of room Room4 Room5 Room6 Room7
2 Length of exposed wall 15.0 ft 8.0 ft 13.0 ft 132.0 ft
3 Room dimensions 10.0 x 5.0 ft 10.0 x 6.0 ft 8.0 x 5.0 ft 1.0 x 870.0 ft
4 Ceilings Condit.Option 8.0 ftj heat/cool 8.0 ft heat/cool 8.0 ftj heat/cool 8.0 ft heat/cool
TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh)
EXPOSURE NO. Htg I Clg (ft� Htg Clg M Htg I Clg M Htg Clg I(ft� Htg CIg
5 Gross a 12E3 5.4 1.0 120 **** **" 64 **** **** 1(A **** **** 1056
Exposed b 0 0 Mill '•«. «««. !!M «.«. ««.. 1!M .««. .«.« II!!!! •«'• •"•"
walls and c 0 0 11111! •*«. «.«. III!!! ««.. «««. !!!!!! **.. «..: !!!!!! •«.. ..««
partitions d 0 0 I!MI •««« :*«. 1IIffl '*«. .«*« IM!I I *•*• •••"
f 0 0 !! M **** **** IIIM **** **"* IIIM **'* ***' IIIIII
6 Windows and a 3A0 39.7 " 0 0 "" 0 0 "" 0 0 *"' 45 1785 ***"
glass doors b 0 " 0 0 "" 0 0 ""* 0 0 ""` 0 0 **""
Heating c 0 ** 0 0 **** 0 0 **** 0 0 "** 0 0 '***
d 0 0 0 '*** 0 0 '*"* 0 0 0 0 ****
e 0 0 0 0 0 "** 0 0 "" 0 0 ****
f 0 " 0 0 *"" 0 0 `*'* 0 0 "" 0 0 '***
7 Windows and North 19.0 0 '**" 0 0 *"' 0 0 **** 0 0 **** 0
glass doors NE/NW 0 0 ***' 0 0 *"` 0 0 *"*` 0 0 **" 0
Cooling E/W 68.0 0 **" 0 0 "" 0 0 **** 0 30 **" 2040
SE/SW 0 0 *'** 0 0 *'** 0 0 ***' 0 0 **** 0
South 34.0 0 "** 0 0 *"' 0 0 "** 0 15 "`* 510
Hoe 0 0 '*'* 0 0 ***' 0 0 `*'* 0 0 "*' 0
8 Other doors a 11 FO 12.2 2.3 21 257 49 0 0 0 0 0 0 21 257 49
b 0 0 0 0 0 0 0 0 0 0 0 0 0 0
c 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9 Net a 12E3 5.4 1.0 99 535 101 64 346 65 104 562 106 990 5346 1010
exposed b 0 0 11!M 0 0 !!1!!! 0 0 1!!111 0 0 I!M 0 0
walls and c 0 0 !!!!!1 0 0 1lIM 0 0 !!M
partitions d 0 0 1!1!1! 0 0 1I1!1! 0 0 11 0 0
0 0 !!!!!! 0 0 !!IM III 0 0
e 0 0 Mill 0 0 IIIIII 0 0 1IM! 0 0 M!11 0 0
f 0 0 !111!! 0 0 !!!1!! 0 0 1!!!!! 0 0 II!!!! 0 0
10 Ceilings a 16GO 2.4 1.1 50 119 56 50 143 67 40 95 45 0 0 0
b 0 0 111M 0 0 IIIIII 0 0 111!!! 0 0 IIIM 0 0
c 0 0 IliM 0 0 !III!! 0 0 !IM! 0 0 IIIIII 0 0
d 0 0 !1111! 0 0 IIIIII 0 0 1!!!!! 0 0 !!!!!!
0 0
e 0 0 !!I!1! 0 0 11l!I! 0 0 IIIM 0 0 !!!II! 0 0
f 0 0 1IM! 0 0 11111! 0 0 1IM! 0 0 Ili I1! 0 0
11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 870 1503 0
(Note:room b 0 0 1!1!!! 0 0 !I M 0 0 I!!!!! 0 0 II!!!! 0 0
perimeter c 0 0 Mill 0 0 Mill 0 0 I!!!!! 0 0 Mill 0 0
is displ. d 0 0 Mill 0 0 Mill 0 0 11!!!! 0 0 Mill 0 0
for slab e 0 0 1M!! 0 0 IIIM 0 0 1M!!
