IM Inspection Worksheet_24-07-2023_15-43-44INSPECTION WORKSHEET (RPLUM-026757-2023)
RC-0860-2021Case Number:Case Module:Permit Management
07/24/2023 PassedInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:15 Tuscarora Dr
Queensbury, NY 12804
239.8-1-44
Company Name NameContact Type
Applicant William Mason
Contractor Takundewide Management Group Inc. (TMG INC)
Granted Permission Lisa Paplanus
Primary Owner Lisa Paplanus
Checklist Item CommentsPassed
Building Inspector Notes True 3/21/22 rough plumbing for renovations to existing home
approved
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min True
All Return Air Hard Duct Work True
5 psi or 10 ft. above highest conn. for 15 minutes True Sanitary plumbing and vents tested with air head test, holding 5
psi for 15 minutes
Rough Plumbing / Nail Plates True
Water Supply Piping True
Duct work sealed properly True
Plumbing Vent Vents in Place True
Air Head True
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size True
July 24, 2023 Page 1 of 1