IM Inspection Worksheet_20-07-2023_15-25-31INSPECTION WORKSHEET (RESFINAL-026597-2023)
RC-0129-2022Case Number:Case Module:Permit Management
07/20/2023 PassedInspection Status:Inspection Date:
Residential Final InspectionInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:19 Fitzgerald Rd
Queensbury, NY 12804
289.18-1-17
Company Name NameContact Type
Applicant Rucinski-Hall Architecture
Architect Rucinski-Hall Architecture
Granted Permission Michael Crotty
Primary Owner Alice Crotty
Michael Crotty
Checklist Item CommentsPassed
Low flow toilet 1.3 gal/flushing cycle True
Bathroom Fans, if no window True
3" Plumbing Vent through roof minimum 18 inch True
Grade away from foundation: 6" down, 10' out True existing
Final Survey Plot Plan False
Window guards req:<2' above floor/6' above grade True
Interior privacy/trim/doors/main entrance 36 True
Emergency egress below grade False N/A walkout at lakefront
Fuel Tanks above flood plain elevation False
Intake Openings True
Site Plan / Variance required True contact Bruce Frank 518-761-8226
Seals on Garage Doors, esp. Wood True
Attic Access Insulation = Attic R- Value True
Gas Shut-off Exposed & Regulator 12" min abv grd True propane
Platform at all exterior doors True
Garage Floor Pitched True
Buried Fuel Tanks anchored in flood zone False
Inter Connected True
Arc Fault Breaker Habitable Spaces True
Furnace/Hot Water Heater operating True
Fresh Air Intake True
Outside every bedroom area True
Fin Elect; Energy Saving Light Bulbs 90 Percent True
OK to Issue C/O True
4 inch Building Number Address visible from road True
Attic Access Gasketed True
Flood Plain Certification, if required False
Guard at deck, porches 36" or more True
6" clearance to sill plate True
5/8" Type X with Living Space Above True
July 20, 2023 Page 1 of 2
INSPECTION WORKSHEET (RESFINAL-026597-2023)
Checklist Item CommentsPassed
Propane Tank: Proper Setback from Prop Line/Struct True
4+ Deck Joist Ledger Connections-24" From Ends True
20 Minute Fire Door/Self-Closing Hardware True
Every level, Every bedroom True
Furnace shut-off w/in 30 ft. or w/in line of site True
within 10' of all sleeping areas True
Relief Valve ,Heat Trap/Water Temp 110 deg or less True
1/2" Gypsum or House Wall and Gable True
Bathroom / Kitchen Watertight True
Duct work sealed properly True
As Built Septic System True
Outside Spigots have Air Gap True
Battery backup True
Fresh air supply 3' from grade True
Guards at stairs,decks,patios 30" + above grade True
Handrail 4 or more risers True
Attic Access 22 x 30 minimum True
Handrail Termination at Newell Post or Wall True
Roof Complete / Exterior Finish Complete True
Interior/Exterior Railings 34 to 38 True
General Comments True Project is almost completed, initial contractor walked off job,
homeowner to schedule final inspection within a week. 6/6/23
7/20/23 verified completion of project
Carbon Monoxide Detectors:True
Guard at stairwell at 34" or more True
Deck Ledger-Bolted per Code True
Flex Gas Pipe Bonding False
Smoke Detectors:True
July 20, 2023 Page 2 of 2