floors) f 0 0 II!!I! 0 0 !!M 0 0 !!I!!! 0 0
12 Infiltration a 96.6 6.0 21 2030 125 0 0 0 0 0 0 66 6379 394
Ventilation 0 0 01 0 0 0 0 0
13 Subtotal loss=6+8..+11+12 *""` 2940 "" '*" 488 ""*` "" 657 "'* "** 15270 '*'*
Less external heating •••• 0 ...« ..*« 0 .... .*.« 0 .*.« .... 0 ...«
Less transfer •••• 0 •••« *•** 0 **.« .... 0 ..,« "«.. 0 ...«
Heating redistribution "** 0 **** *"* 0 **** *"` 0 *"' **" 0 "**'
14 Duct loss 6% 176 *'** 6% 29 **"* 6% 39 ***` 6% 916 ****
15 Total loss=13+14 '**' 3116 **** **** 517 '*** **" 696 **" **" 16187
16 Int.gains: People @ 300 0 *"' 0 0 "`* 0 0 "'* 0 0 "** 0
Appl. @ 1200 0 '*** 0 0 **** 0 0 **** 0 0 **** 0
17 Subtot RSH gain=7+8..+12+16 """` *"* 331 *'*' "** 133 *"' **** 151 "`* "*' 4002
Less external cooling •••• *••• 0 •••• «••• 0 •••• •••• 0 •••• •••• 0
Less transfer «... .««. 0 «... «... 0 .... ,... 0 «... «... 0
Cooling redistribution .««. **«« 0 ««.. «... 0 ««.. **.. 0 ..«. «««. 0
18 Duct gain 5% `*** 17 5% **** 7 5% "** 8 5% "** 200
19 Total RSH gain=(17+18)*PLF 1.00 347 1.00 *"* 139 1.00 ""` 159 1.00 "" 4202
20 Air required(cfm) 46 17 8 7 1 10 a 240 206
Calculations approved by ACCA to meet all requirements of Manual J 7th Ed
wrightsoft- 2022-Feb-03 14:58:48
Right-Suite®Universal 2017 17.0.16 RSU25116�� ...scott.langeworthy\Documents\York\31 NACY RD.rup Calc=MJ7 Front Door faces: N Page 2
I �
-W
RN;C4-TPF
HEAT RECOVERY VENTILATOR
ENGINEERING DATA
THERMALLY CONDUCTIVE,PATENTED DEFROST
ALUMINUM CORE Fan defrost Temperature sensor activated,periodically shuts down supply motor.
The cross-flow heat recovery core transfers heat between the two airstreams. CASE
It is easily removed for cleaning or service.
Twenty gauge prepainted galvanized steel for superior corrosion resistance.
MOTORS AND BLOWERS Insulateelto prevent exterior condensation.Drain connections 2-1/2 in.(12 min)OD.
Each airstream has an independent motorized impellerwith multiple fan speed Balancing ports are located on unit
operations.
INSTALLER SELECTABLE HIGH SPEED SETTINGS
FILTERS Adjustable DIP switches are located on the circuit board,Hi3 is the factory setting.
Washable air filters in exhaust and supply airstreams. Refer to the Installation manual for the adjustment instructions.
MOUNTING ELECTRONICS
Four threaded inserts at comers of the cabinet designed to accept the The optional control can bewail mounted in a central location of the home.
"S"hooks and hanging straps supplied with the unit 3 wire 20 gauge(min.)100 ft length(max.).
OPTIONAL ACCESSORIES:
dual Hood Weather Hood TechGrille Terminator
99.190 99.185 99-EAG4 Fittin
99-194 99.186 �i 99-FAG5 ��,� 99-0
99-181 \ 99EAGB C1 99TM6
j l
LIFEBREATH CONTROL OPTIONS TIMER OPTIONS
1 1 i 1 1 99-DET01-Lifebreath 20/40/60 Minute Timer
FEATURES Initiates high speed Ventilation for 20,40 or 60 minutes.3 wire
connection.
5 speed fan operation on each mode ✓ -
2speed fan operation(Low/High) ✓ ✓ 99-DEi02-Wireless Lifebreath 20/40/60 Minute Timer
Initiates high speed Ventilation for 20,40 or 60 minutes.Wirelessly
Continuous low speed fan operation ✓ ✓ ✓ ✓ connects to main control for ease of installation.40'approximate range.
Exclusive to Lifebreath.
Humidity control through adjustable Dehumid- ✓ ✓ ,�
istat 99-RX02-Wireless Lifebreath Repeater
Large digital LCD screen ✓ Extends range of 99-DEF02 Wireless Timers.Plugs into 120V power
outlet.Wirelessly connects to main control and 99-DET02.Install at
LED status indicator lights ✓ ✓ ✓ halfway point between timer and main wall control if timer is out of
✓
range.
