IM Inspection Worksheet_25-07-2023_13-03-25INSPECTION WORKSHEET (RESFINAL-026770-2023)
RC-000165-2015Case Number:Case Module:Permit Management
07/25/2023 FailedInspection Status:Inspection Date:
Residential Final InspectionInspection Type:Inspector:John O'Brien
Job Address:Parcel Number:8 Lockhart Mountain Rd
Lake George, NY 12845
252.-1-2
Company Name NameContact Type
Applicant THOMAS BARBER
Granted Permission THOMAS BARBER
Primary Owner THOMAS BARBER
Checklist Item CommentsPassed
Bathroom Fans, if no window True
3" Plumbing Vent through roof minimum 18 inch True
Grade away from foundation: 6" down, 10' out True
Interior privacy/trim/doors/main entrance 36 True
Backflow Preventors where required True
Emergency egress below grade True
Basement ceiling covered 2x8 fl joist or less False Provide mineral wool at plumbing traps
Attic Access Insulation = Attic R- Value False At pull down
Gas Shut-off Exposed & Regulator 12" min abv grd True Propane
Platform at all exterior doors True
Smoke Detectors: Carbon Monoxide True
Wood deck: 2'+ from grade dia bracing required True Existing
Inter Connected True
Arc Fault Breaker Habitable Spaces False
Furnace/Hot Water Heater operating True
Fresh Air Intake False
Chimney Rain Cap Installed True
Basement stairs closed rise greater than 4 inches False Existing basement stairs
Outside every bedroom area True
Fin Elect; Energy Saving Light Bulbs 90 Percent False Provide final electrical
Gas Log In Sealed or Glass Enclosure True
OK to Issue C/O False 7/25/23 As per my phone conversation with Tom Barber I have
asked him to get into the Town to renew his building permit and
get the outstanding items closed out within the renewal time
period. The final electrical inspection should be performed asap
seeing he resides in the home. Tom said he would be in Monday
7/31/23 to renew his permit.
1. Provide insulation at box plate area
2. Firestopping at plumbing traps
3. Complete insulation at foundation walls as per REScheck.
4. Provide handrail at new basement stairs from exterior door.
5. Provide final electrical inspection
4 inch Building Number Address visible from road True
July 25, 2023 Page 1 of 3
INSPECTION WORKSHEET (RESFINAL-026770-2023)
Checklist Item CommentsPassed
CO in bedrooms w/gas appliances True
Safety glazing on any window below 5' above floor True
Attic Access Gasketed True
Guard at deck, porches 36" or more True
6" clearance to sill plate True
Propane Tank: Proper Setback from Prop Line/Struct True
Every level, Every bedroom True
Furnace shut-off w/in 30 ft. or w/in line of site True
Chimney Height / B Vent / Direct Vent Location True
Relief Valve ,Heat Trap/Water Temp 110 deg or less False
Basement Egress: 5s.f. window w/sill or Bilco door True
Bathroom / Kitchen Watertight True
Duct work sealed properly True
Foundation insulation to floor False Provide R 21 at box plate area/band joist, complete studding at
new foundation walls, provide R 15 at cavities of studding as per
REScheck.
As Built Septic System False Contact E Hall for septic asbuilt report
Outside Spigots have Air Gap False
OK to Issue Temporary C/O False 7/25/23 As per my phone conversation with Tom Barber I have
asked him to get into the Town to renew his building permit and
get the outstanding items closed out within the renewal time
period. The final electrical inspection should be performed asap
seeing he resides in the home. Tom said he would be in Monday
7/31/23 to renew his permit.
Battery backup True
Guards at stairs,decks,patios 30" + above grade True
Handrail 4 or more risers False Provide handrail as discussed at basement stairs
Attic Access 22 x 30 minimum True
Handrail Termination at Newell Post or Wall False Provide at basement stairs
Roof Complete / Exterior Finish Complete True
Interior/Exterior Railings 34 to 38 True
July 25, 2023 Page 2 of 3
INSPECTION WORKSHEET (RESFINAL-026770-2023)
Checklist Item CommentsPassed
General Comments False This is an expired permit, a renewal notice has been mailed to
you with no response. Please contact building department in
regards to this notice. If building department does not hear from
you within 2 weeks, another letter will be sent out for renewal.
Called T. Barber to remind him of renewal 2/12/18
3/5/18--permit renewed
2/6/20- spoke with T.Barber, he's to be in to renew permit by
2/7/20
Please comply
Stopped at site to address items to close out permit, Tom Barber
to make contact with building department to renew permit. 2/7/22
This is a 2015 permit, please provide renewal fee, complete listed
items to close this permit out. 7/28/22
7/25/23 As per my phone conversation with Tom Barber I have
asked him to get into the Town to renew his building permit and
get the outstanding items closed out within the renewal time
period. The final electrical inspection should be performed asap
seeing he resides in the home. Tom said he would be in Monday
7/31/23 to renew his permit.
3' from Baths True
Guard at stairwell at 34" or more True
Plumbing fixtures True
Sticker on Furnace: R- value & Heating System False