FMP-0352-2023 :)MCC use Only
,*ffnntr _a 52. FIRE MARSHALTENTAPPLICATION
'3ermict99:Sirs,ca t$\,2� 2oco,ZS
nmct4: La23tm 4��1u!!)Sk3fjRr
ieviewed by:
Officeof the Fire Marshal dire Marshal
742 Bay Road,Queeusbury,NY 12804 '
S18-761-8206/820! www,qumnsbury net
NOTICE:Tent sales require Planning Board Approval
Please contact the Piann:ng Department at leas:3 months prior to the date of the sale
Project Location:18StOWRoute149,Lake Gene NY12845 Tax Map tD✓#:288.12-1-12
Dates of installation: June 19th 2023-June 29th 2023
CONTACT INFORMATION:PLEASE PRINT LEGIBLY OR TYPE,PLEASE INCLUDE AN EMAIL
ao 0 (f�r
Applicant: a)z
IVame(s}: Adam R Pensel C
18 State Route 149.Lake George NY 12845
` Mailing Address,C/S/Z:
Ce0 Phone: 1518 i 926-0286 `_Land.Linz:_ 1�7935 N 452 z io
E.ail•adamQ�oaf'bygeorge.com C: 0 u u u
rn
n o
George Pensel • W
OZ
•Property Owner(s): NJ
Name(s): a ran
w
Mailing Address,C/S/Z:256 Lake Parkway Assembly Paint NY 12845 (n
Cell Phone:_51(8 ) 361-1414 Land Line:
Email: georgeQboatsbygeorge.com
•Tent Contractor(s):
Name(s):Above All,INC
Mailing Address,C/S/Z:278 Fortsville Rd Gansevoort NY 12831 .
Cell Phone: II - Land Line:' 18 13384671
Email nmarshllauser gma .com
Please submit Workers'Comp documentation with this application
oEa ARATiON:
acknowledge teat this is not a permit but only an application for a permit and no work shall
commence prior to approval.All work will be in accordance with the approved plans and in
accordance with the Town of Q>aeensbuia,and the NY$Fire and Building Cods.
If,forany reasoi,this application Is withdrawn,30%of the fee is'retaineid bytheTown of
Queensbury.After i year from the initial application date,100%of the fee Is retained.
I have read and agree to the above:
APPLICANT NAME: Adam RPensel
"APPLICANT SIGNATURE: DATE:6/19/23
PROPERTY OWNER NAME: George R Pensel
PROPERTY OWNER SIGNATURE: _ A14ATE': 6119/23
YN rent AppHcuaa Rovind 34OZI
TEMPORARY STRUCTURE WO KSfIpF.T..
STEP 1
USE and OCCUPANT LOAD FACTOR(OLF)Indicate the type of use and circle the corresponding OLF. You'll use this
number in Step 2.
TENTUSE OCCUPANT LOAD FACTOR/OLF(st Rlperson)
Concentrated assembly use(chairs only,not fixed,no ibraiture) 7
Unconantrated assembly(tables and chairs) Is
Standing space only assembly use(no obstructions permitted) 5
Real and all other uses 3
STEP 2
OCCUPANT LOAD Enter the length and width of each-tent in the spaces below.Multiply time numbers to determine the tea)
square footage for each tent.Divide the total square footage by the OLF(Step 1)to determine the Occupant Load for cub teat.
Tent i x "'('✓ - 2 b a . + _
Length Width / Area OLF Occupant Load
Tent 'q x _L = 6�� + 15 7
Length Width. Area OLF Occupant Load
Tent 3 x' � _ �b + y
Length Width Area OLF Occupant Load
STEP 3
REQUIRED EXJITS Using the Occupant Load(Step 2)for each tent,determine the coal number of exits and minimum required
width far each exiL Please note:The key difference between a teat and a membrane structure for exiting purposes is that a
membrane structure utilizes traditional doors and door frames vents a simple opening or removal ofa tent side wall panel.
Occupant Load(Step 2) Required fF of Exits Minimum width of each exit(in inches)
Tent Membrane
1-9 i 72 36
10—199 2 72 36
200—499 3 72' 72
500—999 4' 96 72
1000—1999 5 120 96
2000—2999 6 120 96
Over 3000• 7 120$ 96$
*The total width of all exits shall not be less than the'total occupant load multiplied by 0,2 inches per person.
Exiting through other,nearby tents,is NOT an acceptable configuration.
Ym Teat/Application Revised U2023
STEP 4
EXITING SUMMARY Using the Occupant Usd(Step 2)use the Table in Step 3 to determine the corresponding Required
Number of Exits and Minimum Width of each exit.Provide n summary of this determination below.
Tent 1
Required#of exits Width of each exit 71
Tent 2
Required#of exits Width of each exit
Tent 3
Required#of exits 2 Width of each exit
STEP 5
FIRE EXTINGUISHERS Using the square footage of each tent(Step 2)indicate the appropriate number of fire extinguishers ere
needed for each tem.
Size of Tent(sq.ft) Min.#of fire extinguishers Fire Extinguisher Summary
1—200 .1 Tent 1:
201—500 2 Tent 2: Li
501-1000 3 Tent 3:
1001—3000 4
3001—5000 5
5001—7000 6
7001—9000 7
9001-11000 9
Add 1 additional 2A:IOBC extinguisher for each additional 2000 sq.ft.,or fraction thereof:
STEP 6
ANCHORING Tents or membrane smuctum shall be designed and installed to handle the elements and prevent collapse.Please
indicate the location ofell anchoring weights(minimum of 500lbs.).
Each vertical support will be anchored with a minimum of a 50O#weight.
All comers will be anchored with a minimum 500#weight:
EXAMPLE OF A 20'x 40'TENT:
5000 g 500#
500# 500#
500# TENT
500#
500# cW
SOD#
FM Tent Application Revised 342023
1�lw�lrttsaa ... ..... .......... -
STEP 9
COMBUSTIBLES If any orthe rollowing conditions apply please submit details,including a drawing and distanus from tha feat
orrnembm estructwe.
Generator,cooking applications,heating equipment,LP container,other combustibles.
Describe:
LorvyRz
CD
Ev
0 MR
to u
0 0
:OOS MOOS
i100S �. #OOS
#005
ii00S
o g -
en u an
0 0 0
FM Tent Applicatlm Ravlsed irAn