Continuous Ventilation ✓ ✓ ✓
Continuous Recirculation ✓
20 ON/40 OFF
10 ON/50 OFF
20 ON/40 Recirculation ✓ ✓ ✓
99-BCO2 99-BC03 99-BC04 99-DET02 99-DET01
20/40/60 min.High speed override button ✓
Compatiblewith 99-BET02 Wireless Timer ✓ ✓ ✓
o/
3 wire connection ✓ ✓ ✓ ✓ L/FEBRERTH'
NO Indoor Air Systems
69-RNC4-TPF(1121) www.[ifebreath.com
r IL
RNC4-TPF
HEAT RECOVERY VENT , ■ I
W '
PERFORMANCE (HVI CERTIFIED)
SPECIFICATIONS
CFM(Us) CFM(Us) CFM(Us) CFM(Us) CFM(Us) CFM(Us)
--- J- ---- - — — VAC @ ISM 120
Net SupplyA(r(low 89(42) 83(39) 14(35) 68(32) 59(28) 51(24) Watts/Low Speed 38
Gross SupplyAilflow 89(42) 83(39) 16(36) 68(32) 59(28) 51(24) Watts/High Speed 51
Gross Exhaust Airflow 85(40) 81(38) 14(35) 68(32) 61(29) 53(25) Amp Rating AB
Sensible Effectiveness(ASD 327(0°C) 15% 100 .................................................................. WEIGHT:
@ 55 CFM(26 Us) 90 ........ ................................................... 3S LBS(16 KG)
Sensible Efiiciency(SRO so I...... ... .... ...................................... SHIPPING WEIGHT:
@ 55 CFM(26 Us) 32°F(0°C) 67% u 70 38 LBS(17 KG)
........................ .... .. ...........................
Sensible Efficiency(SRO ....................................•••••
@ 66 CFM(31 Us) 32°F(0°C) 66% o so .........' ...
a so NOTE:
Sensible
Efficiency(SRO -13°F(-25°C) 61% Front clearance of 25 in.(635 mm)is
@ 59 CF M(28Us) 40 .................•••••••••••---••••••••••••••••. recommended for servicing unitAll ducts
30 ................................................................... use 4 in.(102 mm)round collars.Balancing
n Cp ® ISO 20 dampers are located in both air streams.
MMMM C V us VI 90001 �O® 0.1 0.2 0.3 0.4 o.s 0.6 0.7 0.8
mtim m CERTIFIED uum m
Static Pressure(in w.g.)
........................................................................................................................................................................
DIMENSIONS
FRONT VIEW TOP VIEW
in.(102 mrW
Collars
Ak AIL
(5Ai rflow:
- (3
E - Stale Air to Outside
Fresh Air from Outside
l> Stale Air from Inside
Fresh Air to Inside
111/8 in.f454 mn0 •
li .I
...................................................................................................................................................................................
Date: Contractor: WARRANTY
lifetimeUnits carry a
Tag: Supplier: on ' and
Project: city: quote#: replacement parts warranty.
All units conform to CSAand UI-standards
Engineer: Submitted By: o/
Control: Timer: Timer qty: L/FEBRERTH°
R' Indoor Air Systems
69-RNC4-TPF(1121) www.lifebreath.com
ANDERSENT"
WINDOWS & DOORS
CREATED DATE
SOLD BY: SOLD TO: 12/2/2021
Curtis Lumber Company, Inc.
