Loading...
IM Inspection Worksheet_25-07-2023_09-16-19INSPECTION WORKSHEET (COMFIN-026796-2023) CC-0042-2023Case Number:Case Module:Permit Management 07/25/2023 PassedInspection Status:Inspection Date: Commercial Final InspectionInspection Type:Inspector:Mark Smith Job Address:Parcel Number:21 Baywood Dr Queensbury, NY 12804 296.11-1-37 Company Name NameContact Type Applicant Rucinski-Hall Architecture Architect Rucinski-Hall Architecture Contractor Corhouse Construction, LLC Granted Permission Diana Sandu Primary Owner 21 Baywood Drive LLC Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle True Building Inspector Notes True 6/7/23 final inspection for for interior renovations not approved, please address the items listed below. - hand rail at stairs to break room need to extend 12" past bottom riser and have returns at top and bottom, - sheet rock and electrical work not completed at first floor - submit letter of substantial completion from architect. - complete Fire Marshals items * have contractor call to set up on site meeting. 6/8/23 final commercial inspection for interior renovations not approved - met on site with contractor to discuss punch list items that will need to be completed before the C.O. Can be issued. 7/723 partial approval for for commercial final inspection - submit letter of substantial completion from design architect for final approval - provide electronic as built drawings 7/25/23 final commercial inspection approved. - items listed above have been completed/received H/C rear grab bar 36" with 24" to open side True Public Toilet Room Handicapped Accessible True Handicap parking striping True Bldg Num or Tenant Address on Bld or Drive True 12" beyond top & bottom True H/C side & rear grab bars 36" above floor True H/C sinks 34" above floor True H/C 18" minimum vertical grab bar True Engineer or Architect Approval True Provide letter of substantial completion from design architect H/C grab bar: 42" side, 12" from center True OK to Issue C/O True Universal Symbol of Access displayed True Final Electrical / Flex Gas Piping Bonded True July 25, 2023 Page 1 of 2 INSPECTION WORKSHEET (COMFIN-026796-2023) Checklist Item CommentsPassed Plumbing Vent Through Roof/Roof complete True Relief Valve ,Heat Trap/Water Temp 110 deg or less True Electronic as-builts False Provide electronic as built Handicapped Bath/Parking Lot Signage True Exits At Grade Or Platform 36 (w) x 44 (l)True H/C mirrors 40" above floor True H/C toilet flush handle on open side True H/C vertical grab bar 39" from floor and corner True Ext Finish /Grade Complete/6 in 10ft or Equivalent True Stair rail 34"–38": both sides of stairway True Doors 36 inch wLever Hand Panic Hardware, if req True Floor Bathroom Watertight Other Floors Okay True July 25, 2023 Page 2 of 2