Loading...
IM Inspection Worksheet_20-07-2023_11-23-17INSPECTION WORKSHEET (SEP-026696-2023) SEP-0435-2023Case Number:Case Module:Permit Management 07/20/2023 Partial PassInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:12 Queens Ln Queensbury, NY 12804 301.5-1-34 Company Name NameContact Type Applicant IBS Septic Contractor IBS Septic Granted Permission Rick Davidson Primary Owner Rick Davidson Checklist Item CommentsPassed Building Inspector Notes True partial inspection only / placement of 1250 gallon fiber / plastic tank Soil Type: Sand True ETU Maintenance Contract provided False Size of Stone False Waterline separation distance True Building to Tank True 4" SCHD 40 [Provide extension collar if Yes]True Tank to Distribution Box False Size False Opening Sealed:True End Cap False Absorbtion Fields: Total Length False not installed at time of inspection 7/20/23 Septic system field above flood plain True Foundation to Tank True Engineer Report and As-Built False Sump pump not connected to septic system True Location of system on property False Inlet & Outlet manholes 12"+ below grade True Type of Water: Municipal / Well Water True municipal Locations / Separations True new tank off of patio behind garage Depth of Trenches False Separation of Pits False Stone Size:False Seepage Pits: Number False Length of Each Trench False System Use Status False Conforms as per Plot Plan False Size of tank True 1250 gallon Distribution box to Field / Pit False Foundation to Absorption False July 20, 2023 Page 1 of 2 INSPECTION WORKSHEET (SEP-026696-2023) Checklist Item CommentsPassed InletOutlet Pipes & Baffles False only inlet at time of inspection July 20, 2023 Page 2 of 2