Queensbury LATEST UPDATE
885 Route 67 12/6/2021
Ballston Spa, NY 12020
Fax:518-885-1630 OWNER
Thomas Keller
Abbreviated Quote_ Report - Customer Pricing _
—� QUOTE NAME - Y PROJECT NAME . QUOTE NUMBER_ CUSTOMER PO# TRADE ID'
Reece Rudolph New Cons 1613k2
t ORDER NOTES: — DELIVERY NOTES:
Item Qtv Operation Location Unit Price Ext. Price
100 1 Active-Passive None Assigned $671.11 $671.11
( RO Size= 36"x 23"
Unit Size= 35 1/4"x 22 1/4"
ryL�
1 ry G32, Unit, 400 Series Gliding XX, Dark Bronze Exterior Frame, Pine w/Unfinished Interior Frame, Pine w/Unfinished Interior
Sash/Panel, Active-Passive, Dual Pane Low-E4 Standard Argon Fill Stainless Glass/Grille Spacer, Dark Bronze, Full Screen,
35.25- � Aluminum
RO-36-
Insect Screen 1: 400 Series Gliding XX, G32 Full Screen Aluminum Dark Bronze PN:9074521
Unit# U-Factor SHGC Clear Opening/Unit# Width Height Area (Sq. Ft) Comments:
---------------------------------------- ----------------------------------------------------------------------------------
A1 0.3 0.29 Al 14.2810 17.1250 1.70000
O
C� uuu
�Z �
z-n co
G)p o
90rn
p M o 0
OW
N
CDC
Quote#: 1613942 Print Date: 12/6/2021 7:30:47 PM UTC All Images Viewed from Exterior Page o,1
Item Qtv Operation Location Unit Price Ext. Price
200 3 AA None Assigned $666.20 $1,998.60
RO Size= 32"x 54 1/2" Unit Size= 31 1/2"x 54 1/2"
TW 2' 7 1/2"X4'6 1/2", Unit, 400 Series Double-Hung, Equal Sash, Installation Flange, Dark Bronze Exterior Frame, Dark Bronze
Exterior Sash/Panel, Pine w/Unfinished Interior Frame, Pine w/Unfinished Interior Sash/Panel, AA, Dual Pane Low-E4 Standard
!-----_ -__ Argon Fill Stainless Glass/Grille Spacer, Hand Lift, Traditional, Stone, Traditional, 1 Sash Locks Stone (Factory Applied),
315 GrayJamb Liner, Dark Bronze, Half Screen, Aluminum
Sash Lift: TW Hand Lift Traditional Stone PN:9159483
Insect Screen 1: 400 Series Double-Hung, TW 31.5 x 54.5 Half Screen Aluminum Dark Bronze
Unit# U-Factor SHGC Clear Opening/Unit# Width Height Area (Sq. Ft) Comments:
---------------------------------------- -----------------------------------------------------------------------------------
A1 0.3 0.31 Al 27.7960 22.3940 4.32270
Item _Qty Operation Location Unit Price Ext. Price
300 2 Active-Passive None Assigned $671.11 $1,342.22
RO Size= 36"x 23" Unit Size= 351/4"x 221/4"
&'� i [IE.___ ] G32, Unit, 400 Series Gliding XX, Dark Bronze Exterior Frame, Pine w/Unfinished Interior Frame, Pine w/Unfinished Interior
Sash/Panel, Active-Passive, Dual Pane Low-E4 Standard Argon Fill Stainless Glass/Grille Spacer, Dark Bronze, Full Screen,,
3523- Aluminum
RO-36-
Insect Screen 1: 400 Series Gliding XX, G32 Full Screen Aluminum Dark Bronze PN:9074521
Unit# U-Factor SHGC Clear Opening/Unit# Width Height Area (Sq. Ft) Comments:
---------------------------------------- -----------------------------------------------------------------------------------
A1 0.3 0.29 Al 14.2810 17.1250 1.70000
SUBTOTAL: $4,011.93
FREIGHT:- $0.00
LABOR: $0.00
TAX:'-'-. $280.84
TOTAL: 1 $4,292.77
CUSTOMER SIGNATURE DATE
Quote#: 1613942 Print Date: 12/6/2021 7:30:47 PM UTC All Images Viewed from Exterior Page 2 of 3
f
*All graphics as viewed from the exterior. ** Rough opening dimensions are minimums and may need to be increased to allow for use of building wraps
or flash ings or sill panning or brackets or fasteners or other items.
Thank you for choosing Andersen Windows & Doors
Quote#: 1613942 Print Date: 12/6/2021 7:30:47 PM UTC All Images Viewed from Exterior Page 3 of 3
fe orminkur
Y(our 'Vendation Vleedss
R
Good air quality is based In part on ahe capacily of tho hm6 as ventilation system.t waHy, the unifs capacity is
measured In CFM fCubtc Feet per Minule) or Us(Liters par second)of gresh air be distributed in the giving
space.Use the ASHRAE 62.2 Ventilation Standard, the Room Count Calculation M thod, or the Air Change Per
Hour(ACH)Method to dete=ine your ventihalion needs.
Ai*344RAE 221 Vbrillbkcdivi-. Slavfiijut,
ASHRAE 62.2 CFM Sizing Chart
Number of Bedrooms J CFM
Floor Area#V)
1-1 0-1 2-3 4-5 16-7 >7
1500 so 45 Go 75 qQ,
'1501 -3000 45 so 75 go 105
60 75 90 105 120
3001 -4500
4501 -6000 75 90 W5 120 136
6001 -750D 90 -105 120 135 150
7,1>7500 -.05 120 135 1.90 165
ANSIIA,9HRAE STANDARD 62,2-2010-VentRalinn Air Requirements:values in rl
E�
The athove chart outlines the minimurn requirements for cantinumis ventilation.
CFIV\ cv/1 164