Loading...
IM Inspection Worksheet_20-07-2023_15-25-31INSPECTION WORKSHEET (RESFINAL-026597-2023) RC-0129-2022Case Number:Case Module:Permit Management 07/20/2023 PassedInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:19 Fitzgerald Rd Queensbury, NY 12804 289.18-1-17 Company Name NameContact Type Applicant Rucinski-Hall Architecture Architect Rucinski-Hall Architecture Granted Permission Michael Crotty Primary Owner Alice Crotty Michael Crotty Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle True Bathroom Fans, if no window True 3" Plumbing Vent through roof minimum 18 inch True Grade away from foundation: 6" down, 10' out True existing Final Survey Plot Plan False Window guards req:<2' above floor/6' above grade True Interior privacy/trim/doors/main entrance 36 True Emergency egress below grade False N/A walkout at lakefront Fuel Tanks above flood plain elevation False Intake Openings True Site Plan / Variance required True contact Bruce Frank 518-761-8226 Seals on Garage Doors, esp. Wood True Attic Access Insulation = Attic R- Value True Gas Shut-off Exposed & Regulator 12" min abv grd True propane Platform at all exterior doors True Garage Floor Pitched True Buried Fuel Tanks anchored in flood zone False Inter Connected True Arc Fault Breaker Habitable Spaces True Furnace/Hot Water Heater operating True Fresh Air Intake True Outside every bedroom area True Fin Elect; Energy Saving Light Bulbs 90 Percent True OK to Issue C/O True 4 inch Building Number Address visible from road True Attic Access Gasketed True Flood Plain Certification, if required False Guard at deck, porches 36" or more True 6" clearance to sill plate True 5/8" Type X with Living Space Above True July 20, 2023 Page 1 of 2 INSPECTION WORKSHEET (RESFINAL-026597-2023) Checklist Item CommentsPassed Propane Tank: Proper Setback from Prop Line/Struct True 4+ Deck Joist Ledger Connections-24" From Ends True 20 Minute Fire Door/Self-Closing Hardware True Every level, Every bedroom True Furnace shut-off w/in 30 ft. or w/in line of site True within 10' of all sleeping areas True Relief Valve ,Heat Trap/Water Temp 110 deg or less True 1/2" Gypsum or House Wall and Gable True Bathroom / Kitchen Watertight True Duct work sealed properly True As Built Septic System True Outside Spigots have Air Gap True Battery backup True Fresh air supply 3' from grade True Guards at stairs,decks,patios 30" + above grade True Handrail 4 or more risers True Attic Access 22 x 30 minimum True Handrail Termination at Newell Post or Wall True Roof Complete / Exterior Finish Complete True Interior/Exterior Railings 34 to 38 True General Comments True Project is almost completed, initial contractor walked off job, homeowner to schedule final inspection within a week. 6/6/23 7/20/23 verified completion of project Carbon Monoxide Detectors:True Guard at stairwell at 34" or more True Deck Ledger-Bolted per Code True Flex Gas Pipe Bonding False Smoke Detectors:True July 20, 2023 Page 2 of 2